University of Education Winneba College of Technology, Kumasi

Faculty of Technical and Vocational Education Department of Design Technology Education

Installation and Maintenance of Electrical and Electronics Equipment Course code: EET 482 Level: 400 Semester: 8

Program: B. Tech. Education (Electrical and Electronic Engineering) Academic Year: 2012-2013

K. A. Dotche
Ph. D. Telecom. Eng. (Research candidate)

(Lecturer)

Course objective This course aims at impacting electrical and electronics equipment maintenance and management. This includes general rules of equipment installation, their servicing and their management within a chain/ plant production in order to optimize the general maintenance cost involved and personnel safety. Course outline Maintenance and services definition and concepts, Different types of maintenance: corrective, preventive, Intervention planning and advantages, Pareto Analysis in scheduling preventive maintenance, Maintenance and Policies, Decision tree of maintenance strategy, Maintenance oriented with software packages advantages over traditional maintenance.

ii

Contents UNIT ONE: MAINTENANCE AND MANAGEMENT----------------------------------------------- 4 1.0. 1.1. 1.2. Conceptual Fundamental -------------------------------------------------------------------------- 4 Definition and stipulation ------------------------------------------------------------------------- 5 Maintenance components ------------------------------------------------------------------------- 6 Structural analysis ---------------------------------------------------------------------------- 6 Maintenance flowchart ----------------------------------------------------------------------- 7 Sub-servicing contractor --------------------------------------------------------------------- 7

1.2.1. 1.2.2. 1.2.3. 1.3.

TYPES OF MAINTENANCE ------------------------------------------------------------------- 7 PREVENTIVE MAINTENANCE --------------------------------------------------------- 8

1.3.1.

UNIT TWO: MAINTENANCE AND MANAGEMENT ---------------------------------------------- 10 2.1. Reliable Centered Maintenance -------------------------------------------------------------------- 10 2.2. Choice and strategy of maintenance policies ----------------------------------------------------- 10 2.3. Objective of RCM service ------------------------------------------------------------------------ 11 2.4. Decision tree ------------------------------------------------------------------------------------------ 12 2.4. Strategy and Policy in Maintenance --------------------------------------------------------------- 13 3.1. Data Information ------------------------------------------------------------------------------------- 14 3.2. Tools of analysis for the maintenance service --------------------------------------------------- 14 3.2.1. Evaluation of risk and failure of the equipment -------------------------------------------- 14 3.2.2. Analysis of fault effect and degree of failure ----------------------------------------------- 14 3.2.3. Pareto Analysis ---------------------------------------------------------------------------------- 15 UNIT FOUR: STANDARD FOR AN ELECTRICAL PREVENTIVE MAINTENANCE (EPM) PROGRAM --------------------------------------------------------------------------------------------------- 16 4.1. Characteristics of maintenance service (Types) ------------------------------------------------- 16 4.1.1. Frequency of EPM ------------------------------------------------------------------------------ 16 4.1.2. Equipment Efficiency and aging -------------------------------------------------------------- 16
iii

4.2. Recommended Maintenance Practices ------------------------------------------------------------ 16 4.2.2. Air Circuit Breakers ---------------------------------------------------------------------------- 19 4.2.3. 4.2.4. Arc Interrupters ------------------------------------------------------------------------------ 20 Operating Mechanism ----------------------------------------------------------------------- 20

4.2.5. Auxiliary Devices ------------------------------------------------------------------------------- 20 4.3. Vacuum Circuit Breakers ------------------------------------------------------------------------ 21 Air Disconnect Switches-------------------------------------------------------------------- 21

4.3.1.

4.4. Oil Circuit Breakers ---------------------------------------------------------------------------------- 22 4.4.1. External ------------------------------------------------------------------------------------------- 22 4.4.2. Internal -------------------------------------------------------------------------------------------- 22 4.4.3. 4.5. Auxiliary Devices---------------------------------------------------------------------------- 23

Molded-Case Circuit Breakers ------------------------------------------------------------------ 23

4.6. Battery Stations / Chargers-------------------------------------------------------------------------- 23 4.6.1 Batteries ------------------------------------------------------------------------------------------- 24 4.6.2. Charger ---------------------------------------------------------------------------------------- 24

4.6.3. Safety --------------------------------------------------------------------------------------------- 24 4.7. Cables and Bus --------------------------------------------------------------------------------------- 24 4.7.1. Cables in Manholes ----------------------------------------------------------------------------- 24 4.7.2. Aerial Cables ------------------------------------------------------------------------------------- 25 4.7.3. Raceways ----------------------------------------------------------------------------------------- 25 4.7.4. Bus Duct ------------------------------------------------------------------------------------------ 25 UNIT FIVE: TRANSFORMERS -------------------------------------------------------------------------- 26 5.1. Dry Type Transformers ----------------------------------------------------------------------------- 26 5.2. Liquid-Filled Transformer -------------------------------------------------------------------------- 27 5.3. Protective Relays ---------------------------------------------------------------------------------- 28
iv

5.3.1. 5.3.2. 5.4.

