Student Ingrid Alms Berg

Design for Reliability


Applied to development of
subsea process systems
Appendices
Trondheim, J une 14th, 2010
M
a
s
t
e
r

s

t
h
e
s
i
s
N
T
N
U
N
o
r
w
e
g
i
a
n

U
n
i
v
e
r
s
i
t
y

o
f

S
c
i
e
n
c
e

a
n
d

T
e
c
h
n
o
l
o
g
y
F
a
c
u
l
t
y

o
f

E
n
g
i
n
e
e
r
i
n
g

a
n
d

T
e
c
h
n
o
l
o
g
y
D
e
p
a
r
t
m
e
n
t

o
f

P
r
o
d
u
c
t
i
o
n

a
n
d

Q
u
a
l
i
t
y

E
n
g
i
n
e
e
r
i
n
g
Appendices
There are 6 appendices to this report numbered from A to F. Except for the preliminary report the
appendices are confidential and therefore left out of the main report. The appendices are meant to be
read together with the main report and a description of how this should be done is given in chapter 1.3.

The appendices are the following:
A) System description of the Midgard Subsea Compression System
B) Project execution model for Technical Qualification in Aker Solutions
C) Aker Solutions methodology for reliability
D) Project Execution Model (PEM) for Aker Solutions
E) Equipment Reliability Management Programme (ERMP) for the Midgard SCS
F) Preliminary report

Appendix A System description Midgard SCS
This Appendix describes the Midgard Subsea Compression System. The sgard field is situated on the
Halten Bank in the Norwegian Sea about 200 kilometres from the Mid-Norway shoreline. The sgard
B platform receives gas production from the Midgard and Mikkel reservoirs. Due to a decline in
natural pressure from the reservoirs, additional pressure support will be required to maintain a stable
production flow from the Midgard and Mikkel reservoirs from 2014 and onwards. To meet these needs
Aker Solutions has developed a Subsea Compression System.
Subsea compression is considered to be a more environmentally acceptable concept compared to a
platform based compression solution. Subsea compression is designed for close to zero direct emission
of substances to air, and the amount of raw materials required for construction will be significantly
lower than for a platform. In addition, the subsea alternative contributes to a significantly lower risk
for personnel as it is unmanned.
A subsea compression station will also be located closer to the well, thus requiring a lower inlet
pressure and it is a less costly alternative than a platform solution.

Figure A - 1: agard field location (european-interaction.com) and sgard field development sketch
(regjeringen.no)
The Subsea Compression System (SCS) comprises a Subsea Compression Station (SCSt) with two
compression trains and a Subsea Compression Manifold Station (SCMS).
Power and Control is supplied to the SCS through 2 combined Power and Control Umbilicals. The
umbilicals are terminated in a Transformer and Umbilical Termination Module.
The SCS is illustrated in figure A - 2
Compression Train installed on alignment frame





The Subsea Compression System can be broken down into three sub-systems:
- Process system
- Control system
- HV power system
Each sub-system is described in detail in the following sub-chapters.




SCMS
SCSt
Figure A - 2: Subsea Compression Station and Subsea Control Module System
A.1. Process system
The process system consists of the following:
1. A manifold with station by-pass valve and isolation valves.
2. Two compression trains, each consisting of the following main process modules:
- Interface Spool Module
- Combined Inlet/Anti-Surge Cooler Module
- Scrubber Module
- Condensate Pump Module
- Compressor Module
- Discharge Cooler Module
- Stand-alone Subsea Control Module
Each compression train is installed on an alignment frame that allows for installation of one complete
train, as shown in figure A- 2:

Compressor Train
Transformer and
Umbilical Termination
Module
Train Base Frame

Figure A - 3: Compression Train installed on alignment frame

The main modules will in the following tables be presented with a short description and a figure.


Table A - 1: Compressor train modules
Name Figure Description
Manifold

The name is old English and refers to the "folding
together of many inputs and outputs (wikipedia). The
manifold for Midgard is a quite simple manifold that
directs the flow from the reservoirs to and from the
Subsea Compression Station. The manifold consists of
piping and valves, both ROV and electrically operated.
Template Structure

The SCSt structure gives the support and protection for
the Compressor trains and the UPS and UTA modules. It
is designed in accordance with the soil conditions,
pressure ratings and temperatures of the field.

Compression Train
Base Frame

The compressor train base/alignment frame is the
foundation for all the process modules.
It is designed to be installed/retrieved to the SCSt with
all process modules in place, and with all process and
control connections made up and tested prior to loadout.
Interface Spool
Module

The Interface Spool Module consists of piping and hubs
and is meant to distribute the tie-ins between the Subsea
Compressor Manifold System (SCMS) and the modules
on the Compressor Train base frame. It shall also serve
as a foundation for the Inlet cooler.
Combined Inlet/
Anti-Surge Cooler
Module

The function of the combined inlet and anti-surge cooler
is to cool the inlet gas temperature. The anti-surge flow
from the compressor will have a high temperature due to
heating from the compression. Also the inlet temperature
from the wells may have a high temperature during
certain production phases. The inlet cooler module
consists of long, thin pipelines exposing it to the
temperature of the seawater surrounding the pipe. As a
result of how the pipe is constructed, the element will
spread out and thus the temperature is lowered.
Anti-surge is necessary when the flow does not match
the current operating point of the compressor
(emersonprocess.com). Especially when the amount of
gas coming in to the compressor is higher than it can
handle.
Scrubber module

A scrubber is a separator. In this system the scrubber's
function is to separate gas and liquid going into the
compressor. This will ensure that only gas enters the
compressor, as it can only handle limited amounts of
liquid.
Condensate Pump
Module

The Condensate pump module includes a pump and
motor unit based on Aker Solutions own
LiquidBooster technology. The purpose of the pump
is to drain the condensate water from the separator and
to further boost the liquid phase before it is re-injected
into the gas phase.
Compressor
module

A compressor reduces the volume of a gas or liquid in
order to increase the pressure. In this system the
compressor is a gas compressor. The increased pressure
is meant to be added to the current pressure of the
Midgard and Mikkel reservoirs.
Discharge cooler
module

Like the inlet cooler module, this is meant to cool the
flow coming through the pipes from the compressor.
The flow from the discharge cooler will be reconnected
to the flow from the pump module and then discharged
into the main production flowlines.

