Documente Academic
Documente Profesional
Documente Cultură
1.
Introduction
This report has been prepared in accordance with the agreement between Government of Nepal, Department of Road, Puspalal (Mid Hill Highwa! Pro"ect and #ab Pvt$ #td$ (hereinafter referred to as the %firm% or the %&onsultant% in response to the Terms of Reference (T'R , (anepa, #alitpur for the feasibilit! (tud!, Detailed )ngineering (urve!, (oil *nvestigation, H!drological (tud! and Detailed Design of +ridge of proposed ,ali +ridge over ,ali River at Nerpa -D&./0 of ,hotang District$ Preliminar! field visit carried out during 1/234/345/$ Proposed +ridge locall! interconnects +hule to Mam6ha along Mid Hill (Puspalal Highwa! Pro"ect, )astern (ector of ,hotang District$ The bridge site is about 73 6m earthen road from +ho"pur +a8ar$ The road falls on National Highwa! road categor! and earthen surface stage$ +oth of the ban6s of river lie in Nerpa -D& 9 /0 of ,hotang district$ The geographical co.ordinates of the proposed bridge site are: #atitude #ongitude )levation M$?$($#$ ; ; ; 175<$533= N >2</$017= ) 5230 m
1.1 1.1.1
@hile identif!ing the possible alternative bridge sites adeAuate consideration on various factors were carried out$ &urrent bridge site along the eBisting road is fiBed in the presence of eBperts from Pro"ect 'ffice and consultants$ ? team with +ridge engineers, Geotechnical persons, and (urve! )ngineer visited the site$ ?fter a fruitful discussion among local residence, technical personnel of Mid Hill (Puspalal Highwa! Pro"ect 'fficeC proposed bridge alignment was fiBed along the eBisting route$ Total span of proposed bridge is 5/m$
CONTENTS Salient Features of the Project 1. Introduction 5$1 5$5 Eield @or6s Proposed +ridge T!pe
Annexes
?nneB 5: #ocation Map ?nneB 1: Proposed +ridge Plan ?nneB 0: H!drological ?nal!sis ?nneB F: Photographs
Annex
: !"drological Anal"sis