Visual and Mechanical Inspection -------------------------------------------------------- 28 Electrical Testing ---------------------------------------------------------------------------- 29

UPS Systems --------------------------------------------------------------------------------------- 30

UNIT SIX: Electric Motors --------------------------------------------------------------------------------- 31 UNIT SEVEN: CASE STUDY ---------------------------------------------------------------------------- 34 7.0. 7.1. 7.2. 7.3. 7.4. INSTALLATION AND MAINTENANCE OF TRANSFORMERS --------------------- 34 Introduction ---------------------------------------------------------------------------------------- 34 Accessories and fittings to a transformer ------------------------------------------------------ 35 Installation and maintenance -------------------------------------------------------------------- 35 INSULATION RESISTANCE TEST ---------------------------------------------------------- 36

PART ONE: REGULATION AND PROCEDURES ON INSTALLATION INSTALLATION OF PLANT Definition Plant installation is the process of putting a large piece of equipment (machine) in place and connecting it to the requisite energy source such as electricity, gas or water so that it is ready for. Stages of Installation of Equipment Installation begins with taking delivery of the equipment and includes 1. Loading the equipment onto a truck 2. Transporting it to site 3. Unloading it from the truck 4. Moving it to the place of installation 5. Preparing the foundation and leveling 6. Mounting the machine on the foundation 7. Aligning components 8. Test running Procedure for preparing the foundation 1. Study the machine and its specification and requirements 2. Examine the place of installation 3. Set out the foundation 4. Excavate the floor where necessary 5. Cast the foundation 6. Position and secure in place the foundation bolts where possible Procedure for mounting the machine on the foundation 1. Convey the machine near the foundation 2. Lift and suspend the machine over the foundation 3. Place wooden blocks on the foundation 4. Lower the machine on the wooden blocks
1

5. Check for alignment and ensure the hold-down bolts will fit into the holes on the base plate of the machine correctly 6. Remove the wooden blocks gently one after the other 7. Tighten the nuts in place as you check for leveling and alignment 8. Connect the machine to the appropriate power source 9. Test run and make the necessary adjustments 10. commission Plant Services Servicing is the term used to describe the act of carrying out minor planned maintenance. Planned maintenance refers to work organized and carried out with forethought , control and records. It includes the whole range of maintenance and can equally apply to any type, that is replacement, breakdown or preventive, provided that; i. the maintenance policy has been considered carefully ii. the application of the policy is planned in advance, and iii. historical and statistical records are compiled and maintained to assess the results and provide a guide for future policy. The reason for servicing a plant is to ensure that: i. the machine must be available for start-up when needed ii. the machine must not breakdown during production runs iii. the machine operates in an efficient manner at the required level of production iv. the down-time for maintenance does not interfere with production schedules or runs. v. The downtime which may be caused by a breakdown should be at minimum. Alignment Shafts and other components are said to be in alignment when they are collinear at the coupling point or when they are in-line with other machine components. Shafts are considered to be in alignment when they are collinear at the coupling point. This implies that shafts which are not collinear at the coupling point are misaligned.

The term collinear refers to the conditions where the rotational centre lines of two mating shafts are parallel and intersect. This is necessary so that the two shafts rotate just like a solid shaft. Any deviation from the aligned or collinear condition, results in abnormal wear of machine train components, such as bearings and shaft seals. Several operational effects could send signals of misalignment, the most noticeable indications of misalignment in rotating machinery, however, are shaft wobbling, excessive vibrations and over heating of bearings. Periodic alignment checks on all coupled machinery are considered to be one of the best tools in a preventive maintenance programme. Such checks are important because the vibration effects of misalignment can seriously damage a piece of equipment. There are four alignment conditions. These are; Perfect alignment Offset or parallel misalignment Angular or face misalignment Combination or skewed misalignment Causes of misalignment Misalignment may be caused by any one or a combination of the following; Foundation movement or setting Thermal expansion Accidentally bumping the machine with another equipment Distortion caused by connecting piping Loose hold-down nuts, expanded grout and rusting shims.

PART B: MAINTENANCE AND MANAGEMENT

UNIT ONE: MAINTENANCE AND MANAGEMENT 1.0. Conceptual Fundamental

Electrical equipment failures account for millions of dollars in damage and lost business every year. As electrical infrastructure continues to age, this problem is only going to worsen unless active steps are taken to counter the trend. Ironically, more than two-thirds of electrical system failures can be prevented by a routine preventive maintenance (PM) program. Studies show that the failure rate of electrical equipment is three times higher for components that are not part of a scheduled preventive maintenance program as compared with those that are. In addition, a planned PM program allows the equipment owner to schedule the system outage at a time of their choosing rather than having to correct major problems resulting from an always untimely failure.
Therefore some production plant may define and organize the maintenance activities with regard to a given standard or a recommended one by the manufacturer. The purpose of this standard is to provide the insured with recommended practices and frequencies that would form the core of a regularly scheduled electrical preventive maintenance program. All work associated with electric power systems and equipment should be performed in accordance with accepted industry safety standards and work practices

Maintain To keeping something in its good state to insure the continuous of the plant production Repair To fix something that has developed a fault, in such way that its efficiency is restored

Maintenance: definition)

Work that is done to keep something in its good state or condition. (Dictionary

Ideally, maintenance is any activity undertaken with the aim of either retaining or restoring something to a state or condition that enables its function very satisfactorily. The activities may

not be confined to the technical aspect of the work only but may also include all supervisory, managerial and administrative activities connected with the work. In Engineering, however, activities may include replacements of parts, taking measurements, conducting tests, adjusting parts of a machine and repairs. Maintenance can also mean all the activities done to ensure that an item or material is retained in a serviceable state, including testing, servicing inspection, classification in terms of serviceability, rebuilding, reclamation and repairs. 1.1. Definition and stipulation

The Reference AFNOR X60-010, ought that, maintenance is the general actions which aim at maintaining and fixing any equipment in a specific state to ensure a predefined service. However, the German Institute of Normalization by its Reference DIN/RFA 311251 proposes that it is the general measures with goal to maintain and fix a given equipment/ good and to appreciate its current efficiency in the production chain. The Reference X60.000 It stipulates that maintenance is the general principles / rules or regulation in place in a given organization /enterprise / production unit, to ensure the personnel safety and equipment efficiency. Meanwhile the Reference X60.010 identifies that maintenance might be the management of equipment/ goods with a long term vision. It may be argued that maintenance is a general management task which aims at ensuring the working personnel safety and efficiency of goods/equipment in order to achieve a satisfactory production. It may also be defined as all routine recurring work needed to ensure that an item is kept in a good condition so that it can be used continuously for its intended purpose and at the capacity, and efficiency at which it was designed. In complex organization or firms software package are needed to manage maintenance information eg. aerospace, military installations, large plants and ships. These software help

improve supply chain communication as such material supply time is reduced, material availability in increased, cost and repair times are reduced.

