1. OBJECTIVE AND DESCRIPTION

The following document will help the user:
in designing step by step controllers for AFE in abc and dq synchronous reference
frame,
in designing step by step controller for a Thyristor rectifier.

Test cases are done in order to test and validate the theory using the power electronics
components from the Engineering suite V6 Electrical library.

1.1. AFE RECTIFIER IN ABC REFERENCE FRAME
An AFE (Active Front End) rectifier is built with IGBT components to keep constant the DC
voltage and have fewer harmonics compares to the front rectifier (diode building a converter).
With an AFE rectifier, the load factor can be set as desired value and generally it set as unity.
DC voltage is kept constant by using a PI controller (block Gc see figure below).






3
3
Voltage controller design
Formulation for general load
The input converter voltage is given by

(1)

(2)

(3)
The input power to the converter is given by

(4)
Equations (1) (3) into (4)

(5)
Assuming a balanced voltage source as follows:

()

)
Since the AFE rectifier has to output a current with fewer harmonics (generally less than 5%),
we assume that the input current is given as below:

()

)
Where
Phase delay (voltage versus current)

Current R.M.S

Voltage R.M.S



4
4
NB:

is time dependent
Equation (5) can be rewritten as follows:

(6)
The small signal analysis (around the operating point) gives

(7)
Where

The current at steady state (operating point)


The transfer function is

()

(8)
Neglecting the converter power loss, the capacitor power is given as:

(9)
The small signal analysis (around the operating point) gives

(10)
The transfer function is

()

(11)
The PI controller is given by

()

(12)
The graph of the converter transfer function is given by using (8), (11) and (12)




+
+
-
+
-
+
+
+








5
5
Then, the converter transfer function is given by

()

()

()

()

()

()

()

()

()

()

()

(13)
Taking only the first transfer function, we have
()

()

()

()

()

()

()

()

) (


To have a stable system, poles and zeros must be in the left half plane and the following
conditions should be taken:
1. To avoid a significant zero on the right half plane, we must have:


2. Applying the Routh-Hurwitz criterion, we must have:


Using the condition (1) and neglecting the resistance, the above transfer function becomes:
()


The choice of PI parameters depends on the specification requirements. So, this transfer
function is close to the well-known second order transfer function. So, the zero must be placed
to almost at the infinity (compares to the dominant pole).






6
6
Other formulation for Resistive load
For a define load as a resistor, the transfer function can be changed.
Since

, equation (9) can be written as follows:


For small signal analysis, we have


The transfer function is

()


Hence, the converter transfer function is given by:

()

()

) (

)
)

)

Or

()

()

)
(

)

Where

)

Thus, the PI controller is calculated by using the IMC method design. So, we have:



Where

the time constant of the closed loop transfer function






7
7
Since the system was linearized, the choice of

is critical.

Suggestion: Good start could be

. One can try to select



The diagram block control of AFE in abc reference frame





1.2. AFE RECTIFIER IN DQ SYNCHRONOUS REFERENCE FRAME
Comparatively to previous method, this method will design two PI controllers respectively for
current and DC voltage.
Current controller design
Using the Park transformation in synchronous reference frame of equations (1)-(3), the matrix
form is given as follows:
[]

[]

[]

[][][]

[]

[]
([][]

(14)
Where
(

(

) (

)
(

) (

)
)
The Park transformation with q axis leading d axis and

the angle between the rotor d


axis and the reference (stator d axis).






8
8
Thus, we have:

(15)

(16)
Since the system is coupled, lets decoupled it by using the following new variables:

(17)

(18)
Where


Thus, the PI controllers that control both current axes (d and q) are calculated using the IMC
(Internal Model Control) and are given as follows:

()


Where

Switching frequency

Proportional gain

Integral gain
Voltage controller design
Neglecting the converter power loss, we have:

(9)
Where





9
9


The small signal analysis (around the operating point) where

, gives:


Hence, the converter transfer function is given by:

()

()

)[

)
]

)

Where

()

)

The converter transfer function becomes:

()

()

)
(

)(

)

Where

)


Thus, the PID controller is calculated by using the IMC method design. So, we have:

)
,

)
,



Where

the time constant of the closed loop transfer function



Since the system was linearized, the choice of

is critical.

