Documente Academic
Documente Profesional
Documente Cultură
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
68
105
24
13
30
78
116
32
17
45
80
135
20
20
60
55
120
31
15
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
281
476
107
65
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
92.73
476.00
187.25
146.25
902.23
Table 2
Location: PARIT RAJA APPROACH(RIGHT TURN)
Day: Monday
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
21
18
30
10
10
45
30
15
60
22
17
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
83
60
25
7
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
27.39
60.00
43.75
15.75
146.89
Table 3
Location: EVERGREEN APPROACH (RIGHT TURN)
Day: Monday
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
13
25
30
20
18
45
15
13
60
10
15
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
58
71
16
7
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
19.14
71.00
28.00
15.75
133.89
Table 4
Location: EVERGREEN APPROACH (LEFT TURN)
Day: Monday
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
20
17
30
14
20
45
16
14
60
18
16
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
69
67
14
14
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
22.77
67.00
24.50
31.50
145.77
Table 5
Location: UTHM APPROACH (LEFT TURN)
Day: Monday
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
18
15
30
35
18
45
23
11
60
19
15
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
95
59
30
13
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
31.35
59.00
52.50
29.25
172.10
Table 6
Location: UTHM APPROACH (THROUGH)
Day: Monday
Date: 11/11/2013
Traffic Count
Vehicle Class
Time/min
1
15
55
62
32
30
42
55
43
10
45
31
35
26
60
30
36
31
12
Vehicle Class
Class 1 (Motorcycle)
Class 2 (Car)
Class 3 (Van & Medium truck)
Class 4 (Heavy Truck & Buses)
Traffic Volume
(Veh/hour)
158
188
132
39
Total
Note: p.c.u. = passenger car unit
p.c.u
Factor
0.33
1.00
1.75
2.25
p.c.u
52.14
188.00
231.50
87.75
559.39
Table 7
1
Phase
Diagram
Movement
Uthm(Through)
Uthm(Th+Left)
PR(Through)
PR(Right)
E(Left)
E(Right)
W (m)
3.6
3.6
4.2
3.6
4.2
4.2
S *(pcu/hr)
1897
1897
2053
1897
2053
2053
q (pcu/hr)
559.39
172.10
902.23
146.89
133.89
145.77
y = q/S
0.29
0.09
0.44
0.08
0.07
0.07
0.29
0.44
0.07
* Saturation flow (S) must be corrected for effect of gradient, turning radius, left-turn and rightturn (whichever required).
* Assume turning radius for this intersection is between 10 15 m.
Calculation of Saturation Flow, S
Y = y1 + y2 + y3 = Ymax
(Note: Y must be 0.85 or below, in order to proceed with calculations.)
Number of phases, n = 3
Total lost time, L = n(I a) + nl = 12 sec
Practical capacity, Yprac = 0.9 0.0075L = 0.81
Reserve capacity, RC = 100% ( Yprac Y ) / Y = 100% x (0.81 0.80/0.80) = 1.25%
Table 9
Phase
Movement
Uthm
(Through)
Uthm(Th+Left)
PR(Through)
PR(Right)
E(Left)
E(Right)
C (sec)
80
80
112
110
110
110
g (sec)
32
32
90
17
15
15
l = g/C
0.40
0.40
0.80
0.15
0.14
0.14
S (pcu/hr)
1897
1897
2053
1897
2053
2053
q (pcu/hr)
559.39
172.10
902.23
146.89
133.89
145.77
qs(pcu/sec)
0.16
0.05
0.25
0.04
0.04
0.04
x = q/lS
0.74
0.23
0.55
0.52
0.47
0.51
d (sec)
24.33
14.89
4.81
45.13
43.88
45.40
LOS