Documente Academic
Documente Profesional
Documente Cultură
0.204
0.3125
0.024
0.725
cross section of Pedestal of Rails
0.047
2
1.042 t/m
Hand Rails
(ii). Loads due to Hand Rail and Crash Barrier
=
=
0.04 t/m
0.73 m2
0.38
Density of concrete
Weight of Crash barrier
=
=
2.40 t/m3
1.752 t/m
Toal Weight
1.792 t/m
0.4 m
0.772
1.17
UDL per Square meter
t/m
4.48 t/m
1.79/0.4
e =
0.572
0.257
m from edge of the contact with on the Deck
0.2 m
(From Auto cad)
Section ofHand Rail and Crash Barrier( Parapet)
Eccenticity of parapet =
0.372 m
P
A
Max. stress =
29.48 t/m
Min. stress =
-20.52 t/m
M
Z
0.225
0.08
0.83
Total Area of Cable Trough
0.168 m2
0.402 t/m
Weight of Cable
0.1 t/m
Toal Weight
0.502 t/m
0.502/0.83
0.605 t/m
(Refer DBR)
=
=
=
3.5 t
1.8 t/m
7 tm/m
0.49 t/m
0.4 m
t/m
1.225 t/m
0.49/0.4
t/m2
B.
0.3
M
Z
P
A
2
Max. stress =
6.74
t/m
Min. stress =
-4.29
t/m2
15t
2.3
15t
4.4
15t
15t
2.3
12.4
15t
2.3
Longitudinal Direction
7.50t
7.5t
1.505
Transverse Direction
For simply supported span
c/c dist. between web/ span of deck
c/c dist. b/n two tracks
Height of rail
Height of pedestal
toatal height
Loaded length on deck along track
width of dispersion
refer IRC-21-2000 cl.305.16.2 page-52
Effective span
constants depends on b/lo ratio
=
=
=
=
=
=
=
=
width of dispersion
=
=
=
=
Design width
=
beff =
Design width
1.505/2 + (4 - 4.7)/2
0.4025 m
1.2* a + b1
1.829 m
=
1.909
4.7 m
4
0.18
0.313
0.493
1.346 (for steel 1V:2H and concrete 1V:1H)
beff =
x a (1 - a/lo) + b1
lo =
=
a1=
beff =
beff =
2.82
4.7 m
2.648 m
(from IRC Table)
1.505 - 0.4025
1.103
2.648 x 1.1025(1 - (1.1025/4.7) )+ 1.346
3.581
m
In transverse Direction
45 degree through from rail throough pedestal and no dispersion in deck
Width of pedestal
Height of pedestal
Width of rail at base
Dispersion length
Impact factor
=
=
=
=
=
0.796
0.313
0.23
0.796
1.67
m
m
m
m
(As per DBR)
5.58 t/m
8.24 t/m
C.
Derailment Loads
(i) Servicesability Limit State (SLS) Condition :
(a) Case A:
C/L of track
1.4
1.9
1t
1t
1.3
0.1
C/L of Deck
Position -1
1t
1.4
0.1
1t
1.3
Position -2
(1.5*15)/22.5
1.000 (for 22.5 axle load value of line loadis 1.5t, as per bridge rule)
1.4 m
(b) CASEB:
6.67t/m
C/L of track
1.3 m
1.3 m
6.67t/m
Position -1
Intensity of load
=
=
(10x15)/22.5
6.67t/m (for 22.5 t axle load value of single load is 10 t,as per
bridge rules)
beff
=
=
=
2.35 m
2m
(1.3-(2.35-2))
0.95 m
1.2x0.95
1.14 m
5.851 t/m
a
a
lo
=
=
=
=
(1.3+(2.35-2))
1.65 m
2.6 m
4.7 m
beff
(2.6*1.65(1-1.65/4.7)))/2
1.39 m
=
=
6.67/1.39
4.799 t/m
=
=
=
(5*15)/22.5
3.33t/m (For 22.5 axle load value of single load is 20t,as per bridg
1.4 m
=
=
(20*15)/22.5
13.33 t/m (For 22.5 axle load value of single load is 20t, as per bridg
Intensity of load
=
=
=
Intensity of load
=
=
Intensity of load
1.39 m
13.33/1.39 (From SLS condition)
9.59 t/m
2.11
0
thickness of member
=
Young's modulus of concrete
Coefficient of thermal exp.