1.2.

Maintenance components

We may identify three main parties, these are: Structural analysis Functional flowchart Sub-servicing contractor

These components make use of a challenging factor, which is the time. We identify: o Running before break time: o Total repair time o Total break time 1.2.1. Structural analysis This consists to define the necessary and sufficient activity/intervention out of a technicaleconomic survey in order to identify the best method/strategy of maintenance which can minimize the Global Maintenance Cost (GMC). This accounts for the intervention cost, the failure/break cost, equipment-stored cost and the damping stored cost.

Maintenance Officer Maintenance Officer

Planning / Regulation Planning Unit Unit


Work-Order Officer Work-Order Officer Electrical / Mechanical team Electrical / Mecanical team

Storage-Officer Store and supply-Officer


1.2.2. Maintenance flowchart

1.2.3. Sub-servicing contractor It consists of assigning a partial servicing to a contractor. Thus, for some given equipment their maintenance is undertaking by the contractor, who ensures and maintain the production efficiency.

1.3.

TYPES OF MAINTENANCE 1. Scheduled maintenance (Preventive) 2. Unscheduled maintenance (corrective) 3. Conditional maintenance (predictive/ systematic) (depending on plant servicing) 4. Curative maintenance 5. Palliative maintenance
7

Maintenance

Preventive

Curative

Other operations

Innovation

Modification Inspection Control Visits Testing Detection Localization Diagnostics

replacement (Standard)

Inventary

Diverse Conditional Maintenance Systematic Maintenance Palliative (repairing) Curative (fixing)

1.3.1. PREVENTIVE MAINTENANCE The term preventive maintenance refers to the care and servicing of an equipment or facility for the purpose of maintaining it in satisfactory operating condition. It involves systematic inspection, detection and correction of imminent failures before they occur or develop into major defects.
8

The maintenance engineer may test, measure, adjust or replace parts mainly to prevent faults from occurring. It is to be noted that this type of maintenance occurs before failure to avoid far more expensive damage. It is therefore designed to preserve and restore equipment reliability by, for example, replacing worn out parts or components before they actually fail. Activities of preventive maintenance (PM) may involve partial or complete or overhauls at specific periods, change of oils, lubrication etc. An ideal PM program is necessary to prevent all equipment failure before they occur. There is however, the element of human error and equipment failure that can lead to failures despite carrying out PM. The importance of PM cannot be over emphasized. However, it is often misunderstood by most people who think the expenses involved are unnecessary. In conclusion PM is conducted to ensure that an equipment is kept in a good working condition and to extend its life span. Corrective maintenance also called REPAIRS ensures that an equipment is working again. In this instance failure has occurred and there is need for correction else the equipment cannot function again. This may happen as a result of negligence of PM.

UNIT TWO: MAINTENANCE AND MANAGEMENT

2.1. Reliable Centered Maintenance RCM is an industrial improvement approach aimed at identifying and establishing the operational, maintenance and capital improvement policies for the effective managing of the risks of equipment failure. It addresses the following seven basic questions: 1. What is the function of the item? 2. What are the ways of failure in the provision of its functions? 3. What events symptoms lead to each failure? 4. What happens in the event of failure? 5. Why does it matter? 6. What systematic activities can be carried out to prevent it or satisfactorily minimize the impact of its failure? 7. If a suitable preventive activity cannot be found, what other step must be taken? This type of maintenance lays emphasis on predictive maintenance (PdM) technique as well as traditional preventive measures.

2.2. Choice and strategy of maintenance policies This consists to define clearly: What preventive maintenance is beneficial for our production/unit What are the economic resources requirements to minimize the failure/ cessation cost out of the repair maintenance to curative maintenance.

10

From unscheduled curative maintenance, wait for the problem/ cessation/ failure then look for what next to do and to solve the equipment/ failure/ cessation

Either to decide for predictive / systematic maintenance, this means to change all delicate equipment susceptible to cause the failure or cessation of the production plant/ unit, etc

2.3. Objective of RCM service It targets to minimize the provisional global maintenance cost of equipment by identifying the measures and tasks. This consists to evaluate either the preventive maintenance, or the corrective maintenance for a given equipment in terms of its intrinsic and extrinsic elements is suitable: Intrinsic elements: these correspond to the technical conception at designing process and usually defined by the manufacturer such as: Lubrication, response to atmospheric effect, subsets of the equipment which life spans are relatively shorter than the equipment one. However, it may be pointed out that, these elements yield fatal cost such that any corrective action cannot be undertaken for further improvement. Extrinsic elements: these correspond to the usage of the equipment such as: Production plant legislation constrains defining the periodic visits, inspections, controls etc utilization condition at the production plant o the life span of the equipment

o Annual utilization hours o The risks in terms of cessation o The availability of the equipment o The qualification of personnel o The real power used to the supply power The personnel security and environment protection
11

2.4. Decision tree The decision tree is often used whereby we have little information about the running before break time.
Conditional (Unscheduled) Maintenance

Yes

Yes

Is the fault Progressive ? No Preventive Maintenance

Fault impacts security

Yes Variable Is the fault Progressive ?

Yes

Conditional (Unscheduled) Maintenance

No

No

Predictive Maintenance

Fault Ratio

Yes Is the fault Progressive ?

Conditional Maintenance

Yes No Constant
Fault impacts security

No

Curative/ Corrective Maintenance

Predictive Maintenance Is the fault Progressive ? Curative/ Corrective Maintenance

No

No

12

2.4. Strategy and Policy in Maintenance The choice of maintenance policy and strategy for equipment may rely on the deployment and installation of the so-called no-destructive controllers e.g. alarm / signaling, indicating light system. They are self-learning and auto diagnostic types of failure or any type of apparent fault. These controllers are helpful in monitoring and management of the global maintenance cost.

