Lecture Overview
1. Hydro Power Introduction 2. Hydro Power Characteristics 2.1. Types of Hydro Power Systems 2.2. Identifying Hydro Power Resource 3. Micro Hydro Power System Design 3.1 Mechanical Design - Inlet - Pipeline - Turbines 3.2 Electrical Design 4. Case Study Waterval Micro Hydro Power System
Introduction
Hydro power systems Very significant source of electrical energy Represents 19% of annual global electrical energy production Current global installed capacity: 1,010GW South African installed capacity: 690MW Hydro Power size classification Capacity > 10MW 1 10MW 100 1,000kW < 100kW Classification Large Hydro Power System Small Hydro Power System Mini Hydro Power System Micro Hydro Power System SAs Share 95% 3.7% 1.2% 0.1%
Introduction
Micro Hydro Power Systems Disadvantages High Capital investment is usually required Recent increases in electricity tariffs and those planned for future Micro Hydro Power Systems becomes more feasible Advantages No large complicated and expensive civil works Low Operating and Maintenance cost Depending on technology spare parts could be easily available Base load can be supplied continuously Reliable systems with long life spans Capacity factor can be >90%, compared to wind where capacity factor of 20 - 40% usually achieved
Remember the environmental reserve, i.e. minimum flow that need to remain in the river after water is diverted from the river
14 12
10
10
8
Flow (m 3/s)
Flow (m3/s)
4
4
0 1 2 3 4 5 6 Month 7 8 9 10 11 12
0 1 2 3 4 5 6 Month 7 8 9 10 11 12
10
11
12
13
Pipeline losses determined by: Length of pipeline Diameter of pipeline Material type Flow rate Valves, Bends, etc.
14
2.5
2 Cost (ZAR)
1.5
0.5
120
140
220
240
15
Jointing Handling
Slide into one another Easy, light and available in fixed lengths
Need to be welded on site Easy, light and available in fixed lengths or long rolls
17
18
Kaplan Turbine
Turgo Wheel
Pelton Wheel
Francis Turbine
19
20
v= 2
. ( )/
(m)
21
22
23
W = 1.5m Determine maximum flow to be measured: Consider constraint of W > 3h; h = 0.5m Q = 1.8( 0.2)/ Q = 1.8(1.5 0.2(0.5))(0.5)/ Q = 0.89m3/s
24
25
27
d= d=
. ( )/
. ((.)(.))/
d = 13.5mm
28
90 Net head at the end of the main pipeline (m) 80 70 60 50 40 30 20 10 0 0 5 10 15 Flow (l/s) 20 25 30 Measured Results Calculated Resu lts
29
6
Maintenance
4
System downtime
0
1/7/2009 3/7/2009 5/7/2009 7/7/2009 9/7/2009 11/7/2009 13/7/2009 15/7/2009 17/7/2009 19/7/2009 21/7/2009 23/7/2009 26/7/2009 28/7/2009 30/7/2009 1/8/2009 3/8/2009 5/8/2009 7/8/2009 9/8/2009 11/8/2009 13/8/2009 15/8/2009 17/8/2009 20/8/2009 22/8/2009 24/8/2009 26/8/2009 28/8/2009 30/8/2009
Date
30
20
15
13.20834
13.06559
10
8.14
9.04263
31
Micro Hydro Power System Capital Expenditure R135,610 Annual Operation and Maintenance Cost R350
32
400 350 300 250 200 150 100 50 0 -50 -100 -150 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 MHPS Life Cycle (Years)
33
34
Thanks
adriaanlombard@gmail.com