Sunteți pe pagina 1din 3

Scheduling/Leveling Report - 27-Feb-14 - PM.

exe
===============================================
Default Project..................................................DSOA
Projects:
DSOA............................................................
160 villas - Gate House
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as ...................................Longest
Path
Compute Total Float As ..........................................Finish
Float
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................No
Statistics:
----------# Projects.......................................................1
# Activities.....................................................178
# Not Started....................................................178
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................263
# Activities with Constraint.....................................1
Project:
DSOA
Activity:
A1530 Project Close ou
t
Errors:
------Warnings:
--------Activities without predecessors..................................1
Project:
DSOA
Activity:
A1540 Mobilization
Activities without successors....................................18
Project:
DSOA
Activity:
A1000 AC Works Shop Dr
awings
Project:
e Work Shop Draw-SubStr

DSOA

Activity:

A1010

Plumbing Drainag

Project:
Shop Darwings-SubStr
Project:
Shop Darwings-SupStr
Project:
op Drawings-supstr
Project:
op Drawings-substr
Project:
e Work Shop Draw-SupStr
Project:
ion & Details
Project:
Layout, Wall Elevation
Project:
s Option Layout
Project:
tions
Project:
g, Location on Elevation
Project:
olour Scheme layout
Project:
t
Project:
MP
Project:
0 Ltr
Project:
ER WITH WIRE MESH
Project:

DSOA

Activity:

A1020

Electrical Work

DSOA

Activity:

A1030

Electrical Work

DSOA

Activity:

A1040

Builder Works Sh

DSOA

Activity:

A1050

Builder Works Sh

DSOA

Activity:

A1060

Plumbing Drainag

DSOA

Activity:

A1100

Cat Ladder Locat

DSOA

Activity:

A1110

Bathroom Tiling

DSOA

Activity:

A1190

Internal Finishe

DSOA

Activity:

A1200

Roof Slope Direc

DSOA

Activity:

A1210

Ext Light Fittin

DSOA

Activity:

A1220

External paint C

DSOA

Activity:

A1530

Project Close ou

DSOA

Activity:

A1590

WATER BOOSTER PU

DSOA

Activity:

A1600

WATER HEATER - 5

DSOA

Activity:

A1620

EXHAUST AIR LOUV

DSOA

Activity:

A1630

Exhaus fanst

Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0
Milestone Activities with invalid relationships..................1
Project:
DSOA
Activity:
HO-M
Handing Over
Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................178
# Relationships with other projects..............................0
Data Date........................................................16-Feb14
Earliest Early Start Date........................................17-Feb14
Latest Early Finish Date.........................................02-Jun14
Exceptions:
----------Critical Activities..............................................1
Project:
DSOA
Activity:
A1530 Project Close ou
t
Activities with unsatisfied constraints..........................1
Project:
DSOA
Activity:
A1530 Project Close ou
t

Activities with unsatisfied relationships........................0


Activities with external dates...................................0