The failure/ cessation of the Equipment May affect the Production or The personnel security

No

The Cost yields by this failure / cessation Is it Acceptable / Manageable

Yes

Curative Maintenance

No

Yes

Is it Possible to use Measurament/ Testing Techniques

Systematic Maintenance

Yes

No

Is this Method/ Technique Good for us?

Predictive Maintenance

Yes

13

UNIT THREE: DATA INFORMATION FOR MAINTENANCE UNIT (RCM)

3.1. Data Information It helps the maintenance unit to appreciate any discontinuity or apparent fault in order and how to schedule/ undertake the preventive maintenance with respect to the equipment in store. These tools are also called the indicators or indicating parameters. They are defined in the Reference AFNOR X60-020 and also emphasis on the maintenance unit response to a given fault. These are: Mean Time Between Failures (MTBF) It is a measure of the mean time between failures. It is the mean time of running time before break/fault. It is a measure of the equipment availability after a failure has occurred. It is measured in hours and defined by the manufacturer. Mean Time To Repair (MTTR)

It is a measure of the quality of response to a given fault by the maintenance unit/team. 3.2. Tools of analysis for the maintenance service 3.2.1. Evaluation of risk and failure of the equipment This method aims at classifying the equipment with respect to the degree of risks or failures likelihood during the production time. It is carried by out the survey of three to four technicians. This survey allows scheduling the preventive maintenance. 3.2.2. Analysis of fault effect and degree of failure It consists to point out a maximum likelihood record of failures of the equipment by a simple rating exercise. Failure =G*P

14

Fault Stop a sub-set of the equipment but not the production plant Stop the equipment but not the production plant Stop the production plant and fixing is needed Stop the production plant and the personnel is unsecure

Value 1 2 3 4

likelihood exceptional Rare/ scarce frequent certain

With this rating exercise, the maintenance officer or maintenance unit may schedule a predictive maintenance on relative equipment. 3.2.3. Pareto Analysis It accounts for the preparation before interventions. It consists of adapting the preparation activities in terms of demand and priority. Pareto assumes that 20% of interventions correspond to 80% of the intervention expense yield and 50% of interventions correspond to 95% of the cost of global maintenance interventions. Consequently, the gain of intervention remains between: 20% to 40% of the cost due to maintenance intervention 30% to 50% of the fault and failures maintenance charges The gain represents the observed and practical well planning intervention. 3.2.3.1. Preparation before intervention It may consist of defining the procedures and rules to improve the maintenance Unit /team with regard to the potentiality of a given site. In general, it is recommended that simple rules may be applied as follows: Write down, what we have to do Do exclusively what was written Record (short report) exactly, what have been done.

15

UNIT FOUR: STANDARD FOR AN ELECTRICAL PREVENTIVE MAINTENANCE (EPM) PROGRAM Recommended Maintenance Practices for Electrical Distribution System Equipment 4.1. Characteristics of maintenance service (Types) 4.1.1. Frequency of EPM In general, Hartford Steam Boiler recommends a frequency of once every three years for conducting regular preventive maintenance on electrical equipment. Where applicable, this standard will note components that require a more frequent EPM program to help ensure reliability and operation. It is recognized that individual locations may require more frequent maintenance due to the physical environment or operational nature of the equipment. For example, harsh environments where excessive moisture or dust may be present should have a more frequent EPM program. Similarly, equipment that is used intermittently or equipment critical to a key process should be considered for a more frequent program. Sound engineering judgment should be used in determining if more frequent maintenance is appropriate. 4.1.2. Equipment Efficiency and aging The equipment efficiency may be affected by age of utilization. Thus, as time goes on the equipment may be unable to deliver its optimal efficiency. Therefore, in such a situation the maintenance unit/ officer would have to schedule either a systematic maintenance or a predictive maintenance running not necessary with respect to the manufacturer guidelines. It is assumed that by then the maintenance/Unit have enough information on the equipment and how its failure or cessation in the running process may affect the production. 4.2. Recommended Maintenance Practices The following sections are segmented by equipment type. For each component, a recommended minimum practice for preventive maintenance is provided; additional suggested practices are presented for a more thorough EPM program.

16

4.2.1. Switchgear 4.2.1.1 Enclosures 1. Ensure that all enclosure panels, doors, and structures are well-maintained in accordance with the manufacturers specifications. 2. During deenergized maintenance, enclosures are to be vacuum cleaned of all loose dirt and debris use of compressed air is not recommended since this may cause foreign particles to become embedded in the insulation or damage insulators. 3. Any buildup of dirt or other contaminates that will not come off with vacuuming should be cleaned with lint free rags using cleaning solvents recommended by the manufacturer. 4. All vents and fan grills are to be cleaned of all dust and/or dirt accumulations. 5. Ensure that ventilation openings are not obstructed. 6. Where seals and/or gaskets are installed, these should be examined and repaired or replaced as necessary. All doors and access panels should be properly secured during operation. 7. Where heater elements are installed, these should be cleaned, examined for damage and/or deterioration, and tested. Repair or replace heater elements as necessary. 8. In environments where there is an extreme exposure to adverse conditions, the frequency of maintenance for enclosures should be increased as conditions warrant. 9. Electrical equipment rooms or vaults should be kept cleaned of dirt and/or dust accumulations on a regular basis. 10. Doors and windows should be maintained in proper working order and kept closed during routine operation. 11. Access doors should be clearly marked to alert personnel that live electrical equipment is in use. 12. Where ventilation and/or air conditioning is used, all fan motors should be cleaned and examined for signs of wear and deterioration. 13. Fan blades should be cleaned of dirt and dust and bearings should be properly lubricated. 14. Vent openings should be cleaned of all dust and dirt accumulations. 15. Filters should be cleaned and/or changed as recommended by the manufacturer, or more often if conditions warrant. Electrical equipment rooms should never be used as storage areas.
17

16. Electrical equipment rooms or vaults should be examined for evidence of water seepage. The tops of electrical equipment enclosures should be examined for evidence of water since this is a common entryway that often goes undetected until a failure occurs. 17. The source of the water should be immediately identified and corrective measures taken to permanently correct the condition.