Figure A-4 shows how the modules in the compressor train are connected and how the flow goes
through it.
LC
SC
M
M
PT
PT TT
FT
ASC
Note 1
Note 2
FC
HOLD 7
HOLD 1: Actual inlet / anti surge cooler arrangement
HOLD 2: Deleted
HOLD 3: Sand removal arrangement
HOLD 4: Barrier fluid (MEG/Oil) not decided
HOLD 5: Demisting internals
HOLD 6: Requirement of hot gas BYPASS based K-Lab trip test results
HOLD 7: Exact design of compressor drainage
NOTE 1: GVF control
NOTE 2: Inlet device of type spinlet or evenflow
NOTE 3: Maintain straight length upstream
NOTE 4:
SCMS
SCMS
Hold 3
SC
SCRUBBER
INLET/ANTI-SURGE
COOLER
CONDENSATE
PUMP
COMPRESSOR
OUTLET
COOLER
PC
Barrier fluid from
PLIM
Motor
cooler
Hold 4
PVR
SY
HSC
M
Hold 5
HGB
HOLD 6
RO
HLL
NLL
LLL
M
min
Hold 1
RC
M
FT

A.2. Control and HV Power system
HV Power and Control is supplied to the SCS through 2 combined Power and Control Umbilicals. The
umbilicals are terminated in a Transformer and Umbilical Termination Module. The Combined
Transformer and Umbilical Termination module holds the main subsea electrical equipment and
provides an interface towards the control equipment. The HV Power cables in the umbilicals supplies
power to the electric motors for the Compressor and the Pump, as well as power to the UPS.
The Control and HV Power system mainly consists of the following:
- Topside controllers
- Topside Circuit Breaker
- Topside Variable Speed Drives for HV Power
- Combined Power and Control Umbilical
- Subsea Transformers
- UPS (Uninterruptible Power Supply)
- Subsea Communications network
- Subsea control modules with controllers and routers
- Interconnections
- Subsea HV connection system for retrievable compressor and pump unit.

Name Figure Description
Topside controllers The SCSt needs input and follow-up topside in order
to function as required, especially when alterations
and shut-downs are needed. The topside controllers
receive the information topside and pass it on to or
from the subsea systems.
Input circuit breaker The circuit breaker is meant to protect the electrical
circuit in case of a fault, e.g. overload. It detects
failures and breaks off the electrical flow.
Variable Speed Drive -
Frequency converter
A frequency converter controls the alternating
current of the electrical power supplied to a system
and converts the incoming alternating current
frequency to the correct frequency for the
compressor and pump (wikipedia.com).
Combined Control and HV
power umbilical
An umbilical provides the power and communication
to and from topside to the SCS. The umbilical
contains HV power cables for power supply to the
electric motors and to the UPS, fibre optic cables for
communication and a barrier fluid distribution line
for the pump. Each compression train is connected to
a dedicated umbilical.
Umbilical terminations Umbilical termination and
Subsea transformer
module

This is where the umbilical going between the
platform/ship and the seabed is connected. The
termination usually includes armours, tubes and
other tensile-strength elements.. At the termination
the power cables are connected to the respective
transformers while the fibre optic cables are
distributed to the subsea control modules (SCM).
Subsea Step-down
Transformer
Step-down transformer:

Step-down transformers are used to decrease the
voltage current in to or out from a module. The
cables between topside and subsea installations
create a resistance which alters the voltage. Due to
this the transformers are introduced in order to
ensure that the necessary and correct voltage for use.
Three step-down transformers are included in the
Subsea Transformer Module; a step-down
transformer for the HV power supply to the
compressor, a step-down transformer for the HV
power supply to the pump and a step-down
transformer for the UPS supply.
UPS

The UPS system provides auxiliary power to the
compressor subsea control equipment in case of loss
of the primary power supply. It comprises energy
storage means and a power conversion system to
charge it with. The UPS also has a control system
and a cooling system
Each UPS shall be able to provide power to both
compressor trains at the same time when the ordinary
power supply is lost
Subsea control modules.

The typical SCM recieves communication signals
and electrical power supplies from the topside
control equipment. These modules then use the
signals to control the subsea system
(www.freepatentsonline.com).
Active Magnetic Bearing
Control Module

The Active Magnetic Bearing Control Module
controls the magnetic bearing that levitate the
compressor. The motor-compressor has three radial
bearings and one axial, which requires a 7-axes
AMB control system. The ABM assemblies also
contain emergency run-down bearings of ball
bearing type to safely run down the motor-
compressor in case of magnetic bearing failure.
Subsea HV connection
system
This is where the HV power umbilicals or cables are
connected and the electrical current sent on to
transformer systems subsea, and from there on to the
electric motors.

Appendix B Aker Solutions Technical Qualification

System
requirement
definition
Gap Analysis
Develop Technical
Qualification plan
(TQP)
GO/
NO-GO
meeting
R&D Project set-up
NO-GO
GO
Evaluate external
technical
alternatives
Procure external
solution
M1A
1A - Opportunity appraisal
ENGINEERING
Basisof design
S2
ENGINEERING
SoW
S5
GAPReport Internal wishes Market need
Aker Solutions
technology
status
Client spec
ENGINEERING
GAPReport
S5
Tender need SoW Basisof design Lessonlearned
ENGINEERING
Riskregister
ENGINEERING
Schedule
ENGINEERING
CTR&Budget
ENGINEERING
MPP
ENGINEERING
WBS
ENGINEERING
Toplevel SAP
structure
ENGINEERING
TQP
ENGINEERING
Project
organisation
chart
Project Execution Model Technical Qualification Page 1 of 8
Title
Eng
(M1B)
MILESTONE
REVIEW
PROCURMENT
PO

M1A M1B
1B Concept development & selection
ENGINEERING
Concept
development &
selection
Kick off
Concept
Development
Concept design
review
S02
Concept screening/
selection
TQP
Update
DesignBasis
Concept design
review Client feedback
Concept design
review
S02
MANAGEMENT
Budget
MANAGEMENT
MPP
MANAGEMENT
Riskmitigation
plan
MANAGEMENT
Riskregister
MANAGEMENT
Project schedule
ENGINEERING
Concept design
review
S05
Fallback
solutions
Primaryconcept
ENGINEERING
Fallback
solutions
ENGINEERING
Primaryconcept
ENGINEERING
Component test
requirement
evaluation
ENGINEERING
IPsearch
MANAGEMENT
CTR
Eng
(M1A)
MILESTONE
REVIEW
Project Execution Model Technical Qualification Page 2 of 8
Title


2A - Detail Engineering & Procurment of LLIs
M1B M2A
MILESTONE
REVIEW
PROJ ECT KICK OFF
DETAIL PRODUCT
DEVELOPMENT
Eng.
(M2A)
Supply
Chain
(M2A)
PROCUREMENT OF
CRITICAL LONG
LEAD ITEMS &
SERVICES
TQP
FMECA
review.
S2
PreFEA
S2
SAPBOM
S2
Detail design
file
S2
MDL
S2
I/FData
S5
Purch.
OrdersLLI
ITP LLI
Concept
designfile
Patent
application
S5
REVIEW
MANUFACTURING
AND A&T
CAPABILITY AND
REQUIRED
CAPACITY
PMS/OPR
Basisof
Design
Make/buy
strategy
MANAGEMENT
LLI
ENGINEERING ENGINEERING ENGINEERING
ENGINEERING ENGINEERING ENGINEERING ENGINEERING
PROCUREMENT
AND QS FOLLOW
UP
Alloc. Stock
items
Supplier
ITPs
EPMS SMDLs Eng. Docs.
Project
Shedule
LLI - Drawings
andmaterial
S5
ENGINEERING
3Dlayout
froozen
ENGINEERING
Update
Project
Schedule
MANAGMENT
Scopeof
Supply
S3
ENGINEERING
Quotation
DRWs
S2
ENGINEERING
Quotation
DRWs
Quotation
DRWs
Project
Schedule
Project
Schedule
TQP
DETAIL
ENGINEERING FOR
LONG LEAD ITEMS
Updatedbasis
of design
ENGINEERING
BOM
skeleton
A&T

