Sync your project easily with existing SharePoint Task Lists or create a new list from here
Consulting | Solutions | Products | Training
TPG The Project Group - you are not allowed to copy this slide - Slide 6 www.facebook.com/tpg.munich www.twitter.com/tpg_muc (@tpg_muc) www.theprojectgroup.com/newsletter
Office Background
Options - General
Options - Save
Visuals
Task Path
Driven Successor
As soon as possible
No constraints will be created anymore when assigning tasks to resources unless there is a shift on the schedule.
Click on Reports and select the type of report to work with or go to More Reports
Selected Report Chart with Design Tools and Field List to change what ever you want.
Please also take a view at our recorded webinars on TPG YouTube channel
Video 1: Microsoft Project 2013 - That's new in MS Project Server http://www.youtube.com/watch?v=WBMnrf1IMNE Video 2: Microsoft Project 2013 - Project Management with SharePoint 2013 http://www.youtube.com/watch?v=5m2IwMs3aa8 Video 3: Microsoft Project 2013 - That's new in the Project Client http://www.youtube.com/watch?v=nP87sxRg2o4
TPG Austria Mooslackengasse 17 A-1190 Wien Austria Tel.: +43 1 23060 3145 Austria@theprojectgroup.com
www.theprojectgroup.com
Consulting | Solutions | Products | Training
TPG The Project Group - you are not allowed to copy this slide - Slide 19 www.facebook.com/tpg.munich www.twitter.com/tpg_muc (@tpg_muc) www.theprojectgroup.com/newsletter