Sunteți pe pagina 1din 11

ITTC Recommended Procedures and Guidelines

REGISTER

0.0 Page 1 of 11 Effective Date Revision 2011 05

Section 0.0 1.0 1.0-01 1.0-02 1.0-03 4.0 4.0-01 4.2 4.2-01 4.2-02 4.2-03 4.2-04 4.2.3 4.2.3-01 4.2.3-01-01 4.2.3-01-02 4.2.3-01-03 4.2.4 Updated by P P P P

Contents REGISTER SCOPE Description and Rules of the ITTC Committee Structure of ITTC General Guideline for the Activities of TechniP cal Committees, Liaison with Executive Committee and Advisory Council QUALITY MANAGEMENT SYSTEM G Guidelines for Benchmarking DOCUMENT AND DATA CONTROL Adoption or Modification of ITTC Recommended Procedures Updating the ITTC Symbols & Terminology List Review of ITTC Recommended Procedures and Guidelines by the Advisory Council Updating the ITTC Dictionary of Hydromechanics

Effective Revision Pages Date 2011 05 12

2008 2008 2008

01 02 00

8 3 10

2002

00

11

2008 2011 2008 2011

02 02 00 00

5 4 4 4

Document Control Recommended Procedures and Work Instructions Guide for the Preparation of ITTC RecomP mended Procedures G P Guidelines for Preparation of Technical Committee and Working Group Reports Work Instruction for Formatting ITTC Recommended Procedures Records Approved 26 ITTC QS Group
th

2008 2011 2008

01 02 01

4 7 6

26th ITTC Date 09/2011

Date 2011

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 2 of 11 Effective Date Revision 2011 05

Section 7.5 7.5-01 7.5-01-01 7.5-01-01-01 7.5-01-02 7.5-01-02-01 7.5-01-02-02 7.5-01-03 7.5-01-03-01 7.5-01-03-02 7.5-01-03-03

Contents PROCESS CONTROL Test Preparation Ship Models P Ship Models Propeller Models Terminology and Nomenclature for Propeller P Geometry P Propeller Model Accuracy Instrumentation, Calibration P Uncertainty Analysis, Instrument Calibration P P Uncertainty Analysis, Laser Doppler Velocimetry Calibration Uncertainty Analysis: Particle Imaging Velocimetry (PIV)

Effective Date

Revision

Pages

2011

03

2008 2005 2008 2008 2008

01 00 00 00 00

21 8 14 13 12

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 3 of 11 Effective Date Revision 2011 05

Section 7.5-02 7.5-02-01 7.5-02-01-01 7.5-02-01-02 7.5-02-01-03 7.5-02-02 7.5-02-02-01 7.5-02-02-02 7.5-02-02-03 7.5-02-02-04 7.5-02-02-05 7.5-02-02-06 P

Contents Testing and Extrapolation Methods General Guide to the Expression of Uncertainty in Experimental Hydrodynamics Replaced by 7.5-02-02-02 P Fresh Water and Seawater Properties Resistance P Resistance Tests P P P P P Uncertainty Analysis Guidelines for Resistance Towing Tank Tests Uncertainty Analysis, Spreadsheet for Resistance Measurements Uncertainty Analysis, Spreadsheet for Speed Measurements Uncertainty Analysis, Spreadsheet for Sinkage and Trim Measurements Uncertainty Analysis, Spreadsheet for Wave Profile Measurements

Effective Revision Date

Pages

2008 2008 2011 2011 2008 2002 2002 2002 2002

01

17

02 03 01 00 00 00 00

45 13 16 5 4 5 4

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 4 of 11 Effective Date Revision 2011 05

Section 7.5-02-03 7.5-02-03-01 7.5-02-03-01.1 7.5-02-03-01.2 7.5-02-03-01.3 7.5-02-03-01.4 7.5-02-03-01.5 7.5-02-03-02 7.5-02-03-02.1 7.5-02-03-02.2 7.5-02-03-02.3 7.5-02-03-02.4 7.5-02-03-02.5

Contents Propulsion Performance P Propulsion/ Bollard pull Test P Uncertainty Analysis: Example for Propulsion Test

Effective Date

Revision

Pages

2011 2002 2008 2011 2008

04 00 00 02 01

16 25 21 9 9

P Podded Propulsor Tests and Extrapolation C P 1978 ITTC Performance Prediction Method G Predicting Powering Margins C Propulsor P Open Water Test P P P Uncertainty Analysis, Example for Open Water Test Nominal Wake Measurements by LDV, Model Scale Experiments Nominal Wake Measurement by a 5-Hole Pitot Tube

