ANNUAL ROAD WORKS PROGRAMMES 2013/2013 F/Y

COUNTY GOVERNMENT OF SAMBURU


ANNUAL ROAD INVENTORY AND CONSTRUCTION SURVEY FEB 2014 INTERVENTION PLAN
Roa
d

LENG
THKM

No.

Road Name

Length in Kilometers

Unit

QUANTITIES

Rate Kshs

Amount Kshs

Heavy grading.

M2

225,000

13

2,925,000

Dozing

Hrs

240

8,000

1,920,000

of Arches

Gravelling

M3

8,100

1,500

12,150,000

post Town

New culvert installation


M

120

15,000

1,800,000

210

12,000

2,520,000

25
Improvement

Roads.

900mm
New Culvert installation
600mm.
New Drifts (rated).

Pc

2,500,000

7,500,000

New drifts (Access).

Pc

1,500,000

6,000,000
.

Remarks

To Cover
10Km Section

Sub totals
15
Improvement
of Wamba
Town Roads.

34,815,000

Heavy grading

M2

135,000

13

1,755,000

Dozing

Hrs

120

8,000

960,000

New drift (Rated)

Pc

2,500,000

5,000,000

Grading

M3

8,100

1,500

12,150,000

New culvert
installation 900mm

80

15,000

1,200,000

New culvert

M2

2,500

1,650

4,125,000

installation 600mm.

Sub-Totals
7.

Improvement

of Baragoi
town Roads.

Sub-Totals

25,190,000

Heavy grading

M2

40,500

13

526,000

Gravelling

M3

4,040

1,500

6,060,000

New culvert 900mm.

30

15,000

450,000

7,036,000

To Cover
10Km Section

Heavy grading

M2

312,000

13

54,056,000

New culvert

M3

16,000

1,600

25,600,000

New culvert

280

18,000

5,040,000

installation 600mm.

140

15,000

2,100,000

Stone pitching.

M2

3,000

1,650

4,950,000

New drift rented.

No

2,500,000

7,500,000

Gabion installation.

No

120

8,500

1,020,000

Rock fill to gabions

M2

100

1,500

150,000

Scour checks

No

100

800

80,000

Site clearance.

M2

120,000

10

Improvement
of Maralal

installation 900mm

town Roads.

29.
8

1,200,000
Sub Totals
E47
2

51,696,000

39

West gate-

Light grading.

.2

Lengusaka

New culvert

C79.

M2

352,800

13

4,586,400

installation 900mm

294

18,000

5,292,000

Access drift

No

1,500,000

6,000,000

Vented drifts

No

2,500,000

7,500,000

Gravel patching

M3

8,100

1,500

12,150,000

Sub- Totals
URF
1

Junction C78 Resim.

35,525,400

Heavy grading.

M3

54,000

13

702,000

Full

Bush clearing.

M3

24,000

120,000

Gravelling

Gravelling.

M3

4,860

1,500

7,290,000

New culvert

21

12,000

252,000

installation 600mm.
Sub-Totals
URP
1

8,364,000

15.

LORUKO-

Heavy grading.

10

NGUME-ELMALO

New culvert
installation 900mm

M2

105,700

13

1,374,100

38

18,000

684,000

Improvement

Level drifts.

1,500,000

10,500,000

opening new
road

Grading.

Hrs

10,192

1,500

15,288,000

Dozing.

Hrs

100

8,000

800,000

New culvert
M

14

12,000

168,000

installation 600mm

Sub- Totals
E66
7

38.

Tuum-

LONJORIN
Junction

29,026,100

Light grading.

M2

140,000

10

1,400,000

Gravelling.

M3

12,600

1,500

18,900,000

New culvert
installation 900mm.

120

18,000

2,160,000

Level drifts.

No

25

1,500,000

37,500,000

Protection

c77.

t opening
new road

works/Gabion

Improvemen

installation.

No

20

8,500

170,000

Heavy grading.

M2

128,800

13

1,674,400

New culvert
installation 600mm.

64

12,000

Sub Totals

62,572,400

33.

Baragoi-

LOGETEI
kawap.

Heavy grading.

M2

231,000

13

2,310,000

Dozing.

M2

280

8,500

2,380,000

Gravelling.

20,790

1,500

31,185,000

New culvert
installation 900mm.

140

18,000

2,520,000

New drift vented

No

2,500,000

5,000,000

Improvemen

Level drift.