4.2.1.2 Insulators, Supports, and Connectors 1. Inspect insulators and conductor supports for signs of cracking, broken pieces, and other physical damage or deterioration. 2. Clean all loose dirt with lint free rags. For contaminates that will not remove easily, solvents approved by the manufacturer may be used. Examine for evidence of moisture that may lead to tracking or flashover while in operation. 3. Examine surrounding areas for signs of tracking, arcing, or overheating. Repair or replace damaged insulators and supports as necessary. 4. Examine all bolts and connecting devices for signs of deterioration, corrosion, or overheating. Ensure that bolts and connecting devices are tight, according to manufacturers specifications. Be careful not to over torque bolts and connecting devices since insulators are easy to damage and difficult to replace. 5. Where copper and aluminum conductors and/or connectors are used together, examine connections for signs of galvanic action. Ensure that the connectors are properly used and installed in accordance with manufacturers specifications. Apply an antioxidant compound to all aluminum-to copper connections.

4.2.1.3 Conductors 1. Examine insulation for signs of deterioration, cracking, flaking, or overheating. 2. Examine all connections for signs of overheating, cracked or broken connectors, and signs of tracking or arcing.
18

3. Ensure that conductors are clean and dry. 4. Examine and clean all connections, and torque to manufacturers recommendations.

4.2.2. Air Circuit Breakers 4.2.2.1 Insulation 1. Remove and clean interphase barriers. 2. Clean all insulating materials with vacuum and/or clean lint free rags. If it is necessary to use cleaning solvents, use only solvents recommended by the manufacturer. 3. Inspect for signs of corona, tracking, arcing, or thermal or physical damage. Ensure that insulation is left clean and dry.

4.2.2.2 Contacts 1. Ensure that all contacts are clean, smooth, and in proper alignment. 2. Ensure that spring pressures are maintained according to manufacturers specifications. 3. On silver contacts, discoloration is not usually harmful unless caused by insulating deposits. Clean silver contacts with alcohol or silver cleaner using non-abrasive cloths. 4. Manually close breaker to check for proper wipe, contact pressure, contact alignment, and to ensure that all contacts make at approximately the same time. If possible, a contact resistance test should be performed to determine the quality of the contacts. 5. Older breakers equipped with carbon contactors generally require very little maintenance. Examine for proper pressure, deterioration, or excessive dressing which may interfere with their proper operation. 6. Draw-out contacts on the circuit breaker and the stationary contacts in the cubicle should be cleaned and inspected for overheating, alignment, and broken or weak springs. Coat contact surfaces with contact lubricant to ease mating (see manufacturers recommendations)
19

4.2.3. Arc Interrupters 1. Clean all ceramic materials of loose dirt and examine for signs of moisture, make sure the assemblies are clean and dry. 2. Examine for cracked or broken pieces. Dirt and arcing deposits may be removed by light sanding do not use emery cloth or wire brushes which may leave conductive residue behind. Repair or replace as necessary. 3. Examine arc chutes for dirt and/or dust accumulations and clean as necessary. Dielectric testing of arc shields may be recommended by the manufacturer. Check air puffer for proper operation. 4.2.4. Operating Mechanism 1. Inspect for loose, broken, worn, or missing parts (consult manufacturers schematics for required parts). Examine for excessive wear of moving parts. 2. Observe that operating mechanisms function properly without binding, hanging, or without delayed action. 3. Ensure any lubrication is done according to the manufacturers specifications. 4. Ensure mechanisms are clean, properly lubricated, and all bolts and screws are properly secured. Repair or replace as necessary. 4.2.5. Auxiliary Devices 1. Inspect operating devices for proper operation and general condition. 2. Ensure all indicating devices are fully functional and properly set. 3. Protective relays and circuit breaker trip devices should be inspected and tested according to manufacturers specifications and applicable industry standards such as those issued by the Institute of Electrical and Electronics Engineers (IEEE) and the National Fire Protection Association (NFPA).

20

4.3.

Vacuum Circuit Breakers

1. All maintenance is similar to that performed on air circuit breakers. As always, it is recommended that the manufacturer be consulted for specific maintenance and testing procedures. 2. The integrity of the vacuum chamber is often tested by applying a test voltage across the open contacts of the breaker. However, this can be a destructive test and is therefore not recommended by Hartford Steam Boiler. Caution: This procedure can produce X ray emissions, so personnel should maintain a safe distance from the breaker if this test is performed. It is important to closely follow manufacturers recommended procedures if conducting this test in order to ensure that proper results are obtained. The breaker vapor shield can accumulate an electrostatic charge during this test. Ensure that it is discharged immediately following the test. 4.3.1. Air Disconnect Switches 1. Inspect and clean insulators and conductors as with circuit breakers. 2. Tighten connections in accordance with manufacturers specifications. Do not overtighten as this may result in damage to connectors. 3. If cleaning solvents are used, ensure that they are as recommended by the manufacturer. Where abnormal environmental conditions exist, more frequent inspection and cleaning may be required. 4. Check the operation of the arc blades, if applicable, and ensure proper wipe of the main contacts. 5. Interphase linkages and operating rods should be inspected to make sure that the linkage has not been bent or distorted and that all fastenings are secure. 6. The position of the toggle latch to the switch operating linkage should be observed on all closed switches to verify the switch is mechanically locked in a closed position. 7. Operate switch manually several times to ensure proper operation, and then by motor if power-operated.

