HVAC SYSTEM - PROJECT STATUS FOR TSHD INAI KENANGA 32000 M 3 Project Title Date : TSHD INAI KENANGA

32000 M3 : Outstanding Priority Mechanical Equipment / Component for HVAC & R System : 4th April 2014 Procurement Status Sr. No. Top Deck 1 1.1 1.2 1.3 1.4 1.5 Air Cooled Condensing Unit "A" Deck Refrigeration Compressor Air Cooled Condenser Coil Plate Mounted Condenser Fan Refrigeration System Components, Piping, etc,. Unit Casing 2 2 4 2 2 unit unit unit lot lot Pending Pending To issue PO Aicool Chevon Air Trade ES 006 INAIKENANGA/4/14 02/04/2014 04/04/2014 3 ~ 4 weeks ES 018 INAIKENANGA/4/14 03/04/2014 ? ex-stock 30/4/2014 30/4/2014 Unit casing to be fabricated and all equipment and component to be assembled at workshop. ( Duration : 2 weeks ) Equipment / Component Description Qty. Unit Plan Supplier Actual PO Issued Date Faxed Date Lead Time Est. Delivery Fab. / Modify. Assembly Workshop FAT Delivery Installation Job Site Remark

9/5/2014

Electric Heater

unit

To issue PO

Heat Well

2 ~ 3 weeks

30/4/2014

9/5/2014

3 3.1 3.2 3.3 3.4

Window Defrost Unit Blower Fan Electric Motor Electric Heater Unit Casing 1 1 1 1 unit unit unit lot To issue PO To issue PO Pending Kruger Elektrim Heat Well 2 ~ 3 weeks 30/4/2014 ES 002 INAIKENANGA/4/14 01/04/2014 04/04/2014 4 ~ 6 weeks 5/5/2014 Unit casing to be fabricated and all equipment and component to be assembled at workshop. ( Duration : 2 weeks )

9/5/2014

Exhaust Air Fan - Emergency Battery Room

unit

Air Trade

ES 006 INAIKENANGA/4/14

02/04/2014

04/04/2014

3 ~ 4 weeks

30/4/2014

9/5/2014

Refrigeration Equipment 5 6 7 Cooler Unit for Provision Refrigeration System Liquid Receiver Polyurethane Insulation Panel 3 2 1 unit set lot Dwg. To confirm Pending Aicool ES 029 SPCO/11/13 13/11/2013 ? ex-stock

Forward Switchboard Room 8 Electric Heater 1 unit To issue PO Heat Well 2 ~ 3 weeks 30/4/2014 9/5/2014

9 9.1 9.2 9.3 9.4

Water Cooled Condensing Unit for Fwd. Switchboard Room Refrigeration Compressor Water Cooled Condenser Refrigeration System Components, Piping, etc,. Unit Skid 2 2 1 1 unit unit lot lot Pending Pending Aicool Aicool ES 018 INAIKENANGA/4/14 ES 018 INAIKENANGA/4/14 03/04/2014 03/04/2014 ? ? ex-stock ex-stock Unit skid to be fabricated and all equipment and component to be assembled at workshop. ( Duration : 2 weeks )

9/5/2014

Electrical Equipment Room 10 Electric Heater 1 unit To issue PO Heat Well 2 ~ 3 weeks 30/4/2014 9/5/2014

11 11.1 11.2 11.3 11.4

Water Cooled Condensing Unit for Electrical Equipment Room Refrigeration Compressor Water Cooled Condenser Refrigeration System Components, Piping, etc,. Unit Skid 2 2 1 1 unit unit lot lot Pending Pending Aicool Aicool ES 018 INAIKENANGA/4/14 ES 018 INAIKENANGA/4/14 03/04/2014 03/04/2014 ? ? ex-stock ex-stock Unit skid to be fabricated and all equipment and component to be assembled at workshop. ( Duration : 2 weeks )

9/5/2014

HVAC SYSTEM - PROJECT STATUS FOR TSHD INAI KENANGA 32000 M 3 Project Title Date : TSHD INAI KENANGA 32000 M3 : Outstanding Priority Mechanical Equipment / Component for HVAC & R System : 4th April 2014 Procurement Status Sr. No. Equipment / Component Description Aft. Switchboard Room 12 Electric Heater 1 unit To issue PO Heat Well 2 ~ 3 weeks 30/4/2014 9/5/2014 Qty. Unit Plan Supplier Actual PO Issued Date Faxed Date Lead Time Est. Delivery Fab. / Modify. Assembly Workshop FAT Delivery Installation Job Site Remark

13 13.1 13.2 13.3 13.4

Water Cooled Condensing Unit for Aft. Switchboard Room Refrigeration Compressor Water Cooled Condenser Refrigeration System Components, Piping, etc,. Unit Skid 2 2 1 1 unit unit lot lot Pending Pending Aicool Aicool ES 018 INAIKENANGA/4/14 ES 018 INAIKENANGA/4/14 03/04/2014 03/04/2014 ? ? ex-stock ex-stock Unit skid to be fabricated and all equipment and component to be assembled at workshop. ( Duration : 2 weeks )

9/5/2014

Other Space Battery Room 14 Exhaust Air Fan - Battery Room 1 unit Air Trade ES 006 INAIKENANGA/4/14 02/04/2014 04/04/2014 3 ~ 4 weeks 30/4/2014 9/5/2014

Fan Compartment - Port Side 15 Shut Off Damper - Engine Room ( P ) 4 unit SGL ES 001 INAIKENANGA/4/14 01/04/2014 04/04/2014 4 ~ 5 weeks 5/5/2014 9/5/2014

Fan Compartment - Stbd. Side 16 17 Shut Off Damper - Engine Room ( Stbd. ) Shut Off Damper - Pump Room + Workshop ( Aft. Stbd. ) 4 1 unit unit SGL SGL ES 001 INAIKENANGA/4/14 ES 001 INAIKENANGA/4/14 01/04/2014 01/04/2014 04/04/2014 04/04/2014 4 ~ 5 weeks 4 ~ 5 weeks 5/5/2014 5/5/2014 9/5/2014 9/5/2014

AC Room 18 Supply Air Fan - Fresh Air 1 set To issue PO Air Trade ? ? 3 ~ 4 weeks 5/5/2014 9/5/2014

Pump Room + Work Shop ( Fwd. ) 19 Shut Off Damper - Pump Room + Work Shop ( Fwd. ) 1 unit SGL ES 001 INAIKENANGA/4/14 01/04/2014 04/04/2014 4 ~ 5 weeks 5/5/2014 9/5/2014

20

Steam Humidifier

unit

Pending