ENGINEERING
Fallback
solutions
MPP
PMS/OPR
PROCURMENT PROCURMENT PROCURMENT
QSPlan
PROCURMENT
Insp. Rel.
Note
PROCURMENT
Project team
MANAGEMENT
Meeting
Minutes
MANAGEMENT
Secure
Manuf Slot
PROCURMENT
Manufacturig
design
review
A&Tdesign
review
DETAIL
ENGINEERING FOR
MANUFACTURING
DETAIL
ENGINEERING FOR
ASSEMBLY AND
TEST EQUIPMENT
Detail design
file
S2
ENGINEERING
Detail design
file
S2
ENGINEERING
BOM
skeleton
ENGINEERING
Detail design
file
S3
ENGINEERING
E
-
0
5
-
0
9
E
-
0
5
-
1
0
VERIFICATION OF
QUALIFICATION
PROGRAM
TQP
DesignVerif.
TQPStatus
TQPSchedl.
verif.
ENGINEERING ENGINEERING
Component
testing
Procurment
strategy
PROCURMENT
Eng
(M1B)
Project Execution Model Technical Qualification Page 3 of 8
Title

M2B
2B - Final Engineering for procurment
MILESTONE
REVIEW
M2A
Supply
Chain
(M2A)
Eng
(M2A)
Supply
Chain
(M2B)
MTRL&
BOMA&T
S5
FINAL
ENGINEERING FOR
PROCURMENT
Eng.
(M2B)
E
-
0
5
-
0
9
E
-
0
5
-
1
0
VERIFICATION OF
QUALIFICATION
PROGRAM
TQP
DesignVerif.
TQPStatus
TQPSchedl.
verif.
SoS
S5
FMECA
REPORT
S5
FINALFEA
S1
MTRLS&
BOM
S5
PROCUREMENT
AND QS FOLLOW
UP
EPMS Eng. docs. SMDLs
Docapprovl
S5
Inspec.
notes
S2
QSPlan
ENGINEERING
Supplier
ITPs
ClosedPOs
ENGINEERING
FMECA
Results
PreFEA
MDL
I/FData
Project
Schedule
Eng. Report
ENGINEERING
Updated
A&T
drawings
MDL
S2
ENGINEERING
Updated
Project
Schedule
Manufacturig
design
review
A&Tdesign
review
FINAL
ENGINEERING FOR
MANUFACTURING
FINAL
ENGINEERING FOR
ASSEMBLY AND
TEST EQUIPMENT
Draft weld/
machdrws
Final design
file
S2
Finale
designfile
S2
ENGINEERING
Finaledesign
file
Weld/ mach
drawings
S2
Draft Assy
drawings
Draft test
setupdrws
Updated
manufacturing
drawings
A&Tequi drws
S2
Test setup
drws
S2
ENGINEERING
Assydrws
S2
ENGINEERING
Drawing
review
BOM
Skeleton

Updated
BOM

A&TBOM
skeleton

A&TBOM
S2

Updated
BOM

Final design
file
S2
ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING
Project Execution Model Technical Qualification Page 4 of 8
Title

M2C
3A - Sub-contracting and Manufacturing
MILESTONE
REVIEW
M2B
Eng.
(M2B)
Supply
Chain
(M2B)
Eng
(M3C)
Supply
Chain
(M3C)
TQP
DesignVerif.
VERIFICATION OF
QUALIFICATION
PROGRAM
TQPStatus
TQPSchedl.
verif.
PROCUREMENT
AND QS FOLLOW
UP
Supplier
ITPs
SMDLs EPMS
Docapprovl
S5
Insp.
Rel.
Note
QSPlan
Eng. Docs.
ClosedPOs
ENGINEERING ENGINEERING
DETAILED
MANUFACTURE
PLANNING
MANUFACTURE
ACTIVITIES
Router

Shopfl
Sched.
Prodorder
release
S5
Manuf Spec
Traceab
Sheets
ITP
Manuf
Proc.
Comlp. Parts
Manuf.
Doc
S5
MANUFACTURING
PREPARATION
BOM
AssyProc.
Manuf. BOM
Manuf.
Spec.
ITP
S5
PickList f/
manf
Manuf.
Spec.
Manuf.
Proce.
Manuf. BOM
Router ITP
Manuf.
drawings
Trace.
Sheets
RoughCut
MANUF. MANUF. MANUF. ENGINEERING ENGINEERING MANUF.
MC MANUF. MANUF.
A&TTool list
ENGINEERING
FOLLOW-UP
OPR/
PMS
PROCUREMENT OF
BOM ITEMS &
SERVICES
Purch.
Orders
ITP
OPR/
PMS
Purch.
OrdersLLI
Released
BOM
Released
BOMA&T
Equip
RFQ Make/buy
strategy
Drawings
Manuf.
(M3C)
VQN/
PQN
Project Execution Model Technical Qualification Page 5 of 8
Title

M3B
3B - Pre-fabrication & Engineering
MILESTONE
REVIEW
M3A
Eng.
(M3A)
Manuf.
(M3A)
Supply
Chain
(M3A)
Eng.
(M3B)
Manuf.
(M3B)
Supply
Chain
(M3B)
DETAILED
ASSEMBLY & TEST
PLANNING
BOMs
SAP
Short
List S5
Prod.
Order
S5
Pickinglist f/
Assy
AssyProc. Tracesheets
INITIAL
MC ACTIVITIES
PROCUREMENT AND
QS FOLLOW UP
GOODS RECEIVING
FROM SUPPLIERS
AND OTHER WPS
SMDLs
Supplier
ITPs
Doc.
Approvl
S5
QSPlan
EPMS
Income
Matrs
S5
Matr. Doc.
S5
Vendor
NCRs
Test &Assy
Router
MCCR
Sheets
Man. BOM
ITP
PVT
MRB
S1
LCI Req. Mat. Doc.
MANUF. ENGINEERING ENGINEERING MANUF.
MC MANUF. ENGINEERING
MANUF. MANUF. MRP PROCUR.
MANUF.
LCI Plan BOM
MCCR
Sheets
S5
MANUF.
Eng. Docs.
ClosedPOs
Insp. Rel.
Note
Appr. Matrs
S5
E
-
0
5
-
1
6
3rdparty
notification
3RDPARTY.
Engineering for
A&T - Procedures
and documentation
VERIFICATION OF
QUALIFICATION
PROGRAM
TQPStatus
Complete
Engineering
MDL
Assembly
Procedure
S5
PVT
Procedure
S5
SAFOP
S5
Assembly
S5
ENGINEERING
Test
Schematic
S5
ENGINEERING
Test
Stackupdrw
S5
ENGINEERING
A&Tdesign
review
FAT
S5
ENGINEERING
Finale
designfile
S3
FINALFEA
Finale
designfile
ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING
TQP
DesignVerif.
TQPSchedl.
verif.
ENGINEERING ENGINEERING
GADrw
S5
Product data
sheet
S5
Finale
designfile
S5
FEA
REPORT
S5
Project Execution Model Technical Qualification Page 6 of 8
Title