21

8. Ensure that all moving parts are properly secured and lubricated as specified by the manufacturer. 9. Contact resistance testing of each phase contact should be performed. The results should be recorded and analyzed to ensure proper contact is being made. If the contact resistance of the switch exceeds recommended minimums, repair or replace the switch immediately 4.4. Oil Circuit Breakers 4.4.1. External 1. Inspect the enclosure for signs of oil leakage. 2. Clean external bushings assemblies and examine for signs of deterioration, tracking, and loose or broken parts. 3. Observe oil gauge to ensure device is operating properly and measuring the oil level accurately. Insulating Oil Test 1. Conduct a dielectric screen test of the insulating fluid. Based on the results of this test, filter or replace oil as required. Heavy carbon content can indicate potential contact wear and should be investigated further. 4.4.2. Internal 1. Since the contacts for oil circuit breakers are not readily accessible for inspection, the contact resistance should be tested as a minimum. 2. More extensive maintenance on the contacts might be require draining the oil and dropping the tank, and is therefore performed less frequently. 3. Follow manufacturers recommended schedule for examination of internal components such as contact inspections. 4. Open breaker and examine contacts for wear and/or excessive deterioration. Examine linkages for loose, broken, or missing parts; repair or replace as necessary.

22

4.4.3. Auxiliary Devices 1. Operating mechanisms should be maintained as with air circuit breakers. 2. Where applicable, examine oil level indicators, sight glasses, oil lines, gaskets, and tank lifters for proper conditions. Repair or replace as necessary and in accordance with manufacturers recommendations. 3. Examine arc-quenching assemblies for carbon deposits or other contaminates. Follow manufacturers recommendations for cleaning. 4.5. Molded-Case Circuit Breakers 1. Molded-case circuit breakers should be kept clean for proper ventilation of the breakers. These types of breakers are usually tripped by a thermal element that senses an increase in temperature due to excessive current draw. However, if dirt accumulates on the surrounding of the breaker, the heat build-up may not be permitted to dissipate properly and result in nuisance tripping. 2. Clean the breaker housing and inspect it for cracks or signs of overheating. 3. Tighten all connections. Exercise the breaker several times to ensure the mechanism has freedom of movement and to allow contact wiping. 4. In addition, larger duty circuit breakers (225 amps or above) should be electrically trip tested to ensure proper operation of the trip elements and trip linkages. Refer to the latest edition of the National Electrical Manufacturers Association (NEMA) Standard AB4, Procedures for Verifying Field Inspections and Performance Verification of MoldedCase Circuit Breakers. If possible, test contact resistance to ensure quality of breaker contacts. 5. All molded-case circuit breaker panels should be cleaned of all dirt, dust, and debris using a vacuum.

4.6. Battery Stations / Chargers

23

4.6.1 Batteries 1. Thoroughly clean all battery surfaces of dust and/or dirt accumulations. Clean and tighten all terminal connections. Remove any corrosion on battery terminals with bicarbonate of soda. 2. Clean battery studs and cable ends. On stranded cable, if ends are corroded, cut off ends or separate strands and clean internally. 3. Check electrolyte levels and specific gravity. Variations of more than fifty (50) points between cells may indicate a bad cell. 4.6.2. Charger 1. Clean all dust and/or dirt accumulations from charger. 2. Clean all vent openings and ensure that they are free from obstructions. 3. Check terminals and connections for tightness. 4. Check all relays, lights, and other indicating devices for proper operation. 5. If all cells consistently read low, check charger for proper operation. 6. If electrolyte levels are low, check charger rate settings against the manufacturers specifications. Consistently low levels may indicate the charge rate is too fast. 4.6.3. Safety While charging, batteries emit explosive gases. Allow no open flames or sparks permitted near charging batteries. Battery rooms should be well ventilated and smoking should not be permitted.

4.7. Cables and Bus De-energize cables if they are to be touched or moved during maintenance. 4.7.1. Cables in Manholes

24

1. Caution: Check for dangerous gases using a properly calibrated test meter before entering any confined space such as a manhole. 2. Inspect for sharp bends, physical damage, excessive tension, oil leaks, pits, cable movement, soft spots, cracked jackets, damaged fireproofing, poor ground connections, deteriorated and corroded or weakened cable supports. 3. 4. Inspect for wear at entrance point and at supports. Inspect manhole for spalled concrete, proper ventilation and excessive moisture. Inspect potheads for oil or compound leakage and for cracked / chipped porcelain. 5. Examine the manhole and cable grounding system to ensure its integrity. 6. If cathodic protection has been installed in the manhole, it too should be evaluated. Corrective action should be taken as appropriate to maintain the integrity of these systems. 4.7.2. Aerial Cables 1. Check supports for excessive wear or deterioration, check cables for wear at support points, inspect for mechanical damage from vibration. 2. At dead-ends, check cable for worn insulation, sharp bends, or cracks. 4.7.3. Raceways 1. Check raceways for proper mechanical support of raceway and cables as well as check insulation for abrasion or cracks at support points. 2. Examine raceway joints for clean and tight connections.

4.7.4. Bus Duct 1. Bus duct joint covers should be removed to allow access for a thermographic survey of the energized bus under load.

25

2. After de-energizing and grounding the bus duct, connections should be checked for proper tightness as well as evidence of overheating, corrosion, arcing, or other forms of deterioration. 3. All loose or dirty connections should be cleaned and properly torqued be careful not to overtorque the bolts. 4. Consult the manufacturer for recommended maintenance practices and torque values. 5. The tops of the bus duct enclosure should be inspected for evidence of water or other foreign matter that may contaminate the bus duct.

Testing 1. Suggested cable or bus tests include insulation resistance testing and polarization index testing. 2. Recorded these tests to track trends that may indicate a deterioration of the cables insulation.