2008 2002 2008 2011 2011

02 00 00 01 00

10 16 11 11 7

G Experimental Wake Scaling Methods

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 5 of 11 Effective Date Revision 2011 05

Section 7.5-02-03-03 7.5-02-03-03.1 7.5-02-03-03.2 7.5-02-03-03.3 7.5-02-03-03.4

Contents Cavitation P Model-Scale Cavitation Test P Description of Cavitation Appearances P P Cavitation Induced Pressure Fluctuations Model Scale Experiments Cavitation Induced Pressure Fluctuations Numerical Prediction Methods

Effective Date 2011 2002 2011 2002

Revision Pages

03 01 04 01

9 7 16 7

7.5-02-03-03.5

Cavitation Induced Erosion on Propellers, P Rudders and Appendages Model Scale Experiments G Podded Propulsor, Model - Scale Cavitation Test

2011

02

14

7.5-02-03-03.6

2011

02

12

7.5-02-03-03.7

Prediction of Cavitation Erosion Damage for P Unconventional Rudders or Rudders behind Highly-Loaded Propellers P Modelling the Behaviour of Cavitation in Waterjets

2008

00

13

7.5-02-03-03.8

2008

00

13

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 6 of 11 Effective Date Revision 2011 05

Section 7.5-02-04 7.5-02-04-01 7.5-02-04-02 7.5-02-04-02.1 7.5-02-04-02.2 7.5-02-04-02.3 7.5-02-04-02.4 7.5-02 04-02.5 7.5-02-05 7.5-02-05-01 7.5-02-05-02 7.5-02-05-03.1 7.5-02-05-03.2 7.5-02-05-03.3 7.5-02-05-04 7.5-02-05-04.1 7.5-02-05-05 7.5-02-05-06 7.5-02-05-07

Contents Ice Testing P General Guidelines P Test Methods for Model Ice Properties P Resistance Test in Level Ice P Propulsion Tests in Ice C P Manoeuvring Tests in Ice C P Tests in Deformed Ice P Experimental Uncertainty Analysis for Ship Resistance in Ice Tank Testing High Speed Marine Vehicles P Resistance Test P Propulsion Test P Waterjet Propulsive Performance Prediction Propulsion Test and Extrapolation Uncertainty Analysis - Example for Waterjet Propulsion Test Excerpt of ISO 2631, Seasickness and Fatigue Manoeuvrability, Evaluation and Documentation of HSMV

Effective Date

Revision

Pages

1999 2002 2002 1999 1999 1999 2005

01 01 01 00 00 00 00

5 4 7 8 6 4 15

2008 2011 2011 2011 2011 1999 1999 2002 1999 1999

02 02 02 01 01 00 00 01 00 00

18 6 9 10 9 12 5 4 5 4

P Waterjet System Performance P

P Seakeeping Tests P P

P Structural Loads P Dynamic Instability Tests

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 7 of 11 Effective Date Revision 2011 05

Section 7.5-02-06 7.5-02-06-01 7.5-02-06-02 7.5-02-06-03 7.5-02-06.04 7.5-02-07 7.5-02-07-01 7.5-02-07-01.1 7.5-02-07-02 7.5-02-07-02.1 7.5-02-07-02.2 7.5-02-07-02.3 7.5-02-07-02.4 7.5-02-07-02.5 7.5-02-07-.2.6 G

Contents Manoeuvrability P Free Running Model Test Procedure P Captive Model Test Procedure P Validation of Manoeuvring Simulation Models P Uncertainty Analysis: Forces and moment Example for Planar Motion Mechanism Test Loads and Responses Environmental Modelling Laboratory Modelling of Multidirectional Irregular Wave Spectra Seakeeping P Seakeeping Experiments P Predicting of Power Increase in Irregular Waves from Model Test Validation of Seakeeping Computer Codes in the Frequency Domain Verification and Validation of Linear and Weakly Nonlinear Seakeeping Computer Codes

Effective Revision Pages Date

2008 2008 2011 2008

02 03 02 00

11 21 11 25

2005

00

2011 2011 2011 2002 2011 2011

04 04 03 01 01 00

22 13 12 13 17 15

P Experiments on Rarely Occurring Events P P

P Global Loads Seakeeping Procedure

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 8 of 11 Effective Date Revision 2011 05