Suggestion: Good start could be

. One can try to select






10
10
The diagram block control of AFE in dq synchronous reference frame




1.3. SELECTION OF SOURCE IMPEDANCE FOR AN AFE RECTIFIER
Starting with


Since for unity power factor

and using a PLL that will locked

, we have in steady
state:


Or


Neglecting the resistance voltage drop, we have:


The magnitude of the voltage is






11
11
Where

The input converter peak voltage

The source peak voltage


Since,

, where is the modulation index, We have:


Thus,



Having selected the inductance, the resistance can be selected as follows:


1.4. THYRISTOR RECTIFIER FEEDING GENERAL LOAD

General equation

The AC side parameters are function of DC voltage side of a rectifier as follows:

(1)
Where

Source resistance

Source Inductance

Source line to line voltage



On the DC side and assuming a general load RL and E (EMF), we have:

(2)



12
12
Where

Load resistance

Load Inductance
Load internal voltage source
Rectifier transfer function

In order to linearized the control, the control input delay angle is modified to be

) (3)
Where

The control voltage

Maximum value of the control voltage


Then (3) into (1) yields:

(4)
However, there is always a time delay between the command and the rectifier response which
is one-twelfth of a period of AC source. So, the Laplace function of DC voltage is given as
follows:

()

() (5)
Where

Transfer function gain

Time delay
Load transfer function

The general load RL and E (emf) transfer function is given by

() () (

() (6)




13
13
Where
Internal voltage of the load

Resistor and inductance of the load


PI transfer function

The PI transfer function is given by

()

(7)
Global transfer function

Combining (5) and (6), we have:

)(

)

()

() (8)
Where


Using equation (8), the graph of the converter transfer function is given below

Where

()

)
Rectifier transfer function

()

)
Load transfer function
() The perturbation



14
14
Controller PI design

Classical method of PI design

Then, the converter transfer function is given by

()

()

()

()

()

()

()

()

()

()

()

()
()
Assuming that the internal voltage is constant and taking only the first transfer function, we
have
()

()

()

()

()

()

()

The open loop transfer function is given as:

()

()

()
(

)(

)

To reduce the characteristic equation from order 3 to order 2, the following assumption can be
made


So,

()

()

()
(

)

Using the pole-zero cancellation, we have:

()

()

()


Then, the closed loop transfer function is given as:
()



For a desired raising time , we have:

Proportional gain



15
15

Proportional gain
Internal Model Control (IMC) of PI design

The following study shows how IMC is implemented. For more information about IMC theory,
see appropriate books.

The process open loop transfer function is

()

()

)(

)

Since

, we can approximate

()

()

)

Where


So, the PI which represents the IMC is given by

()

)
( )

( )

)
Where

Proportional gain

Proportional gain
NB: Internal voltage source is supposed to be constant. If the internal voltage source is time
dependent, an estimated value can be compensated in feedforward with a time delay of the
converter.




16
16

Where
()

) Filter function for internal voltage source feedforward compensation.



2. PROCESSES DATA

Active Front End Rectifier

Two simulations will be performed for each case by assuming a pre-charged and not pre-
charged capacitor. For the AFE in dq reference frame the configuration is slightly different
when capacitor is pre-charged or not.

Example 1

A three phase voltage source

supplies an AFE three phase rectifier


that feeds a resistive load. The DC voltage is set to 500 Volts, and the load resistance jumps at
0.4 s from 50 ohms to 20 Ohms. The IGBTs are modeled by ideal switches in parallel with
diodes. The capacitor . The AFE should be designed in abc and dq references
frame. Here below the characteristic for each design:

AFE in abc reference frame

The IGBTs are triggered by a hysteresis control which is set to .

