LENG
THKM
No.
Road Name
Length in Kilometers
Unit
QUANTITIES
Rate Kshs
Amount Kshs
Heavy grading.
M2
225,000
13
2,925,000
Dozing
Hrs
240
8,000
1,920,000
of Arches
Gravelling
M3
8,100
1,500
12,150,000
post Town
120
15,000
1,800,000
210
12,000
2,520,000
25
Improvement
Roads.
900mm
New Culvert installation
600mm.
New Drifts (rated).
Pc
2,500,000
7,500,000
Pc
1,500,000
6,000,000
.
Remarks
To Cover
10Km Section
Sub totals
15
Improvement
of Wamba
Town Roads.
34,815,000
Heavy grading
M2
135,000
13
1,755,000
Dozing
Hrs
120
8,000
960,000
Pc
2,500,000
5,000,000
Grading
M3
8,100
1,500
12,150,000
New culvert
installation 900mm
80
15,000
1,200,000
New culvert
M2
2,500
1,650
4,125,000
installation 600mm.
Sub-Totals
7.
Improvement
of Baragoi
town Roads.
Sub-Totals
25,190,000
Heavy grading
M2
40,500
13
526,000
Gravelling
M3
4,040
1,500
6,060,000
30
15,000
450,000
7,036,000
To Cover
10Km Section
Heavy grading
M2
312,000
13
54,056,000
New culvert
M3
16,000
1,600
25,600,000
New culvert
280
18,000
5,040,000
installation 600mm.
140
15,000
2,100,000
Stone pitching.
M2
3,000
1,650
4,950,000
No
2,500,000
7,500,000
Gabion installation.
No
120
8,500
1,020,000
M2
100
1,500
150,000
Scour checks
No
100
800
80,000
Site clearance.
M2
120,000
10
Improvement
of Maralal
installation 900mm
town Roads.
29.
8
1,200,000
Sub Totals
E47
2
51,696,000
39
West gate-
Light grading.
.2
Lengusaka
New culvert
C79.
M2
352,800
13
4,586,400
installation 900mm
294
18,000
5,292,000
Access drift
No
1,500,000
6,000,000
Vented drifts
No
2,500,000
7,500,000
Gravel patching
M3
8,100
1,500
12,150,000
Sub- Totals
URF
1
35,525,400
Heavy grading.
M3
54,000
13
702,000
Full
Bush clearing.
M3
24,000
120,000
Gravelling
Gravelling.
M3
4,860
1,500
7,290,000
New culvert
21
12,000
252,000
installation 600mm.
Sub-Totals
URP
1
8,364,000
15.
LORUKO-
Heavy grading.
10
NGUME-ELMALO
New culvert
installation 900mm
M2
105,700
13
1,374,100
38
18,000
684,000
Improvement
Level drifts.
1,500,000
10,500,000
opening new
road
Grading.
Hrs
10,192
1,500
15,288,000
Dozing.
Hrs
100
8,000
800,000
New culvert
M
14
12,000
168,000
installation 600mm
Sub- Totals
E66
7
38.
Tuum-
LONJORIN
Junction
29,026,100
Light grading.
M2
140,000
10
1,400,000
Gravelling.
M3
12,600
1,500
18,900,000
New culvert
installation 900mm.
120
18,000
2,160,000
Level drifts.
No
25
1,500,000
37,500,000
Protection
c77.
t opening
new road
works/Gabion
Improvemen
installation.
No
20
8,500
170,000
Heavy grading.
M2
128,800
13
1,674,400
New culvert
installation 600mm.
64
12,000
Sub Totals
62,572,400
33.
Baragoi-
LOGETEI
kawap.
Heavy grading.
M2
231,000
13
2,310,000
Dozing.
M2
280
8,500
2,380,000
Gravelling.
20,790
1,500
31,185,000
New culvert
installation 900mm.
140
18,000
2,520,000
No
2,500,000
5,000,000
Improvemen
Level drift.