M3C
3C - Assembly & test
MILESTONE
REVIEW
M3B
Eng.
(M3B)
Supply
Chain
(M3B)
Eng.
(M3C)
SC
(M3C)
PROCUREMENT
CLOSE OUT
Vendor Doc
ASSEMBLY
Manuf.
(M3B)
FAT/
PVT
(M3C)
PRODUCT
VERIFICATION
TESTING
Q CONTROL
(REVISION)
PVT
completed
Test doc.
S5
Manuf Spec
A&T Manf.
Doc
S5
ITP
Manuf
Proc.
POCls
Report
Updated
MRB
Manuf.
Spec.
Assy
Manf. Doc.
Trace.
Sheets
Assembly
Proc.
Trace.
sheets
ITP
PVT
Q CONTROL
(VERIFICATION)
MRB
S5
Sub-Assy
Test doc.
Manuf.
Proc
MC MANUF.
MC MC
MANUF.
BOMs Drawings
Traceab
Sheets
S5
MANUF.
E
-
0
5
-
6
0
E
-
0
5
-
4
5
Engineering
Follow-up
ENGINEERING
Test report
S5
FAT
Procedure
Project Execution Model Technical Qualification Page 7 of 8
Title

M4A
4A - Close-out and Handover
MILESTONE
REVIEW
M3C
Eng.
(M3C)
Eng.
(M4A)
Project Execution Model Technical Qualification Page 8 of 8
Title
R&D project closure Handover meeting
ENGINEERING
IPsearch
documented
ENGINEERING ENGINEERING
Preparesales
presentation
ENGINEERING
Product cost
ENGINEERING
Document
releasedBOM
ENGINEERING
Lesson
learned
ENGINEERING
Preparerisk
evaluation
ENGINEERING
Posand
subcontract
closeout
ENGINEERING
Contract
close-out
report issuedif
required
ENGINEERING
Punchlist
cleared
All required
documentsare
releasedinSAP


Appendix C Methodology for the Aker Solutions
Technical Qualification
Each page in Aker Solutions technical qualification model is between two milestones and marked by
a number and a letter from 1A to 4A. These numbers can be found in the following table where they
are listed according to the phases they are thought to correspond with. The technical qualification
model finishes with handover and phases 6 to 8 are therefore less relevant for Aker Solutions, as any
actions after handover mainly lies with the client. The factors contributing to unreliability, as
discussed in chapter 7, are used as a basis together with the general methodology presented in chapter
8.
Phase Aker Solutions project execution model
1 1A + 1B
2 2A
3 2B
4 3A + 3B
5 3C + 4A
6-8 No direct comparison possible

As Aker Solutions whish to develop more shelfware products in the future, the general methodology
might become even more useful to them. The question will then be whether to develop a new
methodology, including the final phases and a more extensive phase 5. What is certain is that phase 6
from the general methodology would become more interesting to the development projects.
Phase 1
Opening for a
new product
GAP analysis
System
requirement
definition
Develop
Technical
Quakification plan
(TQP)
GO/
NO-GO
meeting
Recommence
project?
Yes
Terminate
project
No
Concept
Development &
selection Kick off
Yes
Project tasks Project reliability tasks
QFD
Reliablity, availabllity and
maintainability reqiurements
HAZID, SWIFT,
Early FMEA
Create reliability
programme
Desired reliability
Reliability report
1A
Evaluate external
technical
alternatives
R&D Project
set-up
Procure external
solution
No
Concept
screening
/selection
TQP update
1B
1A
Reliability report
1B
Reliability
programme
update
2A
Concept
development

Figure 1: Phase 1 for Aker Solutions
The Subsea Power and Process department at Aker Solutions can start a development process of new
technology either based on client needs, or a perceived market need. As all the projects the department
participates in have very specific demands and an environment which changes from one operational
area to another. The Subsea Power and Process department is still rather new on the market and their
subsea process systems are thus also new solutions. Currently they do not produce much on a larger
scale, but this is the wish for the future. If a product such as the Subsea Compression System (SCS) is
produced on a larger scale, it still needs to be altered for each new oil or gas field. It is important that
even the larger scale products, remains highly qualified to perform the desired functions. The Midgard
SCS is a good example as another SCS is in development for the Ormen Lange project.
The current project execution model for technical qualification starts in 1A with the GAP analysis on
which the system requirement definition is based. As the content of the GAP analysis is not described,
it is possible to suggest that a QFD is performed before or as a part of it. The technical qualification
does not include any specific reliability activities in the first phase, although some may say that
reliability requirements are an obvious part of the system requirements. If the client is the initiator,
availability and possibly reliability requirements will be handed directly to Aker Solutions. What the
team investigating the possibility of a new product then has to do, is to decide whether they want to
stick with the requirements. The alternative is to settle on even stricter requirements. A good reason
for this would be that it increases the competitive powers for future projects, as well as the current.
When the requirements have been specified, a technical qualification plan is developed. A reliability
programme should then be based on this, or developed concurrently with it. As the technical
qualification follows a preset project execution model, a reliability programme would do so as well. It
should consist of the methods most suitable for the specific system and the dates scheduling the
analyses.
Phase 1 also includes part 1B of the technical qualification. This is where the concept is developed and
chosen, before the project is started on a larger scale. In order to choose the best idea, economy, time,
feasibility and reliability must be considered. The demands for these aspects were specified in part 1A
and each concept will be reviewed according to them. In order to see whether the reliability of the
concept can answer to the requirements, early hazard analyses should be performed. HAZID and
SWIFT are suitable for such a purpose, either alone or together.
The main functions of the system, as well as some of the sub-systems will to an extent be decided on
before phase 1 ends. As soon as hazards and possible failures are discovered, an FMEA is begun. If it
is possible to rank the criticality of a failure, the FMEA is extended to an FMECA. More reliability
methods of both quantitative and qualitative manner ought to be implemented as the concept develops,
depending on the existing knowledge about the system. An evaluation of the possibility of reaching
the reliability requirements for the specific concept must be performed. This is part of the information
needed to decide whether the concept is acceptable or not. If the reliability engineer has desires for
improvements for the concept, this should be included.
Based on the chosen concept, the technical qualification programme is updated. When this final part of
1B is performed, an update of the reliability programme must be done simultaneously.
Phase 2
Input from reports phase 1, e.g.
HAZID, SWIFT and FMEA results
Phase 2: Aker Solutions
2A Detail Engineering & Procurement of LLIs
Project tasks Project reliability tasks
Update FMEA
FTA and/or RBD
Create overview of reliabilty predictions
RAM analysis
Document
reliability results
etc.
Reliability allocation
2A
Detail Product
development
Detail engineering
for manufacturing
Detail engineering
for assembly and
test equipment
Detail engineering
for Long Lead
Items
Verification of
qualification
program
Project kick-off
Review
manufacturing and
A&T capability and
required capacity
Procurement of
critical Long Lead
Items & Services
Procurement and
QS Follow up
2B
Early HAZOP
Reliability analysis for
procurement where necessary
Process FMEA
SWIFT/HAZID
for production
Human factors
analysis
Compare predictions with desired
reliability and requirements
Compare predictions with desired
reliability and requirements

