Frigstad D90

Operational Excellence in Ultra Deepwater Drilling

RAMRIG AkerKvaerner MH, 2 x 1,000 sT RamRig, full dual activity capability.

RISER TENSIONERS Six (6) in line skid mounted hydraulic cylinder riser tensioners.

TOP DRIVES Two (2) Hydraulic top drives, 1,000 sT SWL each.

PIPE HANDLING SYSTEM Efficient pipe handling system with set-back capacity for up to 50,000 ft drill pipe, or in combination with most casing strings.

RISER HANDLING SYSTEM Efficient riser handling system with set-back capacity for 10,000 ft 21 marine riser system in 100 ft stands.

THRUSTERS Eight (8) 4.3 MW azimuth thrusters. Designed for change out in the field at operating draft.

HELICOPTER DECK Designed for MI8 and EH101.

LIFE SAVING EQUIPMENT Four (4) lifeboats, total capacity 400 persons. Fourteen (16) inflatable lift rafts, 25 persons each. One (1) fast rescue boat.

DECK CRANES Two (2) 100 mt main deck revolving cranes with 60m boom. Capable of handling any under water thruster change out.

RISER SYSTEM Robust 21 marine riser (clip type design, for efficient make-up / break-out).

SIMULTANEOUS OPERATIONS Running BOP & Riser.

Pull-Out 26'' BHA.

20'' Casing Hung Off In DATS Frame.

ACCOMODATION/OFFICES Total capacity 200 men, all in 1 or 2 men cabins w/individual bathroom. Ample office spaces and service facilities.

MAIN POWER Eight (8) diesel engines with total installed power of almost 62,000 BHP.

MOORING SYSTEM Four (4) double drum winches with eight (8) fairleads for connection to pre-set system with 6 x 450 and 2 x 1113m 3.5,, wire. Eight (8) chain lockers, each 5,000 ft x 3.25,, chain (reserve).

Design, lay-out & illustrations: SoftDoc3D

DUAL ACTIVITY

TEMPLATE INSTALLATION

Drilling in main rig & running casing with aux rig

Barge with template positioned under rig with AHVs

Drilling in main rig & preparing BOP in aux rig

Template lowered into water with both rigs

Drilling in main rig & preparing stands in aux rig

Landing template on seabed

Frigstad Engineering Established in 1989, Frigstad Engineering is a multi-disciplinary engineering & design company providing services to the petroleum and offshore industry, with a focus on developing highly advanced semi-submersible drilling rig designs. With affiliated companies in Singapore and Norway, Frigstad Engineering is committed to deliver world-class quality standards. Frigstad Engineering offers a wide range of services ranging from design, consultancy and project engineering to feasibility studies. Frigstad D90 _ Operational Excellence The Frigstad D90 is a purpose-designed semi-submersible drilling unit for ultra deepwater exploration & development work, created by Frigstad Engineering. The Frigstad D90 is a proprietary design, developed to offer superior operational performance and cost efficiency.

Frigstad D90 DRR DP3 + PSM _ Key Features 12,000 ft water depth capacity 50,000 ft drilling depth capacity Vertical racking capacity for 10,000 ft drilling riser in 100 ft stands and 50,000 ft drill pipe in 93 ft stands Dual activity Ram Rig with 2 x 1,000 short tones hoisting capacity Variable deck load capacity of more than 8,000 tones 2 x 100 tonnes platform cranes and large deck space for handling and storage of a number of fully assembled X-mas trees Large moonpool opening of 42m x 8m Powerful DP3 system with 8 thrusters that enables the rig to evacuate location and transit by up to 8 _ 10 knots Anchor winches for hook-up to pre-laid mooring system

