Documente Academic
Documente Profesional
Documente Cultură
PowerGen India
Rahul Pandey
New Delhi, 21st April 2012
Agenda
Introduction-Alstom Group
Page 3
Plant IntegratorTM
Page 8
Page 13
Page 20
Conclusion
Page 30
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Alstom Thermal Transport Power Equipment & services for power transmissio
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom Grid
Europe 39%
AsiaPacific 26%
Hydro
Solar
Geothermal
Biomass
Tailor-made Tailor-made to to customer customer requirement requirement through through our our unique unique Plant Plant Integration Integration concept concept
350-1200 MW
300 - 800 MW
400 - 800 MW
400 - 660 MW
500
1000
1500
Agenda
Introduction-Alstom Group
Page 3
Alstom-Plant IntegratorTM
Page 8
Page 13
Page 20
Conclusion
Page 30
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Integrated Systems
Increased cash flow lowest cost of electricity Higher power output Increased installation
efficiency
Reduced fuel
consumption
Increased operational
flexibility
EPC Operation & Maintenance
Minimum environmental
impact
1980 1980
HMK6
1990 1990
2000 2000
2010 2010
Neurath
(Germany) 2 x 1100 MW
Narva
(Estonia) 2 x 300 MW
RDK8
(Germany) 912 MW
Sostanj 6
(Slovenia) 600 MW
Medupi
Kusile
(South Africa) 6 x 800 MW
(South Africa) 6 x 800 MW Alstom Flexible SC Power Blocks - PowerGen India - RP - 21/04/2012
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Project Showcase
6x800 MW Medupi South Africa
Agenda
Plant IntegratorTM
Page 8
Page 13
Page 20
Conclusion
Page 30
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Steam turbine & auxiliaries Generator & auxiliaries Condenser Condensate polishing plant Condensate system Feedwater system LP-Bypass Control, Protection and Instrumentaion Structural and civil works Erection & commissioning O&M
Turbine Island Boiler Island Services: cooling water, compressd air, HVAC, Fire fighting Electrical building & Transformers Air Quality Control System Particle removal Flue gas desulphurisation Erection & commissioning O&M Alstom Flexible SC Power Blocks - PowerGen India - RP - 21/04/2012
Power Island Balance of Plant, including: Water treatment plant Water intake and outlets Fuel unloading Coal yard Ash handling HV switchyard O&M
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Condensate Single, Double-stage pumps with medium-pressure polishing plant Boiler feed pumps 2 x 50% turbine-driven pumps & 1 x 50% motor-driven pumps simple start-up and operation plant operation maintained in the event of one pump trip Feedheating plant 4 LP + 3 HP
BFPT
Main steam Pressure 242 bar(abs) Main steam temperature 565 C Re-heat Steam Temperature 593 C Unit Gross Output (100 % TMCR) 60% HP/LP bypass 660 MW quick and safe start-up
Reduced construction cost Reduced pressure loss Alstom Plant Integrator approach to
optimise ACC for:
Agenda
Plant IntegratorTM
Page 8
Page 13
Page 20
Conclusion
Page 30
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Tower Boilers
CFB Boilers
Steam Turbines
Turbogenerators
AQCS equipment
Coal mills
Ash handling
Control Systems
Tamuin Mai Lio Fiddlers Ferry Drax (Biomass Cofiring) Niederaussem K Patnow II Maritza East Belchatow II Neurath F/G Waigaoqiao II and III RDK 8 Westfalen D/E Iatan Comanche 3 Pee Dee Shoaiba Chalk Point 3 Ravenswood 3 Pittsburgh 7 LaSpezia 4
Tonghae, Luohuang
Bi
s as om
Li
ite n g
l* Oi
r th n A
ite c a
ke o tc Pe
*Oil-fired boiler
Drainable heating surface Lower ash carry over Minimized erosion potential Easy and quick maintenance
Low NOx & SO2 Handles low grade fuels Simple feed system Good sorbent utilisation
Excellent fuel/air mixing enables tolerance to fuel fluctuation Low slagging tendency: Reduced cleaning Maximised efficiency
Reheat steam temperature control No spray attemperation for reheat temperature control High efficiency over load range
Spiral tube and vertical tube wall options The know-how to optimise boiler design to suit all types of coal
Operation modes
Base Load Cycling mode Two shift
Highly suitable for USC steam conditions No casing distortions in operation Long-term reliability and operational flexibility Fast start-up & load cycle Easy and quick maintenance
Optimal material selection for every part of the rotor Lower stress levels enabling faster start-up and load cycling No failure in over 80 years of application
Reduced cost due to lower turbine floor level Simple & fast erection
Concave-convex wedges
Mercury Control
KNXTM MercureTM FilsorptionTM
Particulate Control
Fabric Filter Electrostatic Precipitator
Operate power plant Ensure safe operations Deliver electrical quality Improve efficiency of operations Leverage ALSTOM knowledge
Design Manufacturing Systems Integration
Enable flexible generation Maximize plant availability Optimize emissions footprint Manage plant information
Commissioning Training
Manage uncertainty of renewable generation on power fleet Optimize fleet wide performance across fuels, whole sales and carbon capture market
Site Services Modernisation Lifecycle Extension
Automation & IT
Information System
Scheduling
Performance Management
Agenda
Plant IntegratorTM
Page 8
Page 13
Page 20
Conclusion
Page 30
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Conclusion
Pre-engineered supercritical power block
Decades of experience in turnkey solutions globally are now applied to a supercritical power block for the Indian market Plant Integrator Concept utilised to optimise power block for:
Fuel Flexibility Minimised water use with ACC variant Performance Operability Maintainability Quality
Unique Alstom technology incorporated into the major components Alstoms extensive international experience in turn-key power plant, together with our Indian footprint provide world class solutions for local conditions
Alstom Flexible SC Power Blocks - PowerGen India - RP - 21/04/2012
ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
www.alstom.com
Leading engineering solutions Plant operation & performance guarantees Risk analysis, control and safety measures
Global procurement & logistics Project procurement strategy & integrated logistics Global sourcing management Supplier management from prequalification to equipment delivery
Boiler
FGD
SCR
APH ESP
GGH
GGH
Beater Wheel
Bowl mills
Tube mills
Fan
Over 1000 references in the last 20 years Easy maintenance, long service life
APH: Air preheaters for all boiler types (>100 MW PC; > 150 MW CFB) GGH: Gas-Gas Heaters for FGDs (new and retrofit) and SCRs (retrofit only) Technology leader Long product life (30 - 40 years) New equipment, full service and retrofit Over 16000 units installed worldwide