Sunteți pe pagina 1din 8

Arabian Industries Projects LLC

PROJECT CLIENT CONTRACT No MAIN CONTRACTOR AIP PROJECT

: : : : :

AL NOOR MGI ,SAK I!A MINI"LOO# $ %AL%ALA GAS INJECTOR CONSTR&CTION PETROLE&M #E'ELOPMENT OMAN L(L(C C )**+** ARA,IAN IN#&STRIES PROJECTS L(L(C

P*+-*-*.

TITLE: MET O# STATEMENT "OR INSTALLATION $ TESTING O" S/ITC GEAR #oc( No(: ANR0*-10*-.+230,A02-1-0.)--10---*

'

Re4 -*

#ate -3(-)(*)

#escri5tion Issued <or A55ro4a=

Pre5ared ,6 #E SI##ES/ARA

Re4ie7ed ,6 :A;:C

C8ec9ed ,6 CM Go5a Ku>ar

A55ro4ed ,6 P#O

Area Sub Area Sub #oc T65e

Contract Mana?e>ent :ua=it6 Mana?e>ent Met8od State>ent Met8od State>ent <or Insta==ation $ Testin? o< S7itc8?ear Area Code ' ANR *-1 "aci=it6 Code Ori?inator #oc SeAuence #isci5=ine S8eet Code T65e No( *-.+23 ,A 2-1.)--1 ---*

Arabian Industries Projects LLC

Tit=e @ #escri5tion

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

IN#EC
S=( No( CONTENTS Pa?e No(

*(+()(.(3(2(1(1(* 1(+ 1() 1(. D(-

INTRO#&CTION SCOPE RE"ERENCES INSTR&MENTS AN# E:&IPMENT RE:&IRE# A,,RE'IATIONS RESPONSI,ILITIESE ' PANEL@S/ITC GEAR INSTALLATION, TESTING $ PRECOMMISSIONING MET O# RECEI'ING O" MATERIALS TRANSPORTATION O" L' PANEL@S/ITC TO T E LOCATION ASSEM,L! $ ERECTION TESTING $ PRECOMMISSIONING EALT SA"ET! $ EN'IRONMENT GEAR

) ) ) ) ) . . . . 3,2 2,1 D

#ocu>ent No( ANR-107-104265-BA-6070-43007-0001

Re4ision No( 0

Pa?e No( Page 2 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

*(-

INTRO#&CTION The purpose of this procedure is to provide the details of installation, testing and pre-commissioning requirements for the HV Switchgears, in order to ensure that all related equipment are functioning properly, relay settings are done and interlocks are correctly wired. SCOPE The scope of this procedure is for Installation testing and pre-commissioning of HV Switchgears for the pro ect. RE"ERENCES S!-"#$$ S!-""#$ !'-"$() !'-"$(* ,%! --..).#".-" 2ssem3lies ,%! .-."#.#*."" %lectrical Installation !ractice. Specification for %arthing and &onding !rocedure. %lectrical Safety 'ules %lectrical Safety +peration !rocedure /ow Voltage !anel0 Switchgear and 1ontrol 4ield commissioning and maintenance of electrical Installations and %quipment.

+(-

)(-

.(Instru>ents and EAui5>ents ReAuired


5## 6 5###V insulation tester /ow 1ontact resistance tester 7,uctor8 Torque 9rench %arth Tester !rimary : Secondary in ection kit. 4luke ;ulti meter, clamp meter Tool 3o< with complete set of tools. Trailer0Hia301rane : lifting tackles 3(A,,RE'IATIONS 1T 1urrent Transformer 1& 1ircuit &reaker ;11 ;otor 1ontrol 1entre /V /ow Voltage HV High Voltage !T !otential Transformer
#ocu>ent No( ANR-107-104265-BA-6070-43007-0001 Re4ision No( 0 Pa?e No( Page 3 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

