LEADING THE PRECAST INDUSTRY SINCE 1919

PRECAST

CONCRETE FLOORING

This Bison precast concrete ooring document is a comprehensive product and technical guide designed for Structural Engineers, Civil Engineers, Speciers and Contractors. It provides a range of products and solutions to choose from and is supported by technical details, specications and design guidelines/considerations for Part A, Part E and Part L.

2
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

CONTENTS

INTRODUCTION
PAGES 0 - 7

COMMERCIAL/INDUSTRIAL PRODUCTS
PAGES 08 - 23

01 02 03 04 05 06 07 08
3

HOUSING PRODUCTS SINGLE OCCUPANCY


PAGES 24 - 29

HOUSING PRODUCTS MULTIPLE OCCUPANCY

PAGES 30 - 39

COMPOSITE STEEL BEAM DESIGN


PAGES 40 - 41

BUILDING REGULATIONS
PAGES 42 - 57

SPECIFICATIONS & HEALTH AND SAFETY


PAGES 58 - 61

RELATED PRODUCTS
PAGES 62 - 63

BISON ONLINE
PAGES 64

For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BISON

LEADING THE PRECAST INDUSTRY SINCE 1919

Excellent customer service, investment in research and development and an unrivalled understanding of market needs are just some of the reasons we have been ahead of the eld for so long.

RESOURCE and Capacity


The largest production capacity across four manufacturing plants throughout the UK, with Certificates of Assessed Capability, awarded by the British Standards Institution.

Innovation
Over the last seven years, Bison has invested 50 million to ensure that our customers continue to benefit from innovative approaches to production, installation and service. We can boast a number of unique developments such as mechanically inserted Lifting Hooks and the Trailasafe fall arrest system.

4
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SUstainaBility
With Bison products, you can be certain that all materials have been produced in conditions designed to have as little impact on the environment as possible. Swadlincote is the most environmentally friendly factory of its kind in the world.

DESIGN SUPPORT
Bisons in-house team represents the very best in the industry and is on hand to give design

CUstomer Driven
Our investment is focused on meeting and exceeding customer expectations. Bison customers in all the sectors we serve know that they can rely on us for outstanding technical support, reliability and the highest quality product.

advice for any project, large or small. They can help identify the optimal solution for your project, whether this means using one of our many precision-made steel moulds, or taking the bespoke approach with a custom-made casting.

CUstomer SERVICE
The Bison service team provide comprehensive support, from estimating to production and a contract team who install the products on site. Wherever you are in the UK, Bisons nationwide coverage ensures that support is never far away. The Bison Precast Floor Designer software can assist with the design of many Bison products including Hollow Core slab units, Composite Hollowcore slab units and Solid Composite slab units. Designs are produced in our centralised production planning department and downloaded to the factory machines by wireless link.

5
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BISON CONCRETE FLOOR TYPES

Bison Concrete Floors are prestressed precast concrete slabs used in all building types
Bison Concrete Floors are manufactured using a long line casting technique with automatic casting equipment which places high strength, low water/ cement ratio concrete under a high degree of vibration and compaction.

BISON HOLLOW CORE & SOLID FLOORS


Widely used in masonry, steel and concrete structures for domestic, commercial and industrial buildings. The most economic ooring solution for the widest variety of situations, providing the maximum benets of speed of construction.

BISON HOLLOW COMPOSITE FLOORS


A combination of the Bison Hollow Core Slab with a structural concrete topping. This type of oor gives the benet of an increased structural performance with an enhanced lateral load distribution where necessary for heavy point loads. The oor may be designed in the unpropped or partially propped condition to suit particular requirements.

6
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

BISON CONCRETE FLOOR TYPES

BISON SOLID COMPOSITE FLOORS


Combines the advantages of a precast, prestressed element acting compositely with an in-situ concrete structural topping to form a solid slab. The prestressed element, whilst eliminating the need for conventional shuttering, provides a structural performance far superior to normally reinforced concrete.

THE BISON SOUND SLAB


The Bison Sound Slab has been specially developed to provide an economic and structurally efcient means of satisfying the requirements of Part E Sound Regulations.

Floor Heating and Cooling Systems


As the conservation of energy continues to be a major issue surrounding the environment, Bison has entered into a strategic partnership with velta UK. With over 35 years experience, velta have been responsible for some of the industrys most important innovations in oor heating and cooling systems and now offers the widest range of

LIFTING HOOKS
All Bison Precast Concrete Floors are available with inserted lifting hooks. For more information see section Related Products, pages 62 & 63.

INSULATED HOLLOW CORE GROUND FLOORS


The system consists of expanded polystyrene (EPS) bonded to the soft of Hollow Core units and formed to provide special end and side bearing support where required.

solutions specically designed to meet the requirements of each individual project. Bison and velta have joined forces to provide an innovative, sustainable and cost effective oor heating and cooling system which is precast in to Bison ooring products providing off site manufacturing benets.

7
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

MARKET APPLICATIONS

COMMERCIAL/ INDUSTRIAL

Bison has a prolonged proven track record within commercial / industrial markets and produces a range of products and solutions for many different oor applications.
This encompasses shops, shopping precincts, multi-storey car parks, ofce developments, factories and warehouses. However, the types of constructional components used in these buildings are also often specied for large public developments such as schools and hospitals.

8
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

MARKET APPLICATIONS

HOUSING

HOUSING SINGLE OCCUPANCY


In traditional single-occupancy housing, individual Bison products can solve particular problems for the designer, arising from site conditions, constructional constraints or the Building Regulations, including Part E, Part A and Part L.

HOUSING MULTIPLE OCCUPANCY


Similarly for multiple-occupancy housing, individual Bison products can solve particular problems. Bison has a sustained track record and reputation within the multiple occupancy market. A range of oor solutions and products provide the architect and the structural engineer with exibility in design as well as satisfying the Building Regulations, particularly with reference to sound attenuations (Part E), Thermal Performance (Part L) and Structural Robustness (Part A).

9
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

HOLLOW CORE FLOORS


THE BENEFITS
DESIGN
StRUCtURAL EFFICIeNCY A Hollow Core slab offers the ideal structural section by reducing deadweight while providing the maximum structural efficiency within the slab depth. FLeXIbILItY OF DesIGN APPROACh Precast floors are available with a variety of factory-formed notches, slots and reinforcement arrangements which offer various design approaches. EXtRA LONG SPANs Factory made prestressed units offer the design benefit of long span units for given depths. This avoids the need for intermediate supports and provides an economically light solution throughout the entire structure. The Bison long span 450mm-deep unit can span in excess of 16 metres.

MANUFACTURING
FACtORY PROdUCed tO RIGOROUs QUALItY StANdARds Because precast floors are factory produced, they are manufactured in an environment which is more readily controlled than a building site. Quality control systems are properly implemented and are independently examined on a regular basis under the British Standards Institution Quality Assurance Scheme, BS EN ISO 9001 approved. DIAPhRAGM ACtION FIRe ResIstANCe Standard precast floors can be supplied with a fire resistance of up to two hours. Periods in excess of this can be provided with modified sections if required. PReFORMed SIte SeRVICes FINIshed SOFFIts Precast floors are manufactured on high quality steel beds and, in appropriate cases, are suitable for direct decoration. Exposed soffits can easily be accommodated. Precast floors can be provided with factory formed service holes, thus avoiding laborious setting out and shuttering on site. Precast floor slabs are structurally grouted to provide a floor with full diaphragm action, as required in most multistorey frameworks. SheLF ANGLe BeARING Slab ends can be notched during manufacture to facilitate a bearing within the depth of a main steel support. This minimises storey height, causing substantial cost benefits from reduced cladding, lower internal fittings and other related peripherals.

CONSTRUCTION
MINIMUM IN-sItU CONCRete With a precast floor, a lot of the work is done off site. This eliminates what can be complex, time-consuming and weather-affected site work. SPeed OF EReCtION Time-consuming activities such as propping, shuttering and concrete-pouring are virtually eliminated. IMMedIAte UNPROPPed WORKING PLAtFORM Once a precast floor is erected, it is immediately available as a working platform. In comparison, steel deck systems can present problems in achieving level surfaces while concrete is being poured, and in enabling access while in the propped condition.

10
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

HOLLOW CORE FLOORS


CASE STUDIES
COMMERCIAL BUILDINGS AND CAR PARKS
The office block shown is the British Gas offices in Solihull, West Midlands. This is a typical commercial application where the structural form consists of a steel frame with 7.5 x 8.7m bays and 200mm precast Hollow Core units spanning 7.5m. A total of 9100m2 of precast units were used and 40m3 of precast stair. Multi storey car park in Nuneaton where 10,000m2 of 150mm deep Hollow Core oor units and 67m3 of precast stair units was used to provide excellent durability and performance in a busy, robust car park environment.

RETAIL DEVELOPMENTS
The IKEA outlet in Manchester is constructed using a steel frame with precast unit floors. Over 40,000m2 of 200mm deep Hollow Core precast floor units were used in the construction. The grid reflected the use of car park, retail and offices on different floors. Drake Circus Shopping Centre located in Plymouth used 19,000m 2 across a combination of Hollow Core floor profiles from 200mm up to 450mm deep.

HOSPITAL & STADIA DEVELOPMENTS


Pictured is a hospital in Exeter constructed using a steel frame structure with 200mm and 300mm deep Hollow Core units used to span up to 9m. This provided flexibility in span lengths and optimised design for the applied loads over 4,250m 2 floor area throughout. Millennium Stadium in Cardiff used over 48,000m2 of precast Hollow Core floor units and over 380 precast stair units.

11
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

HOLLOW CORE FLOORS


UNIT PROFILES
150mm Sound Slab unit prole

75mm unit prole 100mm unit prole 150mm unit prole

200mm unit prole

250mm unit prole

260mm unit prole

300mm unit prole

350mm unit prole

400mm unit prole

450mm unit prole

12

1200mm Nominal Width

For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

HOLLOW CORE FLOORS


LOAD/SPAN TABLE
Largely because of fast on-site construction, Bison Hollow Core Floors are one of the most economic flooring solutions for the widest variety of situations including masonry, steel and concrete structures for retail, commercial and industrial buildings.

Spans indicated below allow for characteristic service load (live load) plus self weight plus 1.5 kN/m2 for nishes Overall structural depth mm Characteristic service loads kN/m2 0.75 1.5 2.0 2.5 3.0 4.0 5.0 7.5 10..0 15.0

Effective span in metres 100* 150* 200 250 300 350 400 450 5 7.5 10 12.3 15 17.4 18.5 19.9 5 7.5 10 11.5 14.9 16.5 17.6 19 5 7.5 9.7 11.1 14.4 15.9 17 18.5 5 7.5 9.4 10.7 13.9 15.5 16.6 18 4.8 7.3 9.1 10.4 13.5 15 16.1 17.5 4.5 6.8 8.5 9.7 12.8 14.2 15.3 16.7 4.2 6.4 8 9.2 12.1 13.6 14.6 15.9 3.7 5.6 7.1 8.1 10.9 12.5 13.2 14.5 3.3 5 6.4 7.4 10 11.2 12.1 13.4 2.8 3.2 5.5 6.3 8.7 9.8 10.6 11.7

The table is given as a guide only. When using maximum spans, consideration must be given to the effect of camber and deflection on partitions or finishes. Further advice is available on request. * 35mm screed required for 2 hour fire resistance.

13
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

HOLLOW CORE FLOORS


BEARING DETAILS
BEARING ON SHELF ANGLES

Finishes

Structural concrete infill

Nominal bearing 75 Minimum bearing 50

Projection of angle beyond extremity of flange 50 mm. Greater where U.C. sections are used. Refer to Bison for assistance.

25 mm clearance

25 mm clearance is required to allow unit to be dropped into position past the flange of the supporting U.B.

14
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

HOLLOW CORE FLOORS


BEARING DETAILS
BEARING ON MASONRY

Finishes

Nominal bearing t / 2 - 10 mm

Wall thickness t 190

SIDE BEARING

Where required by Building Regulations for sound insulation. Finishes

Continuous wet mortar by builder to take up camber

15
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

HOLLOW CORE FLOORS


BEARING DETAILS
NARROW WALL BEARING

Finishes Structural concrete infill Nominal bearing t / 2 - 10 mm (Min. 65 mm) Wall thickness t < 190 (Min. 140 mm)

Structural concrete infill

Tie reinforcement at 400 c/c in joints and troughs provided in 1200 wide units t

(NB. In order to satisfy the tolerances in this situation, this detail is only recommended where a full bearing is available at the other end of the slab)

NARROW BEARING ON STEELWORK

Structural concrete infill Finishes Structural concrete infill

Nominal bearing t / 2 - 10 mm

Tie reinforcement at 400 c/c in joints and troughs provided in 1200 wide units

Wall thickness t 150 (Min. 140 mm) t

16
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

HOLLOW CORE FLOORS


BEARING DETAILS
END SLOTS IN UNITS
Slots may be provided in slab ends for the purpose of tying into the structure for nominal continuity. Finishes Structural concrete infill

TRIMMING OPENINGS
M.S.Trimmer. Fire protection, where necessary by General Contractor.

Finishes

The recommendations for bearings of precast units are set out in Clause 5.2.3 of B.S. 8110:1997. These vary according to the type of floor construction and the type of support material and building tolerances. In general nominal bearings of 100 mm on masonry or 75 mm on steelwork are recommended but may be reduced dependent upon circumstances and subject to the above clause.

17
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

HOLLOW COMPOSITE FLOORS


UNIT PROFILES
200 to 225mm overall composite depth comprising 150mm unit with 50 or 75mm structural topping

250 to 275mm overall composite depth comprising 200mm unit with 50 or 75mm structural topping

300 to 325mm overall composite depth comprising 250mm unit with 50 or 75mm structural topping

335mm overall composite depth comprising 260mm unit with 75mm structural topping

375mm overall composite depth comprising 300mm unit with 75mm structural topping

425mm overall composite depth comprising 350mm unit with 75mm structural topping

475mm overall composite depth comprising 400mm unit with 75mm structural topping

525mm overall composite depth comprising 450mm unit with 75mm composite material

18

1200mm Nominal Width For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

HOLLOW COMPOSITE FLOORS


LOAD/SPAN TABLE
A Bison Hollow Composite Floor is a Bison Hollow Core Slab with a structural concrete topping. This combination delivers increased structural performance overall, with an improved lateral load distribution where necessary for heavy point loads. The floor may be designed in the unpropped or partially propped condition to suit particular requirements. It is particularly suitable for industrial buildings, high buildings, car parks or other structures where additional longitudinal and transverse tying is required.
Spans indicated below allow for characteristic service load (live load) plus self weight plus 1.5 kN/m2 for nishes Overall structural depth mm Characteristic service loads kN/m2 0.75 1.5 2.0 2.5 3.0 Effective span in metres 200 250 300 375 425 475 525 8.25 10.4 11.7 14.5 16 17.1 18.5 8.25 9.9 11.2 14 15.5 16.5 17.9 8.1 9.7 10.9 13.7 15.2 16.2 17.6 7.9 9.4 10.6 13.5 14.9 15.9 17.3 7.7 9.2 10.4 13.2 14.6 15.6 17 7.4 8.8 9.9 12.7 14.1 15.1 16.4 7.1 8.4 9.5 12.3 13.7 14.6 15.9 5.8 7 7.8 10.7 11.9 12.7 13.9 4.9 6 6.8 8.8 10 10.7 11.7 4.0 5.0 10..0 15.0

The above data is based upon 50 or 75mm structural topping of C30 concrete which should be regarded as a minimum. Other topping depths may be recommended in some circumstances. Design data for alternative combinations are available from Bison design offices. In relation to the overall structural concept of the building it is also important also to consider topping reinforcement, daywork and movement joints.

19
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMMERCIAL / INDUSTRIAL PRODUCTS

SOLID COMPOSITE FLOORS


UNIT PROFILES
Bison Solid Composite Floors consist of a precast, prestressed element acting compositely with an in-situ concrete structural topping to form a solid slab. This combination of elements delivers the benefits of both, such as a structural performance far superior to normally-reinforced concrete, reduced construction depths, no shuttering, minimal propping, built-in fire resistance, fast erection, and increased flexibility of architectural and engineering design, such as the scope to incorporate all the details normally associated with in-situ design, such as the tying in of balconies, trimming of openings, maximum load distribution and minimum structural depth.

75mm unit with 50mm structural topping

75mm unit with 75mm structural topping

75mm unit with 100mm structural topping

75mm unit with 125mm structural topping

100mm unit with 50mm structural topping

100mm unit with 100mm structural topping

100mm unit with 150mm structural topping

100mm unit with 200mm structural topping

1200mm Nominal Width

20
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

SOLID COMPOSITE FLOORS


LOAD/SPAN TABLE
A Bison Hollow Composite Floor is a Bison Hollow Core Slab with a structural concrete topping. This combination delivers increased structural performance overall, with an improved lateral load distribution where necessary for heavy point loads. The floor may be designed in the unpropped or partially propped condition to suit particular requirements. It is particularly suitable for industrial buildings, high buildings, car parks or other structures where additional longitudinal and transverse tying is required.
Spans indicated below allow for characteristic service load (live load) plus self weight plus 1.5 kN / m2 for nishes Unit depth Overall structural depth mm Self Wt kN / m2 Propped or Unpropped Characteristic service loads kN / m2 0.75 1.5 2.0 2.5 3.0 4.0 5.0 10.0 15.0

*Enhancement of the stated fire period may be achieved by applied soffit finishes.

For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

Fire Resistance* 1 hour 1 hour 1 hour 1 hour 2 hour 2 hour

Effective span in metres 125 75 150 175 200 125 75 150 175 200 150 100 200 250 300 150 100 200 250 300 150 100 200 250 300 150 100 200 250 300 2.95 3.54 4.12 4.71 2.95 3.54 4.12 4.71 3.54 4.71 5.89 7.07 3.54 4.71 5.89 7.07 3.54 4.71 5.89 7.07 3.54 4.71 5.89 7.07 U/P P U/P P U/P P 6.70 7.50 8.32 8.90 3.75 3.75 3.75 3.75 7.80 9.10 10.18 10.66 5.00 5.00 5.00 4.95 7.26 8.57 9.00 10.20 5.00 5.00 5.00 4.65 6.25 7.00 7.78 8.40 3.75 3.75 3.75 3.75 7.27 8.64 9.85 9.58 5.00 5.00 5.00 4.92 6.80 8.25 8.80 9.00 5.00 5.00 5.00 4.65 6.00 6.80 7.52 8.12 3.75 3.75 3.75 3.75 7.00 8.22 9.15 9.45 5.00 5.00 5.00 4.90 6.66 8.05 8.65 8.90 5.00 5.00 5.00 4.65 5.70 6.50 7.25 7.85 3.75 3.75 3.75 3.75 6.75 8.08 9.00 9.15 5.00 5.00 5.00 4.88 6.46 7.83 8.50 8.70 5.00 5.00 4.95 4.65 5.50 6.35 7.02 7.62 3.75 3.75 3.75 3.75 6.50 7.82 8.90 8.80 5.00 5.00 5.00 4.85 6.23 7.10 8.35 8.30 5.00 5.00 4.90 4.60 5.15 5.95 6.62 7.20 3.75 3.75 3.75 3.75 6.10 7.33 8.45 8.15 5.00 5.00 5.00 4.80 5.85 6.85 8.10 7.30 5.00 5.00 4.85 4.55 4.87 5.60 6.29 6.85 3.75 3.75 3.75 3.75 6.77 7.05 8.08 7.60 5.00 5.00 5.00 4.71 5.50 6.60 7.80 7.20 5.00 5.00 4.80 4.55 3.90 4.56 5.12 4.98 3.60 3.75 3.75 3.75 4.55 5.80 6.12 5.80 4.50 4.96 4.80 4.60 4.30 5.62 5.75 5.50 4.30 4.60 4.55 4.40 3.80 3.92 4.05 3.96 3.10 3.50 3.65 3.68 3.85 4.50 4.50 4.40 3.88 4.50 4.50 4.40 3.60 4.25 4.35 4.20 3.62 4.20 4.35 4.02

21

COMMERCIAL / INDUSTRIAL PRODUCTS

SOLID COMPOSITE FLOORS


BEARING DETAILS
SIMPLE BEARINGS ON TOP FLANGE OF STEELWORK
Nominal support reinforcement and/or daywork joints determined by general layout and site operation.

40 mm 40 mm Min. bearing

Min. bearing

SLAB COMPOSITE WITH SUPPORTING BEAM

Flange reinforcement and shear studs as required by steelwork design

40 mm Min. bearing

BEARINGS ON SHELF ANGLES

Minimum 25 mm cover to top of steel beam ange

Minimum 50 mm clearance

Nominal 50 mm bearing

22
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

01

SOLID COMPOSITE FLOORS


BEARING DETAILS
CANTILEVER CONSTRUCTION

In-situ structural topping on precast element

Precast balcony element For IsoPro balcony requirements refer to Bison for assistance.

IN-SITU CONSTRUCTION CENTRED


Solid composite floors may be placed on in-situ beam downstands or supported on shutters before pouring site concrete

Nominal 50 mm bearing for precast elements

IN-SITU CONSTRUCTION SIDE

Beam depths and widths to suit specific requirements

Nominal 50 mm bearing for precast elements

23
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS SINGLE OCCUPANCY

HOLLOW CORE FLOORS


THE BENEFITS
USER BENEFITS
SOUNd ResIstANCe The single most common complaint in relation to housing is noise nuisance. Timber oors have little sound resistance and most people will be familiar with the problems and the inconvenience of sound transmission, particularly from upstairs to downstairs. Precast concrete oors provide an extremely efcient sound barrier between separate living areas. MAINteNANCe Precast concrete is an inert material. It does not shrink and warp like timber and does not produce the cracking of plasterwork and other finishes which result in an ongoing and costly maintenance problem. Concrete is not subject to damage from rot or insect attack. SqUeAKY FLOORs Another problem associated with the shrinkage of timber materials is the squeaking between boards and joists when walked upon. This is extremely irritating and very expensive to rectify. This problem does not exist with a concrete floor. FACtORY PROdUCed tO RIGOROUs QUALItY StANdARds Because precast floors are factory produced, they are manufactured in an environment which is more readily controlled than a building site. Quality control systems in Bison factories are properly implemented and are independently examined on a regular basis under The British Standards Institution Quality Management System dened in BS EN ISO 9001. FIRe Adequate re resistance is an important design feature of any modern building. It has long been recognised that oors between ats in multi-occupancy housing should have a high level of re resistance. Consequently, these are almost always constructed in concrete in order to satisfy the Building Regulations. It seems reasonable that a similar level of protection should be afforded to those living in houses. Concrete is, of course, a non-combustible material and it also acts as a solid barrier which will contain not only the re but the smoke, which is the primary cause of most fatalities in fire accidents.

CONSTRUCTION BENEFITS
DesIGN FLeXIbILItY Unlike timber, a precast concrete floor provides a structural platform which gives the house designer greater freedom in supporting upper floor wall partitions to virtually any layout. Furthermore with a concrete upper floor the partitions can be built in blockwork with its greater sound resistance, instead of timber stud. SIte SAFetY SPeed OF EReCtION Typically a single precast floor slab is up to 10 square metres in area and can be laid in minutes. Dependent upon site conditions and house sizes, the floors to several houses can normally be completed in one day. PReFORMed SeRVICe PROVIsION Precast concrete floors can be provided with factory-formed service holes to accommodate all the necessary service routes with ease. Once a precast concrete floor is erected it is immediately available as a working platform. Combined with Trailasafe synthetic mesh for trailer deck fall arrest, and the Bison Air Mat for roll-off fall protection, this creates the safest possible environment for site workers. StRUCtURAL EFFICIeNCY A Hollow Core slab offers the ideal structural section by reducing the deadweight whilst providing the maximum structural efficiency with the minimum slab depth. This offers the design benefit of longer spans, thus reducing the lengths of internal loadbearing walls and foundations.

24
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

HOUSING PRODUCTS SINGLE OCCUPANCY

SECTION

02

HOLLOW CORE FLOORS


CASE STUDIES
TERRACED SINGLE OCCUPANCY HOUSING DEVELOPMENTS
Pictured is part of a large housing development based in London. Over 578m2 of 150mm Hollow Core floor units were used throughout for 1st and 2nd floor applications across varying design type houses, typically from town type, 2 floor houses, to traditional 1st floor houses. Hollow Core floors have been installed by many housebuilders, both large and small, for terraced developments.

DETACHED HOUSING DEVELOPMENTS


Pictured is a detached housing development based in Warwick. The development was a mix of three, four and five bedroom detached houses, where 250m 2 of 150mm Hollow Core units were used throughout the plot for all first floor applications. Further detached developments using Hollow Core floors have been constructed across the country, from Sterling in Scotland to Portsmouth in England.

LARGE ESTATE HOUSING DEVELOPMENTS


Pictured is an estate type housing, consisting of 8 bedrooms, 24 rooms and 3 outbuildings based in Oxshott. 496m2 of Hollow Core floor units were used throughout the house.

25
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS SINGLE OCCUPANCY

HOLLOW CORE FLOORS


GROUND/UPPER FLOOR SLAB PROFILES
The most suitable and widely used precast unit for single occupancy housing is a 1200mm wide Hollow Core slab with a depth of either 150 or 200mm.

150mm unit prole

200mm unit prole

1200mm Nominal Width

CONSTRUCTION DETAILS
TYPICAL HOUSE LAYOUTS

1200 mm Wide Units

Structural steel supports by others

Slab span direction

Load bearing walls

Non-Load bearing walls

26
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

02

HOLLOW CORE FLOORS


alternative Batten arrangements to soffits

Battens

Plasterboard

Short firing is not recommended. Various site-drilled anchors are available and, used in accordance with the manufacturers instructions, are a simple and economic fixing method.

Service routes in ceiling void

Battens and counterbattens

Plasterboard

To view load span tables please go to page 13

A SUSTAINABLE CHOICE...
The use of Bison Hollow Core flooring can significantly cut the carbon dioxide emissions of a project by up to one fifth; a CO2 reduction and material saving of 23% can be achieved in the construction of an office block.*
*based on a 2600m2 office block development

27
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS SINGLE OCCUPANCY

HOLLOW CORE FLOORS


BEARING DETAILS
TYPICAL DUAL BEARING

Alternative services route

Alternative services route

190 mm Block Wall

SIDE BEARING
Where required by Building Regulations for sound insulation. Finishes

Continuous wet mortar by builder to take up camber

TYPICAL SINGLE BEARING

TRIMMING OPENINGS
M.S.Trimmer. Fire protection, where necessary by General Contractor.

100 mm Block Wall

190 mm Block Wall

28
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

02

INSULATED HOLLOW CORE FLOORS


GROUND FLOOR
150 mm unit prole

200 mm unit prole

1200 mm Nominal Width

INSULATED HOLLOW CORE UNIT DETAILS


Finishes 150 mm or 200 mm

Support Castellations

Hollow Core Unit

Expanded Polystyrene (EPS) bonded to soffit

INSULATED HOLLOW CORE FLOORS


BEARING DETAILS
DUAL BEARING
Finishes Support Castellations Finishes

EXTERNAL WALL BEARING

190 mm 262 mm or 312 mm Foundation Sleeper Wall Expanded Polystyrene (EPS) bonded to soffit

The Building Regulations Part L1A, L2A 2006 Conservation of fuel and power require that a building is airtight and pressure testing for this is covered by regulation 54. The regulations no longer allow the elemental method and a building needs to be considered as a whole to satisfy the requirements of the regulations. Bison can provide an insulated slab to give a thermal U value of 0.22W/m2 for the floor and greater if required. For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

29

HOUSING PRODUCTS MULTIPLE OCCUPANCY

HOLLOW CORE FLOORS


THE BENEFITS
SPeed OF EReCtION Time consuming activities such as propping, shuttering and concrete pouring are virtually eliminated. LIFtING HOOKs Bison can supply Hollow Core units with cast-in lifting hooks that speed up the installation and bring associated Health & Safety benefits. IMMedIAte UNPROPPed WORKING PLAtFORM Propping is generally not required with Hollow Core floors. Once a precast floor is erected it is immediately available as a working platform. In comparison, steel deck systems can present problems in achieving level surfaces while concrete is poured, and in enabling access while in the propped condition. MINIMUM IN-sItU CONCRete With a precast floor a lot of the work is done off-site. This eliminates on-site work that can be complex, time-consuming and weather affected. EXtRA LONG SPANs Factory-made prestressed units offer the design advantage of long span units for given depths. This can avoid the need for intermediate supports. DIAPhRAGM ACtION Precast floor slabs, when structurally grouted, provide a floor with full diaphragm action to the building. A structural concrete topping is not required. FLeXIbILItY OF DesIGN APPROACh Precast floors can provide the technical solution for the requirements of Part A of the Building Regulations 2004 for Disproportionate Collapse. FACtORY-PROdUCed tO RIGOROUs QUALItY StANdARds Because precast floors are factory-produced, they are manufactured in an environment which is more controlled than a building site. Quality control systems are properly implemented and are independently examined on a regular basis, under the British Standards Institution Quality Management Scheme defined in BS EN ISO 9001:2000. StRUCtURAL EFFICIeNCY A Hollow Core slab offers the ideal structural section by reducing the deadweight whilst providing the maximum structural efficiency within the slab depth. PReFORMed SIte SeRVICes Precast floors can be provided with factory formed service holes, thus avoiding laborious setting out and shuttering on-site. SOUNd ReqUIReMeNts BUILdING ReGULAtIONs PARt E In new-build attached dwellings a developer may choose between Pre-Completion Testing (PCT.) or, if available, a Robust Detail (RD). Bison Concrete Products have developed a series of solutions to cover the use of precast concrete units in association with masonry buildings and steel and concrete frames. Solutions have been developed and testing is in the process of being completed prior to an application for Robust Detail status. COMPOsIte SteeL BeAM DesIGN Composite Steel Beam Design incorporating either Hollow Core or solid slabs provides a structural and cost efficient solution for steel frames. It reduces total tonnage of steel beams by up to 40% and also reduces the number of components to be erected.

