SECTION 15020 GENERAL PROVISIONS FOR HEATING, VENTILATING AND AIR CONDITIONING WORK PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS The scope of contractor work include also the following: A. Adaptation and connection of the new network with the existing network according to specifications including all aaccessories,components,devices with but not limited to:pipes,specialists,tags,connections,flanges,bolts,nuts,gaskets,sealers,coupling,expansi on,joints,valves,supports,hangers including rods,anchors,beams,rollers,saddle and surface cleaning,treatment,paintaing,flow indicator,welding,cutting,testing ,pipe insulation with its accessories, balancing and startup B. Coordination between both networks as installation and performance C. Remove ,fixing and treatment of any defective part of the existing network D. Specification Section 15997(WATER TREATMENT & CHEMICAL CLEANING SYSTEMS) should be applied for old network, as well as the new network, and should be applied in the same time to each other. E. The requirements of the Contract Documents, including General Conditions and Special Conditions and Division 1 - General Requirements apply to the work of this division. F. In case of conflict between these General Provisions and the General Conditions and/or Supplementary General Conditions the more restrictive requirements govern. G. The drawings are schematic and diagrammatic and are intended to be a graphic representation of the contract requirements. Due to restrictions of scale, complete details cannot be shown. It is however assumed to represent a complete installation. The contractor shall be responsible for providing a complete installation, coordination with other trades, and coordination with field conditions. H. Riser diagrams and schematic diagrams generally indicate equipment connections to be used for various systems. Provide all work shown on diagrams whether or not it is duplicated on the plans.
Rev. 0 Apr. 2012 General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 1 of 16
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 2 of 16
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 3 of 16
Refer to the Engineer for decisions on any items or requirements noted in the specifications or drawings which conflict with the standards listed above. Provide all work necessary to comply with these requirements at no extra cost to the Owner. 1.4 ORGANIZATION OF THE WORK A. Implement the work called for under these specifications simultaneously with the work of other Trades in a manner such as not to delay the overall progress of the project. Be prepared to furnish promptly to other Trades involved at the project all information and measurements relating to the work which they may require. Cooperate with them in order to secure the harmony necessary in the interest of the project as a whole.
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 4 of 16
D.
E.
1.5 ACCEPTANCE OF THE WORK A. Make all workmanship, equipment and materials supplied under these specifications acceptable to the Engineer, who has the power to reject any items which in their judgment are not in full accordance with the Drawings and Specifications.
1.6 PERMITS, CERTIFICATES, AND FEES A. Make delivery to the Engineer for transmittal to the Project Manager upon completion of the work and before final payment. Pay all charges required by the inspection authority and include their cost in the bid. B. Include the procurement of and payment for all permits, certificates and fees for the performance of the work in compliance with codes, applicable laws and municipal regulations. Including those from local utilities for services. 1.7 SCOPE OF WORK A. The Specifications and the accompanying drawings are intended to secure the provisions of all material, labor, equipment, and services necessary to install complete, tested, ready for operation and set to work the HVAC Systems in accordance with the Specifications and Drawings. Provide all systems complete with necessary appurtenances and minor auxiliaries, including offsets to clear interferences and supports which are not shown but are needed to make each system complete in every respect. Provide all work described in the Specifications and not shown on the Drawings, or vice versa, in complete working order. If mention has been omitted of any item of work or material, necessary for completion of the system, then such items must be and are hereby included.
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 5 of 16
1.8 Contractor design items Verify and provide external static pressure calculations for all duct work with all fittings and accessories based on the approved work shop drawings. This applies for all fans, fan coil units and air handling units, according to the relevant specifications requirements Verify and provide pressure drop calculations on the side piping of HVAC system, based on the approved work shop drawings and according to the relevant technical specifications requirements. Provide analysis of sound level spectrum in different spaces, according to the relevant technical specifications requirements. Verify and provide calculations of the net positive suction head on all pumps, based on the approved work shop drawings and according to the relevant technical specifications requirements. Provide complete design and calculations for the seismic and vibration control system of all mechanical and electrical equipment, according to the relevant technical specifications requirements. Provide analysis of the water treatment and chemical treatment system concerning raw water, blow down water, etc, according to the relevant technical specifications requirements. Verify and provide smoke calculation showing smoke flow rate, smoke temperature rise and the fan flow rate , and provide complete selection of the smoke fans including fire rating and pressure drop according to the approved shop drawings and according to the relevant technical specifications . Verify and provide calculations for the prissrization units , expansion tanks capacity, based on the approved work shop drawings and according to the relevant technical specifications requirements. Provide computer selection, according to the relevant technical specifications requirements, of all mechanical and devices including, but not limited to: Provide copmelete CFD calculation for parking ventilation, smoke of atruim, technical data and fire zoning. Chillers Cooling towers
Rev. 0 Apr. 2012 General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 6 of 16
1.10 SHOP DRAWINGS AND OTHER INFORMATION REQUIRED A. Prior to purchasing equipment or materials, submit a list of proposed manufacturers to the Engineer, for approval. B. Shop drawings which are submitted out of sequence or without supplemental information necessary for proper evaluation of the submission may be subject to delay in processing. C. Shop drawings must bear the Contractor's stamp certifying: 1. That he has checked the submitted shop drawings. 2. That the submitted shop drawing is fully coordinated with all interfacing trades and with other trades where interference may occur. 3. That the submitted shop drawings are in conformance with the contract documents, except for stated substitutions and/or changes.