Figure 2: Phase 2 for Aker Solutions


As the system development continues in phase 2, part 2A begins. This is where the project team is
chosen in Aker Solutions. Although it is normal to leave the first phase to managers from the
manufacturer and the client, it is advisable that the main project team is included earlier on. Reliability
and design engineers with experience from previous projects should be among the team members in
phase 1. Whether they are included as advisors or for permanent work at an early stage, their input is
valuable.
As the more detailed design begins, it will be easier to implement new reliability tools. To start with, it
is necessary to perform a reliability allocation. The subsea process systems are often quite complex
and an allocation will thus minimise the quantity of components which need to be studied for each
update. When the product development becomes more detailed it will also be useful to update the
FMEA. An early HAZOP can be implemented in order to discover more possible failures and
problems of different types than those found previously.
With the system architecture in place, FTAs and RBDs are performed. These are often used together
with or as a part of a RAM analysis which gives an overview of the overall reliability and availability.
The RAM analysis was described in chapter 6. At this stage the reliability tasks are meant to study
how the components and subsystems in the system work on each other, not to find new hazards. The
discovery of critical connections can help prevent one failure from affecting the whole system through
the implementation of two off structures. In some cases, the FTA, RBD and RAM analysis can be
used to see whether planned redundant structures truly are important or may be omitted.
Phase 2 is to a large extent the one where most of the information needed for reliability predictions
becomes available. Any of the tools recommended for this phase can be used for predictions. These
will be based on OREDA, previous projects or subcontractors, which have all been shown to include
factors contributing to unreliability in chapter 7. It is thus necessary that all choices are made with
great care. Depending on whether the predicted reliability matches the desired reliability, the next
phase begins. It should also be noted that any concepts matching the criteria, but considered too
expensive for further development must be re-evaluated.
Phase 3
Assign requirements and
functions to components,
assemblies and sub-systems
Phase 3: Aker Solutions
2B Final Engineering for procurement
Project tasks Project reliability tasks
Decompose for reliability
Update FMEA, FTA and RBD
HAZOP
Are requirements and
functions met with?
Document
reliability results
etc.
Final engineering
for manufacturing
Procurement and
QS follow up
Final engineering
for assembly and
test equipment
Final engineering
for procurement
Verification of
qualification
program
Input from
previous
phases
No
2B
3A
Yes

Figure 3: Phase 3 for Aker Solutions
There is a difference between detail and final as keywords in the project execution model. This
difference is also where phase 2 is separated from phase 3. Part 2B in the model is where the final
engineering takes place before any manufacturing is planned. What may be noticed throughout Aker
Solutions model is that very few tasks directly linked to reliability are mentioned. It is stated in a
document concerning the model that all design, FMECAs and HAZIDs should be finalised before the
sub-contracting and manufacturing begin. To perform a HAZID after the design is frozen might be
unnecessary as little new will come of it. A finalisation of the FMECA can on the other hand be
wrong. This tool can be used throughout the product life cycle whenever new data are retrieved and
the possible failures become more evident. Instead of a finalisation, the documents should be prepared
for further use, but with a statement of before and after frozen design. Any findings from before
the design was frozen will thus be recognised when the failure described occur. The failures which
were not previously known can be analysed, put into the FMECA, and marked as new discoveries.
Keeping the FMECA updated throughout the product life cycle will give good input for operators,
maintenance activities and later projects.
As suggested in the general methodology for this phase, a last assignment of requirements and
functions could be done as the design is finalised. A HAZOP is supposed to return the best answers
when the input information is the largest and most detailed collection possible. This suits the detailed
information in the final design. As one HAZOP has already been suggested, this could be a shorter and
less expensive update. Any discoveries that were not done before this HAZOP should be analysed and
alterations made if needed.
Among the analyses done before the design is frozen, is a finite elements analysis (FEA). This is not a
method made for reliability, but it is able to return helpful information about how the materials in the
product will respond to the operational conditions. For a reliability engineer, it could be used as
supporting material when the criticality and likelihood of a failure are stated. This can be useful
together with the results of the last HAZOP for the update of the FMEA, FTA and RBD. The FTA and
RBD should now be performed at the lowest level possible, showing how the smallest details may
affect the whole system. When the reliability is predicted at the end of this phase, it will be based on
the largest retrievable amount of information possible, without a physical product. If the requirements
from the previous phases are met with, the project can continue.
Phase 4
Phase 4
Project tasks Project reliability tasks
Update reliability analysis
for procured items
Prepare plan for
accelerated life tests
and reliability growth
Document
reliability results
etc.
Analyse test results
Follow-up of test-results
and possibe deviations in
production
Prepare FAT
Engineering
follow-up
Verification of
qualification
program
Manufacturing
preparation
Detailed
manufacturing
planning
Manufacture
activities
Procurement
of BOM items
& services
Proquirement
and QS
follow-up
Engineering for
A&T Procedures
and
documentation
Complete
engineering
Verification of
qualification
program
Initial MC
activities
Detailed
assembly &
test planning
Procurement and
QS follow-up
Goods receiving
from suppliers and
qother WPs
Testing of
materials
Consider procured items
for testing
3A
3B
3C

Figure 4: Phase 4 for Aker Solutions



Part 3A of the project execution model is where the manufacturing takes place. As the manufacturing
is planned and performed, the general methodology suggests that an analysis of the procured items is
performed. The Subsea Power and Process department starts evaluating the procurement earlier, but as
some items are still received during phase 4, an updated analysis should be performed. This will
provide information about the necessity of testing these parts.
When a system is installed sub sea, it is important that the materials are able to withstand the
environment. The SCS will see pressures and temperatures which are different on the inside than on
the outside of the system. The outer element is sea water, which brings with it the possibility of
corrosion. The pressure and temperature differences mean that the materials must withstand certain
stresses. As phase 4 starts, plans for testing of materials, components and sub-systems should be
established. Although the SCS is a custom-built system, there is no reason not to perform tests which
do not pose problems where time, resources and costs are concerned. Some items may be tested to
failure without large expenditure, while other items barely can be touched. This must be taken into
account when the reliability is predicted based on the new results.
Part 3B is where the detailed assembly and testing is planned. This could also mean that the basic
manufacturing is partly finished, and that early testing of the smaller components is possible. Any
information obtained either through manufacturing or testing should be analysed. If there are
deviations in the process from the original manufacturing plan, the reliability engineer ought to study
whether these affect the reliability or not.
As phase 4 ends, the handover comes closer. In the technology qualification, the FAT is found
between 3C and 4A. Although the planning for this may start in phase 5, it is perhaps useful to do it
when the results of the tests in phase 4 are obtained. These can be great indicators to what the test
personnel must look out for during the FAT.

