ESPAK established its regional office in Muscat, Sultanate of Oman, in 1980 after it started work on its first project

titled Al-Khabura to Dariz Road Project awarded by the Sultanate's Ministry of Transport and Communications in 1979. With the passage of time, NESPAK has emerged as a reliable consultancy organisation by showing good performance in the development of infrastructure facilities in the Sultanate. During the last 32 years of operations in Oman, NESPAK acquired 168 projects costing over US$ 5 billion in the Highways & Transportation, Environmental & Public Health Engineering and Water Resources Development sectors. As many as 20 projects are in progress in the Sultanate. NESPAK has 141 employees including 28 Omanis at its Regional Office in Muscat and 20 site offices spread all over the Sultanate of Oman. An overview of some of the major projects carried out by NESPAK in the Sultanate of Oman is given in the following pages.

A beautiful view of a road in Shinas

Sohar Roads Project


Project Status: Completed in 1987 Scope of Services: Feasibility Study, Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 21 million Client: Ministry of Transport and Communications, Oman
The project roads are located almost 225 km from the capital Muscat. The project consisted of the construction of service roads, roundabouts, intersections, landscaping, and the provision of street lighting in the coastal city of Sohar. These roads traverse flat/desert/Wadi areas including coastal terrain. NESPAK also provided consultancy services for the internal roads of His Majesty's Palace in Sohar.

Roads in Liwa and Shinas Wilayats


Project Status: Completed in 1993 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 23 million Client: Ministry of Transport & Communications, Oman
These roads are located in Liwa Wilayat between Wadi Bani Umar Gharbi and Wadi Fizh and in Shinas Wilayat between Wadi Bani Umar and Wadi Hatta in the Gulf of Oman along the Batinah Coast. These internal roads connect various settlements of both Wilayats with the dual carriageway of the Batinah Coastal Highway. The project comprised the construction of roads, service roads, roundabouts, landscaping of surrounding areas, provision of street lighting and parking areas around the government buildings.

Different views of roads in Sohar

54

OVERSEAS PROFILE

Two different views of the Batinah Highway

Mulladah-Al-Hazm Road Project


Project Status: Completed in 2011 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 24 million Client: Ministry of Transport & Communications, Oman
The dualisation of 24 km long MulladahAl-Hazm Road project involved the construction of an additional carriageway, the rehabilitation of the existing road, three roundabouts, three underpasses, street lighting systems and service roads. The road was dualised upto Rustaq connecting it further to the Ad Dhahira Region through a single carriageway. In February 2011, a ceremony was held to inaugurate the road, which was attended by three Omanese ministers, government officials and the general public. The ministers highly appreciated the quality of work carried out by NESPAK.
SULTANATE OF

A view of the Mulladah-Al-Hazm Road

Oman

59

Nizwa-Thumrait Road
Project Status: Ongoing Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 103 million Client: Ministry of Transport & Communications, Oman
NESPAK is supervising the rehabilitation of Nizwa-Thumrait Highway which links Ad Dhofar Governorate with the rest of the Sultanate of Oman through the central region. On completion, the project will help improve land transportation between the southern and northern parts of Oman by upgrading the existing road (built in the early 80s) to a modern road network. The new road will also help in reducing road accidents caused by the dilapidated condition of the old road.

A view of the Nizwa-Thumrait Road

Work in progress on the Al-Batinah Coastal Road

Salalah-Thumrait Road
Project Status: Ongoing Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 131 million Client: Ministry of Transport & Communications, Oman
The construction work is in progress on the 74 km long Dualisation of ThumraitSalalah Road Project. The project involves the rehabilitation of the existing carriageway and the construction of an additional parallel carriageway, two roundabouts, six underpasses and several service roads. Thumrait-Salalah Road is located in the Ad Dhofar Region which is known for its monsoon season. The Region attracts a large number of tourists from all over the Gulf during the months of June and July. With the dualisation of this road, the journey will become safe and travel time will also be reduced.

