Some statements contained in this presentation are forwardlooking and, therefore, involve uncertainties or risks that could cause actual results to differ materially. Such forwardlooking statements include comments regarding mining and milling operations, mineral resource and reserve statements and exploration program performance. Factors that could cause actual results to differ materially include metal price volatility, economic and political events affecting metal supply and demand, fluctuations in mineralization grade, geological, technical, mining or processing problems, exploration programs and future results of exploration programs, future profitability and production. Historical resources in this presentation are historical estimates that predate NI 43101 and are not compliant with current definitions, and have not been verified by the company; consequently, they should not be relied on by investors.
www.aurigagold.ca
TheAurigaGoldOpportunity
NeartermObjective Achievegoldproductionin2013(+40,000opa)andexpandgoldresourcesto+onemillionounces Vision Expandgoldproductionto100,000oz/yearanddoublegoldresourcestogreaterthan2millionounces throughexpansion,newdiscoveriesandregional/sectorconsolidation StrategicAdvantage FavourableminingjurisdictioninManitobawithregionalinfrastructure Low$18millioncapitalrequirementtoresumeproductionutilizingexistingmineandmillinfrastructure Existingpermitsandminingleaseinplace,NOAforopenpitminingtobesubmittedinOctober2012 Reducedriskopenpitminestartup Underexploredregionalgoldbearinggeologicalenvironment Managementexperiencedatdiscovery,resourceexpansion,developmentandoperations SuperiorInvestmentOpportunity AttractivevaluationEnterpriseValue/ouncevs PeerCompanies StrongvaluationofPricetoCashFlow PathtoProduction
PropertyAcquisition November2010 InitialPuffy NI43101 Resource August2011 PuffyPEA OpenPit/UG January2012 InitialNokomis 43101 Resource CompleteMill Refurb
Production 2013 3
www.aurigagold.ca
ReFocusingonMaverickGoldProject,Manitoba
RestartofMiningOperationsPlannedfor2013
HistoryofPuffyMineDevelopment/Operations AurigaGoldDevelopmentatMaverick Neartermgoldproduction,withsignificant OperatedfromJan88toApr89byPioneerMetals explorationupside Produced29koz from19881989from370,000tonnes 65kmfromFlin Flon,15kmfromSherridon 1987Kilborn feasibilityrecommended500tpd mill: Nearoperatinggoldandbasemetalmines,rail Capex:~32mln in1987/88 lineandpowerinfrastructure Pioneeractuallybuiltmillwithcapacityof1,000tpd; PositivePEAonopenpitandU/Gminingprogram stillinexcellentconditiontoday Lowcapitalcostrequirementfor40,000oz Auperannumstartup($18.1millionCAPEX) 6.9kmu/gdriftingtoaverticaldepthof130m NPV(pretax5%):$95.4Million 1993Kilborn feasibility: (pretax8%):$79.6Million Resource:524,376oz @~7.6g/tAu IRR(pretax)84% Reserve:184,200oz @6.7g/tAu Explorationtargeting >1millionounces 1200 4.5 InitialNI43101,174,000ouncesIndicated, 4 1000 558,000ounces Inferred@~5.8g/tAu 3.5
800 Tonnage(tpd) 600 400 200 0 3 2.5 2 1.5 1 0.5 0 Tonnage Grade Grade(g/t)
Auriga GoldCapitalStructureandSharePrice
Auriga GoldCorp.(AIA:TSXV)
SharedataandcashpositionasofOctober2,2012 SharesOutstanding WarrantsandOptionsO/S FullyDiluted MarketCapitalization 54,652,980 28,013,768 82,666,748 $10.9million
AIA:TSXVSharePrice
$1.0million $0.9million
SignificantHolders
OptionsandWarrants No.of Warrants/ Options Options Commonsharewarrants 3,107,500 24,906,268 Avg. Exercise Price $0.27 $0.44 PioneerMetals(Barrick Gold) ClaudeResourcesInc. ManagementandDirectors InstitutionalHoldings XstrataCanada
Source:tmx.comandAuriga Gold
Ownership
8.2% 6.2% 5.2% 2.9% 2.4%
Expiringb/wOct2012 February2017
*For details see June 21, 2012 PR
www.aurigagold.ca
FundingOptions
GoldPrepayLoanAgreement:$23Million
IndicativeTermSheet Totalloan:$23million AurigaGoldscapitalexpenditures:$18.1million Loanrepayment:monthlygolddeliveries averaginglessthan20%ofscheduledgold production Term:repaymentover36monthsfollowinga6 monthgraceperiod Goldpricing:Flexibilitytosellatprevailingmarket rates Subjecttoduediligence
www.aurigagold.ca