AFE in dq synchronous reference frame

The IGBTs are triggered by PWM modulation with a carrier of









17
17
Example 2

A three phase voltage source

supplies an AFE three phase rectifier


that feeds an equivalent 2.5 kW resistive load. The DC voltage is set to 700 Volts. The IGBTs are
modeled by ideal switches in parallel with diodes. The capacitor . The AFE should
be designed in dq references frame.

AFE in dq synchronous reference frame

The IGBTs are triggered by PWM modulation with a carrier of



Example 3

A three phase voltage source

supplies an AFE three phase rectifier


that feeds an equivalent 11 kW resistive load. The DC voltage is set to 450 Volts. The IGBTs are
modeled by ideal switches in parallel with diodes. The capacitor . The AFE should
be designed in dq references frame.

AFE in dq synchronous reference frame

The IGBTs are triggered by PWM modulation with a carrier of



Thyristor Rectifier

A three phase voltage source

supplies a
three phase rectifier that feeds a load

. The load reference


current is set to 15 A. At 0.1 s the reference current jumps to 30 A and at 0.2 s and the internal
voltage jumps to 50 V. Simulate the model without and with feedforward compensation. The
maximum DC voltage that can be applied to the load is 220 V.




18
18
3. CONTROLLERS DESIGN

Active Front End Rectifier

Example 1

Current calculations

The power consumption by the load for load resistance 50 Ohms is


On the converter,



Since we want the unity power factor = 1, then converter current should be



Since DC link is constant, the power consumption by the load for load resistance 20 Ohms is



Then the converter current should be



Since DC link is constant, the power consumption by the load for load resistance 20 Ohms is




Then the converter current should be







19
19
Impedance selection

For the worst case scenario when the load resistance is set to 20 Ohms, we have:


Thus, we select


Having selected the inductance, the resistance can be selected as follows:


PLL PI controller



AFE Rectifier in abc reference frame

is rounded to

()


One can select






20
20
So, the PI controller is:

)
,



AFE Rectifier in dq synchronous reference frame

Current controller design

()


Where

Switching frequency

Proportional gain

Integral gain

()


One can select


Thus, the PID controller is calculated by using the IMC method design. So, we have:

)
,

)
,






21
21
Example 2

Current calculations

Since we want the unity power factor = 1, then converter current should be



Impedance selection


Thus, we select


Having selected the inductance, the resistance can be selected as follows:


AFE Rectifier in dq synchronous reference frame

Current controller design

()


Where

Switching frequency

Proportional gain

Integral gain



22
22

()


One can select


Thus, the PID controller is calculated by using the IMC method design. So, we have:

)
,

)
,



PLL PI controller




Example 3
Current calculations

Since we want the unity power factor = 1, then converter current should be



Impedance selection


Thus, we select:





23
23
Having selected the inductance, the resistance can be selected as follows:


Current controller design

()


Where

Switching frequency

Proportional gain

Integral gain

()


One can select


Thus, the PID controller is calculated by using the IMC method design. So, we have:

)
,

)
,



PLL PI controller







24
24
Thyristor Rectifier

Let first define the

. Then, the following parameters are calculated:


Since the maximum DC voltage is 220 V, the PI must be anti-windup with a limit of


Using the formulas above where (

), we have:

, we have


4. SIMULATION PARAMETERS

The simulation was run in time domain with sample time of

5. PROCESSES REPRESENTATION IN ES V6

See the end of the document





25
25
6. ENGINEERING SUITE V6 RESULTS

Example 1: AFE Rectifier in abc reference frame






26
26





27
27





28
28







29
29
Example 1: AFE Rectifier in dq synchronous reference frame







30
30






31
31






32
32







33
33
Example 2: AFE Rectifier in dq synchronous reference frame







34
34







35
35





36
36
Example 3: AFE Rectifier in dq synchronous reference frame







37
37







38
38









39
39
Thyristor Rectifier




Green without feedforward compensation load internal voltage

Blue with feedforward compensation load internal voltage


















40
40
Conclusion

The following conclusions can be made:
for AFE rectifier, both methods show how to design controllers. The choice of a closed-
loop parameter is sensitive since the system was linearized,
for AFE rectifier, the current and source voltage are in phase as desired,
for AFE the inrush current can be eliminated by using pre-charged capacitor as
displayed above,
for AFE rectifier, a LC filter can be also added to reduce harmonics,
for thyristor rectifier the load internal voltage compensation has an impact on the
response.
for thyristor rectifier the method can be extended to the control of DC motor.


