Sunteți pe pagina 1din 11

2-room slab

Item
1.0
2.0

3.0

Description
General requirements

Quantity Unit

Unit rate

Amount

lot

50,000.00

50,000.00

Mobilization/Demobilization

lot

100,000.00

100,000.00

Permits & Licenses

lot

75,000.00

75,000.00

Temporary Facilities

lot

15,000.00

15,000.00

Bonds & Insurances

lot

40,000.00

40,000.00

Preparation of As-built coordinated plans

lot

50,000.00

50,000.00

Drawings & Forms submittals

lot

10,000.00

10,000.00

Water and Electrical Consumption

lot

20,000.00

20,000.00

Communication Expenses

lot

30,000.00

30,000.00

Service Vehicle

lot

350,000.00

350,000.00

Engineering supervision

lot

100,000.00

100,000.00

Materials Inspection & testing

lot

35,000.00

35,000.00

Safety and Health

lot

150,000.00

150,000.00

41.90

Earthworks
3.1 Clearing and Grubbing
3.2 Structural Excavation
3.3 Backfilling and Compaction
3.4 Gravel Bedding G1
3.5 Soil Poisoning
3.6 Disposal

45.3

265.00

12,004.50

28.317

598.38

16,944.33

26.03

1475.00

38,394.25

222.2

95.00

21,109.00

17

239.00

4,063.00
-

4.0

Structural Works
4.1 Concrete, 3000 psi
4.2 Formwork
4.3 Grade 60 Rebar
4.4 Strutural Steel
4.5 4 20mmx400mm LONG A307 Anchor Bolts

67.27

4811.31

323,656.82

473

438.18

207,259.14

8646.58

kgs

58.93

509,542.96

kgs

pcs
-

5.0

Architechtural Works
5.1 6" thk CHB Wall
5.2 4" thk CHB Wall
5.3 Plastering Work
5.4 12 x 300mm Fiber Cement Fascia Board
5.5 Floor Topping
5.6 Waterproofing on Roof deck

152.89

718.87

109,908.03

24.15

692.67

16,727.98

408

211.35

86,230.80

180

6.0

Doors and Windows


6.1 2100mmH x 900mmW Single Panel Door, 50mm
6 thk. Tanguile Solid Door, Duco Painted Finish

set

6.2 2100mmH x 700mmW PVC Type Assembly Single


Door w/ Louver

set

2475.00

4,950.00
-

6.3 1200mmH x 2400mmW PVC Frame Casement

set

Type Glass Window (6mm thk. Glass)

6.4 1200mmH x 1800mmW PVC Frame Casement

set

Type Glass Window (6mm thk. Glass)

6.5 600mmH x 600mmW PVC Frame AwningType

Glass Window (6mm thk. Glass)

7.0

Roofing Works
7.1 Ga. 24 GI Longspan Prepainted
Roofing with insulation

m
-

7.2 10mm dia x 8.810 m with Standard Nuts &

sets

Washers, each end (for classroom)

7.3 10mm dia x 2.060 m with Standard Nuts & Washers,

set

each end (for CR)

8.0

Painting Works
8.1 Concrete Surfaces Exterior

154

260.01

40,041.54
-

8.2 Concrete Surfaces Interior

212

253.01

53,638.12
-

9.0

Tile Works @ CR
9.1 Wall
9.2 Floor
9.3 Plumbing works
9.4 Electrical Works
9.5 Septic Tank

14.64

922.57

5.6

922.57

13,506.45
5,166.39

lot

52817.00

52,817.00

lot

103981.60

103,981.60

lot

97650.50

97,650.50

2,689,775.42

Item No./De
Unit of Mea
Output per

A.

B.

C.
D.
E.

DETAILED UNIT PRICE ANALYSIS (DUPA)


Item No./Description
Unit of Measurement
Output per day

:
:
:

3.3
80

Designation
A.

Backfilling & Compaction


m

No. of
Person

No. of
Hours

Daily Rate

1
2
2

8
8
8

400.00
350.00
250.00

No of
Units

No. of
Hours

Daily Rate

1
4

8
8

23,940.00
20.00

Labor
a. Construction Foreman
b. Skilled Laborer
c. Laborer

Sub - Total for A


Name and Capacity
B.

Equipment
a. Backhoe
b. Shovel

Minor Tools (10% of Labor)

C.
D.
E.

Sub - Total for B


Total (A + B)
Output per day = 80.
Direct Unit Cost (C D)

160.00

Amount

400.00
700.00
500.00

1,600.00
Amount

23,940.00
80.00

160.00

24,180.00
25,780.00
80.00
322.25

2-room slab
Item

Description

1.0
2.0

General requirements
Mobilization / Temporary Structures,
Utilities and Services / Demobilization
/ Standard Billboard

3.0

Earthworks

4.0

Structural Works

5.0

Architechtural Works

6.0

Doors and Windows

7.0

Roofing Works

8.0
9.0

Painting Works
Tile Works @ CR

Quantity

Unit

Unit rate

lot

#########

lot

#########

TOTAL

Amount
#########
#########

#REF!