Masjid Project Bill Of Quantities

Works Statement: (Masjid construction surface area of657.61M3 + Bathrooms and Kee er area of 57.77 M3! "tem $escri tion %#" '&( () #o. & )ate *mount +rame ,ork for Masjid+ -athrooms 1 ./ca0ation1 +i22in31 and "nsu2ation: 1.1 Mechanical Earth excavations for the foundation to get to the suitable depth. Price will include costs of re oving and!or relocating of all obstacles such as debris" garbage" trees and existing services in addition to the re#uired aterials necessar$ for wor% co pletion according to engineer&s instructions and specifications. 'he (ontractor should include in his price the costs of cut and re oval of trees roots. 1., Earth Bac%filling with clean soil ixing with -oling of good gradation in a co pacting la$ers of ). c thic% with good spra$ing and co pacting b$ not less than ).t co pacter. Bac%filling in the entire building up to the plinth according to building levels as in the drawings according to wor% specifications and engineer direct. Provide One la$er of 1.P.(. , depth with hot bitu en under foundations. Provide and appl$ 2n insulation la$er of hot bitu en for reinforce ent" and all buried foundation wor%s . Provide and appl$ 2nti3white ant treat ent for building within e ban% ent before flooring wor% 4ement 4oncrete Works: -uppl$ and appl$ a reinforce ent concrete with using a echanical vibration" according to the drawings" specifications and the engineer&s 5nstructions6Portland -ulphate resistant ce ent 6P-7(8 shall be used for buried M) *1+

1/) M)

1.)

0+1 M) M) M) 1)1

1./ 1.+

+++ )*4

1.0

M)

Masjid Project Bill Of Quantities


.

,.1

parts8 Provide and construct 1. c thic% of Plain (oncrete with strength not less than ,,. %g!c ," under the building foundations and ground bea s" according to wor% specifications. M)

//

,.,

,.) ,.).1 ,.)., ,.).) ,.)./ ,.).+

Provide and construct Plain (oncrete 6P-7(8 1. c thic% for the building floors the rate include la$ing 1.c of crushed stone under the plain concrete la$er according to the drawings" wor% specifications and engineer direction. Provide and construct 7einforce ent concrete with strength ).. %g!c , for :ooting foundations. Provide and construct 7einforce ent concrete with strength )+. %g!c , for colu ns& nec% Provide and construct 7einforce ent concrete with strength ,+. %g!c , for ;round bea s Provide and construct 7einforce ent concrete with strength )+. %g!c , for colu ns. Provide and construct 7einforce ent concrete with strength ,+. %g!c , for opa#ue 7oof slabs and bea s< staircase Provide and construct 7einforce ent concrete with strength )+. %g!c , for , dia eters and 1. height eight figure Minaret" ,nr.

9. M) M) M) M) M) M) M) )* +.+ 14 +. 149 ,.

"tem #o. 3

$escri tion Masonr5 Works:

%#" &

'&( )ate

() *mount

Masjid Project Bill Of Quantities


.

).1

Provide and construct with cubic eter 6-ha san$ or 2lburi#a -tone8 asonr$ for stone bed chair as shown in drawing and according to wor% specifications and engineer directions.

M)

+.

).,

Provide and construct a hollow bloc%s for walls ,. c thic% Su-6&ota2 +rame Work +or Masjid+Bathrooms

M,

+)/

)4/+

"tem #o. 7

$escri tion +inishin3 Works for Masjid+ Bathrooms 4ement 2asterin3 Works : (e ent plastering with 'artasha " roughening" and softening. 2lso use net window bloc%er to crac%ing with 1=) including spra$ing water twice a da$ for ) da$s as per drawings" specifications and supervisor engineer 5nstructions. (eilings 5nternal walls External walls 8aint ,ork: 2ccording to drawings and engineer directions Prepare and appl$ E ulsion paint" for interior #ualit$ in one pri ing coat and two finishing coats" for application to ceilings using putt$ and e er$. Prepare and appl$ Oil paint se i3gloss for internal walls and triangles in one pri er coat" two coats of under coat and a third and final coat of finish using

%#" &

'&( )ate

() *mount

M, M, M,

/,* *9* *,/

M,

/,*

M,

*9*

Masjid Project Bill Of Quantities


.

5 +.1

+.,

+.)

