PUBLIC COMMENTS PUBLIC COMMENTS allows you, the public, to speak for a maximum of three minutes on any subject which is within the jurisdiction of the MPRWA TAC and which is not on the agenda. Any person or group desiring to bring an item to the attention of the Committee may do so by addressing the Committee during Public Comments or by addressing a letter of explanation to: MPRWA TAC, Attn: Monterey City Clerk, 580 Pacific St, Monterey, CA 93940. The appropriate staff person will contact the sender concerning the details.
AGENDA ITEMS
1. Receive Report on RFP Process for the Value Engineering (VE) Study of the Monterey Peninsula Water Supply Project (MPWSP) and Approve Selection of Rick Riedl as TAC Representative on the VE Review Committee - Cullem.
2. Receive Report on the Test Slant Well Permits and Construction - Cal Am
3. Receive Report on Negotiations for GWR Source and Product Water - Isreal
4. Receive Report on Cost Comparison Study of GWR vs DESAL - Stoldt
ADJOURNMENT
The Monterey Peninsula Regional Water Authority is committed to include the disabled in all of its services, programs and activities. For disabled access, dial 711 to use the California Relay Service (CRS) to speak to staff at the Monterey City Clerks Office, the Principal Office of the Authority. CRS offers free text-to-speech, speech-to-speech, and Spanish-language services 24 hours a day, 7 days a week. If you require a hearing amplification device to attend a meeting, dial 711 to use CRS to talk to staff at the Monterey City Clerks Office at (831) 646-3935 to coordinate use of a device or for information on an agenda.
Agenda related writings or documents provided to the MPRWA are available for public inspection during the meeting or may be requested from the Monterey City Clerks Office at 580 Pacific St, Room 6, Monterey, CA 93940. This agenda is posted in compliance with California Government Code Section 54954.2(a) or Section 54956.
Monterey Peninsula Regional Water Authority Agenda Report
Date: May 05, 2014 Item No: 1.
06/12 FROM: Executive Director Cullem
SUBJECT: Receive Report on RFP Process for the Value Engineering (VE) Study of the Monterey Peninsula Water Supply Project (MPWSP) and Approve Selection of Rick Riedl as TAC Representative on the VE Review Committee
RECOMMENDATION: It is recommended that the TAC confirm the selection of TAC member Riedl to serve on the VE review committee.
DISCUSSION: Section V., Category A.2 of the Governance Committee Agreement specifies that the Governance Committee shall make a recommendation to California American Water (Cal-Am) on selection of professional engineer to perform a value engineering analysis for the Desalination Project. The Committee will consider adoption of a process for selection of a value engineer. At its meeting of March 31, 2014, the Governance Committee voted to advertise, select, and award a contract for a Value Engineering study on Cal Ams Desal project at the 30% design level. The Governance agreement currently allows the Committee to select the VE consultant, but it will be modified to have the Committee advertise and award the contract in lieu of Cal Am doing so. Since the Governance Committee had no way to award contracts, and since time was of the essence, the Water Authority was requested to advertise the RFP, select the consultant, and award a contract. The TAC reviewed the draft RFP and scope of work for the VE and its comments were incorporated into the final versions. The Authority advertised the RFP on April 17 and proposals are due on May 12. The Authority will conduct the proposal review May 14 and 15, and provide the consultant ranking to the GC. On May 23 the GC will select the consultant. Subsequently, the Water Authority will award and administer the contract. The Executive Director has recommended that Rick Riedl (Seaside and TAC), Jeff Krebs (City of Monterey), an engineer from the MPWMD (to be named), and a non-voting representative of Cal-Am (to be named) serve as the review committee to make a consultant recommendation to the GC. MPRWA TAC Meeting, 5/5/2014 , tem No. 1., tem Page 1, Packet Page 1
BUDGET CONSIDERATIONS: The Water Authority FY 2013-2014 budget has been increased by not-to-exceed $200,000 to pay for the VE study, with the full cost to be reimbursed by Cal-Am per the Governance Agreement.
MPRWA TAC Meeting, 5/5/2014 , tem No. 1., tem Page 2, Packet Page 2 Monterey Peninsula Regional Water Authority Agenda Report
Date: May 05, 2014 Item No: 2.
06/12 FROM: Executive Director Cullem
SUBJECT: Receive Report on the Test Slant Well Permits and Construction - Cal Am
DISCUSSION: There is no written report for this item. A verbal report will be given at the meeting. MPRWA TAC Meeting, 5/5/2014 , tem No. 2., tem Page 1, Packet Page 3
Monterey Peninsula Regional Water Authority Agenda Report
Date: May 05, 2014 Item No: 3.
06/12 FROM: Executive Director Cullem
SUBJECT: Receive Report on Negotiations for GWR Source and Product Water - Isreal
DISCUSSION: There is no written report for this item. A verbal report will be given at the meeting. MPRWA TAC Meeting, 5/5/2014 , tem No. 3., tem Page 1, Packet Page 5
Monterey Peninsula Regional Water Authority Agenda Report
Date: May 05, 2014 Item No: 4.
06/12 FROM: Executive Director Cullem
SUBJECT: Receive Report on Cost Comparison Study of GWR vs DESAL - Stoldt
DISCUSSION: There is no written report for this item. A verbal report will be given at the meeting. MPRWA TAC Meeting, 5/5/2014 , tem No. 4., tem Page 1, Packet Page 7