METHOD STATEMENT M & E NO.: M & E MST- 004/ REV 0 TIT E: V S!IT"H#EAR INSTA Page 1 of 5 ATION AND TESTIN#.

V S!IT"H#EAR INSTA
1.0 P$RPOSE

ATION AND TESTIN#.

The purpose of this procedure is to describe the method for Installation, and Testing of LV Switchgears. 2.0 S"OPE This procedure shall be applicable to LV switchgears vi ., !ower "ontrol "entres, #otor "ontrol "entres, $istribution %oards and &eeder !illars of voltage '1( V and below. ).0 ).1 ).2 ).) '.0 '.1 '.2 '.) RE%EREN"E *+!,0(0 *+!,100 *+!,0'0 DE%INITIONS "ompan. *ualit. 2ngineer $iscipline 2ngineer /01 3ominated *ualit. 2ngineer at Site. "ompan. designated 2lectrical 2ngineer as decided b. the #anagement and assigned with the responsibilit. of managing electrical part of the !ro4ect. "urrent Transformer. 5eneral +rrangement. Low Voltage. Voltage Transformer. $ocument - $ata "ontrol. Inspection - Testing. $esign "ontrol.

'.' '.( '.6 '.7

"T 5+ LV VT

(.0

PRO"ED$RE
$ate; <anuar. 26, 2001

# - 2 #ST8 00'9 :2V 0

XYZ
METHOD STATEMENT M & E NO.: M & E MST- 004/ REV 0 TIT E: V S!IT"H#EAR INSTA Page & of 5 ATION AND TESTIN#.

(.1 (.1.1

Responsibility The responsibilit. for carr.ing out this #ethod Statement shall be that of the $iscipline 2ngineer9 &oremen, unless otherwise specificall. mentioned in this procedure. The *ualit. 2ngineer9 $iscipline 2ngineer9 &oremen shall be responsible for inspection - testing. In case of conflicting re=uirements with the manufacturer>s instructions or "ustomer>s specifications for installation and testing, then such re=uirements shall prevail in addition to the non8conflicting re=uirements of this procedure. Preparation The t.pe, model and rating of the switchgear?s@ to be installed shall be identified from the applicable electrical drawings 9 specification. The e=uipment to be installed shall be inspected, and it shall be ensured that the e=uipment is free from damages. The pacAing list shall be verified against the item?s@ for completeness of suppl.. +n. parts supplied loose during shipping shall be removed during erection of the e=uipment. Such loose parts shall be assembled as per the instructions of the manufacturer after erection of the e=uipment. The e=uipment foundations shall be checAed for compliance of the foundation bolt hole location, si e and t.pe. +n. variation in the foundation shall be corrected prior to installation of the e=uipment. The e=uipment shall be installed and fiBed 9 grouted on the foundation in conformance with the applicable drawing?s@. &or switchgears supplied in different shipping sections, the individual shipping sections shall be placed together and levelled as per the 5+ drawing. The sections shall be assembled to form one single switchgear. The bus bars for power, control suppl. and earthing of the various sections shall be interconnected as per the wiring diagrams. &or connecting the bus bars, the hardware and accessories supplied along with the switchgear shall be used. +fter levelling the e=uipment, the smooth in 9 out operation of the withdrawable t.pe modules shall be checAed. Initial Checks Initial checAs on the installed switchgear as detailed in the applicable section of LV Switchgear Installation Check &orm 3o. # - 2 *",&orm8 00'8019 :2V. 0 shall be carried out and the results shall be recorded.
$ate; <anuar. 26, 2001

(.1.2

(.2 (.2.1 (.2.2 (.2.)

(.2.'

(.2.(

(.2.6

(.2.7

(.)

# - 2 #ST8 00'9 :2V 0

XYZ
METHOD STATEMENT M & E NO.: M & E MST- 004/ REV 0 TIT E: V S!IT"H#EAR INSTA Page ' of 5 ATION AND TESTIN#.

(.'

Ductor Testing The $uctor test for checAing the contact resistance of the "ircuit %reaAer, Isolator and %us %ar <oints shall be carried out and the results shall be recorded in the Ductor Test &orm 3o. # - 2 *",&orm8 00'8029 :2V. 0.