Al-Batinah Coastal Road


Project Status: Ongoing Scope of Services: Detailed Design, Construction Supervision Project Cost: US$ 936 million Client: Supreme Committee for Town Planning, Oman
The construction work on 245 km long Al-Batinah Coastal Road Phase-1 is in full swing under NESPAK's supervision. This project comprises a new four-lane facility along the coastline situated in the Batinah Region. The salient features of the project include main carriageways, services roads, link roads, bridges, two interchanges, a flyover, several roundabouts, drainage structures and provision of street lights.

60

OVERSEAS PROFILE

Ibri-Ad Dariz-Miskin Road


Project Status: Ongoing Scope of Services: Detailed Design, Construction Supervision Project Cost: US$ 92 million Client: Ministry of Transport & Communications, Oman
This project comprises the dualisation of 34 km long section of the Ibri-Ad' DarizMiskin Road located in Wilayat Ibri, Sultanate of Oman. The construction of an additional carriageway, 25 km long service roads, seven roundabouts, eight Irish bridges, 29 box culverts, a vehicular underpass & four pedestrian underpasses and the rehabilitation of the existing road are the main components of the project.

Work under way on the Ibri-Ad Dariz-Miskin Road

SULTANATE OF

Oman

61

Pressure filters at the Al-Buraimi Sewage Treatment Plant and Sewerage System

Ibri & Al-Buraimi Sewage Treatment Plants


Project Status: Completed in 1998 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 4 million Client: Ministry of Regional Municipalities & Water Resources, Oman
The project areas were located at Al-Buraimi Town in Al-Buraimi Wilayat and Ibri town in Ibri Wilayat of the Ad Dhahirah Region. The sewage treatment plants comprised waste stabilisation ponds, reed beds and grassy plots for tertiary treatment.

Al-Buraimi Sewage Treatment Plant & Sewerage System


Project Status: Completed in 2009 Scope of Services: Detailed design, Tender Documents, Construction Supervision Project Cost: US$ 29 million Client: Ministry of Regional Municipalities & Water Resources, Oman
The purpose of this project was to upgrade and rehabilitate the existing Sewage Treatment Plant (STP) and design of Sewage Collection System at Al-Buraimi. The 3000 cu. m/day capacity STP based on extended aeration process was meant to treat the sewage carried through the collection system comprising 4 km main and 25 km lateral sewers, one lift station and 8 km pumping main.

Two views of the Ibri and Buraimi Sewage Treatment Plants

62

OVERSEAS PROFILE

A view of the Nizwa Sewage Treatment Plant & Sewerage System

Nizwa Sewage Treatment Plant & Sewerage System


Project Status: Completed in 2009 Scope of Services: Project Planning, Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 36 million Client: Ministry of Regional Municipalities & Water Resources, Oman
This rehabilitation and upgradation project involved UPVC/high-density polyethylene sewer pipeline of 200 mm to 500 mm dia, ductile iron force mains of 150 to 500 mm dia, three sewage pump stations and five sewage lift stations, a sewage treatment plant of 5,600 cu. m/day capacity based on extended aeration process. Submerged membrane filtration system was used for the first time in this sewage treatment plant in the Sultanate of Oman.

Sumail-Dakhiliya Region Sewage Treatment Plant & Sewerage System


Project Status: Completed in 2009 Scope of Services: Detailed design, Tender Documents, Engineer's Cost Estimates, Construction Supervision Project Cost: US$ 18 million Client: Ministry of Regional Municipalities & Water Resources, Oman
This project was aimed at upgrading and rehabilitating the existing Sewage Treatment Plant (STP) and the design of Sewage Collection System. Based on extended aeration process, the 2340 cu. m/day capacity STP was meant to treat the sewage carried through the collection system comprising 15 km main & 50 km lateral sewers, one lift station and 5 km pumping main.

Biological reactors (Top) and screens and grit chamber in the Sumail-Dakhiliya Region Sewage Treatment Plant and Sewerage System

SULTANATE OF

Oman

63

A view of completed Sewage Treatment Plant in Sur

Sur Sewage Treatment Plant & Sewerage System


Project Status: Completed in 2010 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 11.20 million Client: Ministry of Regional Municipalities & Water Resources, Oman
The objective of this project was the upgradation and rehabilitation of the existing Sewage Treatment Plant (STP) and design of the Sewage Collection System. The 1400 cu. m/day capacity STP is based on extended aeration process and will treat the sewage carried through the collection system comprising 3 km main and 26 km lateral sewers, 2 lift stations and 3 km pumping main.