8
0.33 m
=
=
3456845.047t/m2
1.17E-05
stress
0.33 m
Force
323.6t/m2
6.7
98.42532 t
0.160 0.377418
273t/m2
Thickness of member
=
Young's modulus of concrete
Coefficient of thermal exp.
8
0.275 m
=
=
3494217.431t/m2
1.17E-05
stress
0.275 m
Force
323.6t/m2
7.0
82.0211 m
0.134 0.254839
273t/m2
thickness of member
Young's modulus of concrete
Coefficient of thermal exp.
1.1
0.3 m
0.758294
0.0
=
=
=
0.3 m
3465851.172t/m2
1.17E-05
stress
46.12t/m2
30.75t/m2
0t/m2
Force
6.91856 m
2.11
=
=
=
0.333 m
3456845.047t/m2
1.17E-05
0
0.333 m
stress
0.8417 m
0t/m2
34.04t/m2
51.06t/m2
1.3
Thickness of member
Young's modulus of concrete
Co-efficient of thermal exp.
=
=
=
Force
8.50221 m
0.275 m
3494217.431t/m2
1.17E-05
0
0.275 m
stress
0.6951 m
0t/m2
28.42t/m2
42.63t/m2
1.042654028
Thickness of member
Young's modulus of concrete
Co-efficient of thermal exp.
=
=
=
Force
0.3 m
3494217.431t/m2
1.17E-05
6.86
0.3 m
3.90
stress
Force
91.142439
0.1462 m 0.312875
280.6t/m2
8
327.1t/m2
0.372
0.4
0.572
(From Auto cad)
h Barrier( Parapet)
oncrete 1V:1H)
1025/4.7) )+ 1.346
17
5
-6.92
-0.28
0.30
0.15
0.00
6.92
0.28
0.30
0.15
0.00
7
7
82.02
0.25
0.28
0.14
0.00
0.00
0.00
0.00
0.00
18
6
-6.92
-0.28
0.30
0.15
0.00
6.92
0.28
0.30
0.15
0.00
0.96
19
0.97
-82.02
-0.25
0.28
0.14
0.00
0.00
0.00
0.00
0.00
19
7
-6.92
-0.28
0.30
0.15
0.00
6.92
0.28
0.30
0.15
0.00
0.97
19
0.97
-6.92
-0.28
0.30
0.15
0.00
m(t-m)
v1(t)
V2(t)
Total(t)
0.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17
5
-91.14
0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
-91.14
0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
19
0.97
-5.86
-0.22
0.28
0.14
0.00
0.00
0.00
0.00
0.00
5.86
0.22
0.28
0.14
0.00
0.00
0.00
0.00
0.00
19
7
0.97
91.14
-0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
18
6
0.96
91.14
-0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19
0.97
91.14
-0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
-91.14
0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
91.14
-0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
8
19
9
18
18
0.96
82.02
0.25
0.28
0.14
0.00
0.00
4.96
0.12
5.08
-98.43
-0.38
0.33
0.17
0.00
0.00
-4.96
-0.12
-5.08
98.43
0.38
0.33
0.17
0.00
0.00
0.00
0.00
0.00
20
19
-98.43
-0.38
0.33
0.17
-98.43
-0.38
0.00
0.00
0.00
21
18
18
-6.92
-0.28
0.30
0.15
0.00
6.92
0.28
0.30
0.15
0.00
0.96
6.92
0.28
0.30
0.15
0.00
17
0.42
17
0.42
-6.92
-0.28
0.30
0.15
-6.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8
19
9
18
18
8.50
0.38
0.33
0.17
0.00
0.00
0.80
0.17
0.97
-8.50
-0.38
0.33
0.17
0.00
0.00
0.00
0.00
0.00
18
18
0.96
-5.86
-0.22
0.28
0.14
0.00
0.00
-0.80
-0.17
-0.97
8.50
0.38
0.33
0.17
8.50
0.38
0.00
0.00
0.00
21
0.96
-91.14
0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
17
0.42
20
19
-0.28
0.00
0.00
0.00
17
0.42
91.14
-0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
-91.14
0.31
0.30
0.15
0.00
0.00
0.00
0.00
0.00
91.14
-0.31
0.30
0.15
91.14
-0.31
0.00
0.00
0.00