(.( (.(.1

Circuit Breaker Test Chen the switchgear is provided with circuit breaAers, checAs 9 tests as detailed in Circuit Breaker Testing Report &orm 3o. # - 2 *",&orm8 00'8 0)9 :2V. 0 shall be carried out and the results shall be recorded. If the LV switchgear is provided with independent "T operated protection rela.s, other than integral overloaded short circuit protection, then the tripping of the breaAer through these rela.s shall be checAed. Starters / Switch Fuse Unit Test Chen the switchgear is provided with starters and 9 or switch fuse units, such items shall be checAed 9 tested as per details in Starter / Switch Fuse Unit Testing &orm 3o. # - 2 *",&orm8 00'80'9 :2V. 0, and the results shall be recorded. Chen withdrawable t.pe of starters 9 switch fuse units are used, it shall be ensured that the male and female contacts of both power and control is mating properl. establishing proper connection. :emote interlocAs, if an., provided for starter modules shall be checAed and verified for correct operation. Electrical Connections The incoming and outgoing cables to the switchgear shall be connected as per the applicable drawings. The terminations and glands provided shall be as per specifications. The control earthing between sections, if an., shall be provided as per the applicable termination drawings. Earthing The switchgear shall be connected to the earth grid, at least at two different locations, using earth conductors 9 cables as specified in the drawings. It shall be ensured that the earth continuit. bar in the switchgear is connected properl..

(.(.2

(.6 (.6.1

(.6.2

(.6.) (.7 (.7.1

(.7.2

(.D

(.E

CT !T an" Relay Testing


$ate; <anuar. 26, 2001

# - 2 #ST8 00'9 :2V 0

XYZ
METHOD STATEMENT M & E NO.: M & E MST- 004/ REV 0 TIT E: V S!IT"H#EAR INSTA Page 4 of 5 ATION AND TESTIN#.

(.E.1 (.E.2

"urrent Transformers and Voltage Transformers shall be tested as per # 2 #ST8 00(9 :2V. 0 and the test data shall be recorded. The rela.s shall be tested in accordance with the # - 2 #ST8 00(9 :2V. 0. If rela.s other than covered b. the above procedure is to be tested, then such rela.s shall be tested in accordance with manufacturer>s instructions and 9 or in accordance with specific procedures to be developed for testing of such rela.s. The test data shall be recorded. Final Installation Check +fter completion of the testing as listed above vi ., $uctor Test, "ircuit %reaAer Test, Starters and Switch fuse unit test, "T test, VT test and :ela. test, as applicable, the switch gear shall be sub4ected to the final installation checA. "hecAs 9 tests as indicated in the applicable sections of the LV Switchgear Installation "hecA &orm 3o. # - 2 *",&orm8 00'8019 :2V. 0 shall be carried out and the results shall be recorded.

(.10

(.11

#cceptance

(.11.1 The results obtained during the testing of the LV switchgears shall be verified with the records of routine test reports, if an., supplied b. the manufacturer of the switchgear for conformance. (.11.2 Fn completion of the checAs9tests the applicable test records shall be signed8off b. the $iscipline Supervisor 9 Test 2ngineer. If re=uired contractuall., the "ustomer representative>s signature shall be obtained on the records for acceptance. 6.0 6.1 6.2 6.) 6.' 6.( 6.6 6.7 DO"$MENTATION / RE"ORDS LV Switchgear Installation "hecA 0. $uctor Test 0. "ircuit %reaAer Testing 0. Starter 9 Switch &use Gnit Testing 0. "urrent Transformer Test Sheet 0. Voltage Transformer Test Sheet 0. Inverse Time Fver "urrent :ela. Test 0. # - 2 *",&orm8 00'8019 :2V. # - 2 *",&orm8 00'8029 :2V. # - 2 *",&orm8 00'80)9 :2V. # - 2 *",&orm8 00'80'9 :2V. # - 2 *",&orm8 00(8019 :2V. # - 2 *",&orm8 00(8029 :2V. # - 2 *",&orm8 0068019 :2V.

$ate; <anuar. 26, 2001 # - 2 #ST8 00'9 :2V 0

XYZ
METHOD STATEMENT M & E NO.: M & E MST- 004/ REV 0 TIT E: V S!IT"H#EAR INSTA Page 5 of 5 ATION AND TESTIN#.

6.D 6.E 6.10 6.11 6.12

#otor !rotection :ela. Test Sheet 0. ?"onventional T.pe@ #otor !rotection :ela. Test Sheet 0. ?#icro !rocessor %ased@ Fver 9 Gnder Voltage :ela. Test Sheet 0. $ifferential :ela. Test Sheet 0. Timer :ela. Test Sheet 0.

# - 2 *",&orm8 0068029 :2V. # - 2 *",&orm8 00680)9 :2V. # - 2 *",&orm8 00680'9 :2V. # - 2 *",&orm8 00680(9 :2V. # - 2 *",&orm8 0068069 :2V.

$ate; <anuar. 26, 2001 # - 2 #ST8 00'9 :2V 0