Khasab Sewage Treatment Plant & Sewerage System


Project Status: Ongoing Scope of Services: Detailed Design, Construction Supervision Project Cost: US$ 8 million Client: Ministry of Regional Municipalities & Water Resources, Oman
NESPAK has been engaged to upgrade and rehabilitate sewage treatment plant (STP) and sewerage system at Khasab. The components of this project include 200 mm and 400 mm diametre gravity sewer pipelines of 49 km length, 250 and 75 mm dia, 7.4 km long ductile iron force main and 2625 house connections including cleanouts, inspection chambers, connection pipes and related works, demolition and the removal of existing septic tanks, construction of valve chambers, thrust blocks, sewage pump stations and sewage lift station. The construction of a new STP with capacity 1,700 cu. m/day is also part of the project.

Clarifier of Sur Sewage Treatment Plant and Sewerage System

64

OVERSEAS PROFILE

Misfat Al-Abreen Wilayat Sewage Treatment Plant & Sewerage System


Project Status: Ongoing Scope of Services: Detailed design, Tender Documents, Construction Supervision Project Cost: US$ 2.63 million Client: Ministry of Regional Municipalities Environment & Water Resources, Oman
NESPAK has been hired for providing services for a Sewage Treatment Plant (STP) and Sewage Collection System at the Misfat Al-Abreen Wilayat Al-Hamra. This 250 cu. m/day capacity STP is based on extended aeration process which will treat the sewage carried through the collection system comprising 3 km main & 2 km lateral sewers, 5 lift stations and 2.5 km pumping main. Work is in progress on this project.

Water Supply Schemes to Shinas & Liwa Wilayats


Project Status: Completed in 1997 Scope of Services: Detailed Design, Tender Documents Project Cost: US$ 25 million Client: Ministry of Electricity & Water, Oman
This project was aimed at supplying water to the Wilayats (towns) of Shinas and Liwa in the North Al-Batinah Region, almost 300 km from Muscat, the capital of Oman. Shinas Wilayat is bordered with Liwa Wilayat and the source of water was four wells/boreholes located in the Nabar area of Liwa along the main highway. Water was pumped from wells/boreholes to ground reservoirs at four Booster Pump Stations (BPSs). Then the water was further transmitted from ground reservoirs to elevated tanks, located at the BPSs and the distribution network was fed by these tanks.

Sohar Water Distribution Network


Project Status: Completed in 1999 Scope of Services: Project Planning, Detailed Design, Tender Documents Project Cost: US$ 24 million Client: Ministry of Housing, Electricity & Water, Directorate General of Water, Oman
The purpose of this project was to construct a water distribution system for the residents of Falaj, Ab-Qabil/Majis, Mala Ab-Sanqab and Al-Multaqa/AlQufrab in Sohar. The project involved the preparation of design of the water supply distribution network including pump houses, ground reservoirs, elevated tanks, guard room etc.

SULTANATE OF

Oman

65

Al-Ghalila Water Supply Project


Project Status: Completed in 2006 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 3 million Client: Ministry of Housing, Electricity & Water, Oman
The purpose of this project was to construct a water distribution network at Al-Ghalila village near Sur on the Omani coast. Major components of the project included ground reservoir, pump house, ductile iron transmission mains and HDPE (high-density polyethylene) water distribution network.

A view of the Al-Ghalila Water Supply Project

Wadi Dayqah Dam


Project Status: Completed in 2009 Scope of Services: Detailed Design, Tender Documents, Construction Supervision Project Cost: US$ 290 million Client: Ministry of Regional Municipalities & Water Resources, Oman
The highest dam of Oman, Wadi Dayqah Dam is located near the village of Mazara, 60 km to the south and southeast of Muscat in Al-Hajar, Ash Sharqiyah Region. The project was aimed at supplying water to Muscat, Mazara, Hayl-al-Ghaf, Daghmar and adjoining areas in Quriyat and Muscat Governorate. The 390-metre-long storage dam with a height of 75 metres and a 100 millioncubic-metre (mcm) storage capacity would provide about 35 mcm of water a year: around 10 mcm for villages down the Wadi stream for agricultural purposes and around 5.7 mcm and 19.3 mcm for drinking and domestic use.