+./

co plete putt$" color to be decided and approved b$ the Engineer" according to the drawing and wor% specifications. Prepare and appl$ E ulsion paint" for exterior #ualit$ weathering resistance in one pri ing coat and two finishing coats to application to external walls. &i2in3 and f2oor Works Prices of 'iles > cera ic wor%s shall include suppl$ of all aterials" testing" ortar ix ratio61=)8 6ce ent = sand8" +c sand under tiles or cera ic or bac% the tiles or cera ic 6wall8" s%irting" wor% anship" opening areas and all aterials > tools and an$where else" needed" all according to drawings" specifications" conditions and directed instructions b$ the Engineer or his representative. -uppl$ and install (era ic floor tiles for wo en bathroo s in ce ent sand ortar. -uppl$ and install Mosaic floor tiles si?e ,+x,+x,.+ c " 5nclude sand fill" bedding and jointing in ce ent and sand ortar 61=)8 ix ratio" pointing in white ce ent" grinding cleaning< stairs )c thic% for treads and 1.*c thic% for rise" according to the wor% specifications" drawings and engineer direction. -uppl$ and install (era ic s%irting *c height 6sa e #ualit$ of floor@s tile8 and orator$&s for risers in ce ent sand ortar. -uppl$ and 5nstall ,.x,. c (era ic wall tiles with the floor height" price include bedding in ce ent ortar" grouting and two coats of ce ent and sand plaster" pointing with white ce ent and cleaning" color to be decided and approved b$ the Engineer for wo en bath roo s according to the wor% specifications drawings engineer direction. Provide and install ;ranite for entrance )c thic% for treads and ,c thic% for

M,

*,/

M,

1+

M,

)/)

1)0 MA

M,

10,

Masjid Project Bill Of Quantities


.

risers" cut to di ension and polished" 5nclude bedding and jointing in ce ent and sand ortar61=)8 ix ratio" fill joints with white ce ent and cleaning according to the wor% specifications" drawings and engineer direction.6for the entrance it include built the steps8 Provide and construct 1a p proof and rainwater g 1a p Proof (ourse and 7oofs drain course consist of the following= 3laid two la$ers of waterproof bitu en e brane laid crisscross on dr$ and clean roof surface" turned up at the edge at least ,.c and fixed propert$ to the side of parapet" the rate should include overlaps. 3construct plain concrete +c ini u thic% with s ooth surface finish" slopes for rainwater flow to drains 61B slop8. 2ccording to the drawing" wor% specifications and engineer direction. Provide and construct Pave ent with 1.+ width around building the wor% include excavation" filling" 1+ c crushed stone" 1.c plain concrete" )3 +c clean sand" ,.+c ce ent ortar and ce ent tiles 6,+x,+8" 2ccording to the drawing" wor% specifications and engineer direction. "tem #o. 6 $escri tion MA M,

,.

),/

M, %#" &

1)* '&( )ate () *mount

0.1

4a-inetr51 and *2uminum ,orks : 2ll the following ite s shall be co pleted according to drawings" specifications" conditions and directed instructions b$ the Engineer or his representative. Provide and fix paneled wooden doors M, 6Marantti wood t$pe8 approved #ualit$" the rate will include the fra e ,.3,+ c width" with 2nti3white ant coat and varnish paint" loc% and all necessar$

11.*

Masjid Project Bill Of Quantities


.

accessories" according to the drawing" wor% specifications and engineer direction" Provide and fix 2lu inu doors M, 6 O ani or E irati8 for bathroo s. Provide and fix 2lu inu windows M, approved #ualit$ with reinforced glass 0 thic% panels and all necessar$ accessories" according to the drawing" wor% specifications and engineer direction Provide and fix a handrails ade of MA 6Marantti wood t$pe8 "4+ c height fixed for staircase" tribune shown in drawings8 according to wor% specifications and engineer direction -uppl$ and appl$ a fiberglass do e with CO 0.) dia eter -uppl$ and appl$ a fiberglass Minarets CO with 1.+ dia eter -uppl$ and install brass crescent with CO copper finish to the do e and inarets with all re#uired wor%s to co plete the job. $ecoration: 2ll the following ite s shall be co pleted according to drawings" specifications" conditions and directed instructions b$ the Engineer or his representative. ;$psu wor%s for Mehrab and pulpit M, ;$psu wor%s belt around the Masjid MA fro the inside in the level of the Me??anine slab Water su 25 Sanitar5 Works: 3 2ll the pipes and the connections wor%s are plastic PD( t$pe and 2 erican s$ste 11/ with good anufactured ex.6 Cpro" Ca at" Pilot" ;ulf8 or e#uivalent in #ualit$" with use of hot glue suits with the #ualit$ of that pipes with the need to fetch a sa ple for approval. 3 2ll the fittings and sanitar$ pieces" taps" blenders" valves" 0