AurigaGoldManagementandDirectors
Finance,DevelopmentandOperationalExpertiseinPlace
Gorden Glenn, Interim President & CEO, Director Over 20 years experience in the financial industry as Investment Banker (TD Securities and Desjardins) and Research Analyst as well as various roles in mining companies evaluating economic and technical validity of mostly Canadian projects. Vic Hugo, CMA, Financial Controller and CFO An accounting professional with over 15 years of international financial management experience, particularly in the mining and manufacturing sectors. Bruce Mackie, M.Sc., P.Geo., Geological and Technical Advisor Mr. Mackie is a professional geologist, with over 35 years of mining industry experience in Canada and internationally. He has a proven exploration record, having managed several successful projects in uranium, gold and base metals in senior positions with Noranda, Hemlo Gold and North American Palladium. Chris Irwin, LL.M., Director Mr. Irwin is President of Irwin Professional Corporation, a corporation providing legal services mainly to the natural resource sector. Brian Robertson, P.Eng., Director Over 30 years experience in corporate management, exploration programs, project management, mine permitting, construction, development and operation as well as the evaluations or corporate acquisitions. Mike Kernick, General Manager Mr. Kernick has over 20 years experience in underground and open pit mining operations, particularly in narrow vein gold mining. Formerly Mine Superintendent at the Lake Shore Gold, Bell Creek Mine, Underground Superintendent at Trelawneys Chester Mine and prior to that, Mine Manager at Liberty Mines Redstone Mine. Eric Loch, PMP, Projects Manager Mr. Loch has over 20 years experience successfully building capital projects with understanding of project engineering and construction in the mining and industrial sectors. He has held senior project management positions with DeBeers and Rio Tinto. Alison Tullis, Investor Relations Manager Eight years of investor relations experience in a variety of industry sectors most recently providing IR consulting services to mining companies.
James D.A. White, Director Mr. White is the Managing Partner of Baynes & White, a Torontobased pension and benefits actuarial consulting firm.
ExperienceinDiscovery,ResourceExpansion, MineDevelopmentandOperations
www.aurigagold.ca
MaverickGoldProject
ExistingInfrastructure PastAuProduction ResourceExpansionPotential
PastProducingPuffyMineandMillDevelopment Produced28,000oz from19881989 Existing1,000tpd millandprovidesstartupto productionatreducedcapitalcost Existingportalandramptoundergroundmine workings 2012PEAmineplan:recoveryof348,000oz over 7.5yearsatthePuffyDeposit ResourceExpansiontargeting>1Moz Gold ExpandandupgradegoldresourcesatPuffyand Nokomisdepositsbystepoutandinfilldrilling NumerousdrillingtargetsoutlinedfromVTEM surveyalong20kmgoldbearinghorizon Recentdrillingintersected7.63mwith125.08g/t AuatNokomis
MaverickGoldProject
PuffyDeposit GeologySurfacePlanandSection
A385 2.3m@ 12.6g/tAuand0.5 m@24.3g/tAu A383 2.0m @12.0g/tAu
OPEN
NI43101ResourceEstimate(August2011) 174,000ouncesIndicated,558,000ouncesInferred
www.aurigagold.ca
MaverickGold PuffyMine
SurfacePlanandResourceModel
1000tpd Mill open
open
1.5kmstrike length,openon strikeandtoNE
3DmodellookingW
Portal/Rampto U/GMine
Underground workings Resources: Indicated Inferred Puffy Veins
3DmodellookingNW
open
N
www.aurigagold.ca
10
MaverickGoldProject PuffyMinePreliminaryEconomicAssessment
PEAFebruary2012 basedonAugust2011NI43101ResourceEstimate
AverageAnnualProduction: RecoverableGold1: MillingRate: MillRecovery: LifeofMine: TotalCAPEX: AverageLOMcashcost: 45,000oz/annumAu 348,000recoveredoz Au@avg.of5.8g/tAudiluted 20.3%fromopenpits;79.7%fromu/g 750tpd 90% 7.5years $18.1M (incl.$3.02mcontingency) CAD$949/oz
Goldprice,operatingcost, capitalcostsensitivityanalysis@8%NPV
UndiscountedCashFlow(pretax): $130.5M Payback: 20th month ofprocessingore NPV (pretax,5%) 2: $95.4M (pretax,8%)2: $79.6 M IRR(pretax): 84%
1. 2.