Two superb views of the Wadi Dayqah Dam

66

OVERSEAS PROFILE

Musanaah Wilayat Water Distribution Network


Project Status: Completed in 2012 Scope of Services: Construction Supervision Project Cost: US$ 44 million Client: Public Authority for Electricity & Water
NESPAK rendered consultancy services for the Water Distribution Network in Musanaah Wilayat, Sultanate of Oman. The project involved the laying of ductile iron pipes with the fittings of about 52 km length and high density polyethylene pipes with the fittings of about 550 km length, having diametres ranging from 100 mm to 700 mm.

The inauguration of a transmission line for the Musanaah Wilayat Water Distribution Network

Development of Seeb & Salalah Airports


Project Status: Completed in 2010 Scope of Services: Design Review, Construction Supervision Project Cost: US$ 1 billion Client: Ministry of Transport & Communications, Oman
NESPAK in association with Airport de Paris Ingnierie (ADPi) of France won Seeb and Salalah International Airports expansion project in Oman through an international bidding competition in 2006. The Seeb International Airport expansion which was completed in 2010 included a new passenger terminal building, a new VVIP terminal, a cargo terminal and a new runway. At the Salalah International Airport, a new passenger terminal, cargo terminal and associated infrastructure will be built. Work is in progress on the Salalah Airport project.

Social Housing Project


Project Status: Completed in 1985 Scope of Services: Master Planning, Detailed Design, Tender Documents Project Cost: US$ 13 million Client: Ministry of Social Affairs & Labour, Oman
This project consists of more than 200 standard single storey houses planned as settlements on a plot of 400 sqm each at different locations in Northern Oman. Each settlement is a small community comprising traditional courtyard type houses, mosque and shops complete with other facilities like playgrounds, parking places. Allied infrastructure facilities i.e. roads, water supply, sewerage drainage and electricity were also provided for the project. A conceptual view of the Social Housing Project

SULTANATE OF

Oman

67

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Development of Seeb & Salalah Airports Al-Batinah Coastal Road

Oman

Aeroports de Paris

e f

893

01-10-2006 30-04-2010 10-04-2006 30-11-2012 15-04-2001 31-12-2009 01-12-2009 30-09-2011 01-05-2007 30-06-2012 01-02-2010 30-09-2011

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

936

Sohar-Buraimi Road

Oman

c d e ` c d e

167

Dualisation of Izz-Adam Road

Oman

133

Salalah-Thumrait Road Section No. 5 Upgradation of Izki to Firq and Marfaa Daris to Al-Ghafat Road Rehabilitation Works for Nizwa-Thumrait Road (Stage-III) Batinah Highway

Oman

c d e

131

Oman

c d e

54

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Regional Municipalities & Water Resources Public Authority of Electricity and Water Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

c d e

103

01-11-2008 30-11-2011 01-05-2004 31-12-2009 01-12-2004 31-08-2010 01-12-2010 30-11-2011 15-02-2005 30-11-2011 01-11-2005 31-12-2012 01-04-2008 31-01-2011

Oman

c d e

56

Wadi Dayqah Dam & Water Supply Scheme Water Distribution Network of Musannah Wilayat Marmul--Shaleem-Sharbithat--Waqirah Road Ibri-Dariz-Miskin Road

Oman

c d e

290

Oman

46

Oman

20

Oman

135

Internal Roads, Sumail

Oman

20

68

OVERSEAS PROFILE

Oman
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Dualisation of Road from Az-Zaroob Roundabout to Buraimi Hospital Roundabout Upgrading of Roundabouts at Suwaihrah, Sohar, Sallan and Falaj Al-Qabail on Existing Batinah Highway

Oman

Ministry of Transport & Communications

N.A

30-08-2010 30-09-2011

Oman

Ministry of Transport & Communications

N.A

01-11-2008 30-09-2011

Roads in Kasab Coastal, Dibah and Oman Madha Areas of Musandam Province Internal Roads, Nizwa Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Regional Municipalities & Water Resources a

c d e

245

01-04-1992 30-12-2000 01-04-2008 30-06-2010 05-08-2001 31-12-2006 26-06-2001 12-07-2006 15-07-2003 31-08-2011