=1 !,+ 2I! //1

=uality 1ontrol !etroleum ,evelopment of +man 2ra3ian Industries !ro ects //1

2(-

RESPONSI,ILITIES 2(* E=ectrica= En?ineer@ Testin? En?ineer @ Su5er4isor %lectrical %ngineer0Testing %ngineer0 Supervisor is responsi3le for the following activity including, 3ut not limited to 1onfirming the Installation locations from schedule construction drawings. +rgani>ing tools and equipment required to the work site. 2ssigning work crew. Sequence of activities is carried out for the work as per this procedure. ;aintaining all Safety 'egulations. ?otification to the =1 for inspection after completion of the activities. %nsuring approved method and material are 3eing conformance of the specifications. 1oordination with Vendor for testing : commissioning. used and of approved

1(-

' PANEL@ S/ITC GEAR INSTALLATION, TESTING $ PRECOMMISSIONING MET O# 1(* Recei4in? HV Switchgears is either collected from the stores or received directly from the manufacturer@s works. 2fter receipt of the consignment, utmost care is to 3e taken during lifting and transportation to avoid any damage to insulators, 3ushings, metering and protective equipment. The equipments shall 3e inspected for any a3normalities and damage. 'eceiving Inspection report is prepared listing out the physical damage, short supplies, and non-conformances of items 0 components as per specifications and vendor drawing. In cause of any damage, it is reported to 2I!//10 !,+ for necessary action.

#ocu>ent No( ANR-107-104265-BA-6070-43007-0001

Re4ision No( 0

Pa?e No( Page 4 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

7.2 Transportation of HV Switchgear to the location: 4ollowing precautions are taken 3efore transportation of !anel 0 switchgear to site %nsure the access to 1ontrol 'oom 0 Su3station is availa3le in all respects as per the 2pproved for 1onstruction drawing 3efore transporting the HV !anel 0 Switchgear. %nsure that the lifting gears, slings and spreader 3ar are of adequate capacity and certified. %nsure that the correct equipment is transported from store to the erection site 3y using proper material handling equipment and tackles in a safe way and shifted to the required area. Ase the lifting hooks only for lifting the panel. Anload the HV !anel 0 Switchgear to the access platform and place it a3ove pipe rollers0trolleys . %nsure that the HV !anel 0 Switchgear is properly supported during the transportation from stores to site. 7.3 Assembly & Erection 1heck foundation 0 trenches and dimensions 0 levels of insert plates or foundation 3olts with respect to vendor B2 drawings. %nsure that the approved equipment layout, schematic drawings and other reference documents are availa3le at site. %nsure the foundation is released 3y 1ivil for the erection. In case Switchgear is connected to transformer through 3us duct, verify the dimensions and levels with respect to transformer, 3us duct and transformer foundation also. %nsure proper Ventilation : temperature inside the 1ontrol 'oom 0 Su3station. %nsure that proper and valid work permits : electrical safety documents are availa3le for carrying out the o3. %nsure that approved 0 recommended tools and tackles of appropriate type are availa3le. 1heck foundation and 3ase frame matches with drawing for correctness of 3olt fi<ing holes and correct level all through the foundation frame. %nsure that the equipment to 3e installed has 3een already inspected. Inspect the equipment for possi3le damages during transport. ;ake sure that the cut-out made on the ground floor sla3 0 raised floor for ca3le entry does not foul with the equipment.
#ocu>ent No( ANR-107-104265-BA-6070-43007-0001 Re4ision No( 0 Pa?e No( Page 5 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