30
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

03

HOLLOW CORE FLOORS


TRACK RECORD
MULTI-STOREY HOUSING
The three block housing development in Windsor consisted of 1st, 2nd, 3rd and roof with the other two blocks being 1st, 2nd and roof. All three blocks used 200mm deep Hollow Core sound slab flooring with 3897m2 used throughout the scheme and 30m3 of concrete precast stairs.

MULTI-STOREY HOUSING
The housing development in Worcester, which used 1,700m 2 of 200mm deep Hollow Core sound slab flooring and 10m3 of precast concrete stairs. This included one three storey block and one 4 storey block.

MULTI-STOREY RESIDENTIAL DEVELOPMENTS


This multi-storey residential development used precast Hollow Core floors within a steel frame structure. The development is in Walsall, Birmingham, and used 1500m 2 of 200mm deep Hollow Core sound slab flooring, plus 29m3 of precast stair units. A flat, uninterrupted soffit was achieved with the Hollow Core units, spanning 6.1m between downstand beams, which were at separating wall positions.

31
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS MULTIPLE OCCUPANCY

HOLLOW CORE FLOORS


UNIT PROFILES
150mm Sound Slab unit prole

150mm unit prole

200mm unit prole

250mm unit prole

260mm unit prole

300mm unit prole

1200 mm Nominal Width

To view load span tables please go to page 13

32
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

03

HOLLOW CORE COMPOSITE FLOORS


UNIT PROFILES
250 to 225mm overall composite depth comprising 150mm unit with 50 or 75mm structural topping

250 to 275mm overall composite depth comprising 200mm unit with 50 or 75mm structural topping

300 to 325mm overall composite depth comprising 250mm unit with 50 or 75mm structural topping

335mm overall composite depth comprising 260mm unit with 75mm structural topping

375mm overall composite depth comprising 300mm unit with 75mm structural topping

1200 mm Nominal Width

A SUSTAINABLE PROCESS...
Bison precast floors are produced under sustainable conditions at our flagship production plant at Swadlincote, Derbyshire. The state of the art Hollow Core plant is the most technically advanced and sustainable of its kind in the world: all waste water from the factory is recycled; the fully automated process is energy efficient, taking only 12 hours; and the manufacturing process maximizes efficiency, which prevents material wastage.

To view load span tables please go to page 13

33
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS MULTIPLE OCCUPANCY

HOLLOW CORE FLOORS


BEARING DETAILS
The recommendations for bearings of precast units are set out in Clause 5.2.3 of B.S. 8110:1997. These vary according to the type of floor construction and the type of support material and building tolerances. In general, nominal bearings of 100mm on masonry or 75mm on steelwork are recommended but may be reduced dependent upon circumstances and subject to the above clause.

BEARINGS ON SHELF ANGLES

Finishes

Structural concrete infill

Nominal bearing 75 Minimum bearing 50

Projection of angle beyond extremity of flange 50 mm. Greater where U.C. sections are used

25 mm clearance

25 mm clearance is required to allow unit to be dropped into position past the flange of the supporting U.B.

34
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

03

HOLLOW CORE FLOORS


BEARING DETAILS
BEARINGS ON MASONRY

Finishes

Nominal bearing t / 2 - 10 mm

Wall thickness t 190

SIDE BEARING

Where required by Building Regulations for sound insulation. Finishes

Continuous wet mortar by builder to take up camber

35
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS MULTIPLE OCCUPANCY

HOLLOW CORE FLOORS


BEARING DETAILS
NARROW WALL BEARING

Finishes

Structural concrete infill

Nominal bearing t / 2 - 10 mm (Min. 65 mm) Wall thickness t < 190 (Min. 140 mm)

Tie reinforcement at 400 c/c in joints and troughs provided in 1200 wide units t

N.B. In order to satisfy the tolerances in this situation, this detail is only recommended where a full bearing is available at the other end of the slab.

NARROW BEARING ON STEELWORK

Finishes

Structural concrete infill

Nominal bearing t / 2 - 10 mm

Tie reinforcement at 400 c/c in joints and troughs provided in 1200 wide units

Wall thickness t 150 (Min. 140 mm) t

36
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

03

HOLLOW CORE FLOORS


BEARING DETAILS
END SLOTS IN UNITS
Slots may be provided in slab ends for the purpose of tying into the structure for nominal continuity or disproportionate collapse Finishes Structural concrete infill

TRIMMING OPENINGS
M.S.Trimmer. Fire protection, where necessary by General Contractor.

Finishes

37
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

HOUSING PRODUCTS MULTIPLE OCCUPANCY

SOLID COMPOSITE FLOORS


UNIT PROFILES
Solid composite construction utilises the advantages of a prestressed precast element acting compositely with an in-situ structural topping, combining the benefits of precast and in-situ construction.

These benefits are: Reduced Construction Depths Speed of Erection Elimination of Shuttering Minimal Propping Fire Resistance  Flexibility of Architectural and Engineering design

75mm unit with 50, 75, 100 or 125mm composite material

100mm unit with 50, 100, 150 or 200mm composite material 1200mm Nominal Width

To view load span tables please go to page 21

A SUSTAINABLE FUTURE...
The inherent thermal mass properties of concrete can help to regulate temperature fluctuations, ensuring that indoor environments are comfortable without the use of air conditioning, providing the user with a significant cost and energy saving. Compared to air conditioning, the active Fabric Energy Storage (FES) of concrete reduces carbon dioxide emissions by up to 50%.

38
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

03

SOLID COMPOSITE FLOORS


BEARING DETAILS
SIMPLE BEARING ON TOP FLANGE OF STEELWORK

Nominal support reinforcement and/or daywork joints determined by general layout and site operation. 40 mm Min. bearing 40 mm Min. bearing

SLAB COMPOSITE WITH SUPPORTING BEAM

Flange reinforcement and shear studs as required by steelwork design

40 mm Min. bearing

39
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

COMPOSITE STEEL BEAM DESIGN

Composite steel beam design incorporating Hollow Core or solid slabs provides a structural and cost efficient solution for steel frames. It reduces total tonnage of steel beams by up to 40% and also reduces the number of components to be erected.

Definition
Composite steel beam design is the use of Hollow Core or solid slabs together with in-situ infill in conjunction with welded studs onto steel beams. This enables the slabs and beams to act compositely together, enhancing the load capacity of the steel beams.

DESIGN CONSIDERATIONS 1. SHEAR STUD CAPACITY


PRD = 0.8 f u ( d2/4) / g v or PRD = 0.29 a d2 fcpEcp / g v

Whichever is the lesser.


-0.33

fy 300 40 *1000+2.5g 16 460 s fcu a = 0.2 ( h/d+1) h = height of the stud. d = is the diameter of the shank of the stud. fu = is the specified ultimate tensile strength of the material of the stud but not greater than 500 N/mm2. = a factor which takes into account the gap width g (mm) and is given as 0.5 (g/70+1) 1.0 and g 30mm. = a factor which takes into account the diameter of transverse high tensile tie steel (grade 460) and is given by 0.5 ( / 20+1) 1.0 and 8mm. = transverse joint factor = 0.5 (w / 600+1), w = width of hollow core unit. fcp = average concrete cylinder strength = 0.8 x average cube strength of the in-situ and precast concrete. Ecp = average value of elastic modulus of the insitu and precast concrete. gv = partial safety factor for shear stud.

2. EFFECTIVE WIDTH OF COMPRESSION AREA


Beff = fy 16 460 300 s 40 fcu
-0.33

*1000+2.5g

= transverse reinforcement diameter fcu = concrete strength s = bar spacing fy = reinforcement strength g = gap

40
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

04

DESIGN CONSIDERATIONS

Beff
Insitu Concrete Shear Stud Hollow Core Slab

slab

P . N. A.
Transverse Reinforcement Steel Beam

Rc = 0.45 x f cu; beff x D


slab

P . N. A. Py

Py

41
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BUILDING REGULATIONS

PART A MASONRY BUILDINGS


CONSTRUCTION SOLUTIONS
The Building Regulations Part A December 2004 introduced a system of classication of buildings to reect the risk of disproportionate collapse probabilities. The following solutions give guidance as to the details required for each of the main frame options related to Hollow Core slabs.

CLAss 1 ANd 2A BUILdINGs Flats, apartments and other residential buildings not exceeding 4 storeys. Provision of effective anchorage to satisfy Building Regulations from building in of Hollow Core units.

CLAss 2B BUILdINGs (Horizontal Ties only + notional removal) Flats, apartments and other residential buildings greater than 4 storeys but not exceeding 15 storeys. All design and details for horizontal tying in accordance with BS5628 Part 1 and BS8110 Part 1.

DETAILS FOR TYPE 1 & 2A EXTERNAL


LOAD BEARING CAVITY WALL DETAIL

EXTERNAL
NON-LOAD BEARING CAVITY WALL DETAIL

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit Continuous wet mortar, by builder, to take up camber Solid block wall Continuous wet mortar, by builder, to take up camber Solid block wall

Solid block wall

Solid block wall

100 mm min.

100 mm min.

100 mm min.

100 mm min.

Reinforcement to suit Reinforcement to suit Structural Engineers design Structural Engineers design In-situ concrete stitch In-situ concrete stitch Reinforcement to suit Reinforcement to suit Structural Engineers design Structural Engineers design

10 mm dia. high yield 10 mm dia. high yield U bar per trough U bar per trough

In-situ

concrete stitch

42

In-situ concrete stitch Bison precast concrete Hollow Core slab Bison precast concrete Hollow Core slab 150 mm wide perforated 150 mm wide perforated pocket along the edge pocket along the edge of slab unit at 1200 mmof slab unit at 1200 mm centreswith 10 mm dia. centreswith 10 mm dia.

For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk Bison precast concrete Bison precast concrete
Hollow Core slab unit Hollow Core slab unit with perforated troughs with perforated troughs for tying requirements for tying requirements Continuous wet mortar, by builder, to take up camber Continuous wet mortar, by builder, to take up camber

SECTION

05

PART A MASONRY BUILDINGS


CONSTRUCTION SOLUTIONS
CLAss 2B BUILdINGs (Horizontal and Vertical Ties) Flats, apartments and other residential buildings greater than 4 storeys but not exceeding 15 storeys. All design and details for horizontal and vertical tying in accordance with BS5628 Part 1and BS8110 Part 1 for Class 2B and Class 3 Buildings.