Section 7.5-02-07-03 7.5-02-07-03.1 7.5-02-07-03.2 7.5-02-07-03.3 7.5-02-07-03.4 7.5-02-07-03.5 7.5-02-07-03.6 7.5-02-07-03.7 7.5-02-07-04 7.5-02-07-04.1 7.5-02-07-04.2 7.5-02-07-04.3 7.5-02-07-04.4 7.5-02-07-04.5

Contents Ocean Engineering P Floating Offshore Platform Experiments P Analysis Procedure for Model Tests in Regular Waves Stationary Floating System Hybrid Mooring Simulation, Model Test Experiments Truncation of Test Models and Integration with Numerical Simulations Dynamic Positioning System, Model Test Experiments Wave Energy Converter, Model Test Experiments Stability P Model Tests on Intact Stability P Model Tests on Damage Stability in Waves G G Predicting the Occurrence and Magnitude of Parametric Rolling Numerical Simulation of Capsize Behaviour of Damaged Ships in Irregular Beam Seas

Effective Date 2005 2002 1999 2008 2008 2001 2001

Revision Pages

01 01 00 01 01 00 00

12 8 4 9 8 9 8

P Model Tests on Tanker-Turret Systems P P P P

2008 2005 2006 2011 2011

02 01 01 00 00

9 7 7 10 33

P Numerical Estimation of Roll Damping

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 9 of 11 Effective Date Revision 2011 05

7.5-03 7.5-03-01 7.5-03-01-01 7.5-03-01-02 7.5-03-01-03 7.5-03-01-04 7.5-03-02 7.5-03-02-01 7.5-03-02-02 7.5-03-02-03 7.5-03-03 7.5-03-04 7.5-03-04-01 G C P G P

CFD General Uncertainty Analysis in CFD, Verification and Validation Methodology and Procedures 2008 1999 1999 1999 02 00 00 00 12 2 4 7

G Uncertainty Analysis in CFD, Guidelines for C RANS Codes P CFD Users Guide P CFD Verification Resistance and Flow Uncertainty Analysis in CFD, Examples for Resistance and Flow Benchmark Database for CFD Validation for Resistance and Propulsion Practical Guidelines for Ship CFD Applications Propulsion Manoeuvrability Guideline on Use of RANS Tools for Manoeuvring Prediction

1999 1999 2011

00 00 00

12 7 18

2011

00

16

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 10 of 11 Effective Date Revision 2011 05

Section 7.5-04 7.5-04-01 7.5-04-01-01.1 7.5-04-01-01.2 7.5-04-02 7.5-04-02-01 7.5-04-03 7.5-04-03-01 P

Contents Full Scale Measurements Speed and Power Trials Preparation and Conduct of Speed/Power Trials

Effective Date

Revision Pages

2005 2005 2002 1999

03 00 01 00

10 11 18 8

P Analysis of Speed/Power Trial Data Manoeuvrability P Full Scale Manoeuvring Trials Procedure Ice Testing C Ship Trials in Ice

P G C

signifies Procedure signifies Guideline signifies Concern, needs updating!

ITTC Recommended Procedures and Guidelines


REGISTER

0.0 Page 11 of 11 Effective Date Revision 2011 05

Section 7.6 7.6-01 7.6-01-01 Appendix 1 Appendix 2 Appendix 3 Appendix 4 7.6-02 7.6-02-01 7.6-02-02 7.6-02-03 7.6-02-04 7.6-02-05 7.6-02-06 7.6-02-07 7.6-02-08 7.6-02-09 7.6-02-10 7.6-02-11 7.6-02-12

Contents CONTROL OF INSPECTION, MEASURING AND TEST EQUIPMENT Measuring Equipment Control of Inspection, Measuring and Test Equipment Sample of Measuring Equipment Card Sample of Calibration Certificate Sample Procedure Sample Work Instruction Sample Work Instructions Calibration of Steel Rulers Calibration of Vernier Callipers Calibration of Height Callipers Calibration of Micrometers Calibration of Dial Gauges Calibration of Chronometers with Pointer Indication Calibration of Chronometers with Digital Indication Calibration of Weights Calibration of a Load Cells Calibration of Non Self Indicating Weighing Instruments Calibration of Liquid-in-Glass Thermometers Calibration of Bourdon Tube Pressure Gauges, Pressure-Vacuum and Vacuum Gauges for General Use

Effective Date

Revision Pages

1999 1999 1999 1999 1999

00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00

8 1 2 3 5 7 11 10 12 11 7 13 18 21 10 12 11

2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002 2002

S-ar putea să vă placă și