11
MaverickGoldProject PuffyMinePreliminaryEconomicAssessment
PEAFebruary2012 basedonAugust2011NI43101Resource Estimate
$1,400 $1,200 $1,000 $800 $600 Operating Cost/oz Total Op+Sust Cost/oz U/G
$200,000,000 $175,000,000 $150,000,000 Ounces Recovered Cumulative CashFlowat $1400/ozAu Cumulative CashFlowat $1600/ozAu
OpenPit
20000oz 10000oz oz
$400 $200
10000oz oz
112345678
$0
$50,000,000
112345678
www.aurigagold.ca
12
MaverickGoldProject PuffyMine
LongitudinalSectionFacingWest
RecoveredOunces OpenPits: Pit1:20,760oz Pit2:4,950oz Pit3:6,060oz Pit4/5:37,740oz TotalPits:69,510oz UndergroundMining Areas: Area1:49,000oz Area2:124,000oz Area3:108,000oz Area4:23,000oz TotalUndergound: 304,000oz
Pit 1
Pit 1
Pit 2
AREA 1
13
MaverickGoldProject
MaverickMill 1000tpd
14
MaverickProject SignificantResourceExpansionPotential
Targetinginexcessof1,000,000 ouncesgold Welldefinedmajorregionalgold mineralizedstructureatthe northernborderofFlin Flon greenstonebelt Ongoingdrillprogramtoexpand resources MaverickPropertycoversover 20kmofstrikelength Targethaswelldefinedgeophysics trendwithseveralshowingsfound alongstrike InitialPuffyDepositNI43101Gold Resourcesof174,000oz Au Indicatedand558,000oz Historicalnearsurfaceresourcesat Nokomis,potentialmillfeedfor PuffyMill
www.aurigagold.ca
DrillholeA348 0.50m@23.68g/tAu
15
MaverickGold NokomisDeposit
8kmNortheastfromtheMaverickMill
Potentialopenpitsatellitedeposit Confirmationdrillingprogramcomplete,A.C.A.Howe engagedtocompleteNI43101report,expectedinQ32012 Initialhighgradegoldintercepts 125.08g/tover7.6m(incl.1,830g/tover0.5m); 12.27g/tover5.2m; 5.1g/tover6.4m; 9.65g/tover5.6m(incl.62.23g/tover0.5m)
Highgradenearsurface mineralization
www.aurigagold.ca
16
MaverickGoldProductionTimeline
2 0 1 2 Q1
Resource ExpansionDrilling NI43101Reports Mill,powerandancillarybuilding refurbishmentandsitepreparation Communityengagement Openpitandtestmining U/Gdevelopment anddewatering U/G teststope andmining Paybackcomplete @$1400/oz Au
Q2
Q3
Q4
2 0 1 3
2 0 1 4
NOKOMIS Resource
PUFFY FEAS.Study
GoldProductionMilestone
17
MaverickGoldProject
PotentialGoldProductionExpansion
+Resource Expansion
Exploration successon Maverick Gold Maverick Property covers20 kmofmajor regional mineralized structure
45,000oz/yr >50,000oz/yr
Combined U/Gand openpit PEAStudy 750tpd 7.5year minelife 348,000 recovered goldounces Nokomis Deposit Historical Resource 68,523oz @6.1 g/tAu 8kmfromPuffy MineandMill Openpit potential Targetingfull millcapacityat 1000tpd
++Extend MineLife
Area consolidation Tollmilling opportunities Resource expansionon majorstructure
www.aurigagold.ca
18
Auriga GoldPeerComparison
Company QMXGold Corporation BrigusGold ClaudeResources GoldenBand Metanor Resources SanGold St.AndrewsGold AurigaGold AurigaFullyFunded Share SharesO/S MarketCap Symbol Price($) (M) ($M) QMX.TO BRD.TO CRJ.TO GBN.V MTO.V SGR.TO SAS.V AIA.V AIA.V Total Oz(M) Oz.pa Enterprise Op Cost Value(EV EstCF$M Shares Priceto perOz. $M) EV/oz @$1400 EV/CF /AuOz CashFlow