The transport eyehooks have to 3e strained perpendicularly. Install the equipment on the pedestal matching with the central lines already marked. The panel has to 3e assem3led : aligned. %nsured that all interconnection coupling 3olts and 3us 3ar links fit properly without any strain on any part. 1heck grouting of panels, after final alignment. !anels to 3e tack welded at suita3le intervals. %nsure fi<ing 3olts provided 3y vendor are used at all positions : are tightened properly. %nsure for perfect verticality and proper alignment as each section is completed. 1heck for proper alignment and intactness of door gaskets etc. The panels are to 3e thoroughly cleaned with 3lowers and vacuum cleaners. 2ll loose supplied items are to 3e fitted. 2ll wiring, terminals, 3us 3ar oints are to 3e checked for tightness. Tighten the panel couplings : 3us 3ars etc. to the required torque level as mentioned 3y the manufacturers. %nsure connections of all power, control and earth 3us are completed as per drawing. 1heck Safety features such as hori>ontal : vertical separation sheets, 3us 3ar shrouds and door handle interlock are fitted properly. 1heck mechanical operations of 1.&.@s, racking in and out and shutter closing. Inspect contact alignment of draw out type Switchgears. 2lignment of modules in ;11@s to 3e checked. %nsure that the earth 3uses on the either side of the panel are connected to the main earthing grid. %nsure proper mounting of instruments, relays, meters, and indication lamps which are supplied loose. %nsure all the inter panel wiring is completed as per the drawing. %nsure all e<ternal power 0 control ca3ling and terminations are completed as per approved drawing. %nsure that the equipment identification 0 la3els are properly placed as per drawing. 7. Testing & !re commissioning %nsure that the following tests are conducted 3efore giving clearance for commissioning. 2lso refer vendor@s testing and pre-commissioning procedures 0 manuals. %nsure that valid work permit : electrical safety documents are availa3le for carrying out the o3.
#ocu>ent No( ANR-107-104265-BA-6070-43007-0001 Re4ision No( 0 Pa?e No( Page 6 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

%nsure that approved 0 recommended tools and tackles of appropriate type are availa3le. 1heck foundation and 3ase frame matches with approved drawing for correctness of 3olt fi<ing holes and correct level all through the foundation frame. %nsure that the equipment to 3e installed has 3een already inspected. Inspect the equipment for possi3le damages during transport. ;ake sure that the cut-out made on the ground floor sla30raised floor for ca3le entry does not foul with the equipment. The transport eyehooks have to 3e strained perpendicularly. Install the equipment on the pedestal matching with the central lines already marked. %nsure fi<ing 3olts provided 3y vendor are used at all positions : are tightened properly. %nsure for perfect verticality and proper alignment as each section is completed. 1heck for proper alignment and intactness of door gaskets etc. Tighten the panel couplings etc. to the required torque level as mentioned 3y the manufacturers. %nsure connections of all power, control and earth 3us are completed as per approved drawing. %nsure that the earth 3uses on the either side of the panel are connected to the main %arthing grid. %nsure proper mounting of instruments, relays, meters, and indication lamps which is supplied loose. %nsure all the inter panel wiring is completed as per the drawing. %nsure all e<ternal power 0 control ca3ling and terminations are completed as per drawing. %nsure that the equipment identification 0 la3els are properly placed as per drawing. 4unctional check to 3e carried out for individual feeder. !olarity, 'atio and !hase sequence to 3e checked for 1Ts and !Ts. Insulation resistance to 3e checked for the entire panel. %lectrical simulation test to 3e carried out for all the protective alarm and annunciation relays along with manual operation of the panels. Secondary in ection test is used for testing the protective relays and thermal overload relays. !rimary in ection test is used to check 'estricted %arth 4ault !rotection. 1omplete the Installation check sheets as per S!-""##
#ocu>ent No( ANR-107-104265-BA-6070-43007-0001 Re4ision No( 0 Pa?e No( Page 7 of 8

A= Noor MGI , Sa98i6a Mini<=ood and %a=Ba=a Construction Contract No( C)**+** Met8od State>ent <or Insta==ation $ Testin? o< '
s7itc8?ears

!re commissioning test is carried out as per functional test of S!-""## and records to 3e maintained.

D(-

EALT

SA"ET! $ EN'IRONMENT

&efore commencement of this activity all the personnel shall 3e 3riefed a3out the possi3le risk : ha>ards associated with the o3. In general following precautions shall 3e taken while handling and assem3ly of Structural steel material. a. !ermits availa3le in the site prior to the commencement of the work. 3. Involved personnel shall 3e provided with appropriate !!% c. 2ll equipments shall 3e checked for the general safety, prior to use. d. +nly trained : competent personnel shall 3e allowed for the work. e. The work area shall 3e 3arricaded 3y the warning tape. f. In case of emergency applica3le approved emergency plan shall 3e followed.

#ocu>ent No( ANR-107-104265-BA-6070-43007-0001

Re4ision No( 0

Pa?e No( Page 8 of 8

S-ar putea să vă placă și