7. REFERENCE BOOKS

1. Electric motor drives: modeling, analysis, and control.
R. Krishnan.

2. Internal model control: a comprehensive view.
Daniel E. Rivera

3. Internal model control PID control design and AC Drives.
Daniel E.Rivera, Manfred Morari and Skogestad

4. Power electronics handbook. 2nd edition.
Muhammad R. Rashid








V V C
T
V
X


K
K

X
A/D
A/D

A/D
X
ACTIVE FRONT END RECTIFIER IN ABC REFERENCE FRAME
Vdc reference
Vdc measured
PI Voltage Controller
Ia template
Ib template
Ic template
Hysteresis control
Hysteresis control
Hysteresis control
3
P
3
3
3
3
A
Ia
Ia Ib
Ib Ic
Ic
3
V
Va
Va
C
T
Vb
Vb
Vc
Vc
3
3
d
0
a

b
c q s b b
s a a s G 1 0
1 0

) (
C
Vabc to Vdq
To hysteresis controllers
3 1 a
b
c
a
b
c
d

q
0
C
C
C
PLL
Iq=0
Id=1
I0=0
Ia measured
Ib measured
Ic measured
V V C T
V


K
K
ACTIVE FRONT RECTIFIER IN DQ REFERENCE FRAME
(CAPACITOR NOT PRE-CHARGED)
Vdc reference
Vdc measured
PI Voltage Controller

3
P
3
3
3 3 1 abc
3
A
Ia Ia Ib Ib Ic Ic
3
V
Va
Va
CT
Vb
Vb
Vc
Vc
3
3
d
0
a

b
c q
C

s b b s a a s G 1 0 1 0 ) (
s b b s a a s G 1 0 1 0 ) (

a
b
c
d

q
0
d
0
a

b
c q
K
K
K
K
C
Id*
Iq*= 0
>
>
>
K

s b b s a a s G 1 0 1 0 ) (
C
PLL
Phi angle from
PLL
Phi angle from PLL
Iabc to Idq
Vabc to Vdq
Iabc to dq tranformation block
Triangular source 5.2 kHz
Vdr*
Vqr*
-wsLs
wsLs
PI d axis
Current Controller
PI q axis
Current Controller
V V C T
V


K
K
ACTIVE FRONT RECTIFIER IN DQ REFERENCE FRAME
(CAPACITOR PRE-CHARGED)
Vdc reference
Vdc measured
PI Voltage Controller

3
P
3
3
3 3 1 abc
3
A
Ia Ia Ib Ib Ic Ic
3
V
Va
Va
CT
Vb
Vb
Vc
Vc
3
3
d
0
a

b
c q
C

s b b s a a s G 1 0 1 0 ) (
s b b s a a s G 1 0 1 0 ) (

a
b
c
d

q
0
d
0
a

b
c q
K
K
K
K
C
Id*
Iq*= 0
>
>
>
K

s b b s a a s G 1 0 1 0 ) (
C
PLL
Phi angle from
PLL
Phi angle from PLL
Iabc to Idq
Vabc to Vdq
Iabc to dq tranformation block
Triangular source 5.2 kHz
Vdr*
Vqr*
-wsLs
wsLs
PI d axis
Current Controller
PI q axis
Current Controller
Thyristor Rectifier with feedforward compensation load internal voltage





Thyristor Rectifier without feedforward compensation load internal voltage

S-ar putea să vă placă și