NAME OF WORK :EXTENTION OF FLOOD CARRIER CANAL FROM

MANIMUTHAR RIVER TO VAIGAI & GUNDAR RIVER.


SLICE NO.V: REACH FROM L.S 240.420KM TO 257.992KM)
SUB WORK: CONSTRUCTION OF DROP AT L.S.249.400 KM
Ref Drg: Plate No: V / 12
Particulars
Discharge (Q)

U/s
3000 C/s
(or)
84.95 Cumecs
78.100 M
73.100 m
9.60 m
1 in 13000
5.00 m

FSL
Bed level
Bed Width (D/s)
Bed fall
FSD

D/s
3000 C/s
84.95 Cumecs
76.100 M
71.100 m
9.60 m
1 in 13000
5.00 m

Design of Trapezoidal Notch:


Discharge (Q)
Full supply discharge
Design of Drop wall:
No. of Notches

=
=

3/2
2.96 Cd (L+0.4nd)
84.95 Cumecs

=
=
=

Bed width/(1.50xF.S.D)
9.60 /1.50x(5.00)
1.28

Provide @ 2 nos. of Notches.


Discharge through each
notch for full discharge
=
Q =

84.95 2
42.48 Cumecs

Discharge through each notch at Half supply


Q=
42.48 2
=
21.24 Cumecs
The Notch is designed in such way that at half supply the depth of water in the canal
is 2/3rd of full supply depth.
For Full supply condition
d=
Cd =

5.00 m
0.70

At Full supply discharge


Discharge (Q)

2.96 Cd3/2(L+0.4nd)

42.48
42.48
(L+2.00n)
(L+2.00n)
For Half supply condition
Q
d
Cd

=
=
=
=

2.96x0.70x(5.00)3/2x(L+0.4(nx5.00))
23.17 x ( L+ 2.00 n)
42.477 23.166
1.83
----- ( 1 )

=
=
=

42.48
5.00x2/3
0.70

=
=

21.24
3.33

Cumecs
m

At Half supply discharge


Discharge (Q)
21.24
21.24
(L+1.33n)
(L+1.33n)
Equation (1) - (2)
(L+2.00n)
(L+1.33n)
0.67n
n
(L+2.00n)
L+2(0.22)
L+0.44
L
L

2.96 Cd3/2(L+0.4nd)

=
=
=
=

2.96x0.70x(3.33)3/2x(L+0.4(nx3.33))
12.61 x ( L+ 1.33 n)
21.24 12.610
1.68
----- ( 2 )

=
=
=
=
=
=
=
=
=

Top width of the Notch =


=
Top width of the Notch =
Provide 4.00 m as top width

1.83
1.68
0.15
0.22 m
1.83
1.83
1.83
1.83 -1.39 m

----- ( 1 )
----- ( 2 )

0.44

L+nd
1.39+0.22x5.00
2.51 m (or)

3.00 m

The width of canal @ drop wall can be 7/8th of bed width of U/s
7/8 x 9.60
=
8.40 m
Total top width of notches = 2 x 3.00
=
6.00 m
Adopting the widh of the pier as 2.50 m
Total top width of piers
= 1 x2.5
=
2.50 m
Total length of drop wall

=
=

6.00 + 2.50
8.50 m

FSD(d) =
=
h =

5.00 m
73.100 -2.000 m

8.40 m

Hence OK
BODY WALL DESIGN
Height of fall (h)

Top width
=
Therefore, Top width =
=
Provide 120 cm as top width
Provide top width =

71.100

h/2+15 to h/2+30 cm
200/2+15 to 200/2+30
115
to
130
cm
1.20 m

Base width =
h=
d=
p=
Bottom width =
Bottom width =
Provide bottom width =

h+d
p
2.000 m
5.00 m
2

2.40 Kg/m
2.00+5.00
2.40
4.52 m
say 4.50 m
4.50 m

Thickness of foundation concrete


= 0.55 x
d+h
= 0.55 x 5.00+2.00
=
1.46 m
Provide 1.50 m depth of concrete
Design of Water cushion
(x+d)
d1
x
x + 5.00
x + 5.00
x
Minimum depth of water
cushion
Length of water cushion (L)
Length

h
= 1/1.10xd
= FSD on D/s=
5.00 m
= depth of water cushion
= 1/1.10x5.00x 2.00
=
6.428
=
1.428 m
=
1.50 m

= d+2
dh
= (5.00) + 2
5.00 x 2.00
=
11.32 m
(or) 12.00 m

Provide a length of 12.00 m


Minimum length
=
=
Minimum length
=
Provide 12 m length of cushion

1.5+ 2
dh
1.5+ 2 5.00x2.00
7.82 m
0.60

ABUTMENT:
Base width

= 0.4 h
= 0.40 x 10.20
=
4.08 m
(or)
4.10 m

79.800

10.20
4.10
0.60
4.40

69.600
69.000

U/S return wall:


Base width

0.60
= 0.40 x 6.20
=
2.48
(or)
2.50 m

79.250

6.20

2.50
0.60

73.100
72.500

2.80

0.6
D/S return wall:
Base width

= 0.40 x 6.20
=
2.48
(or)
2.50 m

77.250

6.20
2.50

2.80

71.100
70.500