UNIT FIVE: TRANSFORMERS 1. Transformer data (such as, voltage, current, and temperature readings) should be recorded on a regular basis in order to determine operating conditions of the transformer. 2. Peak, or redline, indicators should be recorded and reset. Readings taken on a weekly basis can provide important information about the loading of the transformer that is needed before additional loads can be added to the transformer. 5.1. Dry Type Transformers

26

1. After de-energizing and grounding the transformer, clean all coils, connections, and insulators of loose dust or dirt deposits with a vacuum cleaner. 2. Examine the transformer for signs of overheating, deterioration, arcing, loose or broken parts, or other abnormal conditions. 3. Ensure all connections are tightened according to manufacturers specifications. 4. Clean enclosure of any dust and dirt accumulations and ensure that vent openings are free from obstruction. 5. If cooling fans are installed, examine for proper operations and lubricate as necessary. test, and a power factor test. These are non-destructive tests which can be performed to track the condition of the insulation over time. 7. Detailed records should be maintained and analyzed to identify undesirable trends that may indicate the onset of an insulation failure. 5.2. Liquid-Filled Transformer 1. Insulating liquid samples should be taken annually and screen tested for dielectric breakdown, acidity, color, power factor, and interfacial tension. 2. A Fault gas analysis or a Dissolved-Gas-in-Oil (DGA) test conducted by a qualified testing laboratory should be performed annually. The results should be trended to track conditions and schedule maintenance as necessary. 3. Examine the transformer tank and bushings for evidence of leakage. 4. Inspect the bushings, insulators, and surge arrestors for broken or damaged parts, signs of overheating or arcing, or tracking. 5. Clean all bushings, insulators, and surge arrestors of any dirt or dust accumulation. 6. Tighten all conductor connections in accordance with manufacturers recommendations. 7. If applicable, perform a ground resistance test to ensure a value of 25 ohms or less. Surge Arrestors 6. Additional suggested testing includes an insulation resistance test, a dielectric absorption

27

1. Clean and inspect porcelain for signs of damage or deterioration. Repair or replace as necessary. 2. Examine arrestor leads for damage and/or deterioration. 3. Other suggested tests are 60 cycle spark over and hold tests, watts-loss and leakage current tests, insulation resistance tests, and grounding electrode circuit resistance tests. These should be conducted according to manufacturers recommendations. 5.3. Protective Relays

1. Inspection, maintenance and testing of protective relays should be done on an annual basis in order to ensure proper and reliable operation. 2. All necessary precautions should be taken while working with protective devices to ensure personnel safety and to avoid any unplanned interruption of service. 3. In particular, when working on control circuits, all current transformer (CT) secondaries should be shorted to ground and never left open-circuited in order to avoid serious injury to maintenance personnel.

5.3.1. Visual and Mechanical Inspection 1. Inspect relays for physical damage and deterioration. 2. Inspect gaskets and covers for damage and/or excessive wear, and repair or replace as necessary. Examine and clean the relay and enclosure of foreign materials, such as dust, dirt, and moisture contamination. 3. Examine the condition of the spiral spring, disc clearances, contacts, and case shorting contacts (if present).

28

4. Check mechanism for freedom of movement, proper travel and alignment, and tightness of mounting hardware and plugs. 5.3.2. Electrical Testing 1. Using an appropriate testing instrument, suitable for the relays being tested, conduct electrical testing of the relays in accordance with manufacturers recommendations and IEEE testing standards. 2. For overcurrent relays, test the following functions of the relay at the established settings specified by the system engineer or manufacturer: Pickup contacts should close when a current equal to the relay tap setting is applied to the induction coil. Adjust the spring as needed to allow for proper operation.

Timing tests should be performed corresponding to two (2) or more points on the relays timecurrent curves. One of the tests should be done at the specified time dial setting.

Instantaneous pickup test should be performed for the specified instantaneous setting, if applicable.

Seal-in units should be tested to ensure that the contacts hold closed with the minimum specified current applied.

Relay target should indicate when the relay has operated.

29

If possible, the relays should be tested to ensure that operation of the relay will in fact cause a tripping action of the respective circuit breaker. Relays that do not test satisfactorily or are found to be defective should be replaced immediately to maintain the integrity of the protection systems.

5.4.

UPS Systems

1. This section provides general recommended maintenance guidelines for Uninterruptible Power Supply (UPS) systems. Since there is a wide variety of systems and equipment available, the manufacturers instructions and recommendations should be consulted for more complete and detailed maintenance requirements. 2. UPS systems are categorized in two basic ways: static and rotary. For the purposes of this standard, only static systems will be addressed. 3. When performing any maintenance and/or testing of UPS systems, follow all recommended safety procedures as indicated by the manufacturer and required by OSHA. Only fully trained and qualified persons with proper test equipment should perform UPS maintenance. 4. Clean interior and exterior of cabinets and enclosures, ensuring that any areas of corrosion and/or deterioration are repaired as necessary. 5. Clean all vent and air circulation openings and ensure freedom from obstructions. If installed, clean cooling fan blades and motor housings. 6. Ensure that motor bearings are properly lubricated and that fan blades are properly secured to drive shafts. Examine for signs of moisture contamination and correct if necessary. 7. Clean and examine all electrical connections for signs of corrosion or deterioration, repair or replace as necessary. 8. Ensure all connections are tightened according to manufacturers specifications. 9. As applicable, clean and test all breakers, disconnects, and relays as prescribed elsewhere in these standards and as specified by the manufacturer. 10. Check all system alarms and indicating lights for proper operation.
30