CLAss 3 BUILdINGs (Horizontal and Vertical Ties + Risk Assessment) All buildings defined above as Class 2A and 2B that exceed the limits on area and/or number of storeys. All concrete design and details for horizontal and vertical tying in accordance concrete with BS5628 BS8110 Hollow Part 1and concrete Hollow Part 1 for Hollow Class 2B and Class 3 Buildings.
Solid block wall Solid block wall Core slab unit Core slab unit Core slab unit Continuous wet mortar, by builder, to take up camber Solid block wall Continuous wet mortar, by builder, to take up camber Solid block wall Bison precast Bison precast Bison precast

on precast

ncrete Hollow

re slab unit

100 mm min.

100 mm min.

100 mm min.

100 mm min.

EXTERNAL
LOAD BEARING CAVITY WALL DETAIL
Reinforcement to suit Structural Engineers design 10 mm dia. high yield U bar per trough Reinforcement to suit Structural Engineers design 10 mm dia. high yield U bar per trough

EXTERNAL
NON-LOAD BEARING CAVITY WALL DETAIL

Reinforcement to suit In-situ concrete stitch In-situ concrete stitch Structural Engineers design

Reinforcement to suit Structural Engineers design

situ

In-situ concrete stitch Bison precast concrete Hollow Core slab Bison precast concrete Hollow Core slab unit with perforated troughs for tying requirements Bison precast concrete Hollow Core slab unit with perforated troughs for tying requirements Continuous wet mortar, by builder, to take up camber Continuous wet mortar, by builder, to take up camber Bison precast concrete Hollow Core slab 150 mm wide perforated pocket along the edge of slab unit at 1200 mm centreswith 10 mm dia. U bar per socket 150 mm wide perforated pocket along the edge of slab unit at 1200 mm centreswith 10 mm dia. U bar per socket

ncrete stitch

140 mm

140 mm

140 mm

140 mm

43
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BUILDING REGULATIONS

PART A CONCRETE FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
CLAss 2B BUILdINGs (Horizontal and Vertical Ties) Flats, apartments and other residential buildings greater than 4 storeys but not exceeding 15 storeys.

CLAss 3 BUILdINGs + (Risk Assessment) All buildings defined above as Class 2A and 2B that exceed the limits on area and/or number of storeys. All design and details for horizontal and vertical tying in accordance with BS8810 Part 1 for Class 2B and Class 3 Buildings.

TYPICAL SECTION
INTERNAL WALL (LOAD BEARING)

TYPICAL SECTION
EXTERNAL WALL (LOAD BEARING)

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suitReinforcement to suit Structural Engineers Structural Engineers design design

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suitReinforcement to suit Structural Engineers Structural Engineers design design

Wire loop connections

Wire loop connections

Bison precast concrete 10 mm dia. Bison precast concrete Hollow Core slab Hollow Core slab U bar in troughts

10 mm dia. U bar in troughts

10 mm dia. U bar in troughts

10 mm dia. U bar in troughts

Bison precast concrete Bison precast concrete Hollow Core slab 175 mm 175 mm 150 mm 150 mm Hollow Core slab

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suitReinforcement to suit Structural Engineers Structural Engineers design design

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suitReinforcement to suit Structural Engineers Structural Engineers design design

Wire loop connections

Wire loop connections

Bison precast concrete Bison precast concrete Hollow Core slab Hollow Core slab

150 mm wide perforated 150 mm wide perforated pocket along the edge pocket along the edge Bison precast concrete Bison precast concrete of slab unit at 1200 mm of slab unit at 1200 mm Hollow Core slab Hollow Core slab centre swith 10 mm dia. centre swith 10 mm dia. U bar per socket U bar per socket

175 mm

175 mm

150 mm

150 mm

44
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION
Grout joint In-situ concrete infill Grout joint In-situ Reinforcement to suit Structural Engineers design Reinforcement to suit Structural Engineers design Grout joint In-situ Grout joint In-situ

05
Reinforcement to suit Structural Engineers design

PART A CONCRETE FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
concrete infill concrete infill concrete infill Wire loop connections Wire loop connections

Reinforcement to suit Structural Engineers design

Bison precast concrete Hollow Core slab

10 mm dia. Bison precast concrete Hollow Core slab U bar in troughts

10 mm dia. U bar in troughts

10 mm dia. U bar in troughts Bison precast concrete Hollow Core slab

10 mm dia. U bar in troughts Bison precast concrete Hollow Core slab

175 mm

175 mm

150 mm

150 mm

TYPICAL SECTION
INTERNAL WALL (NON-LOAD BEARING)

TYPICAL SECTION
EXTERNAL WALL (NON-LOAD BEARING)

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suit Structural Engineers design

Reinforcement to suit Structural Engineers design

Grout joint In-situ concrete infill

Grout joint In-situ concrete infill

Reinforcement to suit Structural Engineers design

Reinforcement to suit Structural Engineers design

Wire loop connections

Wire loop connections

Bison precast concrete Hollow Core slab

Bison precast concrete Hollow Core slab Bison precast concrete Hollow Core slab

150 mm wide perforated pocket along the edge Bison precast concrete of slab unit at 1200 mm Hollow Core slab centre swith 10 mm dia. U bar per socket

150 mm wide perforated pocket along the edge of slab unit at 1200 mm centre swith 10 mm dia. U bar per socket

175 mm

175 mm

150 mm

150 mm

45
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BUILDING REGULATIONS

PART A STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
CLAss 1 ANd 2A BUILdINGs Apartments and other residential buildings not exceeding 4 storeys. This type of building uses the friction and built-in details to achieve tying requirements.

TYPICAL SECTION EXTERNAL STEELWORK DETAILS

In-situ concrete stitch

In-situ concrete stitch

In-situ concrete stitch

Continuous wet mortar by Builder, to take up camber

Continuou camber

by Builder,

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison precast concrete Hollow Core slab unit

Bison prec Core slab

concrete H

In-situ concrete stitch

In-situ concrete stitch 150 mm wide perforated

150 mm w

Reinforcement to suit Structural Engineers design welded to top In-situ concrete stitch Shear stud In-situ concrete stitch Shear stud flange of steel beam at trough bottom

Reinforcement to suit Structural Engineers design welded to top flange of steel beam at trough bottom

Reinforcement to suit Structural Engineers design welded to top trough bottom

pocket along the edge of slab unit at 1200 mm centreswith 10 mm dia.

pocket alo

of slab uni

centreswith

flange of steel beam at U bar per socket

U bar per

Bison precast concrete Hollow Core slab unit Reinforcement to suit design

Bison precast concrete Hollow Core slab unit Bison precast concrete Bison precast concrete Hollow Core slab units with preformed troughs for tying requirements Bison precast concrete Bison precast Hollow Core slab units concrete Hollow with preformed troughs Core slab unit for tying requirements Continuous wet mortar, by Builder, to take up camber mortar, by to take up Reinforcement to suit Structural Engineers design In-situ concrete stitch In-situ concrete stitch In-situ concrete stitch

Bison prec Core slab

46 Structural Engineers

Hollow Core slab units with preformed troughs for tying requirements

concrete H

Continuou

For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

05
by Builder, to take camber

PART A STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
In-situ concrete stitch

In-situ concrete stitch

In-situ concrete stitch


Continuous wet mortar by Builder, to take up camber

Continuous wet mo

CLAss 2B BUILdINGs (Horizontal and Vertical Ties) Flats, apartments and other residential buildings greater than 4 storeys but not exceeding 15 storeys.

CLAss 3 BUILdINGs (Horizontal and Vertical Ties + Risk Assessment)


Bison precast concrete Hollow Core slab unit precast precast precast All buildings defined Bison above as Class 2A and 2B that exceed theBison limits on area and/or number ofBison storeys. concrete Hollow Core slab unit
Bison precast

Bison precast concrete Hollow Core slab unit


concrete Hollow Core slab unit

concrete Hollow Core slab unit

concrete Hollow Bison precast Core slab unit

concrete Hollow Core slab unit

These types of buildings require horizontal and vertical ties which are provided by the steel frame. Additionally the floors must be tied to the steelwork at the perimeter and to each other for internal supports. Additional internal tying of the floor to the steelwork is required where the frame is used for bracing.

TYPICAL SECTION EXTERNAL STEELWORK DETAILS


In-situ concrete stitch

In-situ concrete stitch

Reinforcement to suit Structural Engineers design welded to top flange of steel beam at trough bottom

Reinforcement to suit Structural Engineers design welded to top flange of steel beam at trough bottom

In-situ concrete stitch Shear stud

In-situ concrete stitch Shear stud

150 mm wide perforated Reinforcement to suit pocket along the edge Structural Engineers of slab unit at 1200 mm design welded to top centreswith 10 mm dia. flange of steel beam at U bar per socket trough bottom

150 mm wide perfo

pocket along the e

of slab unit at 1200 U bar per socket

centreswith 10 mm

Bison precast concrete Hollow Core slab unit Reinforcement to suit Structural Engineers design

Bison precast concrete Hollow Core slab unit


Bison precast concrete In-situ concrete stitch

In-situ concrete stitch

In-situ concrete stitch

Bison precast concrete Hollow Core slab units with preformed troughs for tying requirements

precast Bison precast Bison concrete concrete Hollow Core slab units Hollow Core slab unit with preformed troughs

Bison precast concrete Hollow Core slab unit Continuous wet mortar, by Builder, to take up camber

Reinforcement to suit Structural Engineers design

Hollow Core slab units with preformed troughs for tying requirements

for tying requirements Continuous wet


mortar, by Builder, to take up camber

47
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BUILDING REGULATIONS

PART E
CONSTRUCTION SOLUTIONS
The Building Regulations Part E:2003 and the subsequent amendment May 2004 give guidance to the requirements for the resistance to the passage of sound. For new build attached dwellings, two approaches may be made. Part E allows the developer to choose between Pre Completion Testing (PCT) or, if available, a Robust Detail (RD) may be used by registering plots with Robust Details Ltd. The Pre Completion Testing (PCT) and the Robust Detail (RD) requirements are given below.

Building Regulations Approved Document Part E Airborne sound: Walls Floors Impact sound: Floors max 62 dB max 64 dB termed LnT,w New Build min 45dB min 45 dB Change of use min 43dB min 43dB termed DnT,w +Ctr

Robust Detail requirements (new build attached dwellings only) Airborne sound: Walls Floors Impact sound: Floors max 60 dB max 57 dB termed LnT,w Min/Max min 47dB min 47 dB Mean min 50dB termed DnT,w +Ctr

48
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

05

PART E
CONSTRUCTION SOLUTIONS
TYPICAL SOUND ATTENUATION DETAIL

Min. 100mm thick blockwork medium density (1350-1600kg/m3) Yelofon E-strip acoustic edge strip Nominal 8mm thick parge coat 65mm thick sand/cement screed or 40mm thick proprietary screed, nominal 80kg/m2 mass per unit area Flexible cavity closer

10mm Yelofon HD10+ 200mm

100mm min. 200mm deep Bison Hollow Core slab units (300kg/m2) Gypsum-based board (nominal 8kg/m2) mounted on dabs on cement/sand render (nominal 8mm) with scratch finish 100 75 100

275mm min.

49
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BUILDING REGULATIONS

PART E MASONRY BUILDINGS


CONSTRUCTION SOLUTIONS
ROBUST DETAILS SEPARATING FLOOR - CONCRETE E-FC-1
1 2 3 4 PRECAST CONCRETE HOLLOW CORE FLOOR SLAB, SCREED 1. FLOAtING FLOOR See section 4 (Robust Details Handbook) for suitable floating floor treatment. 2. SCReed 40mm (min) screed directly applied to Hollow Core floor slabs - sand/cement or proprietary screed nominal 80 kg/m2 mass per unit area, see Appendix A (Robust Details Handbook).

3. StRUCtURAL FLOOR 150mm (min) precast concrete Hollow Core oor slab - 300kg/m2 mass per unit area. 4. CeILING See section 3 (Robust Details Handbook) for suitable ceiling treatment.

ROBUST DETAILS SEPARATING FLOOR - CONCRETE E-FC-4


1 2 3 4 PRECAST CONCRETE HOLLOW CORE FLOOR SLAB, SCREED LAID ON ISORUBBER RESILIENT LAYER 1. SCReed 65mm (min) sand/cement screed, or 40mm (min) proprietary screed, nominal 80kg/m2 mass per unit area. 2. ResILIeNt LAYeR 6mm IsoRubber layer with IsoEdge flanking strip. 3. StRUCtURAL FLOOR 150mm (min) precast concrete Hollow Core floor slab - 300kg/m 2 mass per unit area. 4. CeILING See section 3 (Robust Details Handbook) for suitable ceiling treatment which is dependent on floorplank depth and supporting wall density. The requirements for a robust detail are taken from the Robust Details Part E Handbook. The latest requirements should always be sought from Robust Details Ltd.

50
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

05

PART E MASONRY BUILDINGS


CONSTRUCTION SOLUTIONS
ROBUST DETAILS SEPARATING FLOOR - CONCRETE E-FC-5
1 2 3 4 PRECAST CONCRETE HOLLOW CORE FLOOR SLAB, SCREED LAID ON ISORUBBER RESILIENT LAYER 1. SCReed 65mm (min) sand/cement screed, or 40mm (min) proprietary screed, nominal 80kg/m2 mass per unit area. 2. ResILIeNt LAYeR YELOfon HD10+ with E-strip perimeter edging and J-strip tape for jointing. 3. StRUCtURAL FLOOR 150mm (min) precast concrete Hollow Core floor slab - 300kg/m 2 mass per unit area. 4. CeILING See section 3 (Robust Details Handbook) for suitable ceiling treatment which is dependent on floorplank depth and supporting wall density.

51
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

4 5 6 7

14 15 16 17

BUILDING REGULATIONS

PART E STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
TYPICAL DETAIL MASONRY WALLS
INTERNAL SEPARATING FLOOR AND WALL
335 mm min. 275 mm min. 30 min. 100 74 100 30 min.

TYPICAL DETAIL STUD WALLS


INTERNAL SEPARATING FLOOR AND WALL
335 mm102 min. 100 100 30 min.

9 10 11 12 13
150 150 min. Bison Units 100 200 min. Bison Units 30 min.

275 mm min.

9 10 11 12 13

11 12 13 14
150 150 min. Bison Units 100 200 min. Bison Units 100 200 min. Bison Units

1 2

100

74 100

30 min.

1 2 3

1 2 3

3
150 150 min. Bison Units

4 5 6 4 5 6 7 8 7 8 9 10 14 15 16 17

100 200 min. Bison Units

4 5 6 7 8

14 15 16 17

15 16 17 18 19

1 Yelofon E-strip acoustic edge strip (by Cellecta). 2 Minimum 40mm thick Gyvlon Screed (by Lafarge). 3 Minimum 10mm Yelofon HD 10+ (by Cellecta). 4 Min. 12.5mm thick Lafarge Gypsum based ceiling

335 mm min. board (min. 8kg/m2) suspended from a proprietary 9 275 mm min. support system.

10 Nominal 8mm thick parge coat (by Lafarge). 11 12.5mm thick Echeck wallboard (by Lafarge). 12 Skirting board. 13 Yelofon J-strip acoustic jointing tape (by Cellecta).
30 14 150 or 200mm min. deep Bison Hollow Core min. 102 100 100

11 12 13 14
150 150 min. Bison Units

100 74 100 30 30 5 Acoustic quilt (by min. Rockwool). min.

10 11 12 13
150 150 min. Bison Units 100 200 min. Bison Units

2 floor units (300kg/m ). 1

6 Soft joint. 7 Compressible filler board. 8 Proprietary sliding brick anchor system.
1800 -2300g/m3.
3 2

15 Grouted void between P .C. units. 2 16 12.5mm thick Echeck wallboard (by Lafarge)
encasement to steelwork. Restrained via proprietary framing system. 3 17 12.5mm thick Echeck wallboard (by Lafarge) 4 tacken up to u/side of floor providing 1.0 hour fire protection to 5 steelwork.
6

9 Min. 100mm thick blockwork (medium density)

52

4 5

14 15 7

15 16 17 18 19

8 6 16 For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk 9 7 17 10 8

6 4 5 6 7 8 14 15 16 17 7 8 9 10 15 16 17 18 19

SECTION

05

PART E STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
TYPICAL DETAIL MASONRY WALLS
EXTERNAL WALL AND SEPARATING FLOOR
335 mm min. 102 275 mm min. 30 min. 100 100 30 min.

TYPICAL DETAIL MASONRY WALLS


EXTERNAL WALL AND SEPARATING FLOOR
102 100 100 30 min.

11 12 13 14
150 150 min. Bison Units 100 200 min. Bison Units

11 12 13 14
150 150 min. Bison Units 100 200 min. Bison Units

1 100 2

74 100

30 min.

10 11 12 13

1 2

1 2 3

3
150 150 min. Bison Units 100 200 min. Bison Units

3 4 5 6

4 5 6 4 5 6 7 8 7 8 9 10 14 15 16 17

15 16 17 18 19 7 8 9 10

15 16 17 18 19

1 Yelofon E-strip acoustic edge strip (by Cellecta). 2 Minimum 40mm thick Gyvlon Screed (by Lafarge). 3 Yelofon J-strip acoustic jointing tape (by Cellecta). 4 Flexible cavity closer.
100 100 30 5 Acoustic 102 quilt (by Rockwool). min.

13 Skirting board. 14 Min. 10mm Yelofon HD10+ (by Cellecta). 15 Min. 12.5mm thick Lafarge Gypsum based ceiling
board (min. 8kg/m2) suspended from a proprietary support system. floor units (300kg/m2). encasement to steelwork. Restrained via proprietary framing system. taken up to u/side of floor providing 1.0 hour fire protection to steelwork. 1800 -2300g/m3.

11 12 13 14
150 150 min. Bison Units 100 200 min. Bison Units

16 150 or 200mm min. deep Bison Hollow Core


6 Compressible filler board. 1


2 joint. 7 Soft

17 2 No. layers of Echeck wallboard (by Lafarge)

8 External leaf. 9 Proprietary sliding brick anchor system.


3

18 12.5mm thick Echeck wallboard (by Lafarge)

10 Proprietary wall ties in accordance with approved



4 document E (2003), section 2. 5 11 Nominal 8mm thick parge coat (by Lafarge). 6 12 12.5mm thick Echeck wallboard (by Lafarge). 15 7 16

19 Min. 100mm thick blockwork (medium density)

53

8 17 For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334 9 18 10 19

4 5 6 7 8

12 13 14

15

BUILDING REGULATIONS

PART E STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
TYPICAL DETAIL STUD WALLS
INTERNAL SEPARATING FLOOR AND WALL

TYPICAL DETAIL STUD WALLS


INTERNAL WALL AND SEPARATING FLOOR

1 2 3

9 10 11
150 150 min. Bison Units 100 200 min. Bison Units

1 2 3

1 2 3 4 5 6 7

10 10 11 11
150 150 100 200 min. Bison Bison Units Units min. 150 150 min. Bison Units 150 150 min. Bison Units 100 200 min. Bison Units 100 200 min. Bison Units

4 5 6 7 8

12 13 14

4 5 6 7

12 12 13 13 14 14 15 15 16 17 18

15

1 Yelofon E-strip acoustic edge strip (by Cellecta). 2 Minimum 40mm thick Gyvlon Screed (by Lafarge). 3 Minimum 10mm Yelofon HD 10+ (by Cellecta). 4 10mm Aerofoil isolation layer. 5 Min.112.5mm thick Lafarge Gypsum based ceiling 9
board (min. 8kg/m2) suspended from a proprietary 2 10 support system.
3 11
150 150 min. Bison Units 100 200 min. Bison Units

9 RSP 38 modified Lafarge stud system studs.


Two 50mm C studs at 600mm centres. Facings. 2 layers Lafarge 15mm dBcheck wallboard both sides. Insulation. 3 50mm glass mineral wool density 19.5 kg/m9 . 1
10

10 Timber sole 2 plate.

6 Acoustic quilt. 7 Deflection Tolerance. 8 RSP 38 modified Lafarge stud system.


4 5 6 7 8

3 11 11 Yelofon J-strip acoustic jointing tape (by Cellecta). 4 12 150 or 200mm min. deep Bison Hollow Core

5 (300kg/m 2). floor units

6 13 Grouted void between P .C. units.

