14.5 Release
Goals
This workshop consists of a gantry crane assembly. The crane is rated to carry a 5 tons weight. The purpose of this workshop is to compare the full transient method versus the mode superposition method.
Support # 3 Support # 4
Support # 1
Support # 2
Release 14.5
Assumptions
Well assume supports # 1 to 3 are fixed in all direction, whereas support # 4 is allowed to move in the x- direction.
A weight of 5 tons (50,000 N) is applied using remote force, and is scoped to the middle of the horizontal beam.
Release 14.5
Project Schematic
Open the Project page.
From the Units menu verify: Project units are set to Metric (kg, m, s, C, A,N, V). Display Values in Project Units is checked (on).
Release 14.5
. . . Project Schematic
Begin a new Workbench session and, from the Project page, choose Restore Archive . . . and browse to the file WS08_Transient.wbpz and Open (location provided by instructor).
When prompted, Save using the default name in the same location as the archive file.
Release 14.5
. . . Project Schematic
In the Workbench Project and drag and drop a new transient analysis
from the toolbox onto the existing Model cell.
Release 14.5
. . . Project Schematic
In the Workbench Project and drag and drop a new transient analysis
from the toolbox onto the existing Solution cell of the Modal analysis system.
The schematic should look like this when this step is complete.
2012 ANSYS, Inc. March 28, 2013 7 Release 14.5
. . . Project Schematic
Double click and rename both transient systems as follows: (B): Full Transient Analysis (C): MSUP Transient Analysis
Release 14.5
. . . Project Schematic
1. From the Static Structural system double click (or RMB > Edit) the Model cell.
1.
2.
2. When Mechanical opens, verify the units are set to Metric (m, kg, N, s, V, A).
Release 14.5
Preprocessing
Since we will be using a remote force to model the hanging weight, lets define a named selection at the location where the remote force will be scoped.
3.
3. 4.
Highlight the Model branch in the tree. Select the 2 faces shown below, RMB > Insert > named selection.
4.
10
Release 14.5
. . . Preprocessing
RMB and rename both transient systems in the tree as follows:
11
Release 14.5
. . . Preprocessing
7.
8.
Support # 3 Support # 4
9.
Highlight the bottom face of support # 4, RMB > Insert > displacement.
X = free, Y = 0.0, Z = 0.0 Support # 1
Support # 2
12
Release 14.5
. . . Preprocessing
10. Highlight the Full Transient Analysis (B5) branch, Analysis Settings
13
Release 14.5
. . . Preprocessing
12. Highlight the fixed support and displacement BCs under Modal (A5, drag and drop in Full Transient Analysis (B5)
13. Highlight the Full Transient Analysis (B5) branch, RMB > Insert > remote force.
14
Release 14.5
. . . Preprocessing
12. Under details of Remote Force
a. Scoping Method > Named Selection b. Named Selection > Selection X Coordinate = - 0.7135 Y Coordinate = 1.1 Z Coordinate = -4.3905 c. Define By > Components
b.
a. c.
15
Release 14.5
. . . Preprocessing
d. Y Component> Tabular e. Fill in the table as shown
e.
d.
16
Release 14.5
. . . Preprocessing
13. Highlight the MSUP Transient Analysis (C5) branch, Analysis Settings
17
Release 14.5
. . . Preprocessing
14. Highlight the remote force under Full Transient Analysis (B5), drag and drop in MSUP Transient Analysis (C5)
18
Release 14.5
. . . Preprocessing
15. Highlight the solution branch under Full Transient Analysis (B5), RMB>Insert>Deformation>Directional.
19
Release 14.5
. . . Preprocessing
16. Highlight the Directional Deformation under Full Transient Analysis (B5), drag and drop in MSUP Transient Analysis (C5)
20
Release 14.5
. . . Preprocessing
17. Highlight the both displacement output
18. Click the New Chart and Table Icon 19. In the Details of the Chart, set the Output Quantities as shown. 20. Solve
17.
19.
18.
21 Release 14.5
. . . Preprocessing
22
Release 14.5