11. Check inverters for fluid leaks from wave-forming capacitors. 12. Check capacitors for signs of bulging or discoloration. 13. Examine transformers and heat sinks for signs of overheating. Maintain batteries as prescribed in section 3.7 of this standard and as specified by the manufacturer. UNIT SIX: Electric Motors A maintenance program for electric motors should utilize proven and well understood testing and inspecting methods performed by qualified knowledgeable personnel to identify and evaluate conditions 6.1. driven load. Installed and offline Actions which require the motor to be electrically disconnected but can be performed with the motor installed and coupled. Overhaul Actions typically completed during a routine overhaul. Additional testing / activities may be required based on the individual situation. Post Overhaul After completion of maintenance, the insured should review work report, ensure all parts sent with the motor(i.e. terminal box, couplings) were returned and perform basic testing of the motor before placing it in the stock system . activity Visual Inspection Installed and running Maintenance Location Performance characteristics Inspection look for: Evidence of damage caused by dirt, loose parts, objects. Verification that air
31

Recommended Maintenance Practices and Frequencies

Installed and running Actions typically performed with the motor installed and coupled to the

Frequency should 6 months

or

foreign

inlets are not blocked Evidence of moisture and/or dirt build-up Unusual high vibration Oil level gages (if present) checked Evidence degradation foundation, plates, anchor bolts Evidence of oil rings turning (if applicable) Evidence of leaking oil and water piping and connections of of bed should be noises, leaking oil seals, or

Temperature monitoring of bearings and windings

Installed and running

If

motor

is

not 6 months with

equipped installed sensors: record temperatures stator using should The


32

bearing and temperature thermographic This be data trended.

imaging.

monitoring

should be completed at similar motor loading and ambient temperature to allow for accurate trending. Vibration Installed and running Record and trend 6 months

vibration levels. This should be done by a trained and experienced technician, preferably a qualified level II technician. Oil analysis Installed Sample and analyze. 12 months Look for at foreign overall matter, conditions and check additive depletion,

varnish precursors and metallic elements. Motor shut should down be when

taking sample. Running current Installed and running Record and trend all 12 months three phase currents and verify the currents are balanced and do not exceed nameplate
33

rating. Each phase should be within +/- 5% of the average of all three phases

UNIT SEVEN: CASE STUDY 7.0. 7.1. INSTALLATION AND MAINTENANCE OF TRANSFORMERS Introduction

Regulations provide some guidelines as to how to install as well as maintain transformer. In this section therefore you will be looking at some steps that need to be taken during the installation and maintenance of the transformer. This section gives emphasis on: the functions of some fittings attached to the transformer some important requirements for installing and maintaining transformers.
34

four methods of cooling transformer.

7.2.

Accessories and fittings to a transformer

In the construction of the transformer certain accessories are required for safe handling and operation of the transformer. They include the following. Lifting lugs - These are the places where the transformer can be held and lifted during handling Drain valves - Drain plugs are provided at the bottom of the transformer and are used to drain oil from the transformer. Thermometers - These thermometers monitor the temperature of the transformer. In large transformers the dial type thermometers are used. They are sometimes fitted with alarm contacts which close at certain temperatures thus blowing an alarm. Oil gauges - Oil gauges are fitted to enable variation of oil level with loading to be read. They are usually the visual-light glass type. Earthing terminals - These are terminals provided to enable earthing to be done on the transformer. These may be on the framework which supports the tank or on the tank chassis. Conservator- larger forms of transformers have conservators fitted to them. They are placed at the highest point above the oil and must have enough capacity to contain variations in oil volume as a result of temperature changes. The conservator allow the main tank of the transformer to be completely fitted with oil thus preventing air from entering the tank and influencing the properties of the oil. Explosion vent - This is also called relief vent. Larger firms of transformers are usually provided with this accessory which is bolted to the cover of the tank. It is a welded pipe with a diaphragm. Under faulty condition gas pressure builds up in the tank which can cause explosion. However the diaphragm bursts providing space for the gas and oil to escape to the atmosphere thus rendering the tank safe.

7.3.

Installation and maintenance

The following are some points to consider during installation and maintenance of transformers Because transformers heat as they operate they require enough ventilation should be provided when installing them. Consequently transformers should not be installed too

35

close to each other or very closed to a wall. Adequate space should always be provided for air circulation. Sometimes there is need to inspect the core and winding of the transformer and this should be done without having to disturb the foundation on which the transformer is mounted. Therefore, adequate headroom should be provided to enable the core and winding to be lifted out of the tank. Foundation on which transformers are mounted should be of strong concrete. It should also be free from vibrations which can lead to weakening A dwarf wall should be built around the transformer. This is to contain escaping burning oil in the event of explosions. If a transformer is mounted inside a buildings, there should be a trench which leads to a sump outside. Such a trench should be filled with chips of stone. Buildings housing oil-fitted transformers must be constructed with fireproof material. The terminals of transformers must be checked regularly and ensured that they are firm and free from corrosion. Samples of oil are taken for testing periodically. This is to ensure that the oil maintains its properties.

7.4.

INSULATION RESISTANCE TEST

This is a test carried to ensure that, there is no possibility of leakage current occurring between conductors and also between conductor and the general mass of earth. The test therefore, tries to prove that the insulation used for electrical materials are of good quality. The instrument used

36

for this purpose is the insulation resistance tester or megger. Some are battery operated and others incorporate a small hand operated generator, which is operated by winding a crank. The scale is in mega ohms but some also have a second scale in ohms, which can be used for continuity testing.

Insulation resistance testers generate a voltage, which is twice the normal working voltage of the circuit to be tested. This stresses the insulation as the test current flows through it and any faulty condition can easily be detected. If the insulation is good less current will flow.

To conduct the test you must ensure that all loads as well as lamps are disconnected. Since the voltage involved is high any control devices that contain semiconductor component must equally be disconnected else they can be damaged. All switches however, must be closed.

For insulation resistance between conductors and earth all the phase conductors are connected together and the test leads connected between the earth and the phase conductors (which are connected together). The minimum acceptable reading is 1M.

The insulation resistance of other equipment and apparatus like iron; cookers etc can also be tested. Here too the test is conducted between conductors and between conductors and earth. You should note however that these equipment must first be disconnected completely from the installation. The minimum acceptable reading should be 0.5M.

37