,.9 /)

)1

1 , )

). +*

Masjid Project Bill Of Quantities


.

traps" and others are of good #ualit$ 6 gulf or e#uivalent8 with need to give a sa ple before suppl$ for approval. 3 'he wor% contains suppl$ing and appl$ing the following= -uppl$ and install white 2rabic t$pe toilet or e#ual with flush cistern of , gal. capacit$" rate to include waste pipes and drainage to the nearest anhole and all associated water pipes" all other re#uired fittings as re#uired. -uppl$ and install basin for ablution en and wo en" the wor% includes all pipe connection to the ain distribution board" chro e traps" drainage to the nearest anhole" rate to include water pipes fro tan% to the unit with all re#uired wor% to co plete the job. -uppl$ and install pre3cast circular anhole of 1..c dia eter reinforced concrete class B).. sewage anholes as per specifications and drawings co plete with 1+ c reinforced concrete base" ,+c reinforced concrete slab" plain concrete" cast iron cover 6,+ tons capacit$ and 0.c opening8" fra e" rings" internal coating" benching" cast iron steps and special joint re#uired to fix the pipe to the anhole. 'he ite also includes excavation" supporting the trench sides and bac%filling using clean sand with watering and co paction 6co paction la$ers at ax. thic%nes of la$er is ,+c 8. 'he wor% also includes coating the inside walls and slab with two coats of special sewer epox$ and the external surfaces with two coats of hot bitu en. Pipe opening at anhole base shall be :actor$ ade without drilling anhole walls at site. Aocations are as shown on in drawings and 1epth up to an$ depth as specified. -uppl$ and install /E galvani?ed steel pipe /.+ drainage rain water pipes

CO

CO

14

CO

MA

).

Masjid Project Bill Of Quantities


.

for roof including all necessar$ bends and connections and a%ing good with all re#uired wor%s. -uppl$ and install 0E dia eter sewer pipes and la$ in all %inds of soil including excavation to the re#uired depth" supporting the trench sides" bedding with clean sand" bac%filling and co paction 6co paction la$ers at ax. thic%ness of la$er is ,+c 8. Fnwanted soil to be re oved outside the site. 'he price includes all necessar$ wor%s" suppl$ing and installing warning tape with copper wires" gas%ets" connection to anholes and others to co plete the wor% as specified in the specification" 1rawings and to the satisfaction of the Engineer. Excavation up to an$ depth as specified. -uppl$ and install plastic water storage tan% 1.. A capacit$ co plete with loc%able cover" float valve 1!,E dia." cleaning opening with plug )!/E dia." overflow pipe )!/E dia." steel base and the connection with the feeding and distribution lines" all according to 1rawings" -pecifications and instructions of the Engineer. .9.4&)"4*9 W:)KS 9uminaires and 9am s: 'he ite s in general shall also include conduits" connection boxes" controls" wires" connectors" cla ps" bolts" and connecting the cables to switchboards and co on electric networ% are included in the unit price. G (ontractor shall sub it shop drawings for all electrical wor%s to be approved b$ the Engineer before executing the wor%. G 2s3built drawings shall be sub itted after handing over the Hor%. G 2ll the electrical wor%s shall be executed according to -tandards" drawings" specifications and supervisor

MA

CO

Masjid Project Bill Of Quantities


.

engineer instructions. -uppl$" install" connect and test fluorescent lighting fixture 1x/.w co plete with lighting tubes )0" choc%" condensers" starters rigid PD( conduits" plastic and iron boxes" switches and , wiring si?e )x,.+ . 1itto" as 618 but ,I/. H 1itto" as 618 but 1I/. H hanged on the external walls against rain and oisture. 1itto" as 618 but ). H econo ical la p with 5sla ic la p on the roof. -uppl$" install" and connect (eiling fans , price include wires6 )x,.+ 8 switches" co plete with PD( conduits" J.boxes." and all necessar$ accessories 1itto" as 6 8 but suction fans ,.x,. with +2 soc%et and control switch. -uppl$" install" and connect an outlet soc%et 1)2" and containing wires , si?e6)x,.+ 8 switches" co plete with PD( conduits" J.boxes." and all necessar$ accessories as the drawing and engineer&s instructions. -uppl$" install" and connect one wa$ switch ,.2 with neon special for sound spea%er. -uppl$" install" and connect /+2 2.(. switch. -uppl$" install" and connect 1+2" , containing wires si?e6)x/ 8 with plastic pipes" co plete with PD( conduits" J.boxes." and all necessar$ accessories as the drawing and engineer&s instructions. -uppl$" install" and connect 1+2" , containing wires si?e 6)x0 8 with plastic pipes" co plete with PD( conduits" J.boxes." and all necessar$ accessories as the drawing and engineer&s instructions. 8ane2s: -uppl$" install sub3distribution board single fuse / line consists of auto atic ain circuit brea%er /.2 against lea%age current 7((B t$pe" and sub3circuit 4