36

Sohar Port to Dhahria Region Road Rustaq--Miskin Road

Oman

c d e

25

Oman

c d e

29

Upgradation and Rehabilitaion of Sewerage Projects at Nizwa, Sur, Khasab, Buraimi and Misfat Al-Abreen Ad-Duqm Al-Kahil Road & Link to Ra's Madrakah Dualisation of Al-Mulladah Al-Hazm Road Rehabilitation of NizwaThumrait Road (Phase-II) Wadi Bani Kharus Road

Oman

b c d e

100

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications a

c d e

18

01-10-1998 30-06-2003 01-11-2007 30-11-2010 29-09-2001 31-12-2006 01-05-2005 30-09-2011 01-10-2003 31-12-2005

Oman

c d e

24

Oman

c d e

40

Oman

c d e

104

Road Link Between Mahout to Nizwa--Thumrait

Oman

c d e

26

SULTANATE OF

Oman

69 21

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Tawi Ateer Hashir Road

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

14

01-10-2008 30-04-2011 19-06-2007 31-10-2011 01-09-2008 30-09-2011 01-02-2011 31-01-2011 05-12-2006 20-02-2010

Madinat Al-Ilam Ring Road

Oman

c d e

54

Repairing of Cyclone Damages on Wadi Tayeen Road Dualisation of Sohar--Buraimi Road, Ubaila-Fayyad Section Internal Roads at Wilayat Shaleem and Jazur AlHallaniy (Demeet Residency) Lakbi-Sawaqrah Road

Oman

c d e

31

Oman

c d e

N.A

Oman

Oman

Ministry of Transport & Communications Public Authority of Electricity and Water

10

01-04-2000 31-01-2007 01-06-2011 30-04-2012

Water Distribution Networks for Wilayat Al-Mudaibi in Al-Sharquia Region Wadi Mistal Road

Oman

c d

N.A

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

91

01-05-2005 31-03-2012 01-01-2006 30-06-2009 01-05-1998 31-07-2003 05-12-2006 30-03-2009

Al-Khadd--Al-Aqir Road

Oman

N.A

Sharshati-Ambruf-Rakhyout Road Internal Road at Wilayat Shaleem and Jazur Al-Hallaniyat (Shaleem Residency) Extension of Water Supply Scheme in Sur

Oman

c d e

Oman

Oman

Ministry of Housing, Electricity & Water

a b c d e

22

01-04-2001 30-06-2009

70

OVERSEAS PROFILE

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Tawi Ateer Hashir Road

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

14

01-10-2008 30-04-2011 19-06-2007 31-10-2011 01-09-2008 30-09-2011 01-02-2011 31-01-2011 05-12-2006 20-02-2010

Madinat Al-Ilam Ring Road

Oman

c d e

54

Repairing of Cyclone Damages on Wadi Tayeen Road Dualisation of Sohar--Buraimi Road, Ubaila-Fayyad Section Internal Roads at Wilayat Shaleem and Jazur AlHallaniy (Demeet Residency) Lakbi-Sawaqrah Road

Oman

c d e

31

Oman

c d e

N.A

Oman

Oman

Ministry of Transport & Communications Public Authority of Electricity and Water

10

01-04-2000 31-01-2007 01-06-2011 30-04-2012

Water Distribution Networks for Wilayat Al-Mudaibi in Al-Sharquia Region Wadi Mistal Road

Oman

c d

N.A

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications

91

01-05-2005 31-03-2012 01-01-2006 30-06-2009 01-05-1998 31-07-2003 05-12-2006 30-03-2009

Al-Khadd--Al-Aqir Road

Oman

N.A

Sharshati-Ambruf-Rakhyout Road Internal Road at Wilayat Shaleem and Jazur Al-Hallaniyat (Shaleem Residency) Extension of Water Supply Scheme in Sur

Oman

c d e

Oman

Oman

Ministry of Housing, Electricity & Water

a b c d e

22

01-04-2001 30-06-2009

70

OVERSEAS PROFILE

Oman
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Dualisation of Nizwa-Thumrait Road from Karsha to Izz Section Dualisation of NizwaThumrait-Salalah Road Sinaw Water Supply Project