Large deck space

Vertical riser storage

D90-Main & Auxiliary Well Centers

Dual activity RamRig

D90 OUTLINE SPECIFICATION


REGULATORY BODY APPROVALS Solas 2004, MARPOL 1973/78, IMO MODU-Code, all with the latest amendments CLASSIFICATION DNV+1A1 Column Stabilized Drilling Unit, DYNPOS AUTRO (DP3), POSMOOR, CRANE, HELIDECK, EC0, F-AM and DRILL ENVIRONMENTAL OPERATING LIMITS Maximum wind velocity 70 knots / 100 knots Air gap (operational / survival 2 / survival 1) 10 m / 14 m / 16 m Wave Height Hs / Hmax 15.8 m / 29.2 m PRINCIPAL PARTICULARS 114 m Length of pontoons Displacement (operational) 54,455 mt Displacement (survival) 48,309 mt Width & length, pipe rack deck 80 m x 77 m Displacement (transit) 42.4 m 39,977 mt Height to pipe rack deck Draft (operational) 23.6 m Water depth (max) 12,000 ft Draft (survival 1 / survival 2) 17.6 m / 19.6 m Drilling depth (max) 50,000 ft STORAGE CAPACITIES 3 3 Drilling water, pontoon 2,766 m3 (17,397 bbls)* Bulk mud, upper hull 424 m (15,000 ft ) Portable water 1,067 m3 (6,716 bbls)* Bulk cement, upper hull 424 m3 (15,000 ft3) Sack material, upper hull Open pipe rack deck area 3,206 m2 (34,509 ft2) 8,000 sacks Variable deck load (max operational) 8,100 mt Base oil for mud, pontoon 433 m3 (2,728 bbls)* 3 Liquid mud/brine, upper hull 1,306 m (8,213 bbls)* Variable deck load (max transit) 6,100 mt 3 Payload (max operational) 14,700 mt Liquid mud/brine, pontoon 1,731 m (10,866 bbls)* Diesel FO 4,049 m3 (25,465 bbls)* * denote 90% capabilities ACCOMODATION / OFFICE Total capacity of 200 men in 1 or 2 men cabins with individual bathroom, ample office spaces and service facilities MATERIALS HANDLING Deck Cranes MARINE SYSTEMS Main Power/Emergency Power Power Distribution Dynamic Positioning Mooring System DRILLING SYSTEMS RamRig Rotary Table Top Drives Riser Tensioners BOP and Riser Maritime Hydraulics Dual RamRig. Both main rig and auxiliary rig have 1,000 s Ton capacity and dual handling capabilities. Set back for max. 50,000 ft drill string/casing in 88 - 92 ft stands ,, Two (2) 60.5 with independent drive Two (2) Maritime Hydraulics top drives with 1,000 s Ton capacity Six (6) in line hydraulic cylinder riser tensioners (DATS) mounted on skid system, under substructure. 3,200,000 lbs total net tensioning capacity. (6 engaged) ,, Two (2) 18.75 x 10,000 psi Annular preventors ,, Five (5) 18.75 x 15,000 psi Ram preventors ,, 10,000 ft of 21 riser, 50 ft joints with c & k, booster and hydraulic lines. Vertical marine riser rack for 10,000 ft (100 ft stands made up of 2 x 50 ft lengths). Storage onboard for 12,000 ft riser ,, 5 7/8 drill string with subs, drill collars, heavy weight drill pipes Four (4) main mud pumps, Triplex, each 2,200 HP @ 7,500 psi wp Four (4) to Six (6)high capacity linear motion shakers with HVAC enclosures Designed for MI8 and EH 101 helicopters Four (4) lifeboats with total capacity of 400 persons. 16 inflatable life rafts with capacity of 25 persons each. One (1) fast rescue boat Eight (8) diesel engines, each with 5,760 BkW capacity. Total installed horsepower is approximately 46,000 BkW (62,000 BHP) AC Power Propulsion and DP with MP+AW drives and VM system. 11KV AC alternators. MH hydraulic power plant for Dual RamRig package DP class 3. Eight (8) 4.3 MW azimuth thrusters Four (4) double drum winches with eight (8) fairleads for connection to pre-set ,, system with 6 x 450 and 2 x 1113m 3.5 wire. Eight (8) chain lockers, ,, each 5,000 ft x 3.25 chain (reserve) Two (2) 100 mt revolving deck cranes with 60 m boom. Capable of handling any under water thruster changeout. One (1) 12 mt knuckle boom tubular handling crane

Drill String DRILLING FLUID SYSTEMS Mud Pumps Shakers OTHER Helicopter Deck Capacity Life Saving Equipment

Note: The details included in this specification may change prior to completion of the rig.

Frigstad Engineering Inc. C/O Frigstad Engineering (Singapore) Pte Ltd 9 Temasek Boulevard Suntec Tower 2 #44-02 Singapore 038989

Tel : +65 6349 0082 Fax : +65 6223 3906 Email : fe@frigstad.com www.frigstad.com

S-ar putea să vă placă și