Sunteți pe pagina 1din 3

Production Schedule

Week 1 Mon On Monday I will be starting off the project by making the template of the layout of my recipe cards. Me and Henry also thought to start this off by working on this together to understand what is been done. Once this is done I can send the template to Henry so he can then work off this too. The background and colours will be placed onto our template. The title will be placed on the template with the font Remachine cript!. "or now# the colour of that font will be a golden# bron$e colour. %ater on we will hopefully be able to find out how we can possibly put a proper gold onto it. &ll the work for this will be done on 'hotoshop. If we ha(e time after doing this# we will be able to go on to a photo library and pick out the photos that we need for our project. Tue If we don!t ha(e enough time on the Monday to get the pictures we need off the photo library# we will use this day to choose them. Once they ha(e been chose# we will decide between us who are doing which recipe cards. )e will then get started on them. This day will be the production of my first card by using 'hotoshop throughout. I will start by adding by photo to the template of my recipe cards I will then go on and add in all my sub titles such as Informa$ioni!# Method! and Ingredients!. &ll these will be done in the Remachine cript! because that is our elegant title font. &fter this# I will add all the writing for# such as the ingredients# method# and information. &ll these will be done in a different font called *alibri!. This font is a lot clearer and easier to read. )ed )ednesday morning I will be carrying on with my first recipe card by completing the things that I did not complete on the following day. This may consist of adding e+tra writing on my recipe card# and sorting out any mistakes I may ha(e made within my writing. I will then ha(e time to go o(er e(ery piece of my first recipe card to see if there are any little bits I can change to make it of a higher ,uality. )ednesday afternoon I will be starting on my second recipe card# and I will try my best to gi(e me enough time to go through the same process as what I did with the first recipe card. This will then gi(e me enough time to add the images that are needed# the design which is needed# and the certain copy which is needed.

Week 2 Mon On Monday# I will carry on with my second recipe card which I won!t ha(e finished yet. This day will consist of just fi+ing up all the little things I may ha(e done wrong# which I will then ha(e time to go back and fi+. I am also gi(ing me time on this day to go back and make a few changes in the first two cards. This is if I want to change a big bit of the layout# for e+ample# If I wanted to change the way that the image is presented# I will most likely ha(e to change it on all my already e+isting cards to make it seem like a bundle pack. In this project# I want all my cards to ha(e the same layout.

Tue On Tuesday# I will be starting on my third recipe card. This day will consist of adding in my image# copy# title# and design. -y this time I hope I am used to what I am doing# and be able to know e+actly what I am doing without thinking.

)ed On )ednesday morning# I am going to carry on with my third recipe card. This will just be a morning of sorting out the little things that I may need to go o(er to complete the third recipe card. I am only gi(ing myself a morning to do this because I am sure I won!t ha(e made as many mistakes as what I did to start with# so I won!t need as much time. )ednesday afternoon I will be starting off my fourth and final recipe card. This will consist of me going through the same process as the other three recipe cards. -y this time is will know e+actly what I am doing# and will most probably be able to go through the process of creating this last card ,uite ,uickly.

Week 3 Mon I will gi(e myself this full Monday to just go o(er the last recipe card I created# and also go back on any of the recipe cards to see if I am missed anything. This will also gi(e me time to change anything I may not like on my recipe cards anymore. I ha(e a feeling there might be a few glitches and things that need sorting out so this is why I will be spending all day on doing any little finishing touches.

Tue Tuesday will be a full day of looking back on all my recipe cards and figuring out what needs sorting out and changing. There will be a few little things that I will want to change# and it may take a bit of time because if I change a thing on one recipe card# I ha(e to go back and change it all of them.

)ed )ednesday I will be looking at possibly trying to find out a way of changing my titles to a proper gold for when they get printed. I will also then go on to send them to .a(e and print them out.

S-ar putea să vă placă și