M3
1,500,000
4,500,000
t /MTCE
Sub Totals
47,895,000
Junction
E667
33
768,000
C77 Tuum.
Heavy grading.
M2
210,000
13
2,730,000
Drift grading.
M2
91,000
10
910,000
45
12,000
540,000
120
18,000
2,160,000
Level drifts.
No
1,500,000
7,500,000
Gabion installation.
No
20
8,500
170,000
Gravelling.
M3
22,275
1,500
33,412,500
Improvement
Sub Totals
45
E145
47,422,500
Junction
Dozing works
Hrs
240
8,000
1,920,000
79-
Heavy grading.
M2
315,000
13
4,056,000
287
18,000
5,166,000
No
2,500,000
12,500,000
Gravelling (Spot)
M3
13,500
1,500
20,250,000
Lolkuresire
SAKARA.
Improvement
Sub Totals
43,892,000
Junction c79
Heavy grading.
M2
95,200
13
1,237,600
URP
- Ngaroni
84
18,000
1,512,000
Resim.
Gravelling.
M3
8,528
1,500
12,750,000
13.
60
Sub Totals
n
10
15,750,600
Ngilati
Land drift.
No
1,500,000
3,000,000
Naimirimo.
Dozing
Hrs
200
8,000
1,600,000
Heavy grading.
M2
70,000
13
910,000
Improvement
70
18,000
1,260,000
Gravelling.
M3
6,750
1,600
10,800,000
Sub Total
12
14,570,000
Matakwani
Lopesiwo.
Dozing.
Hrs
200
8,000
1,600,000
Grading heavy.
M2
84,000
13
1,092,000
M3
133
18,000
2,394,000
Gravelling.
8,100
8,500
12,960,000
Sub Totals
18,046,000
Lolkuniani-
13
Mpagas.
Dozing.
Hrs
150
8,000
1,200,000
Heavy grading.
M2
91,000
13
1,183,000
Gravelling.
M3
8,775
1,600
14,040,000
105
18,000
1,890,000
Gabion installation.
No
30
8,500
225,000
Sub Totals
5.6
improvement
Improvement
18,538,000
Lempuranai-
Dozing.
Hrs
80
8,000
640,000
Improvement
Neterit.
Heavy grading.
Gravelling.
M2
50,400
13
655,200
M3
4,536
1,600
7,257,600
49
18,000
882,000
New culvert
installation
Sub Totals
67
9,434,800
Baragoi-
Light grading.
M2
210,000
10
2,100,000
Latakwenyi
Heavy grading.
M3
375,000
13
4,875,000
Gravelling.
M3
24,300
1,600
38,880,000
New culvert
installation 900mm.
900
18,000
16,200,000
Level drifts.
No.
30
1,500,000
4,500,000
Dozing.
Hrs
245
8,000
1,960,000
Bush clearing.
200,000
100,000
Improvement
Clear Obstruction
M/Day
1,600
400
Sub Totals
70,155,000
Heavy grading.
M2
298,000
13
3,874,000
M3
28,892
1,600
43,027,200
installation 900mm.
175
18,000
3,150,000
Drifts (Level)
No
1,500,000
7,500,000
M2
40,000
200,000
M2
10,000
30,000
Gabion Installation
No.
30
8,500
225,000
33.
Junction
Gravelling.
A2-
New culvert
Westgate.
Sub Totals
Roads.
Heavy grading.
M2
27,000
13
351,00
Dozing.
Hrs
15
8,000
120,000
Culvert new
installation 900mm.
14
18,000
252,000
Gravelling.
M3
2,700
1,600
4,320,000
Sub Totals
7
Improvement
58,006,200
Tuum town
640,000
Improvement
5,043,000
South Horr
Heavy grading.
M2
63,000
13
819,000
Improvement
Town Roads.
New culvert
installation 900mm.
21
18,000
378,000
Gravelling.
M3
6,300
1,600
10,080,000
Level drifts.
No
1,500,000
3,000,000
Sub Totals
14,277,000