13mm open/box end wrench or 13mm deep well socket

Torque wrench recommended for final lock down


Note: Pictures shown are for the ANT-200 series antennas and may
not be identical to your antenna system. For ANT-100 series, refer to
Instructions included with the antenna for proper assembly.

Prior to installation, ensure that the radios are paired, that is,
one low band ODU with one high band ODU, refer to radio label.

Qualified personnel experienced with PTP antenna assembly
and installation are required for installation and setup.


Equipment must be properly grounded to reduce the risk of
electrical shock prior to E-Link 1000LR operation.


Minimum link distance for co-polarization of 1 ft (0.3m) antennas
is 50 meters / 164 ft.
Minimum link distance for co-polarization of 2 ft (0.6m) antennas
is 200 meters / 656 ft.










Carefully remove the contents from the box. Use caution. The
reflector and radome are manufactured to very close tolerances.
Careful handling and assembly is required to avoid denting the
reflector or damaging the radome, which would degrade antenna
performance.

Note: Slots on the brackets allow for the washers and nuts to
remain on the bolts while mounting the antenna on the pole.

Loosen mounting bolts to allow pole mount bracket to slide over pole
or swing brackets open, to allow the brackets to swing around the
pole.


One side of the pole mounting
bracket has a slot which can
be slid under the washers
after the bracket has been
swung around the pole.



Slide bracket under both
washers and tighten.



Tighten the two brackets
equally, so that the bracket
gaps are equal above and
below each bolt on both sides
of pole.








a. Loosen the 4 Azimuth
lockdown bolts.

b. Adjust Azimuth via single
Azimuth adjust bolt, using a
13mm box end or socket
wrench.

c. Tighten the 4 Azimuth lock
down bolts.
Relevant Products:
E-Link 1000LR, ANT-200 Series Antennas
ELink1000LRQuickInstallInstructions
RadioandAntenna
Doc# 980-0200-001 Rev A

1
2
3
Continued
2
Equal gaps
Unpack and mount antenna
Azimuth adjustment
Recommended installation tools
4 Azimuth lockdown bolts




Note: The azimuth lockdown bolts must be tightened before any
elevation adjustment is started. The narrow beamwidth of the
antennas makes it essential to completely tighten the Azimuth
lockdown bolts prior to adjusting Elevation, and vice versa.

a. Loosen the 3 Elevation lock
down bolts.

b. Adjust the Elevation via the
single Elevation adjust bolt, using
a 13mm box end or socket
wrench.

c. Tighten the 3 Elevation lock
down bolts.







After mounting antenna to the pole, install the E-Link ODU. First
apply a small amount of silicon grease to the rubber O ring on the
antenna feed. A tube of grease is supplied with the antenna.
Applying silicon grease aids in sliding the E-Link ODU on to the
antenna and helps seal against moisture. Slide the E-Link ODU
oriented for either V (Vertical) polarization or for H (Horizontal)
polarization as indicated by the lettering on the cover. Secure the
four captive latches/bales and snap into the locked position.












The radio has a M5 ground lug
located on the enclosure. Ensure
that this is connected by a 10AWG
wire to earth ground or building
ground.



The E-Link 1000LR requires 0.7amp @ -48 VDC input power. There
are two options for powering:
1. PoE via the Management cable.
2. Power over Coax via a Type N Connector.
Use surge protectors for either option. Both inputs can be connected
for redundant power input to the radio.









Assemble Management Interface cable
The radio comes with an Amphenol RJ45 (RJFRB6) weatherproof
housing. When using CAT5e cable use all the included parts as
shown in assembly instruction included with the housing. If using
CAT6 Ethernet cable, discard the 3 sealing parts included with this
housing and use the extra Blue seal provided in the E-Link install kit.
Assemble connector as shown above. If necessary the inner section
with tab can be removed to fit larger diameter cables.

a. Slide RJ45 into the housing until it
snaps into place.
b. Make sure the black standoffs are
holding the RJ45 in place. About 3/8
(9.5mm) of the RJ45 connector should be protruding out of the
plastic housing.
c. The housing should have a ~1/8 (3mm) gap between the screw
cap and base when properly tightened.




a. Connect all cables to the E-Link radio.
Drape cables with a drip loop to keep water from collecting
around connectors.
b. Align the link. E-Band
recommends that personnel be
present at both ends of the link,
equipped with either two-way
radios or cell phones for
communications during the
alignment process. Once the link
is aligned and operational,
recheck all hardware and torque
to 15 lb-ft (203.3 N-m).
Horizontal Polarization
4
5
9
6
7
8
Install the Gigabit SFP interface. Refer to
instruction sheet supplied with this kit.
2011 E-Band Communications Corporation www.e-band.com +1.858.408.0660 support@e-band.com 02-17-11
Single elevation adjust bolt
10
Vertical Polarization
Connect Input Power
Complete cable connections, align
link, and tighten hardware
Ground Radio
Elevation adjustment
Mount E-Link 1000LR

S-ar putea să vă placă și