Rev. 0 Apr. 2012 General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 7 of 16
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 8 of 16
A. Before commencing work, procure complete set of reproducible transparencies of Contract Drawings B. Neatly revise to conform with Record Drawings. C. Conspicuously indicate major deviations in Mechanical Equipment Rooms by specific reference to shop drawings of these rooms and provide an accurate and complete record of the work as installed. D. Upon completion of work, submit an electronic copy and signed and certified reproducible transparencies as As-Built and referenced Shop Drawings, along with marked up prints of Record Drawings, to Engineer for acceptance.
1.13
A. Coordinate the work of this division with the work of all other trades and the utility company and so arrange that there will be no delay in the proper installation and completion of any part or parts of each respective work wherein it may be interrelated with that of these specifications so that generally all construction work can proceed without delaying the completion of the project.
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 9 of 16
OF HVAC
A. Deliver and store HVAC equipment at the site, properly packed and crated until finally installed. Store materials in spaces approved by the Project Manager. Investigate each space through which equipment must be moved. If necessary, have equipment shipped from manufacturer in crated sections of size suitable for moving through restricted spaces. B. Adequately protect uninstalled and installed equipment and materials against loss or stealing, damage caused by water, paint, fire, plaster, moisture, acids, fumes, dust or other environmental conditions, or physical damage, during delivery, storage, installation and shutdown conditions. Replace any damaged or stolen material without extra cost to the Owner. Provide periodic maintenance for stored equipment. C. Provide effective protection for all material and equipment against damage that may be caused by environmental conditions. Do no work when conditions of temperature in area or moisture on materials or substrates are not in accordance with material manufacturer's recommended conditions for installation. D. Maintain all equipment and systems installed until, issuance of the certificate of practical completion. The operation of the equipment by the Owner does not constitute an acceptance of the work. Work will be accepted only after the Contractor has adjusted its equipment, demonstrated that it fulfills the requirements of the Drawings and Specifications, and has furnished all required documentation, and fulfilled all contract requirements. E. Provide effective protection against damage for all materials and equipment during shipment, and storage at the Project Site. Cover all stored equipment to exclude dust and moisture. Place stored equipment on pallets or racks with appropriate weather cover. F. After ductwork, piping and equipment are installed, cover openings to prevent entrance of water and foreign materials. Close openings with temporary metal or plastic caps.
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 11 of 16
General Provisions For Heating, Ventilating And Air Conditioning Work Section 15020 14 of 16
f.
1.20 GUARANTEES AND CERTIFICATIONS A. Guarantee all work to be free from leaks or defects. Replace or repair, as directed by the Engineer, defective materials or workmanship, as well as damage to the work of the Trades resulting from same for the duration of stipulated guarantee periods. B. The duration of guarantee periods following the date of acceptance of the entire work shall be a minimum of one (1) year or as noted in the Contract general & special conditions However, due to the nature of the installation, provide additional time as follows: C. Extension of guarantee to include one continuous heating season, from November 1 to April 1. Extension of guarantee to include one continuous cooling season, from May 1 to October 1. D. Submit certification attesting to the fact that specified performance and other criteria are met by all items of equipment. 1.21 PAINTING A. Deliver all equipment with standard factory finish or as specified. Clean all equipment before acceptance by the Owner. B. Except as otherwise specified, priming will be done under other Sections of the work. C. Any Material transported in a piping system will be color coded. Positive Identification of contents of A piping system shall be by lettered legend giving the name of the material in full or abbreviated form Arrows will be used to indicate the direction of flow. Color coding shall be applied to the entire exposed piping system. Identifying color of materials one word in piping systems are as :