CO

0)

CO CO CO CO

/1 1+ 19 )*

CO CO

+ ),

CO CO CO

1 1) 1.

CO

CO

Masjid Project Bill Of Quantities


.

brea%er M.(.B. for Minaret. -uppl$" install sub3distribution board single fuse 0 line consists of auto atic ain circuit brea%er 0)2 against lea%age current 7((B t$pe" and sub3circuit brea%er M.(.B. for Minaret. 2s in drawings -uppl$" install sub3distribution board three fuse 1, line consists of auto atic ain circuit brea%er 0)2 against lea%age current 7((B t$pe" and sub3circuit brea%er M.(.B. for Minaret. 2s in drawings -uppl$" install sub3distribution board three fuse 1, line consists of auto atic ain circuit brea%er 1,+2 against lea%age current 7((B t$pe" and sub3 circuit brea%er M.(.B. for Minaret. 2s in drawings -uppl$" install sub3distribution board three fuse 19 line consists of auto atic ain circuit brea%er 0)2 against lea%age current 7((B t$pe" and sub3circuit brea%er M.(.B. for Minaret. 2s in drawings -uppl$" install ain3distribution panel consists of anti3rust iron sheets with width not less than ) " and totall$ loc% fro dust and bugs with protection degree not less than 65P/+8 suppl$ with hinge door covering with the international paint for panels fixing on a reinforce ent concrete base as sa e as space of its base and height of +.c above the flooring tiles surface. 5t also ust contains all the specified co ponents in the design of ain and sub3 ain brea%ers" copper bus bars" signal light" easure ent e#uip ents" and all the necessar$ civil wor%s re#uired for these panels. Main and -ub3 ain co ponents as the following= 3 ,..2" three fuse copper Bus bar 3 One 1+.2" three fuse M((B ain circuit brea%er.

CO

CO

CO

CO

CO

1.

Masjid Project Bill Of Quantities


.

3 3 3 3 3

/.2" three fuse M((B auto atic sub3 ain circuit brea%er. 'wo 0)2" three fuse M((B auto atic sub3 ain circuit brea%er 'wo ).2" single fuse M((B auto atic sub3 ain circuit brea%er One 1,+2" three fuse M((B auto atic sub3 ain circuit brea%er One 1..2" three fuse.

4a-2es: -uppl$" la$ing underground PD( piping s$ste for the under ground electrical networ% as per drawing. 'he wor% includes anholes" excavation" la$ing pipes" warning tapes" bac%filling "new junction anhole and all re#uired cable joints and cable extensions for the existing building cables . -uppl$" install" and la$ing copper cables M , or single fuse pipes si?e ,x1.< 1x0 into plastic pipes for inaret. -uppl$" install" and la$ing copper cables M or single three fuse pipes si?e /x1.< 1x0 , into plastic. -uppl$" install" and la$ing copper cables M or single three fuse pipes si?e /x10< , 1x1. into plastic. -uppl$" install" and la$ing ordinar$ M copper cables three fuse si?e /x,+< , 1x10 into plastic. ;rounding the building using copper -E' bars with treat ent the soil to reduce the ground resistance under the supervision of the supervisor Engineer. Sound s5stem: -uppl$ and install Aaud spea%er OCE 6,+.Hatt8 1,E with box " with ounting FC5 stand and ar s. Eight headphones" ' Outdoor horn on inaret" and 11 wall headphones 9w with two pic%ups and

)+ /. *. /+

11

Masjid Project Bill Of Quantities


.

their accessories according to drawing and agree ent of the supervisor engineer. Su 6&ota2 of .2ectrica2 ,orks

Summar5 Bi22 of 'uantities &he M*S;"$ B"99 #:.


B5AA1 B5AA, B5AA) B5AA/ B5AA+ B5AA0 B5AA* &:&*9
&:&*9 "# W:)$S:

$.S4)"8&":#

)*&. ()(!