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Housing, Electricity & Water Ministry of Housing, Electricity & Water Ministry of Regional Municipalities & Water Resources Ministry of Transport & Communications Ministry of Regional Municipalities & Water Resources Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Housing, Electricity & Water c a a c c d

N.A

20-04-2006 31-12-2007 14-10-2003 31-12-2005 04-08-2001 31-12-2004 01-07-2006 31-03-2009 26-07-2003 30-09-2005 30-06-2007 31-03-2008 19-02-2005 15-12-2005 15-07-2005 30-06-2007 15-06-2001 30-06-2003 12-05-2001 30-06-2003 05-01-2006 30-09-2007 01-07-2000 31-08-2001 29-01-2002 31-07-2005

Oman

279

Oman

c d e

Water Transmission System from Bahla to Al-Hamra Recharge Dam in Wadi Ghulaji Repairing of Cyclone Damages on Roads Recharge Dam at Wadi Kalboh in Wilayat Nizwa Wadi Shafan Road

Oman

12

Oman

Oman

N.A

Oman

c d EIA Study c e

Oman

76

Khatmat-Malalah Road

Oman

Marmul-ShaleemSharbitha-Swaqirah Road Asphalt Road from Wadi Sa'a in Buraimi to Qumayra in Dank Rehabilitation Work for Batinah Highway Water Supply to Bahla Wilayat

Oman

c d e

16

Oman

N.A

Oman

19

Oman

b c d e

161

SULTANATE OF

Oman

71 21

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Water Transmission System from Nizwa to Manah Sewerage Network System for Sumail Town, Dakhliya Region Extension of Water Supply Services to Bosher Area Al Filayj-Wadi Hibi Road

Oman

Ministry of Housing, Electricity & Water Ministry of Regional Municipalities & Water Resources Ministry of Housing, Electricity & Water Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Electricity & Water

01-07-2006 31-03-2009 26-01-2003 31-12-2007 25-08-2001 30-09-2004 01-01-2006 31-12-2008 15-03-2003 30-09-2004 20-06-1991 31-03-1993 01-08-2004 31-08-2005 01-01-2004 30-06-2006 01-02-2006 31-12-2007 21-03-2001 31-12-2004 01-09-1985 30-11-1985 20-02-1984 31-07-1987 09-11-1981 30-07-1986

Oman

c d e

13

Oman

e f

Oman

N.A

Wadi Al-Ala and Wadi Al-Ayn Road Project Stage-I Construction Supervision of Streets within Liwa-Shinas Al-Suwaiq, Al-Huwqayn & AlHazm Al-Huwqayn Roads Dualisation of Sohar--Buraimi Road Rehabilitation of 16 Bridges Yanqul--Marri Road Falaja's Sidariyyin Road and Link to Saya Extension of Water Supply Scheme in Khasab Design and Construction Supervision of Farm Roads in Barka Sohar Roads

Oman

c d e

Oman

Oman

Oman

c d

N.A

Oman

N.A

Oman

a b c d e

Oman

President, Diwan Royal Court

Oman

Ministry of Transport & Communications Ministry of Land Affairs & Municipalities

c d e

21

Roads, Water Supply, Sewerage & Drainage System of New Community at Ghubra South

Oman

c d

135

72

OVERSEAS PROFILE

Oman
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Al-Khabura to Dariz Road Project, Muscat Water Supply to Al-Ghalila Village

Oman

Ministry of Transport & Communications Ministry of Housing, Electricity & Water Ministry of Regional Municipalities & Water Resources Ministry of Social Affairs

c d e

52

26-07-1979 31-12-1980 05-06-2002 30-06-2006 01-10-1994 30-06-1998 25-05-1983 30-11-1984 15-02-1992 30-06-1993 01-10-1997 30-06-1999

Oman

c d e

Sewage Treatment Plants in Ibri & Buraimi Towns Low Cost Housing Scheme - North

Oman

c d e

Oman

c d e

19

Airport Facilities Building Project at Seeb International Airport Water Supply Schemes to Shinas and Liwa Wilayats in North Al-Batinah Region Roundabout at Al-Nasim Garden on Batinah Highway Increase in Standby Power Generation Capacity Projects at Seeb & Salalah International Airports Rehabilitation for Culverts on Barka--Rustaq Road Additional Works of Gubra South Community Junction Improvement Ibra Town

