Documente Academic
Documente Profesional
Documente Cultură
DATE:
TEAM LEADER
LEGEND:
TIME PROCESS STEP
Manual Automatic Walk
MANUAL WALK AUTO
Element #
Step #
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
TOTAL
LEGEND:
TIME PROCESS STEP
Manual Automatic Walk
MANUAL WALK AUTO
Operator # A A A A A A A
Step # 1 2 3 4 5 6 7
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
12 6 16 3 4 4 50
19
Clean the surface ST 1 clean and insert valve ST 1 fix the jig plate ST 1 fix the small jig plate (P3) ST3 switch on the ST 3 insert nip on ST4 (P4)
45
2 6
TOTAL 95
64
12
107
-107
LEGEND:
TIME PROCESS STEP
Manual Automatic Walk
MANUAL WALK AUTO
Operator # B B B B
Step # 1 2 3 4
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
Load & Switch on stem seal presing machine ST 5 Spring retainer, intake & exhaust valve assembly Leak test unload + Record+Load +Record Load & press the valve lock
5 16 8 32
14
1 3
25 10
3 3
TOTAL 61
49
10
71
-71
LEGEND:
TIME PROCESS STEP
Manual Automatic Walk
MANUAL WALK AUTO
Operator # C C C
Step # 1 2 3
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
66 27 17
TOTAL 110
10
120
-120
A B C
Manual 95 61 110
ST 1 ST 2 ST 3 ST 4 ST 5 ST 6 ST 7 ST 8 ST 9 ST 10 ST 11 ST 12 Total
Manual 34 11 50 5 16 32 8 66
M/C 19 45 14 25 35 25 25 188 Total Manual time/TT 309/119 2.596639 Takt time AVT/CD AVT 475 Mins CD 40 Engines 240 CH TT
Unload
12 4(4)
11 0
10 7(2)[2]
9 0
8 0
7 1(1)
A B C
140 120 100 80 60 40 20 0 -20 A
Manual 95 61 110
120 100 80 60 40 20 0
Manual+Walk A C
6 2
5 0
4 2(2)
3 0
2 0
1 2
Load
1 Load
8 A C
10
11 Manual 89 109
12 Unload
1 Load
10
11 Manual 89 109
12 Unload