Darrell Buxton Chief, Civil Works Branch March 20, 2014

US Army Corps of Engineers

BUILDING STRONG

Civil Works Branch Programs and Project Management


Responsibilities
Project management for the Districts Civil Works program. Lead multi-disciplined Project Delivery Teams. Prepare schedules, budgets and Project Management Plans.

BUILDING STRONG

Civil Works Project Purposes


Navigation Flood Risk Management Ecosystem Restoration Water Supply (Water Conservation) Recreation

Seven Oaks Dam

Sub-Programs O&M General Investigations Construction General CAP Section 219 Environmental Infrastructure Planning Assistance to States Dam Safety Etc.

Port of Los Angeles

Tres Rios Eco. Rest.

BUILDING STRONG

Civil Works Project Delivery Process


Reconnaissance Phase 1- 2 years $100,000 Feasibility Phase 3 years $3 million Preconstruction Engineering and Design Phase Duration dependant on complexity Approximately 10% of construction estimate Construction Phase Duration dependant on complexity $millions
BUILDING STRONG

Tres Rios Environmental Restoration


Recognitions and Awards
Phase 3A and 3B
Phase 3 of the Tres Rios Environmental Restoration project removed salt cedar trees, salvaged existing native plants and revegetated a 3-mile-long, 2,000-acre stretch of openwater and wetland marshes at the confluence of the Gila,Salt and Agua Fria rivers. The project has created 44 acres of new open-water reaches along with 10 acres of marsh habitat and 46 acres of riparian habitat. The Tres Rios project has inspired and united all stakeholders involved,and has increased the value of the area as a regional attraction and a destination for local residents,recreationalists and visitors. .
N
Tres Rios Flow Regulating Wetlands

Tres Rios Flood Control Levee Tres Rios Overbank Wetlands

Riparian Corridors

Tres Rios Demonstration Cobble Wetlands

91st Avenue

Tres Rios Demonstration Hayfield Wetlands

Open Water Marshes

BUILDING STRONG

Flood Risk Management Projects

Santa Ana River Mainstem, Prado

Santa Maria Levee Bradley Canyon


BUILDING STRONG

Ecosystem Restoration
Tres Rios LA River Restoration Rio Salado

Matilija Dam Upper Newport Bay

Slide 7

BUILDING STRONG

SPL Program Projections


$180 $160 $140 Dollars ($k) $120 $100 $80 $60 $40 $20 $0
GI OM CG (incl CAP) Total FY10 $3 $28 $19 $102 FY11 $4 $32 $38 $157 FY12 $3 $34 $43 $113 FY13 $3 $28 $19 $80 8
Data as of: 01/01/2014

Civil Works Program FY 10 - 16

FY14 $4 $44 $58 $140

FY15 $3 $39 $31 $106

FY16 $0 $30 $37 $95 BUILDING STRONG

Civil Works FY14 Opportunities


FY14 Forecasted Project Acquisition Anticipated PA Amount Strategy Award $500K-1M $5-10M $5-10M >$10M $1-5M 3rd Qtr 3rd Qtr 3rd Qtr 4th Qtr 4th Qtr 4th Qtr
BUILDING STRONG

Santa Ana River Mainstem, GSAEnvironmental Mitigation Competitive Contract IDIQ Civil Engineering Unrestricted (Regional Use) IDIQ Civil Engineering SBSA (Regional Use) Santa Ana River Mainstem, SBSA Prison Dike Construction Rio Salado Phoenix & SBSA Tempe, Environmental Restoration Los Angeles-Long Beach Harbor SBSA

$5-10M

Civil Works FY15 Opportunities


FY15 Forecasted Project Acquisition Anticipated PA Amount Strategy Award >$10M $5-10M >$10M 1st Qtr 2nd Qtr 2nd Qtr Santa Ana River Mainstem, BNSF Bridge Protection Unrestricted and Pier Nose Extension South Perris Well TBD Construction Santa Ana River Mainstem, SBSA Reach 9 Phase 4 Bank Protection Soil Cement

BUILDING STRONG

Points of Contact
Los Angeles District www.spl.usace.army.mil Darrell Buxton, Civil Works Branch Chief (213)452-4007 Darrell.W.Buxton@usace.army.mil Charles S. Dwyer, Navigations Branch Chief (213) 452-3385 Charles.S.Dwyer@usace.army.mil Tomas Beauchamp-Hernandez, Operations Branch Chief (626) 378-5267 Tomas.G.Beauchamp-Hernandez@usace.army.mil