12 13 14

14 12.5mm thick Echeck wallboard (by Lafarge)



8 to steelwork. Restrained via encasement proprietary framing system. 12 13 14 15

15 Deflection head detail.

15

16 17 18

54
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

4 5 6 7 8

12 13 14

12 13 14 15

15

16 17 18 SECTION

05

PART E STEEL FRAMED BUILDINGS


CONSTRUCTION SOLUTIONS
TYPICAL DETAIL STUD WALLS
EXTERNAL SEPARATING FLOOR AND WALL

TYPICAL DETAIL STUD WALLS


EXTERNAL WALL AND SEPARATING FLOOR

1 2 3

1 2 3 4 5 6 7

9 10 11

9 10 11
150 150 min. Bison Units 100 200 min. Bison Units 150 150 min. Bison Units 100 200 min. Bison Units

1 2 3 4 5 6 7

9 10 11
150 150 min. Bison Units 100 200 min. Bison Units

4 5 6 7 8

12 13 14

12 13 14 15

12 13 14 15 16 17 18

15

16 17 18

1 Tyvek breather membrane 12.5 moisture resistant


wallboard and 36mm polyfoam plus.

10 Skirting board. 11 Minimum 40mm thick Gyvlon Screed (by Lafarge). 12 Minimum 10mm Yelofon HD 10+ (by Cellecta). 13 150 or 200mm min. deep Bison Hollow Core
floor units (300kg/m2). board (min. 8kg/m2) suspended from a proprietary support system. encasement to steelwork. Restrained via proprietary framing system.

2 Yelofon E-strip acoustic edge strip (by Cellecta). 3 Yelofon J-strip acoustic jointing tape (by Cellecta). 4 Timber sole plate. 5 10mm Aerofoil isolation layer. 6 Flexible cavity closer. 3 7 Acoustic quilt (by Rockwool). 4
5 8 External cladding 102mm brick or 100mm 2 1 9 10 11
150 150 min. Bison Units 100 200 min. Bison Units

14 Min. 12.5mm thick Lafarge Gypsum based ceiling

15 2No. layers of Echeck wallboard (by Lafarge)


block 6 + 16mm render.

9 Lafarge stud system studs. 7

16 Deflection tolerance. 17 Deflection head detail. 18 Lafarge stud system (see above).

CS90/Y Lafarge C studs at 600mm centres. 8 12 Facings. 13 1 layer Lafarge 12.5mm firecheck wallboard 14 on 1 layer 12.5mm vapourcheck wallboard. Insulation. 15 90mm rockwool flex.
16 17 18

55

For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

1 2 3

8 9 10
150 150 min. Bison Units 100 200 min. Bison Units 100 200 min. Bison Units 150 150 min. Bison Units 150 150 min. Bison Units 100 200 min. Bison Units 100 200 min. Bison Units

BUILDING REGULATIONS

4 5 6

11 12 13

PART E CONCRETE WALLS


CONSTRUCTION SOLUTIONS
TYPICAL DETAIL SECTION
A TYPICAL INTERNAL SEPARATING WALL
7 1 2 3 8 9 10
150 150 min. Bison Units 100 200 min. Bison Units 175 mm

TYPICAL DETAIL SECTION


A TYPICAL INTERNAL SEPARATING WALL
102 100 150

7 8 8 9 10
150 150 min. Bison Units

1 2 3 1 2 3 4 5 4 5 6 6 7

9 10

4 5 6

11 12 13

11 12 13

11 12 13 14

175 mm

175 mm 150 mm

1 Yelofon E-strip acoustic edge strip (by Cellecta). 2 Minimum 40mm thick Gyvlon Screed 7 (by Lafarge). 3 Minimum 10mm Yelofon HD 10+ (by 8 Cellecta). 1 4 Min. 2 12.5mm thick Lafarge Gypsum 9based ceiling
board (min. 8kg/m2) suspended from a proprietary 3 10 support system.
150 150 min. Bison Units

8 Dry pack mortar. 9 Skirting board.


102 100 150

10 Yelofon J-strip acoustic jointing tape (by Cellecta). 8 11 150 or 200mm min. deep Bison Hollow Core 1 9
floor units (300kg/m2). 2 12 In-situ concrete infill. 3 13 3mm Plaster skim on 4 15mm Lafarge wallboard 5 furring channel on dabs 12mm Metal 35mm cavity with 6 25mm mineral fibre. 7
10

5 Acoustic sealant. 6 175mm thick concrete wall. 7 3mm Plaster skim on



4 15mm 12mm 5 35mm 6 25mm 11 Lafarge wallboard Metal furring channel on dabs 12 cavity with 13 mineral fibre.

100 200 min. Bison Units

11 12 13 14

175 mm

150 mm

56
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

7 1 2 3 8 9 10
150 150 min. Bison Units 100 200 min. Bison Units

102

100

150

8 1 2 3 4 5 6 7 9 10
150 150 min. Bison Units 150 150 min. Bison Units

SECTION
11 12 13 14

4 5 6

11 12

05

PART E CONCRETE WALLS


CONSTRUCTION SOLUTIONS
175 mm 150 mm

13

TYPICAL DETAIL SECTION


THROUGH A TYPICAL EXTERNAL WALL

TYPICAL DETAIL SECTION


THROUGH A TYPICAL EXTERNAL WALL

102

100

150

7 8 8 9 10
150 150 min. Bison Units 100 200 min. Bison Units 150 150 min. Bison Units 100 200 min. Bison Units

102

100

150

1 2 3 1 2 3 4 5 4 5 6 6 7

8 1 2 3 4 5 6 7 11 12 13 14 9 10
100 200 min. Bison Units

9 10

11 12 13

11 12 13 14

175 mm

150 mm

150 mm

1 Yelofon E-strip acoustic edge strip (by Cellecta). 2 Yelofon J-strip acoustic jointing tape (by Cellecta).
102 100 150 3 Dry pack mortar.

8 3mm Plaster skim on


15mm 12mm 35mm 25mm Lafarge wallboard Metal furring channel on dabs cavity with mineral fibre.

4 Flexible cavity closer. 5 In-situ concrete inll. 6 150mm concrete wall. 7 3mm Plaster skim on

4 15mm 12mm 5 35mm 6 25mm 7 3 2 1

8 9 10
150 150 min. Bison Units 100 200 min. Bison Units

9 Skirting board. 10 Minimum 40mm thick Gyvlon Screed (by Lafarge). 11 Minimum 10mm Yelofon HD 10+ (by Cellecta). 12 150 or 200mm min. deep Bison Hollow Core
floor units (300kg/m2). board (min. 8kg/m2) suspended from a proprietary support system.

Lafarge wallboard Metal furring channel on dabs cavity with 11 mineral fibre.
12 13 14

13 Min. 12.5mm thick Lafarge Gypsum based ceiling

14 Acoustic sealant.

150 mm

100 200 min. Bison Units

57
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

TECHNICAL SPECIFICATIONS & HEALTH AND SAFETY

BISON PRECAST FLOORING


SPECIFICATIONS
MANUFACTURE 1.1 1.2 1.3 1.4 1.5
Bison floors are manufactured by the long line prestressed method using slip form or extrusion techniques. The units are cast on heated steel beds within an enclosed factory environment. The materials used in the manufacture of Bison floors comply with the relevant British Standard for that material. An air entraining agent complying with BS EN 934-2-2001 is included in the concrete mix to improve workability. Reinforcement is generally 5mm diameter high tensile wire or 12.5mm diameter strand complying with the requirements of B.S.5896:1980. Bison units are sawn to length on the manufacturing bed and are supplied as standard with plain sawn ends with open cores.

DIMENSIONS 2.1
Bison units are manufactured in nominal sizes as follows : Standard nominal width of all units is 1200mm. Solid : Depth 75mm 100mm Hollow : Depth 150mm 200mm 260mm 300mm 250mm 400mm 450mm Cross-sectional tolerances are within the limits set out in clause 6.2.8.3. of B.S. 8110:1997. Length tolerances are 20 mm. Bison units will have an upward camber due to pre-stressing as described in clause 6.2.8.4. of B.S.8110:1997. Edges are shaped to form a grout joint giving a shear key to distribute load to adjacent units. Where non-standard widths are provided the edge will be rough cut from a standard unit.

2.2 2.3 2.4

FINISHES 3.1
Concrete surface finish to soffit is Type A finish as described in clause 6.2.7.3. of B.S.8110:1997. The soffit is suitable for the direct application of a textured paint finish where this is applied in accordance with the manufacturers instructions. Where a plaster finish is intended it may be necessary to use a bonding agent in accordance with the instructions of the plaster manufacturer. Plaster finishes are not recommended on longer spans.

3.2 3.3

Sides and top surfaces are as extruded as described in Table 5.5 of B.S.8110:1997. Units may accumulate water within the cores due to exposure during the construction programme. The General Contractor should drill weep holes as necessary, or keep them clear where they are provided during manufacture.

58
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

06

BISON PRECAST FLOORING


SPECIFICATIONS
DESIGN 4.1 4.2 4.3 4.4
The design of Bison units is in accordance with the requirements and recommendations of B.S.8110:1997 The Structural Use of Concrete. Load/Span capacity : The reinforcement pattern within a Bison section will vary according to the design loading specified. EXposure Condition : The standard Bison section is suitable for a XCI exposure classification as defined in Table 3.2 of BS 8500:2002. Other exposure classes can be adopted subject to design approval from Bison Technical Department. Fire Resistance : Fire resistance is based upon the tabulated data contained within B.S. 8110 Part 2 Section 4. Sections are available for fire periods of 1 hour or 2 hours, without the addition of further finishes.These periods of fire resistance may be further enhanced by the application of appropriate finishes. Serviceability : The standard Bison section is designed to meet the criteria of Class 3 as set out in clause 4.1.3 of B.S.8110.1997 Designs to Class 1 and Class 2 are available if required. Sound Insulation : The requirements of The Building Regulations are that a floor construction incorporating the use of precast concrete units should have a minimum mass which is dependent upon whether the finishes to the top surface are directly applied or are on a separating layer. The mass of Bison unit sections are given in the technical data and are net weights of standard hollow sections. HoriZontal & Vertical Ties : Ties necessary to satisfy the requirements for accidental damage should be specified by the Engineer with responsibility for the design of the overall structure in accordance with the Code of Practice.

