CDIP workers removed sticks and small snubs from material used to Crown Earthen Dam between Ch: 3+400 to Ch: 4+000 (East)....Bulldozer transported timber mats from Ch: 2+600 to Ch: 7+200 m....Bulldozer graded West Earthen Dam Crest between Ch: 2+650 to Ch: 4+000 m....No hauling of material by tractors and trailers due to water logged work area....Excavators started to relay material to be use in the construction of Earthen Dam between Ch: 8+980 to Ch: 10+120 m. (East)....Contractor carried out general maintenance to all site equipment on the 3rd and 4th of December 2013....Excavator #51 (Hyundai) carried out works for framer who were affected by the New Hope/ Dochfour drains....Excavators prepared area for the construction of earthen dams between Ch: 8+980 to Ch: 9+180 metres both Eastern and Western Section of Canal. (by remove excessed pegasse material)....Site contractor installed 1# HYPE pipe (dia. 0.76 m) at Ch: 1+260 metres, this is the connection for the Drain for the rice field to the main canal (eastern section) (to form access dam for the rice fields)

Sun. Equipment D6 CAT BULLDOZER DX225 DOOSAN EXC 320DL CAT EXC. DX225 DOOSAN EXC 320DL CAT EXC. 320DL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 312CL CAT EXC. 312CL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. SK 210 LC KOBELCO EXC. 320DL CAT EXC. Hyundai # 29 33 44 39 35 46 38 43 45 31 50 53 3 5 2 1 57 10 51 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Mon. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8 Wk.

Tue. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 Bk.Dn 0 St.By. 6 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 St.By. 90 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Wed. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Thru. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 not on site Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Fri. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Sat. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 Wk. 48 48 48 48 48 0 48 48 48 48 48 0 48 0 48 48 48 48 48

Total Time (hrs.) Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 6 6 6 6 6 0 6 6 6 6 6 0 6 0 6 6 6 6 6

Total Ex. Time Total Bd. Time

720 Wk. 48

Prepared By:

O. Brown 1

Signature:

Equipment Report

Week

#136

8 th December-2013 to 14 th December2013

CDIP workers removed sticks and small snubs from Earthen Dam (East) between Ch: 4+000 to Ch: 6+500 m. (this is where dam has been Crowned)....Bulldozer graded West Earthen Dam Crest between Ch: 4+000to Ch: 6+500 m....Excavators relay material Eastern Borrow Pit to Section where Earthen dam is to be Constructed Ch: 8+980 to Ch: 9+052 m. (East)....Excavator #51 (Hyundai) carried out works for framer who were affected by the New Hope/ Dochfour drains....Excavators excavated area for Clay Key Ch: 8+980 to Ch: 9+058 m (East)....Installation of Geo-fabric PP300 to design specification between Ch: 8+980 to Ch: 9+052 metres (East)....CDIP workers spread and fold Geo-fabric PP300 to Design Specification Ch: 8+980 to Ch: 9+052 metres. (East)...Excavator removed pegasse materials from limit of Construction between Ch: 8+980 to Ch: 9+400 metres. (West)....Excavator removed pegasse materials from limit of Construction between Ch: 8+980 to Ch: 9+400 metres. (East)....Excavator # 53 (Doosan) returned to work area on the 11th December 2013....GEO for NDIA visited the work area on 12th December 2013 to check on construction of Earthen Dam in the pegasse area....

Sun. Equipment D6 CAT BULLDOZER DX225 DOOSAN EXC 320DL CAT EXC. DX225 DOOSAN EXC 320DL CAT EXC. 320DL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 312CL CAT EXC. 312CL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. SK 210 LC KOBELCO EXC. 320DL CAT EXC. Hyundai # 29 33 44 39 35 46 38 43 45 31 50 53 3 5 2 1 57 10 51 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8

Mon. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 0 8 0 8 8 8 8 8 Wk.

Tue. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 Bk.Dn 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 0 1 0 1 1 1 1 1 St.By. 222 St.By. 14 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Wed. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Thru. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 not on site Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Fri. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Sat. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 9 9 9 9 9 0 9 9 9 9 9 9 9 0 9 9 9 9 9 Wk. 40 40 40 40 40 0 40 40 40 40 40 24 40 0 40 40 40 40 40

Total Time (hrs.) Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 14 14 14 14 14 0 14 14 14 14 14 12 14 0 14 14 14 14 14

Total Ex. Time Total Bd. Time

624 Wk. 40

Prepared By:

O. Brown 1

Signature:

Equipment Report

Week

#137

CDIP workers cut surface drains to drain water on Western Crest of Earthen Dam Ch: 3+600 to Ch: 5+000 metres....Bulldozer graded West Earthen Dam Crest between Ch: 2+700 to Ch: 4+500 m....Excavators relay material Eastern Borrow Pit to Section where Earthen dam is to be Constructed Ch: 8+980 to Ch: 9+080 m. (East)....Excavator #51 (Hyundai) carried out works for framer who were affected by the New Hope/ Dochfour drains....Excavators excavated area for Clay Key Ch: 9+058 to Ch: 9+120 m (East)....Installation of Geo-fabric PP300 to design specification between Ch: 9+052 to Ch: 9+074 metres 15 th December-2013 to 21 st December(East)....CDIP workers spread and fold Geo-fabric PP300 to Design Specification Ch: 9+052 to Ch: 9+074metres. (East)....Dewatering of Eastern Borrow Pit using 2# water pump. (these are 150 mm dia. 2013 Pump....Bulldozer transported timber mats from Ch: 2+600 to Ch: 7+200 metres....No operation on site Saturday 14th December, and Monday 16th December 2013 by the Site Contractor due to water logged work area.

