Business Resumption Plan

If Required Inform

Regional District

Emergency Ambulance ROP DIC

Acting OSC

Issue Preliminary Report By DIC Within 1 Business Day Visit The Site

If Site Information Is Available Observer Call Use Emergency Record Form Isolate The Faulty Object As Per ESR By OSC Or His Representative

Fire Bridge

Significant Incident Report

Medium

Is The Incident High

Low

Normal Outage Report Emergency Cases That Activate The BRP Damage Of One Of Grid Transformer At Least Damage Of One Of Grid Transformer At Least Damage Of Transmission Line And Full Blackout Of Certain Area Damage Of A Primary Substation, Transformers Or Switchgear Damage Of Single 20 MVA Transformer During Summer Time Damage Of More Than 30 Poles For Single District (33 & 11 KV) Busbar Failure (indoor) 11, 33 & 132 KV Cyclones And Local District Rain And Wind Storm ( Might Activate Regional Emergency Team) Multiple Injuries Or Fatalities

Control Center

Co-ordinate With CC And DIC

LDC

See The List Of Emergency Cases That Activate The BRP

Inform Effected Large Customers

If Required

Yes

CC Contact

Issue Preliminary Report Within 1 Business Day

External Or Internal Information Source Inform The Board EBC If Required Inform HSEM Visit The Site Continues Update To Call Center By Spokesman Request Assistance From Neighboring Districts Manpower Use Form A Third Party

Emergency Control Committee

ECC Summon In ECR_ Regional Office SOM To Be EBC

Locally

Emergency To Be Managed

Corporately

ECC Summon In ECR If Required Establish OSC Evaluate The Incident Level Of Damage Establish Recovery Plan For Supply Restoration Considering The Time Frame Evaluate The Available Resources

Specialist Support

If Required No Issue Final Report By Scribe (Debrief And Follow Up)

Local Emergency Response

If Required Material No Of Customer Lost Power Refer To Appendix F Available Power Feedback To OSC From Other Sources Refer To Contingency Plan Use Form B Request From Store

Circulate To Effected Dist. Syst. Users AER Management

ECC, EBC, OSC Decide To Call Off Emergency

Yes

Finish Implementing The Recovery Plan

Yes Emergency Can Be Handle By Regional Staff

If Required

If Required Not Exist In Store Use Form C

BRP= Business Resumption Pan, CC= Control Center, DIC = District In Charge, EBC= Emergency Base Controller, ECC = Emergency Control Committee, ECR= Emergency Control Room, ESR= Electrical Safety Rules, HSEM= HSE Manager, LDC: Load Dispatch Center, OSC= On Sense Commander & ROP= Royal Oman Police

Load Shedding Refer To Appendix F & G

Construction Of New Interlink Feeder

Mobile Generator

Request From Regular Supplier