Construction of 220/110 kV Substation with 1x200 MVA Transformer and construction of 28.5 km 220 kV Double Circuit line from 220 kV Substation, Pothencode to Kattakkada.
Upgradation of existing 110 kV Substation to 220 kV with installation of 1x200 MVA Transformer and construction of 18.6 km of 220 kV Double Circuit LILO line from Veeyapuram to Punnapra.
3) Construction of 6.5 km Multi circuit line from 220 kV substation, Pallikkara to 220 kV substation, Brahmapuram
1 / 10
Construction of 110/11 kV Substation with 2x12.5 MVA Transformers and construction of 1.5 km Double circuit tap line from 220 kV Substation Kundara to Perinad.
Upgradation of existing 66 kV Koodal Substation to 110 kV with installation of 2x12.5 MVA Transformers and construction of 8 km Koodal - Pathanapuram line.
Construction of 110/33/11 kV Substation with 1x16 MVA, 110/33 kV and 1x5 MVA, 33/11 kV Transformers.
2 / 10
Upgradation of existing 66 kV Substation, Veli to 110 kV by installation of 3x12.5 MVA transformers and upgradation of existing 14 km of Paruthippara -Veli and Paruthippara -Terls 66 kV line to 110 kV.
8) Upgradation of existing 30 km of 66 kV single circuit line from Pallom Kanjirappally to 110 kV double circuit line.
9) Construction of 0.904 km 110 kV DC line to Karikkayam Hydro Electric Project (Private) by LILO from Kakkad Pathanamthitta 110 kV line.
3 / 10
Construction of 66/11 kV substation with 2x10 MVA Transformer and construction of 300 m tap line from Sasthamcotta - Chittamala 66 kV line to East Kallada.
Construction of 33/11 kV Substation with 2x5 MVA Transformer and construction of 12 km, 33 kV line from 110 kV Substation, Attingal to Kadakkavoor.
4 / 10
Construction of 33/11 kV Substation with 2x5 MVA Transformers and laying of 7 km 33 kV UG cable from 110 kV Substation, Thirumala to Peyad.
Construction of 33/11 kV substation with 2x5 MVA Transformers and construction of 4.7 km 33 kV line from 110 kV Substation, Kottiyam to 33 kV Substation, Paravoor.
Construction of 33/11 kV Substation with 2x5 MVA Transformers and construction of 8 km 33 kV line from 110 kV Substation, Kottiyam to Kannanalloor.
5 / 10
Construction of 33/11 kV Substation with 2x5 MVA Transformers and construction of 8.7 km 33 kV single circuit line from 110 kV substation, Mallappally to Kumbanad.
Construction of 33/11 kV Substation with 2x5 MVA Transformers and construction of 8 km 33 kV single circuit line from 110 kV Substation, Edathua to Kadapra.
Construction of 33/11 kV Substation with 2x5 MVA Transformers and construction of 7 km 33 kV single circuit line from 33 kV substation, Kattanam to Vallikunnam.
Construction of 33/11 kV Substation with 2x5 MVA Transformer and construction of 8.86 km 33 kV single circuit line from 110 kV substation, Thrikkodithanam to Vakathanam.
6 / 10
Construction of 33/11 kV Substation with installation of 2x5 MVA Transformers and construction of 17 km single circuit 33 kV line from 110 kV substation, Udumpanoor to Vannapuram.
Construction of 33/11 kV Substation with installation of 2x5 MVA Transformers and construction of 17 km SC line from 110 kV substation, Kuthungal to Senapathy.
7 / 10
Construction of 33 kV Substation with 2x5 MVA Transformers and construction of 8 km single circuit line from 66 kV substation, Mundakayam to Koottikkal
Construction of 33 kV Substation, with 3x5 MVA Transformers and laying of 5.7 km 33 kV double circuit UG cable from 110 kV Substation New Vyttila to Gandhi Nagar and laying of 4.5 km 33 kV double circuit UG cable from 110 kV Substation,
Construction of 110 kV GIS substation and Kollam and laying of 3.75 km 110 kV UG cable from
8 / 10
Construction of 110 kV Substation, Kodimatha with 2x12.5 MVA Transformers and construction of 3.1 km LILO line from Pallom - Punnapra line to Kodimatha.
Upgradation of 66 kV Substation, Kizhakkambalam to 110 kV by installation of 2x12.5 MVA Transformers and construction of 500 m tap line from Aroor-Kalamassery line to Kizhakkambalam.
Upgradation of 66 kV Substation, Ernakulam North to 110 kV by installation of 2x12.5 MVA Transformers and laying of 3.8 km UG cable from 110 kV substation, Kaloor to Ernakulam North.
Construction of 110 kV Substation with 2x12.5 MVA Transformers and construction of 7.22 km
9 / 10
1 st Portion Construction 10 km of 220 kV Multi Circuit line from Katakkada Substation to Balaramapuram
Construction of 33/11 kV substation with 2x5 MVA Transformer and construction of 18.5 km Single Circuit 33 kV line from 110 kV substation, Ranni to Manimala.
9) 33 kV Substation, Pandalam (New) Construction of 33/11 kV substation with 2x5 MVA Transformer and construction of 5.75 km 33 kV Single Circuit line from 110 kV Substation, Edappon to Pandalam.