Sun. Equipment D6 CAT BULLDOZER DX225 DOOSAN EXC 320DL CAT EXC. DX225 DOOSAN EXC 320DL CAT EXC. 320DL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 312CL CAT EXC. 312CL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. SK 210 LC KOBELCO EXC. 320DL CAT EXC. Hyundai # 29 33 44 39 35 46 38 43 45 31 50 53 3 5 2 1 57 10 51 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Mon. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 9 9 9 9 9 0 9 9 9 9 9 9 9 0 9 9 9 9 9 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8 Wk.

Tue. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 Bk.Dn 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 St.By. 224 St.By. 14 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Wed. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Thru. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 not on site Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Fri. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Sat. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 40 40 40 40 40 0 40 40 40 40 40 40 40 0 40 40 40 40 40

Total Time (hrs.) Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 14 14 14 14 14 0 14 14 14 14 14 14 14 0 14 14 14 14 14

Total Ex. Time Total Bd. Time

640 Wk. 40

Prepared By:

O. Brown 1

Signature:

Equipment Report

Week

#138

Bulldozer transported timber mats from Ch: 2+600 to Ch: 7+200 metres....Excavators relay material Eastern Borrow Pit to Section where Earthen dam is to be Constructed Ch: 8+980 to Ch: 9+080 m. 22 nd December-2013 to 28th December- (East)....Excavator #51 (Hyundai) carried out works for framer who were affected by the New Hope/ Dochfour drains....Dewatering of Eastern Borrow Pit using 2# water pump. (these are 150 mm dia. Pump that the site contractor would normally use)....No operation on site Wednesday 25th December, and Thursday 26th December 2013 by the Site Contractor due to Holidays. 2013

Sun. Equipment D6 CAT BULLDOZER DX225 DOOSAN EXC 320DL CAT EXC. DX225 DOOSAN EXC 320DL CAT EXC. 320DL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 312CL CAT EXC. 312CL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. SK 210 LC KOBELCO EXC. 320DL CAT EXC. Hyundai # 29 33 44 39 35 46 38 43 45 31 50 53 3 5 2 1 57 10 51 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8 Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Mon. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8 Wk.

Tue. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 Bk.Dn 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 St.By. 376 St.By. 25 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Wed. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 9 9 9 9 9 0 9 9 9 9 9 9 9 0 9 9 9 9 9 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Thru. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 9 9 9 9 9 0 9 9 9 9 9 9 9 0 9 9 9 9 9 not on site Wk. 6 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 0

Fri. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 3 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 9 Wk. 8 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Sat. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 38 40 40 40 40 0 40 40 40 40 40 40 40 0 40 40 40 40 32

Total Time (hrs.) Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 25 23 23 23 23 0 23 23 23 23 23 23 23 0 23 23 23 23 31

Total Ex. Time Total Bd. Time

632 Wk. 38

Prepared By:

O. Brown 1

Signature:

Equipment Report

Week

#139

Excavators relay material Eastern Borrow Pit to Section where Earthen dam is to be Constructed Ch: 8+980 to Ch: 9+080 m. (East)....Excavator #51 (Hyundai) carried out works for framer who were affected 29 th December-2013 to 31 st December- by the New Hope/ Dochfour drains....Dewatering of Eastern Borrow Pit using 2# water pump. (these are 150 mm dia. Pump....CDIP workers cut surface drain on Earthen Dam Crest between Ch: 2+600 to Ch: 2013 3+100 metres. (West)....

Sun. Equipment D6 CAT BULLDOZER DX225 DOOSAN EXC 320DL CAT EXC. DX225 DOOSAN EXC 320DL CAT EXC. 320DL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 312CL CAT EXC. 312CL CAT EXC. DX225 DOOSAN EXC DX225 DOOSAN EXC 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. 320CL CAT EXC. SK 210 LC KOBELCO EXC. 320DL CAT EXC. Hyundai # 29 33 44 39 35 46 38 43 45 31 50 53 3 5 2 1 57 10 51 Wk. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Wk. 6 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8

Mon. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 3 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 Wk. 6 8 8 8 8 0 8 8 8 8 8 8 8 0 8 8 8 8 8 Wk.

Tue. Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Bk.Dn 0 Bk.Dn 0 St.By. 3 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 St.By. 32 St.By. 6 Wk.

Wed. Bk.Dn St.By. Wk.

Thru. Bk.Dn St.By. Wk.

Fri. Bk.Dn St.By. Wk.

Sat. Bk.Dn St.By. Wk. 12 16 16 16 16 0 16 16 16 16 16 16 16 0 16 16 16 16 16

Total Time (hrs.) Bk.Dn 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 St.By. 6 2 2 2 2 0 2 2 2 2 2 2 2 0 2 2 2 2 2

not on site

Total Ex. Time Total Bd. Time

256 Wk. 12

Prepared By: