ERGON POWER

COMPANY OVERVIEW November - 2013

Company Overview
Name of Company : Ergon Power Representaciones S.A.C General Manager : Ricardo A. Velasco, Eng. 125 F. Bolognesi St, Office 1401 Centro Ejecutivo Pardo, Miraflores, Lima Per (GM and Commercial Office) Per Telephone Central : (511) 7165907 Tel.Fax : (511) 4466617 Chile Office address: 2670 Vitacura Av, Floor 15, Las Condes, Santiago Chile (Commercial Office) Chile Telephone Central: (56 2) 8204339 Web: www.ergonpower.com

Peru Offices address:

Company Overview
ERGON POWER is a privately held company, created mainly to provide specialized machinery, equipment and services for energy industries.

We have exclusive contracts and commercial agreements with worldwide known manufacturers and the main providers of such equipment in Latin America, Asia and Europe.
We have always obtained from our customers complete satisfaction for our modus operandi, our sincerity in leading them to choose the best kind of equipment for their needs and our after sales service. We are also Advisors and Consultants of a very important Investors and International Generation Companies, that are interested in taking part in Energy Projects in Latin America or make an Investment in that market.

ERGON POWER
Energy Representations

ERGON POWER

Harbin Electric Corporation Ltda: (www.hec-china.com) Chinese group recognized worldwide by its technology and quality in the manufacturing of Electromechanical Equipment for Medium and High Power Plants. Ergon Power is working with Harbin in all the Latin America Energy market with success.

ERGON POWER

China GEZHOUBA Group Corporation: (www.gzbgj.com/english ) One of the most important EPC Contractors in the world. Main Contractor of Three Gorges Project. Its business scope includes infrastructure construction, investment, electrical projects(with financing) and highways as well as real estate.

ERGON POWER

SEPCO III Electric Power Construction Corporation: (www.sepco3.com/english.asp ) No.58 of Top 225 International Engineering Contractors. More than 23,000MW of power plant in operation. Contractor in model EPC, BOO, BOOT + Financing. Its business scope includes thermal power plants, wind farms and Solar power plant.

ERGON POWER

Harbin Mechanical & Electric Equipment Co. Ltd. HMEC


Chinese commercial company from Harbin Group (HE), Supplier all the Electromechanical Equipments for Small and Medium Power Plant (W2W scope). Also of factories as Harbin Boiler Co. and Harbin Turbine Co. from thermal electromechanical equipments.

ERGON POWER

Wuhan GuoCeSanlian Hydropower Equipment Co.,Ltd : Chinese company that : is a key member of Wuhan Guoce Science & Technology Co. Ltd. Partner of HMEC and Specialist Supplier of Control System for Small Power Plants.

ERGON POWER

SanBian Sci-Tech Co.,Ltd : Chinese company that was established in 1968, the most important manufacturer of Transformers in the world, with annual production capacity more than 24.000.000 kVA.

ERGON POWER

Chongqing Fengyu Electric Equipment Co., Ltd: (www.fengyugroup.com)


Top BIOMASS gasifier manufacturer with a history of more than 24 years, Chinese biomass gasification technology forerunner, and we own fluided-bed gasifier patent, which available feedstock are rice husk, woodchips, sawdust, bark, bagasse, crop stalks, olive pomace, palm kernel shell, coconut shell, bamboo, macadamia nut shell and other agricultural residues.

ERGON POWER

Electro Ao Altona S/A ALTONA : (www.altona.com.br)


Brazilian company recognized worldwide by its technology and quality in the foundry and manufacture of pieces and components for manufacturing sector and electrical generation industry

ERGON POWER

REIVAX Automation and Control : (www.reivax.com)


Brazilian company recognized worldwide by its technology and quality supplying systems and solutions for the control of energy generation and in modernization of existing plants.

ERGON POWER

Wuhan GuoCe Nordic New Energy Co.,Ltd : Joint venture company founded by Chinese Wuhan Guoce Science & Technology Co.,Ltd. and Swedish Deltawind AB. The business scope of the company is the production, erection, commissioning, operation, maintenance and after-sales service of Wind Turbines

ERGON POWER

SUMEC Complete Equipment & Engineering Co.,Ltd (www.sumec.com ) :


SUMEC Complete Equipment & Engineering Co. Ltd : (SUMEC-CEEC) is one of the core subsidiaries of SUMEC Group Corporation. EPC contractor for Small Hydro power plants, Biomass Power Plants, Wind Power Plant, Solar Power Plant Seawater Desalinization. Manufacturer of Gen Set for Biomass Power Plant.

ERGON POWER

Jiangsu Antai New Energy Technology Co., Ltd.(JAE):


JAE., is a joint venture established by Jiangsu Antai Power : Machinery Co., Ltd. (one of the most famous engine manufacturer in China) and SUMEC Complete Equipment & Engineering Co., Ltd. (a reputable International Engineering Company). JAE is the largest low speed gas engine and gas generator set manufacturer in China with technology joint venture with MAN (Germany).

ERGON POWER

PHONO SOLAR Technology Co.:


Phono Solar Technology Co., Ltd., was founded by SUMEC : Group Corporation, a member of the China National Machinery Industry Corporation (SINOMACH). Phono Solar is a leading brand in the renewable energy industry, producing high quality solar products since 2004. The Phono Solar brand has become synonymous with high performing, top quality photovoltaic panels and specializes in PV technology innovation, application and system development.

ERGON POWER
Hydro Projects

Contract in operation
POECHOS 2 HPP (02 x 5.5 MW) - Peru
Client: Sinersa (Private Company)

Scope: 02 Butterfly Valves - 3.2m including commissioning


Contractual Date: August , 2007

BONYIC HPP (03 x 11 MW) - Panama

Final Client: Hidroecologica del Teribe S.A.


Scope: Harbin (HE) supplied Mechanical BoP Equipments (Francis Turbines) in consortium with ABB. The scope include commissioning. Contractual Date: June, 2008

Contracts in operation
PIAS 1 HPP (2 x 6.2 MW) - Peru
Client: AYEPSA (Private Company)

Scope: Harbin (HE) supplied the Electromechanical Equipments, Horizontal Francis Turbines (without Main Transformer and electrical auxiliaries), including erection and commissioning. ( Turn Key)
Operation Date: October 2011

INTERPLUS HPP (5 KW) - Chile


Final Client: Universidad de Santiago de Chile

Scope: Tubular Compact Turbine-Generator-Governor-Valve Group


Operation Date: July 2011
.

Contracts in operation
YAUPI HPP (112 MW) - Peru
Direct Client: REIVAX Brazil Scope: Erection of 5 generation groups including man power, tools, local transportation, supervisors, commissioning and maintenance service.

Contractual Date: Since August 2010

MACHUPICCHU HPP (1 x 100 MW) - Peru

Final Client: EGEMSA (Public Company)


Direct Client: Grana y Montero (EPC contractor)

Scope: Francis Turbine, Generator, Valves, Governor, Excitation Sys from Harbin (HE), and Substation and Control Sys. from ABB. The scope include commissioning of the equipments supplied

Contracts on execution
CHUCAS HPP (02 x 25 MW) - Costa Rica
Final Client: ICE / Direct Client: ENEL Scope: Harbin (HE) will supply Mechanical BoP Equipments (Francis Turbines) in consortium with ABB. The scope include commissioning.

Updated Situation : Contract on execution.

SOPLADORA HPP (03 x 164 MW) - Ecuador


Final Client: Government Project Scope: EPC Contract (with CGGC as EPC Contractor and Harbin (HEC) as supplier of E&M Equipments Francis Turbines). Updated Situation: Contract on execution.

Contracts on execution
TOPO HPP (02 x 14.8 MW) - Ecuador
Final Client: Hydrotopo Scope: Harbin (HEC) offered Main Electromechanical Equipments (Horizontal Francis Turbines)

Updated Situation: Contract on execution.

CANCHAYLLO HPP (5.2 MW) - Peru


Client: Empresa de Generacion Electrica Canchayllo (Private Company) Scope: Complete Electromechanical Equipments (02 Horizontal Francis Turbine) from Harbin (HMEC), erection and commissioning (Turn Key) Updated Situation: Contract on execution.

Contracts on execution
ITATA HPP (2 x 10.2 MW) - Chile
Client: Electrica Puntilla S.A. (Private Company) Scope: Complete Electromechanical Equipments from Harbin commissioning (Turn Key) considering Vertical Francis Turbine. (HMEC),

Updated Situation: Contract on execution.

CHAPIQUINA HPP ( 10.2 MW) - Chile

Client: E-CL (GDF Suez Private Company)


Scope: Erection of governor and control systems from REIVAX, including man power, tools, local transportation, supervisors, commissioning and maintenance service. Updated Situation: Contract on execution.

Contract on execution
Transformers Corporate Purchase(163 MVA) - Peru
Client: Electro Oriente, SEAL, ELSE, ELSUR, ELPU, Electro Ucayali, Grupo Distriluz (Public Company) Scope: Supply of 1650 transformers to all country (Sanbian factory)

Updated Situation: contract on execution.

Mazuko Substation (35 MVA) - Peru


Client: ELSE (Public Company) Scope: Supply of transformer of 35 MVA 138/22.9/10kV, erection service and civil works (Sanbian factory) Updated Situation: contract on execution.

Contract on execution
Restitucion HPP (3 x 100 MW) - Peru
Client: Electroperu (Public Company)

Scope: Voltage Regulators, Excitation System of Generators with test, erection, supervision and commissioning ( REIVAX factory) Updated Situation: contract on execution

Canon del Pato (263 MW) - Peru


Client: Duke Energy (Private Company) Scope: Service in site , Exciter Rings, 6 pairs

Updated Situation: contract on execution.

Contract awarded
SANTA MARIA HPP (750 MW) - Peru
Client: Energia Azul (Private Company)

Scope: EPC Contract (CGGC as EPC Contractor 04 units x 187 MW).


Updated Situation: EIA was approved. Energia Azul signed a MoU Agreement with CGGC, CGGC will obtain the 96% of shares, will be the EPC Constructor and will obtain the financial close. The construction could be beginning in year 2014.

PIAS I HPP (3rd Unit - 6 MW) - Peru


Client: AYEPSA (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)
Updated Situation: The client approved this project.

Contract awarded
Hydrika 1 HPP (6.6 MW) - Peru
Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

Updated Situation: This project are finalizing the feasibility studies.

Hydrika 2 HPP (4.0 MW) - Peru


Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) Updated Situation: This project are finalizing the feasibility studies

Contract awarded
Hydrika 3 HPP (10 MW) - Peru
Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

Updated Situation: This project are finalizing the feasibility studies.

Hydrika 4 HPP (8 MW) - Peru


Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) Updated Situation: This project are finalizing the feasibility studies.

Contract awarded
Hydrika 5 HPP (10 MW) - Peru
Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

Updated Situation: This project are finalizing the feasibility studies.

Hydrika 6 HPP (8.8 MW) - Peru


Client: Hydrika Generacion SAC (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) Updated Situation: This project are finalizing the feasibility studies.

Contracts in Negotiation
SANTA RITA HPP (3 x 85 MW) Peru
Client: ELECTRICIDAD ANDINA (Private Company)

Scope: EPC Contract by CGGC including Electromechanical Equipments (03 Francis Turbine).
Updated Situation: CGGC prepared an Optimization Technical Study ,. The Chinese Banks are analyzing the client.

Huatziroki 1 HPP (20 MW) - Peru


Client: ARSAC GEHISA (Private Company) Scope: Complete Electromechanical Equipments (HMEC), (Turn Key) Updated Situation: This project obtained RER contract with government for 20 years.

Contracts in Negotiation
COLCA HPP CHILCAY HPP (4 x 8.2 MW) - Peru
Client: Cascade Hydropower (Private Company) Scope: Complete Electromechanical Equip.from Harbin (HMEC), erection and commissioning (Turn Key) (02 Francis Turbines for each HPP)

Updated Situation: In negotiation.

HUASICANCHA HPP (2 x 4.6 MW) - Peru


Client: Cascade Hydropower (Private Company)

Scope: Complete Electromechanical Equip.from Harbin (HMEC), erection and commissioning (Turn Key) (02 Francis Turbines for each HPP)
Updated Situation: In negotiation.

Contracts in Negotiation
M HPP (2 x 9.1 MW) - Peru
Client: ENDESA Generalima (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) (02 Pelton Turbines)

Updated Situation: In negotiation.

A HPP (2 x 6.1 MW) - Chile


Client: ENDESA (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key).
Updated Situation: In negotiation.

Contracts in Negotiation
POTRERO HPP (20 MW) - Peru
Client: KIEV Asociados (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) (02 Francis Turbines)

Updated Situation: In negotiation.

PIAS 2 HPP (24 MW) - Peru


Client: AYEPSA (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key).
Updated Situation: The client confirmed the investment.

Contracts in Negotiation
CHILCOCO HPPs (2 MW + 20 MW) - Chile
Client: Carran Ltd. (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

Updated Situation: We are in negotiation

ALLIPENO HPP (20 MW) - Chile

Client: GTD (Private Company)


Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) Updated Situation: We are in negotiation

Contracts in Negotiation
CHERQUENO HPP (9 MW) - Chile
Client: GTD (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

Updated Situation: We are in negotiation

ANIHUERAQUIO HPP (4.5 MW) - Chile


Client: GTD (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)
Updated Situation: We are in negotiation

Contracts in Negotiation
EDEGEL HPPs - Peru
Direct Client: REIVAX (Private Company) Scope: Erection services of Control equipments including manpower, tools, local transportation, supervisors and commissioning, for Huinco, Matucana, Moyopampa and Huampani HPPs for 5 years. Updated Situation: In stand by until year 2014.

ANGEL II, III HPP (04x 10.3 MW) - Peru


Client: GEPSA (Privates Companies) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) with 2 Pelton units for each hpp. Updated Situation: In negotiation.

Contracts in Negotiation
Marino 1 HPP (8 MW) - Peru
Client: Marino Co. (Private Company) Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key) 02 Kaplan turbines.

Updated Situation: 2Q 2013 will be defining contractors.

Marino 2 HPP (10 MW) - Peru


Client: Marino Co. (Private Company)

Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key) 02 Kaplan turbines.
Updated Situation: 2Q 2013 will be defining contractors

Contracts in Negotiation
Marino 3 HPP (8 MW) - Peru
Client: Marino Co. (Private Company) Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key) 02 Kaplan turbines. Updated Situation: 2Q 2013 will be defining contractors.

Marino 4 HPP (19 MW) - Peru


Client: Marino Co. (Private Company)

Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key) 02 Kaplan turbines.
Updated Situation: 2Q 2013 will be defining contractors.

Contracts in Negotiation
Cativen 1 HPP (15 MW) - Peru
Client: Minera Poderosa. (Private Company) Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key). Updated Situation: 4Q 2013 will be defining contractors.

Cativen 2 HPP (15 MW) - Peru


Client: Minera Poderosa. (Private Company)

Scope: Complete Electromechanical Equipments from HMEC, erection and commissioning (Turn Key).
Updated Situation: 4Q 2013 will be defining contractors.

Projects in bid
LA PERLA HPP (18 MW) - Costa Rica
Client: Gas Natural Fenosa Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key)

LAGUNA AZUL HPP(19.9 MW) - Peru


Client: Hidroelectrica Laguna Azul SRL (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key), Kaplan turbines

Projects in bid
BELESAR 3 HPP (2 x 107 MW) - Espana
Client: Gas Natural Fenosa (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key) 02 Reversible Turbines

PEARES 3 HPP (157 MW )- Espana


Client: Gas Natural Fenosa (Private Company)

Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key), Francis turbine

Project on Evaluation
AGUAS VERDES (20 MW) - Peru
Client: Energoret (Private Company) Scope: Complete Electromechanical Equipments from Harbin (HMEC), erection and commissioning (Turn Key). Updated situation: the client are founding investor partner.

Project on Evaluation
LLUTA I, II & LLUCLLA HPPs (510 MW) - Peru
Client: EGASA PROINVERSION (Public Company) Scope: EPC contract, probably Concession Contract (30 years). 03 Power Plants : LLuta I HPP - 2 Pelton (214MW), Lluclla HPP - 2 Pelton (238.4 MW), Lluta II HPP: 2 Francis (52.47 MW) Investment $ 1076 MM aprox. ERGON POWER are defining the Representation to taking part. Government will be bidding on 2013.

Project on Evaluation
SAN JOSE HPP (127 MW) - Bolivia
Client: ENDE (Public Company) Scope: EPC contract, using 03 Pelton turbines of 42.3 MW each. -First stage: HPP with 2 Pelton Turbines, 42.3 MW per each. -Second stage: HPP with 1 Pelton Turbines, 42.3 MW Investment : 197 MM aprox.

TANGARA HPP (75 MW) - Bolivia


Client: EDEGEL (Private Company)
Scope: EPC contract.

Investment : 100 MM aprox.

ERGON POWER
Biomass Projects

Contracts in Negotiation
CAMPOSOL (4 MW) - Peru
Client: Camposol (Private Company) Scope: Considering 08 gen sets of 500kW, Biomass Power Plant using Asparagus - Turn Key Contract with FENGYU.

VIRU (1.2 MW) - Peru


Client: Viru (Private Company) Scope: Considering 03 gen sets of 400kW, Biomass Power Plant using Asparagus - Turn Key Contract with FENGYU

Contracts in Negotiation
DANPER (3.6 MW) - Peru
Client: Danper (Private Company) Scope: Considering 07 gen sets of 500kW, Biomass Power Plant using Asparagus - Turn Key Contract with FENGYU.

CAMPOSUR (1.5 MW) - Peru


Client: Camposur (Private Company) Scope: Considering 03 gen sets of 500kW, Biomass Power Plant using Rice husk - Turn Key Contract with FENGYU

ERGON POWER
Thermal Projects

Contracts in Negotiation
PIRQUENES Coal Power Plant (60 MW) - Chile
Client: SWC (Private Company) Scope: EPC Contract with CGGC as EPC Contractor. Updated Situation: We are in the short list. The client are waiting the approbation of the EIA.

EL FARO Dual Power Plant (300 MW) - Peru


Client: Shougesa (Chinese Private Company)

Scope: EPC Contract. Considering 01 gas turbine, a heat recovery boiler and steam turbine.

Contracts in Negotiation
OLIMPIC Gas Power Plant (10 MW) - Peru
Client: Clean Energy (Private Company) Scope: Turn Key electromechanical equipments and commissioning. Updated Situation: We are in the short list.

INKA Gas Power Plant (300 MW) - Peru


Client: Cemento Inka (Private Company)
Scope: Turn Key electromechanical equipments and commissioning.

Updated Situation: We are in the short list.

Project on Evaluation
CALDERA Coal Power Plant (900 MW) - Chile
Client: ABS GROUP(Private Company) Scope: EPC Contract. Updated Situation: Ergon Power are helping the owner to obtain EPC Contractor and Investor. Investment : 1,200 MM aprox

NODO SUR Power Plant (500 MW) - Peru


Client: Enersur (Private Company) IC Power (Private Company) Scope: EPC Contract. Updated Situation: Ergon Power are interested in taking part in the bid

ERGON POWER
Wind Farm Projects

Project on Evaluation
CALAMA Wind Farm (128 MW) - Chile
Client: E-CL S.A.(Private Company) Scope: EPC Contract with financing. Considering turbines of 2.0 MW or 1.5 MW. Investment: $ 240 MM aprox. Updated Situation: ERGON POWER are helping the owner to obtain EPC Contractor - Investor.

Project on Evaluation
LEBU Wind Farm (280 MW + 158 MW) - Chile
Client: Bosquemar Ltd.(Private Company) Scope: EPC Contract with financing. Considering 140 turbines of 2.0 MW + 79 turbines for the second stage. Investment : $ 540 MM aprox. Updated Situation: ERGON POWER are helping the owner to obtain EPC Contractor - Investor.

Project on Evaluation
LLANQUIHUE Wind Farm (54 MW) - Chile
Client: ENER RENOVA.(Private Company) Scope: EPC Contract with financing. Considering turbines of 2.0 MW. Updated Situation: ERGON POWER are helping the owner to obtain EPC Contractor - Investor.

CKANI Wind Farm (240 MW) - Chile


Client: AM Eolica Alto Loa S.P.A.(Private Company) Scope: EPC Contract with financing. Considering turbines of 2.0 MW or 1.5 MW. Updated Situation: ERGON POWER are helping the owner to obtain EPC Contractor - Investor.

Project on Evaluation
LLAY LLAY Wind Farm (56 MW) - Chile
Client: Servicios Eolicos L S.A.(Private Company) Scope: EPC Contract with financing. Considering 28 turbines of 2.0 MW. Updated Situation: ERGON POWER are helping the owner to obtain EPC Contractor - Investor.

ERGON POWER
Solar Projects

Projects in bid
Danper Power Plant (3 MW) - Peru
Client: Danper (Private Company)
Scope: EPC Contract with SUMEC.

Updated Situation: We are preparing the proposal.

Solar Power Plant (20 MW) - Peru


Client: Peru Energia Renovable Enhol (Private Company) Scope: EPC Contract with SUMEC. Updated Situation: We are preparing the proposal.

ERGON POWER
Infrastructure Projects

Project on Evaluation
San Martin Port - Peru
Client: PROINVERSION (Public Company) Scope: BOOT Contract - Concession bid for 30 years Investment: $ 101.2 MM aprox. ERGON POWER are defining the Representation to taking part. The Government opened the qualification bid.

Project on Evaluation
Chincheros International Airport - Peru
Client: PROINVERSION (Public Company) Scope: BOOT Contract - Concession bid for 30 years Investment: $ 420 MM aprox. ERGON POWER are defining the Representation to taking part. The Government opened the qualification bid.

Project on Evaluation
Electric Train Metro Line 2 - Peru
Client: PROINVERSION (Public Company) Scope: BOOT Contract - Concession bid for 30 years Investment: $ 3000 MM aprox. ERGON POWER are defining the Representation to taking part. The Government will open the qualification bid on year 2013.

Project on Evaluation
National Highway - Peru
Client: PROINVERSION (Public Company) Scope: BOOT Contract - Concession bid for 30 years Investment: $ 3800 MM aprox. ERGON POWER are defining the Representation to taking part. The Government will open the qualification bid on year 2013.

OFICINA EN PER:

Direccin: F. Bolognesi 125 Of. 1401 Centro Ejecutivo Pardo, Miraflores, Lima Per.

Gerencia General y Of. Comercial Central Telefnica: (511) 7165907

OFICINA EN CHILE:

Direccin:

Av. Vitacura 2670 Piso 15, Las Condes, Santiago Chile.

Oficina Comercial
Central Telefnica: (56 2) 8204339

THANKS !
Request a Reference Lists of our Representations by email info@ergonpower.com