Phase 5
FAT
Phase 5
Project tasks Project reliability tasks
Analysis of
results
Estimate overall reliability
Prepare FRACAS
Prepare for
hand-over
Hand-over
meeting
Document reliability
results and prepare for
hand-over
Engineering
follow-up
Assembly
Q Control
Product
verification
testing
Q Control
(verification)
Procurement
close out
R&D project
closure
3C
4A
End Project execution model for technical qualification

Figure 5: Phase 5 for Aker Solutions
Phase 5 for Aker Solutions is based on the thought that the systems are custom-built and rarely
produced in more than one exemplary. It is thus thought that phase 5 is concerned with the overall
assembly and testing of the system, the FAT. Failures or problems with the system may occur due to
the assembly process in itself. This implies that problems arise due to components and/or sub-systems
not working together as supposed to. Such problems can be discovered during the assembly or in the
verification testing and FAT. Here a root cause analysis would be necessary. Based on the results from
the tests, an overall reliability should be estimated one final time.
All analyses and test results should now be used as a basis in a reporting system between Aker
Solutions and the client. A possible tool is FRACAS where all the information obtained during the
operational life is reported. Documents established for reporting can also be useful to keep risk and
maintainability documents alive throughout the operation of the system. Living documents are a
demand in the British petroleum industry and could become of larger interest on the Norwegian
continental shelf.
Before handover in part 4A, all reports and lessons learned must be noted and completed. As the
Subsea Power and Process departments purpose is to develop and design offshore equipment, any
information from previous projects can be useful. All lessons learned can therefore become key to a
good performance in future projects.
It is also common to hand over some of the documents to the client. Especially documents concerning
possible hazards and failure mechanisms are of importance. The reliability engineer should therefore
carefully gather all the necessary information, including the updated FMEA. If Aker Solutions is
supposed to be the operator, the documents should be handed over to the department responsible
during the systems operational life.
Phase 6
The project execution model for technical qualification ends with handover, and does not include
production of standard products after factory acceptance testing (FAT). This means that phases 6, 7
and 8 are not included with any specific project tasks. All products produced with basis in the Subsea
Power and Process department must be highly reliable. It is therefore reasonable to suggest that all the
produced items are checked after a production process and that any large deviation is analysed for a
root cause. Human handling in this phase can contribute to unreliability and operators must therefore
be given the tools to recognise them. Information on expected problems and their effects might help an
experienced operator in discovering errors.
Among the reliability activities Aker Solutions could perform are batch tests and analysis of the
deviations. Generally this phase should follow the general methodology, chapter 8.
Phase 7
Given that a client has been the commissioning party, maintaining the contact between the Subsea
Power and Process department and the client should be easy. Any information about failures,
maintenance and repair ought to be easily communicated, but this is not always the case. It will
depend on the routines of the client when it comes to reporting of maintenance and repair actions.
Normally the client would keep records of most incidents, but the manner of recording differs from
one client to another. If the client does report the incidents to Aker Solutions, it is important that the
communication is good. There may be a different understanding of the terms and of which incidents
are of interest to Aker Solutions. An agreement on the content of the reports and the standards
followed should therefore be signed before, or at the beginning, of this phase.
The main activities for the reliability engineer are gathering and analysis of the product performance.
The main goal would be to find an expression of the systems actual reliability and compare this with
the desired and predicted reliabilities. Any information thought to be useful for phase 8 or later
development projects should be stored in a practical manner. It is suggested that the general
methodology, figure 32, is used.
Phase 8
Phase 8 for Aker Solutions should follow the general methodology in chapter 8. The main objective
for the Subsea Power and Process department is to learn from the information and use it to improve
their reliability programmes. Stored reports on the effect of using a certain reliability method and how
it was implemented could save time in the future. Saving time is often said to save money and this
phase should therefore not be overlooked.
Appendix D Aker Solutions PEM
The Project Execution Model (PEM) consists of 5 phases and a tender phase. Each phase is split into
between 3 and 5 stages where project management and execution is described for each stage. The
PEM begins with an opportunity appraisal in phase 1 and ends with the close-out in phase 5. It hence
covers the whole product life cycle, but does not follow the five phases discussed in chapter 4; Front-
end, Design, Development, Production and Post-production.
For the ERMP the stages in the PEM where studied to see which includes the tasks in the regular
Engineering, Procurement and Construction phase. These stages where identified as stages 1D,
concept definition, to 4B, system integration test.
The PEM can be studied on the following page, while the ERMP is found in appendix E.
Opportunity
appraisal
M1B
FEASIBLE CONCEPTS
SELECTED
Stage 1A
Feasibility
studies
Stage 1B
M1C
CONCEPT
SELECTED
Concept
selection
Stage 1C
M1A
ALTERNATIVES
GENERATED
M1D
CONCEPT
COMPLETE
Concept
definition
Stage 1D
Project Management
Business opportunity
evaluated
Products and markets
identified
First cost estimate and
schedule established
Scope definition and
scope statement
established
Identify synergies with
other Aker Solutions and
Aker group companies
Identify any novel Aker
Solutions and Aker group
company technology
which would add value
Project Execution
Possible development
solutions established
Infrastructure identified
Environmental
requirements identified
Key interfaces identified
Possible technology gaps
identified
Project Management
HSE Strategy developed
Technically &
commercially
feasible concepts
identified
General execution
philosophy and strategy
established
CAPEX and OPEX
estimate and schedule
updated
Risk assessment for the
alternative concepts
performed
Involve other Aker
Solutions and Aker group
companies as applicable
Identify any novel Aker
Solutions and Aker group
company technology
which would add value
Project Execution
Preliminary field layout
system schematics
established, equipment
list including
spares/back-up, design
basis and technical
solution description
established for each of
the different field concept
solutions
Main equipment sized
Preliminary
fabrication/testing/installa
tion method established
Major completions
aspects affecting the
concept selection
identified
Screening criteria
defined
Alternative concepts
ranked
Clients specification
requirements reviewed
and deviations /
clarifications list
established
Technology gaps
identified and preliminary
technology qualification
programs identified
Project Management
Preliminary project
execution strategy
Sourcing categories and
scenarios determined
CAPEX and OPEX
estimate and schedule
updated
Risk assessment
updated
HSE goals defined
Involve other Aker
Solutions and Aker group
companies as applicable
Identify any novel Aker
Solutions and Aker group
company technology
which would add value
Project Execution
Final design basis
consolidated. Field
layout, system
schematics, equipment
list including spares /
back-up, design basis
and technical solution
description updated
Concept solution
selected
Technology gaps and
technology qualification
programs updated
Analyses (as applicable)
completed to verify the
integrity of the design
solution concept selected
Clients specification
requirements and
deviations / clarifications
list updated
Project Management
Execution strategy &
schedule finalised
Definitions for potential
design competitions
established
Pre-qualification of main
Sub-Contractors
CAPEX and OPEX
estimate and schedule
defined
Risk assessment
updated
1st Priority Packages
identified
Phase close-out
Milestone Review
Contract close-out report
when applicable
Involve other Aker
Solutions and Aker
group companies as
applicable
Identify any novel Aker
Solutions and Aker
group company
technology which would
add value
Project Execution
HSE studies and
analyses
Functional requirements,
overall system
description & layout
established
Preliminary equipment
list established
Layout and unit
arrangement finalised
Fabrication/installation
methods established
Preliminary testing
philosophy defined
Technology qualification
program defined
Completion execution
strategies finalised
Clients specification
requirements, deviations
/ clarifications list frozen
Phase 1: Feasibility & Concept
M2C
GLOBAL DESIGN
COMPLETE
Project Management
Baseline schedule approved
Project Execution
HSE and safety risk
assessment checked
Engineering for procurement
within stage
POs placed for bulk material
and/or LLI
Qualification program
established
System engineering design
Thermal design analysis
Critical interfaces defined
Project Management
Risk assessment updated
Milestones and detailed
construction schedule
verified
Current estimates updated
Schedules and budgets
updated for next phase
Project mgmt. plan updated
for next phase
Scope changes identified,
agreed and implemented
Capture lessons learnt from
current phase and update
database
Supplier plan started
Project Execution
HSE and safety risk
assessment completed
System engineering (MEL
and P&IDs) issued for
construction
System design basis
completed
Engineering for procurement
within stage
POs for all CLLI equipment
placed
All major interfaces frozen
All main subcontracts placed
Mechanical completion
preparation
Detailed testing program
established
Project Management
Project Charter established /
updated
Project scope defined
Contract reviews performed
Project mgmt. plan (Integration,
Scope, Time, Cost,
Communication, Risk,
Procurement) established /
updated incl. execution strategy
HSE mgmt plan established
Quality mgmt plan established
including internal quality audits
Reporting routines established
Procurement /subcontract
strategy defined
Project schedule, cost
estimate/budgets established
Team alignment program
started
Stakeholder expectation
analysis performed
Consideration of lessons learnt
from other projects
Installation strategy started