EV/oz
120.0 100.0 80.0 60.0 40.0 20.0 0.0
$/oz
19
AurigaGoldSummary
MaverickGoldProject(100%) Manitoba Neartermgoldproduction,withexcellentexplorationupside Pastproducingproperty,withsignificantonsiteinfrastructure 1000tpd mill,ancillaryfacilities,rampandunderground workings, roadaccesstoproperty,powerandraillines PositivePEAonU/Gandopenpittestminingonnearsurface resources CAPEX:$18.1Million;undiscountedcashflow:$130Million Managementexperiencedatdiscovery,resourceexpansion, developmentandoperations NI43101ResourceEstimate: 174,000ouncesIndicated,558,000ounces Inferred ContinuedresourceexpansionandupgradedrillingatNokomis andPuffydeposits Mokoman CopperGoldProperty(100%) Saskatchewan FoxPGMNiCuProperties(75100%) Manitoba
www.aurigagold.ca
Formoreinformation: AurigaGoldCorp. AIA:TSXV 8KingStreetEast Suite1300 Toronto,ON AlisonTullis Manager,InvestorRelations 4162142785 atullis@aurigagold.ca www.aurigagold.ca
AIA_AurigaGold AIA.AurigaGold
21
MaverickGoldProject
Flin Flon GoldandVMSBaseMetalDistricts
MAVERICKGOLD PROJECT
SNOWLAKE
SHERRIDON
FLINFLON
CRANBERRY LAKE
StrategicallylocatedinoneofManitobaspremierminingcamps accesstopeople,infrastructureandGOLD
22
MaverickGoldProject
MineralResources AllZones
NI43101ResourceEstimate October2011 Underground:3,720,000tonnes containing690,000oz Goldatacutoffgradeof2.5g/t;and OpenPit:320,000tonnes containing42,000 oz Goldata0.6g/tcutoffgrade PuffyDeposit@2.5g/tcutoffgrade(undergroundmodel)
ResourceCategory Indicated Inferred Tonnes 702,000 3,018,000 Grade(g/t) 6.29 5.65 InsituOzs Gold 142,000 548,000
PuffyDeposit@0.60g/tcutoffgrade(openpitmodel)
ResourceCategory Indicated Inferred Tonnes 242,000 78,000 Grade(g/t) 4.16 3.81 InsituOzsGold 32,000 10,000
HistoricalResources Nokomisadditionalsatelliteresources(undergroundmodel)
ResourceCategory ProvenandProbable Tonnes 349,110 Grade(g/t) 6.10 InsituOzs Gold 68,523
*HistoricalresourcesinthepresentationarehistoricalestimatesthatpredateNI43101andarenotcompliantwithcurrent definitions,havenotbeenverifiedbythecompanyandconsequentlyshouldnotbereliedonbyinvestors.
The resource was estimated by Fred Brown, CPG, and Eugene Puritch, P.Eng. of P&E Mining Consultants Inc. Mr. Puritch and Mr. Brown are Qualified Persons ("QPs") as defined by NI 43101. Bruce Mackie, P.Geo., was QP for the Companys drill program and supervised the preparation of the scientific or technical information for the property. The contents of this press release has been reviewed and approved by Mr. Brown, Mr. Puritch and Mr. Mackie. An NI 43101 technical report supporting this resource estimate will be filed on SEDAR within 45 days of this press release.
23
PuffyMineCombinedU/GandOpenPitModelfromFebruary 2012PEA