1) Introduction 2) Master Data 3) Testing 1 - Create Purchase Order 2 - Create Inbound delivery
3 - Confirm TO
4 - Post Goods receipt 5 - Inspection Lot processing/Usage Decision 6 - Post the Inspection Lot from (Quality)Blocked to Unrestricted-use
2 2 3 3 4 7 8 8 13
1 / 15
www.rglconsultancy.nl
This document demonstrates QM testing using warehouse DE1 with HUM(storage location 2000). With regard to master data only the differences with the document QM master data & testing non-HUM are shown.
2 / 15
www.rglconsultancy.nl
3) Testing
For testing use will be made of warehouse DE1 with storage location 2000 and material QS6X20.
3 / 15
www.rglconsultancy.nl
In the tab Where on item level the Stock type should have been automatically set to 2 Quality inspection. The Purchase Order Data tab shows:
4 / 15
www.rglconsultancy.nl
Click on button
and indicate that the goods comply with the shipping instructions.
Click on <enter> or Choose Instruction complied with : Choosing Instruction not complied with is also an option which will not stop the process at this point. Than select Item OK: Next click on button Inbound delivery (180000231) is created and is shown at the screen bottom. Note that the material document is not yet created at this point, because the goods receipt is done with the inbound delivery after confirmation of the stock transfer order. If we check the document flow of inbound delivery 180000231, we see that the HU and a transfer order has been created automatically.
5 / 15
www.rglconsultancy.nl
If we display the HU and go to tab History we see that inspection lot 3719 was created and assigned to the HU. Position the cursor on the line with the handling unit and then click on button
Double click on the Inspection lot no. and go to tab Insp. Lot quantities to check the sample size.
6 / 15
www.rglconsultancy.nl
Go back to the document flow, position the cursor on the line with the transfer order and then click on
button
3 - Confirm TO: Call up the transaction as follows: Logistics Sales and Distribution Shipping and Transportation Picking Menu Path Confirm Transfer Order Single Document In One Step Transaction Code LT12
Click on button
7 / 15
www.rglconsultancy.nl
Enter inb. Delivery no. and then click on button Display the material document: Call up the transaction as follows: Logistics Sales and Distribution Shipping and Transportation Menu Path Outbound Delivery Display Transaction Code MB03 Enter material. Doc. No., fiscal year and then click on button
8 / 15
www.rglconsultancy.nl
Except from exploring the HU we can also find any inspection lot no. by just running the Bin overview report. Call up the transaction as follows: Logistics Logistics Execution Internal Whse Processes Bins and Stock Menu Path Display Bin Status Report Transaction Code LX03
9 / 15
www.rglconsultancy.nl
The Inspection Lot no.s can be found in the Insp. Lot column at the right. Make a note of the inspection lot no.(3719) , the bin no. (01-03-01) of the stock and of the HU (00112345670000007233). Next transactions in the SAP menu are relevant: Display the inspection lot. Call up the transaction as follows: Logistics Quality Management Quality Inspection Inspection Lot Menu Path Processing Display Transaction Code QA03
Assume that a sample was taken, the test was successful and that the sample has been returned to the bin(could be a visual test or some other non-destructive one). Note: It is possible to record all these steps in the system, but this is not shown here. Record in the system that the test was OK.
Call up the transaction as follows: Logistics Quality Management Quality Inspection Inspection Lot Menu Path Usage Decision Record Transaction Code QA11
10 / 15
www.rglconsultancy.nl
Enter inspection lot no. and then hit the ENTER key.
Confirm certificate receipt: go to menu Edit Confirm receipt of certificate System Status before confirmation:
11 / 15
www.rglconsultancy.nl
Then select in the UD code field option A, see all options below:
Click on button The system will now jump to tab Inspection lot stock, to offer you the possibility to start a process for posting the stock from category Q to unrestricted use, by creating a Posting change delivery when you save.
12 / 15
www.rglconsultancy.nl
If you follow above step and save the Lot with Posting=To unrestricted use, the system creates a Posting change outbound delivery which needs further processing. I will not use this system offer because there is a much shorter and more elegant way to do the posting from blocked to unrestricted-use using the HU, as you will see in the next step. Just <SAVE> again. At the screen bottom :
13 / 15
www.rglconsultancy.nl
Select the line and than menu Edit Change HU Posting In unrestricted-use stock
Click on menu item In unrestricted-use stock. The system makes the posting and shows the material document no. at the screen bottom :
14 / 15
www.rglconsultancy.nl
As can be seen category Q stock does no longer exist in column S for Insp. Lot 3719.