Oman

Ministry of Transport & Communications Ministry of Electricity & Water

c d e

Oman

c d e

25

Oman

Ministry of Transport & Communications Ministry of Transport & Communications

c d e

09-03-1992 28-02-1995 21-01-1982 01-04-1983

Oman

c d e

Oman

Ministry of Transport & Communications Ministry of Land Affairs & Municipalities Ministry of Transport & Communications Ministry of Transport & Communications a

01-08-2000 30-06-2002 22-03-1984 01-10-1984 01-08-1999 30-11-1999 22-01-1981 10-10-1985

Oman

b c d e

11

Oman

c d e

Feeder Roads Along MutrahQuariyat Highway

Oman

c d e

44

SULTANATE OF

Oman

73 21

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

AQR-Khatmat-Malalah Road

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Electricity & Water c

30-04-2001 30-06-2003 30-10-1983 30-06-1984 01-03-2000 31-12-2000 19-12-2000 19-09-2001 10-01-1997 31-12-1998 17-11-1982 17-08-1983 18-12-1998 17-06-1999 15-12-2000 15-06-2001

Miscellaneous Maintenance Works on Ibri-Dank Junc-Hafit Road Rehabilitation of NizwaThumrait Road Water Distribution Pipeline Between Ghumdha & Bukha Dibah & Madha Roads

Oman

40

Oman

21

Oman

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Sohar Development Office, Diwan of Royal Court Affairs, Muscat Ministry of Electricity & Water

c d e

Streets in Sohar, Liwa and Shinas

Oman

c d e

34

Water Distribution Network in Sohar Extension of Water Distribution System to New Planned Areas in Khasab Water Supply to Aswad Area

Oman

b c d e

22

Oman

N.A

Oman

Ministry of Housing, Electricity & Water Diwan of Royal Court Affairs

N.A

12-05-2002 28-02-2003 15-06-1986

Various Miscellaneous Jobs in Muscat Three Junctions on Batinah Highway Additional Works of Al-Hajir, Jahlut and Arqi Feasibility Study of Sohar-Buraimi Road

Oman

c Survey c

Oman

Ministry of Transport & Communications Diwan of Royal Court Affairs

N.A

01-12-2004 31-01-2005 01-03-1985 01-06-1985 01-01-2004 31-07-2004

Oman

12

Oman

Ministry of Transport & Communications

N.A

74

OVERSEAS PROFILE

Oman
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Small Retention Dams at Wadis Al-Awina and Al-Ghil, Wilayat Bausher, Muscat Governorate Fiza-Ar Rissah Road and Link Road to Dabayan, Wilayat Liwa Beautification of Capital Area

Oman

Ministry of Water Resources

c d

N.A

25-11-2000 29-12-2000

Oman

Ministry of Transport & Communications Diwan of Royal Court Affairs

N.A

01-01-2006 31-08-2006 23-12-1984 30-11-1985 25-05-1985 30-11-1985

Oman

c d e

Intersections on Mutrah Khadamat Malahah Dual Carriageway for Sohar Town Development Scheme of Hayee Al-Bosher Stage-11 Routine Maintenance Works on Rusay-Nizwa Road Bukha Flood Protection Scheme

Oman

Ministry of Transport & Communications

c d e

Oman

Ministry of Land Affairs & Municipalities Ministry of Transport & Communications Ministry of Municipality & Regional Planning Diwan of Royal Court Affairs

b c

14

22-11-1982 01-01-1983 02-06-1992 15-01-1993 25-05-1993 31-08-1995 22-10-1987 30-04-1988 12-02-1986 31-12-1986 29-09-2001 30-06-2002 01-01-1995 25-09-1995 13-10-1985 31-03-1986 20-01-2004 30-06-2004

Oman

Oman

b c d

N.A

Construction Supervision of Sohar Service Road So-19 Planning of Four Industrial Areas in Sohar Rustaq-- Miskin Road, Oman