M3

1,500,000

4,500,000

t /MTCE

Sub Totals

47,895,000
Junction

E667

33

768,000

C77 Tuum.

Heavy grading.

M2

210,000

13

2,730,000

Drift grading.

M2

91,000

10

910,000

New culvert 600mm.

45

12,000

540,000

New culvert 900mm

120

18,000

2,160,000

Level drifts.

No

1,500,000

7,500,000

Gabion installation.

No

20

8,500

170,000

Gravelling.

M3

22,275

1,500

33,412,500

Improvement

Sub Totals

45
E145

47,422,500
Junction

Dozing works

Hrs

240

8,000

1,920,000

79-

Heavy grading.

M2

315,000

13

4,056,000

New culvert 900mm.

287

18,000

5,166,000

New rented drifts.

No

2,500,000

12,500,000

Gravelling (Spot)

M3

13,500

1,500

20,250,000

Lolkuresire

SAKARA.

Improvement
Sub Totals

43,892,000
Junction c79

Heavy grading.

M2

95,200

13

1,237,600

URP

- Ngaroni

New culvert 900mm

84

18,000

1,512,000

Resim.

Gravelling.

M3

8,528

1,500

12,750,000

13.
60
Sub Totals
n

10

15,750,600
Ngilati

Land drift.

No

1,500,000

3,000,000

Naimirimo.

Dozing

Hrs

200

8,000

1,600,000

Heavy grading.

M2

70,000

13

910,000

Improvement

New culvert 900mm.

70

18,000

1,260,000

Gravelling.

M3

6,750

1,600

10,800,000

Sub Total
12

14,570,000
Matakwani
Lopesiwo.

Dozing.

Hrs

200

8,000

1,600,000

Grading heavy.

M2

84,000

13

1,092,000

New culvert 900mm.

M3

133

18,000

2,394,000

Gravelling.
8,100

8,500

12,960,000

Sub Totals

18,046,000
Lolkuniani-

13

Mpagas.

Dozing.

Hrs

150

8,000

1,200,000

Heavy grading.

M2

91,000

13

1,183,000

Gravelling.

M3

8,775

1,600

14,040,000

New culvert 900mm.

105

18,000

1,890,000

Gabion installation.

No

30

8,500

225,000

Sub Totals

5.6

improvement

Improvement

18,538,000
Lempuranai-

Dozing.

Hrs

80

8,000

640,000

Improvement

Neterit.

Heavy grading.

Gravelling.

M2

50,400

13

655,200

M3

4,536

1,600

7,257,600

49

18,000

882,000

New culvert
installation

Sub Totals

67

9,434,800
Baragoi-

Light grading.

M2

210,000

10

2,100,000

Latakwenyi

Heavy grading.

M3

375,000

13

4,875,000

Gravelling.

M3

24,300

1,600

38,880,000

New culvert
installation 900mm.

900

18,000

16,200,000

Level drifts.

No.

30

1,500,000

4,500,000

Dozing.

Hrs

245

8,000

1,960,000

Bush clearing.

200,000

100,000

Improvement

Clear Obstruction

M/Day

1,600

400

Sub Totals

70,155,000

Heavy grading.

M2

298,000

13

3,874,000

M3

28,892

1,600

43,027,200

installation 900mm.

175

18,000

3,150,000

Drifts (Level)

No

1,500,000

7,500,000

Dense bush clearing.

M2

40,000

200,000

Light bush clearing.

M2

10,000

30,000

Gabion Installation

No.

30

8,500

225,000

33.

Junction

Gravelling.

A2-

New culvert

Westgate.

Sub Totals

Roads.

Heavy grading.

M2

27,000

13

351,00

Dozing.

Hrs

15

8,000

120,000

Culvert new
installation 900mm.

14

18,000

252,000

Gravelling.

M3

2,700

1,600

4,320,000

Sub Totals
7

Improvement

58,006,200
Tuum town

640,000

Improvement

5,043,000
South Horr

Heavy grading.

M2

63,000

13

819,000

Improvement

Town Roads.

New culvert
installation 900mm.

21

18,000

378,000

Gravelling.

M3

6,300

1,600

10,080,000

Level drifts.

No

1,500,000

3,000,000

Sub Totals

Arics Carried In January by:- Samwel K Gitahi And John Lelesiit

14,277,000