4.5 4.6 4.7

4.8 Bearings : Level and structurally adequate bearings for Bison precast units should be provided by other contractors. These should generally be 100 mm for masonry or 75 mm for concrete or steelwork, but may be reduced in accordance with clause 5.2.3 of B.S.8110:1997. 4.9 Holes : Small holes up to 60 mm diameter may be drilled on site through the Hollow Cores, care being taken to avoid damage to the reinforced ribs. Larger holes may be cut subject to the design capacity of the slab. 4.10 Grouting : Joints between units should be grouted with a 30 N/mm2 concrete using a 6 mm nominal aggregate size. 4.11
Propping : Where the slab design requires site propping, this should be carried out in strict accordance with the Bison drawings.

59
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

TECHNICAL SPECIFICATIONS & HEALTH AND SAFETY

BISON PRECAST FLOORING


SPECIFICATIONS
QUALITY ASSURANCE
Bison operates a Quality Management System which complies with the requirements of ISO 9001: 2000 for the following scope: design, manufacture and erection of ancillary cube products (including reinforced and normally reinforced concrete). Prestressed floor units are subject to end product testing. Prestressed and ancillary concrete is subject to full design approval, traceable to current codes of practise statutory/regulatory requirements. All Bison U.K. factories have been assessed by the British Standards Institution (B.S.I.) and awarded Certificates of Assessed Capability under the scheme covering Quality Assurance for the manufacture of precast concrete floors. As a customer, you can be sure that all aspects of our production, design detailing and quality control have been independently inspected and have achieved the high level of competence and quality required by the British Standards Institution. The company maintains a policy of continuous development, and reserves the right to change specification and details without prior notice.

FM 00011

BISON PRECAST FLOORING


HEALTH & SAFETY
This information must be read in conjunction with: Health , Safety & Welfare Attendances (supply & erect only). C.O.S.H.H information sheet Precast Elements. Unit weight table. Information sheet: Lifters & Chains, supplier hire or purchase. Technical Information Sheet, Handling & Fixing Instructions for: Sheet No. Sheet No. Sheet No. Sheet No. Sheet No. Sheet No. TI/304/10 TI/304/11 TI/304/12 TI/304/13 TI/304/15 TI/304/16 Hollow Core Solid Composite Precast Elements Prestressed Housebeam & Deepbeam Bison Precast Stairs & Landings Floor products with cast-in lifters Trailasafe

The Bison website www.bison.co.uk contains detailed information and data sheets on all products. Alternatively call the Health & Safety Department at our Burton office Tel 01283 495000 .

60
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

06

BISON PRECAST FLOORING


HEALTH AND SAFETY
Safety Dos & Donts
The dos & donts listed below are by no means fully exhaustive-you should also refer to the current issue of the Precast Flooring Federation Code of Practice available on Tel 0116 253 6161. Do not alter the product without written permission from Bison Design Office, altering the product may compromise its structural integrity and lead to failure. This includes notching, hole forming, shortening, narrowing the unit etc. Do not alter the product in-situ, any permissible alterations must be completed on a flat stable platform. i.e. on the ground or floor area. Do not allow anyone to walk or work beneath the product whilst it is being hoisted or suspended. Do not work in areas without the appropriate perimeter edge protection, handrails, guardrails, platforms or stages. Do not access working areas without properly constructed, maintained, secured and illuminated, stairways, ramps, ladders or the like. Where lifting hooks are specified within a contract, do hoist the units by crane using ALL the lifting points in the top surface provided for that purpose. Prior to lifting safety chains must be loosely slung around the underside of the unit. The safety chains may only be released immediately before the slab is placed in its final position. For insurance purposes, Bison do not supply or hire lifters or chain sets. Please refer to our information sheets for details of supplier hire or purchase. Do not run plant or store equipment on the precast floor before it is grouted and cured. Once cured do not exceed the loads specified by the engineer. Do use a passive fall protection system wherever reasonably practicable considering all heights where the potential fall distance could result in an injury. Do ensure that perimeter edge scaffolding is positioned no more than 900mm below the bearing level particularly on masonry construction. Do ensure all voids created whilst placing units are adequately protected during and after erection. Do ensure all brickwork, blockwork or concrete is adequately cured, stable and fit to receive precast concrete units, and that steelwork is stable. Do ensure the stability of support beams, lintels etc. is considered, particularly the rotation of support member due to unequal loading. Do ensure you include allowance for site handling by referring to the unit weight table. Do ensure that all lifting equipment is supplied, used and inspected in accordance with current legislation. Do ensure all lifting operations are completed and in accordance with current legislation. Do wear adequate personal protective equipment (PPE) whilst handling or cutting concrete. NOTE; Due to the principle constituents of cement, the liquid released whilst drilling drainage points etc is likely to have a caustic effect on the eyes and skin. For further information or to obtain the latest issue COSHH data sheet for cement call our Health & Safety Department at our Burton office Tel 01283 495000.

61
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

RELATED PRODUCTS

Lifting hook being loaded into machine.

From transport to nal position with ease and speed.

Bison Lifting Hooks


This is a unique system from Bison, available with our Hollow Core flooring. The hooks are machine inserted during the production process, for which Bison holds the European patent. The hooks enable faster, safer and more accurate erection. They also offer cost savings by minimising damage to soffit and blockwork bearings.

HEATED AND COOLED SLABS


Bison and velta have joined forces to provide an innovative, sustainable and cost effective oor heating and cooling system which is precast in to Bison ooring products.

DESIGN
The system utilises low temperature water for heating and high temperature water for cooling to condition a building, which provides the opportunity to use renewable energy sources. A sustainable alternative, which can significantly reduce CO2 emissions over the life of the building. Substantial savings in investment, maintenance and operational costs, compared to conventional air-conditioning systems. The requirements for flexible space utilisation and variable partitioning are easily met. Clear benefits to occupants, no noise and no draughts, producing a comfortable and productive environment.

MANUFACTURING
Precast concrete elements are designed and constructed in the factory with a velta PE-Xa pipe matrix cast directly into the precast slab or Hollow Core unit to offer a combined heating and cooling solution. This service covers the design, off-site manufacture and installation of precast, pre-stressed Hollow Core ooring, precast multi-storey wall panel structures and other bespoke solutions with an in built heating and cooling capability.

CONSTRUCTION
Off-site production reduces construction programmes and improves quality control. Elimination of suspended ceilings can reduce building

62

height and lower construction costs.

For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

07

HEALTH AND SAFETY PRODUCTS


Health and Safety is a major concern for Bison, and we have developed a range of methods and systems which help to ensure that anyone using Bison products can do so with minimal risk to themselves or others.

Trailasafe
Trailasafe is designed to prevent or mitigate injuries resulting from falls from trailer decks. Comprising synthetic mesh suspended from a series of brackets housing support arms, the system arrests the fall of personnel, absorbing the energy of their descent and ensuring their safety. Fully demountable, the system can be stored within the vehicle or at the unloading point.

THE BISON AIR MAT


The Bison Air Mat system has been tested by the BRE and approved by the HSE. The Bison Air Mat system comprises a series of interconnected and interlinked mats available in a wide range of standard sizes. Using a combination of modules they will accommodate almost any floor area. Where the edges of an area to be protected are open, or have large vertical voids that may pose the hazard of roll-off fall to a lower area, special parapet and corner mats can be provided.

Hole Covers
Voids such as service holes, formed in precast oor units are trip hazards and have the potential to cause serious injuries. Bisons solution is the Hole Filler: a strong yet slimlined product which is suitable for most holes. The yellow, anti-slip cover is fully reusable and comes in two sizes, 250mm or 350mm square. Each may be either screwed down or tted without the need for power tools, by spreading the unit legs, locking it into position.

63
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BISON ONLINE

www.bison.co.uk
For further information on Bison Precast Concrete Flooring and the full range of Bison products and services, visit www.bison.co.uk or call the Bison sales team on 01283 495000

64
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

08

FLOORS
HOLLOW CORE FLOORS HOLLOW CORE COMPOSITE FLOORS SOLID COMPOSITE FLOORS

BEAM AND BLOCK FLOORS

COMPOSITE STEEL BEAM DESIGN

HOLLOW CORE INSULATED FLOORS

FRAMES

STADIA

STAIRS

HEALTH AND SAFETY


LIFTING HOOKS TRAILASAFE AIR MATS

65
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BISON NOTES

66
For EXTENSIVE TECHNICAL DETAILS PLEASE VISIT oUr WeBsite: www.bison.co.uk

SECTION

09

67
For fUrther HELP AND INFORMATION PLEASE CALL OUR TECHNICAL HELP LINE: 01283 495334

BISON CONCRETE PRODUCTS Ltd Millennium Court, First Avenue, Centrum 100, Burton-Upon-Trent DE14 2WR Telephone: 01283 495000 Facsimile: 01283 544900 Email: concrete@bison.co.uk Web: www.bison.co.uk

OTHER BROCHURES AVAILABLE Staircases Stadia Products Crosswalls Lattice Flooring Beam & Block Flooring Safety Systems

Printed on 100% recyclable paper using vegetable based inks

All dimensions and illustrations in this publication are intended for guidance only and shall not constitute a sale by description. All dimensions given are nominal and Bison Limited may modify and change the information, products and specifications from time to time for a variety of reasons without prior notice. The information printed in this publication at the time of going to print, to the best of our knowledge, is correct and is not intended to have any legal effect, whether by way of advice, representation or warranty (express or implied). We accept no liability whatsoever (to the extent permitted by law) if you place any reliance on this guide you must do so at your own risk. All rights reserved. Copyright in this publication belongs to Bison and all such copyright may not be used, sold, copied or reproduced, in whole or part, in any manner or in any media to any person without prior written consent.

August 2007

S-ar putea să vă placă și