Oman

Oman

Diwan of Royal Court Affairs

b c

Oman

Ministry of Transport & Communications Diwan of Royal Court Affairs

N.A

Check Dams in Muscat

Oman

Service Roads Along Dual Carriageway in Sohar (56 Km) Feasibility Study of MarmulShaleem Sharbithat Road

Oman

Diwan of Royal Court Affairs

c d

23

Oman

Ministry of Transport & Communications

N.A

SULTANATE OF

Oman

75 21

Lis t of Projec t s
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Sohar Farm Road (20 Km)

Oman

Diwan of Royal Court Affairs

25-05-1985 30-11-1985 01-06-1992 15-02-1993

Construction Supervision of Protection Works for LISQIBRA Road Preparation of Site Plans (Krookies) for Al-Tarif Area, Sohar Sur Dam

Oman

Ministry of Transport & Communications

N.A

Oman

Diwan of Royal Court Affairs

N.A

13-09-1985 15-10-1985 01-08-1990 01-07-1991 25-06-1991 31-12-1991 01-12-1995 28-02-1996 01-04-1993 30-06-1995 24-12-1983 31-12-1983 24-06-1982 30-11-1982 23-01-1984 31-12-1984 20-06-1981 30-06-1983 06-12-1987 28-02-1988 10-07-1995 09-09-1995

Oman

M/s Weidleplan Consulting GmbH

N.A

Topographic Survey at Al-Khawd Dam Site Detailed Design of Road from Khasab Port to Airport Design of DST Road Project

Oman

Ministry of Agriculture & Fisheries

Topo Survey

N.A

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Housing, Electricity & Water Ministry of Transport & Communications Mr. Mansoor Bin Naseer

23

Oman

c d

Social Housing Project - 1984

Oman

b c d

13

Feeder Roads Along MutrahQuriyat Highway House for Mr. Mansoor Bin Naseer at Saad Village Seeb--Al-Khawd Highway

Oman

45

Oman

c e

Oman

Ministry of Transport & Communications Diwan of Royal Court Affairs

Development of Area Around Qaboos Mosque, Seeb Updating of Feasibility Study for Khasab-Bukha Road

Oman

N.A

Oman

Ministry of Transport & Communications

24

76

OVERSEAS PROFILE

Oman
a) b) Feasibility Study Project Planning c) Detailed Design d) Tender Documents e) Construction Supervision f) Design Review/Evaluation PROJECT LOCATION CLIENT SCOPE OF WORK COST
US$ Million

Start Date/ Comp.Date

Al-Hajar Link Road

Oman

Ministry of Transport & Communications Ministry of Transport & Communications Ministry of Transport & Communications Diwan of Royal Court Affairs a

c d

23-11-1982 30-04-1983 11-11-1987 31-01-1988 20-08-1981 30-12-1983 27-11-1985 31-12-1985

Feasibility Study of Salalah Bypass

Oman

19

Link Roads to Al-Hajare and Al-Muntefah Project, Muscat Additional Works Covering Design of Roads, Parking Areas etc. in Sohar Roads, Water Supply, Sewerage and Drainage System of Muwellah Industrial Area, Sohar Renovation of Mosque in Bosher Muwellah Industrial Area, Sohar

Oman

c d

Oman

c d

Oman

Diwan of Royal Court Affairs

N.A

12-02-1986 31-12-1986

Oman

Ministry of Transport & Communications Diwan of Royal Court Affairs

N.A

02-04-1983 30-06-1983 12-02-1986 31-12-1986 03-07-1984 31-12-1984

Oman

b c

N.A

Farm-Villa at Barka for Sayyid Salim Bin Nassir Al-Bussaidi, Minister of Communications Clock Tower, Musannah

Oman

Ministry of Transport & Communications

c d

Oman

Chairman Municipal Committee

c d

N.A

19-03-1984 05-04-1984 17-11-1985 31-12-1986 06-11-1981 31-01-1982

Landscape Design of Suway-HirahSalan Roundabouts in Sohar Water Supply & Sewerage System of Pakistan High School, Salalah

Oman

Diwan of Royal Court Affairs

Oman

Pakistan Embassy

b c d

SULTANATE OF

Oman

77 21

S-ar putea să vă placă și