Documente Academic
Documente Profesional
Documente Cultură
Lesson 1 Introduction
by Hans Juvkam-Wold
TAMU-Petroleum Engineering FALL, 2002
1. Introduction
Slide 1 of 16
Lesson 1 - Introduction
g g g g g
Texts Grading Syllabus (attached and on internet) Class Objectives (attached and on internet) Schedule to Textbook (on internet)
http://pumpjack.tamu.edu/~juvkam-wold/
gCorrections
MOVIE
1. Introduction
General Information
I
I I
I
1. Introduction
Class Room:
General Information
I I I
I I
1. Introduction
Phone:
845-4093
juvkam-wold@spindletop.tamu.edu
Pete 411 Well Drilling Slide 4 of 16
Textbook
I
by Adam T. Bourgoyne Jr., Martin E. Chenevert, Keith K. Millheim and F.S. Young Jr., Society of Petroleum Engineers, Richardson, TX, 1991.
I
1. Introduction
Slide 5 of 16
1. Introduction
Slide 6 of 16
Homework Assignment:
I Read:
1. Introduction
Slide 7 of 16
The design and evaluation of well drilling systems; identification and solution of drilling problems; wellbore hydraulics; casing design; well cementing; drilling of directional and horizontal wells; wellbore surveying.
1. Introduction
Slide 8 of 16
1. Introduction, the Rotary Drilling Process, The Rig, Drilling Equipment 2. Drilling Cost & Drilling Rate, Hole Problems, Drilling Structures 3. Drilling Bits, Drilling Hydraulics - Hydrostatics 4. Rheological Models, Pressure Losses in Laminar Flow, Slot Flow
1. Introduction Pete 411 Well Drilling Slide 9 of 16
Schedule - contd
WEEK NO. TOPICS
5. Sept. 30 & Oct. 2: no classes; SPE Fall Mtng. Surge and Swab Pressures - contd 6. Pressure across Bit, Bit Nozzle Sizing, Surge and Swab Pressures 7. Lifting Capacity of Drilling Fluids, Casing Design Procedures, Burst, Collapse, Tension
1. Introduction Pete 411 Well Drilling Slide 10 of 16
Schedule - contd
WEEK NO. TOPICS
8. Casing Design, API Performance Properties, Examples, Drilling Technology - Abnormal Pore Pressure Detection 9. Drilling Technology - Balanced and Overbalanced Drilling, Fracture Gradient Prediction, Gas Cut Mud, dc-exponent
1. Introduction Pete 411 Well Drilling Slide 11 of 16
Schedule - contd
WEEK NO. TOPICS
10. Well Control Methods, Kick Detection and Procedures for Killing Wells, Wireline Logging, MWD 11. Cements and Cementing, Primary & Secondary Cementing Squeeze Operations
1. Introduction Pete 411 Well Drilling Slide 12 of 16
Schedule - contd
WEEK NO. TOPICS
12. Cementing Equipment, Additives, Liner Cementing, Setting Cement Plugs 13. Directional Drilling, Well Trajectory Surveying, Horizontal Drilling
1. Introduction Pete 411 Well Drilling Slide 13 of 16
Schedule - contd
WEEK NO. TOPICS
14. Torque & Drag Calculations, Coiled Tubing, Slimhole Drilling 15. Problem Solving, Review, Finals
1. Introduction Pete 411 Well Drilling Slide 14 of 16
Important Dates
I I I
QUIZ A - Thursday, Oct. 10, 7-9 p.m. QUIZ B - Thursday, Nov. 14, 7-9 p.m
QUIZ A & B: Rich 101
Design Projects Due: - Monday, Dec. 9, 5 p.m. (Rich 501F) FINALS Rich 313 - Sec. 501: Mon., Dec. 16, 8-10 a.m. - Sec. 502: Wed., Dec. 18, 10:30-12:30
Pete 411 Well Drilling Slide 15 of 16
1. Introduction
END Lesson 1
And now, the movie...
1. Introduction Pete 411 Well Drilling Slide 16 of 16