Pre-qualification of main Sub-
Contractors
System completion plan started
Warranty provision booked
Project Execution
Preliminary HSE and safety
risk identification performed
Overall project ITPs
established
MDL, MEL and P&IDs
established
Procurement milestone plan
(PMS) established
Engineering for procurement
within stage
POs for CLLI placed or material
allocated from stock
Draft construction and
completion plan established
Concept design review
performed
System design basis
established
Interface register established
ROV philosophy established
Testing philosophy established
Transportation philosophy
established
Installation philosophy
established
System
definition
M2B
LAYOUT & MAIN
STUCTURE FROZEN
Stage 2A
System design &
Layout development
Stage 2B
Global
design
Stage 2C
M2A
CRITICAL POs
AWARDED
Phase 2: System Definition
Detail design &
Subcontracting
M3B
PRE FABRICATION &
MANUFACTURING COMPLETE
Stage 3A
Pre-fabrication &
Manufacturing
Stage 3B
M3C
PREASSEMBLIES
READY FOR SHIPMENT
Assembly
Stage 3C
M3A
DETAIL DESIGN COMPLETE &
SUBCONTRACTS AWARDED
Phase 3: Detailing & Fabrication
Project Management
HSE & QA audits of
subcontractors performed
and followed up
System completion plan IFC
Project Execution
Procured material on site
and in stock
Manufacturing and
machining completed
Manufacturing and
fabrication for subcontractor
started
Sub-assembly and sub-
assembly testing drawings,
procedures and documents
released
Assembly drawings,
procedures and documents
released
Start procurement close-out
All suppliers documents
received and approved
Project Management
HSE program for
construction updated to
include Phase 4
Schedules and budgets
updated for next phase
Project mgmt. plan updated
for next phase
Capture lessons learnt from
current phase and update
database
Project Execution
Sub-assembly
manufacturing / fabrication
completed
Assembly in-house
completed
Subcontracting fabrication
for minor structures
completed
All engineering drawings /
documents released
Close POs
FAT / EFAT procedure
released
SAFOP for testing
performed
Project Management
Milestones and detailed
construction schedule
verified
Updated project mgmt. plan
implemented
Team Alignment program
continued
Consideration of lessons
learnt from other projects
Project Execution
System engineering
completed
Material, BOM, drawings,
data sheets and documents
released for construction
All reaming POs placed
Vendor information
implemented in detail design
POs expediting
Internal ITPs frozen
RECIPT OF ITT
TENDER PHASE START
(RDG 1)*
TE
KICK-OFF
COMPLETE
Positioning
TA
BID / NO BID
(RDG 2)*
Assess
Stage TA
TB
DRAFT TENDER
Prepare
Stage TB
TC
SUBMIT TENDER
(RDG 4)*
Approve
Stage TC
Business Development
Prospect ID and
screening completed
KT Analysis performed
Core capability strategy
profile (CCSP) checked
Client contract /
objectives identified
Winning strategy
established
Partners and scope
identified
Tender Accountable
identified
Prequalification
performed
Project Management
ITT review held
Tender cost, schedule
and budget established
KT analysis updated
Winning strategy and
cost vs. Client
objectives / budget
checked
Initial project execution
strategy established
Risk register updated
Tender team
nominated, including
SLS coordinator
Bid / No bid
Consideration of
lessons learnt from
other tenders
Project Execution
Initial review of ITT
carried out
Framework of tender
established
Outline of technical
solution established
Execution strategy
determined
Project Management
Tender team and kick-
off mobilised
Tender execution
strategy, budget and
plan established
Project execution
strategy and schedule
established
HSE mgmt. plan
established
Weight and cost
estimated
Organisation defined
and key project
personnel nominated
Pricing / compensation
strategy and formats
established
Tender clarification /
qualifications
established
Risk analysis performed
Drafted tender
Project Execution
Tender process kicked-
off
Detailed costing
completed
Contractual assessment
carried out
Risk and opportunity
assessment carried out
Project Management
Tender document
reviewed
Management approvals
done
Project execution
strategy, organisation
and project team
established
Cost and cash flow
estimated
Schedule / MPP
established
Contract Ts & Cs in
place
Sub-contract: Ts & Cs
in place
Mandate and team
negotiated
Risk mgmt: risk register
and contingency
determination done
Price and compensation
established
Project Execution
Tender approved at the
appropriate
management level
Tender submitted to
client
Tender phase: Tender & Kick off
Tender phase
Negotiate
Stage TD
Project Management
Negotiations done
Bid clarifications done
Updated
Key data
Price /
contingency
Risk analysis
Execution Plan
Management approval
(RDG 5) done
Contract ready for
signature
Hand-over to project
team prepared
Project Execution
Bid Clarifications done
Contract reviewed and
signed
Kick-off
Stage TE
Project Management
Project teammobilised
Tender team hand-over
done
Client kick-off meetings
held
Project start-up Plan
(mgmt.) established
(PIP)
Internal kick-off
meetings held
Teambuilding planned
Capture lessons learnt
from current phase and
update database
SLS project support
plan started
Project Execution
Tender team hand-over
done
Start-up check lists
established
Basis alignment
designed
*RDG = Risk Decision
Gate
TD
SIIGN CONTRACT
(RGD 5)* (RDG 3)*
FAT / EFAT &
Transportation
M4B
ALL ASSEMBLY
WORK COMPLETED
Stage 4A
System
integration test
(SIT)
Stage 4B
M4C
MECHANICAL
COMPLETE
Mechanical
completion
Stage 4C
M4A
ALL PREASSEMBLIES
SHIPPEDTO SIT
Phase 4: Testing & Mechanical completion
Project Management
HSE audits performed and
followed up
Project Execution
System integration test
(SIT)
SIT test reports released
Project Management
Cost, schedule and risk
programs updated
Updated project mgmt.
plan implemented
Team alignment program
continued
Consideration of lessons
learnt from other projects
Project Execution
FAT / EFAT completed
Final documentation index
ready
Initial mechanical
completion
Transport after FAT /
EFAT and MC
System integration test
(SIT) procedure released
Project Management
Service base ready for
handover
Handover to SLS and
customer performed
Equipment handed over to
customer according to
applicable international
standards
Capture lessons learnt
from current phase and
update database
Project close-out report
written
System Completion Plan
updated
HSE program established
Schedules and budgets
established
Project Execution
Engineering: relevant as-
built mark-up performed
Fabrication work MC
complete and quality
records available
Completion: categorized
punch lists for all systems
completed
All systems ready for
installation and
commissioning
All relevant site activities
documented and MC
completed
Operation and
maintenance manuals IFC
Offshore services/
commissioning
M5A
OFFSHORE INSTALLATION
COMPLETE
Stage 5A
Mobilise
Stage 5B
M5C
START-UP
COMPLETE
Demobilise
Stage 5C
M5B
SYSTEMS
COMMISSIONED
M5D
TAKEOVER
COMPLETE
Project Management
All contractual obligations
including completion
certificate closed
Project Management
Install equipment
according to contract
Project Management
Personnel and
equipment
demobilized
All contractual
obligations for this
installation closed
Project Management
If required by the
contract
Quote with commitment
from planning and
verification from sales
prepared and delivered
to customer
PO confirmed
Personnel and
equipment prepared and
mobilized
Close-out
Stage 5D
Phase 5: System Completion
Subsea - Project Execution Model
Key Stage Objectives
Strategic
Control
Execution
Tools
Testing
& MC
Detailing &
Fabrication
System
Definition
Feasibility
& Concept
Tender &
Kick off
System
Completion
Appendix E Equipment Reliability Management
Programme
The Equipment Reliability Management Programme is developed as a part of the Midgard Subsea
Compression System project. As a part of the demands to the project, Statoil asked for an ERMP for
the EPC phase of the project. EPC stands for engineering, procurement and construction. The phase
can thus cover phases 2 to 6 in the eight phase model. Although the original thesis assignment stated
that a specific subsystem should be the basis for the case study, it has been agreed that the whole
system is more suitable.
The reliability programme follows the ISO 20815 standard and the two methodologies developed in
this thesis. The Project Execution Model (PEM) in appendix D has been used to establish the tasks a
reliability engineer has to follow in the reliability programme. From the PEM, stages 1D, Concept
Definition, to stage 4B, System Integration Test, are considered as parts of the EPC phase. This is also
shown in the ERMP.
ISO 20815 demands that the reliability programme is based on a project risk categorisation. An
example for the categorisation table was shown in chapter 9 and has been used to develop a more
specific table in the ERMP. The purpose of the risk categorisation is to study the necessary depth of
the reliability programme. A low risk project needs fewer reliability methods and a smaller amount
of follow-up, than a medium or high risk project.
In the ERMP, it has been considered acceptable to use descriptions as low to medium and medium
to high for the risk categorisation. The main reason for this is to be more specific where the risk is
concerned. For the Midgard SCS project, the risk is evaluated to be somewhere between medium and
high. With this risk level, it is evident that the reliability programme should follow the development
tightly and be used to confirm the quality of the design. The Midgard SCS project is performed by a
project organisation with good knowledge of the system design and is thus not entirely at a high risk
level. The main reason why the project is rated above a medium risk class is the costs and the
newness of the equipment.
To develop a compression system and place it in water is not an entirely new idea. Aker Solutions is
currently testing an SCS at Nyhamna in Mre and Romsdal. The SCS is intended for Ormen Lange,
but is larger than the one for Midgard. This means that the Midgard SCS does not require all the steps
in the Technical Qualification. However, as long as the Ormen Lange SCS has not been finished with
testing, the technology has some risks connected to it. This includes a possibility that changes must be
done in the design and more time will be spent before it is safely on the seabed. The alternative to a
compression system sub sea is to place a compression system on a platform close to Midgard.
The ERMP is a fairly large document and not all parts must be studied in detailed for this master
thesis. The appendices can be left out, as can the shorter descriptions about the reliability methods.
The former consist of previous failure estimates for an SCS, while the latter has been described in the
main report. Of most interest for the thesis are the project risk categorisation (part 3) and the reliability
programme activity schedule (part 5).
Subsea
Ver. Status Issue date Made by Checked by Approved by
00 In Work
Originator:




This document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only
for the person or entity to which it is addressed and any unauthorised use is strictly prohibited. It is provided for limited purpose and
shall not be reproduced, stored electronically, transferred to other documents, disseminated or disclosed to any third parties without
the prior written consent of the relevant Aker Subsea legal entity. Any attachments are subject to the specific restrictions and
confidentiality regulations stated therein and shall be treated accordingly. The document is to be returned upon request and in all
events upon completion of use for which it was provided.








Equipment Reliability Management Program
Technical Risk & Reliability
Midgard Subsea Compression




10000942820-PDC-000

Client Document Number Client Document Version




Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 2 of 33



TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................................. 4
1.1. Background ...................................................................................................................................... 4
1.2. Scope of Work ................................................................................................................................. 4
1.3. System boundaries and life cycle status ......................................................................................... 4
1.4. Distribution ....................................................................................................................................... 6
1.5. Abbreviations ................................................................................................................................... 6
1.6. Definitions ........................................................................................................................................ 6
1.7. References....................................................................................................................................... 7
1.8. Document History ............................................................................................................................ 7
1.8.1. Changes Since Previous Revision .................................................................................................. 7
2. RELIABILITY MANAGEMENT PHILOSOPHY ............................................................................... 8
2.1. General ............................................................................................................................................ 8
2.2. Overall Optimisation Criteria ............................................................................................................ 8
2.3. Performance objectives and requirements ...................................................................................... 9
2.4. Performance measures ................................................................................................................. 10
3. PROJECT RISK CATEGORISATION .......................................................................................... 12
3.1. General .......................................................................................................................................... 12
3.2. Risk categorisation ........................................................................................................................ 12
4. ORGANISATION AND RESPONISBILITIES ............................................................................... 15
4.1. Reliability Organization .................................................................................................................. 15
4.2. Responsibilities .............................................................................................................................. 15
5. ACTIVITY SCHEDULE .................................................................................................................. 17
5.1. General .......................................................................................................................................... 17
5.2. Activities overview ......................................................................................................................... 17
5.3. Reliability activities ......................................................................................................................... 20
5.3.1. Reliability allocation ....................................................................................................................... 20
5.3.2. Hazard identification analysis ........................................................................................................ 20
5.3.2.1. HAZID ............................................................................................................................................ 20
5.3.2.2. SWIFT ............................................................................................................................................ 20
5.3.3. FMECA .......................................................................................................................................... 20
5.3.4. RAM analysis ................................................................................................................................. 21
5.3.4.1. FTA ................................................................................................................................................ 21
5.3.4.2. RBD ............................................................................................................................................... 21
5.3.4.3. Other available tools ...................................................................................................................... 21
5.3.5. Criticality importance measures..................................................................................................... 22
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 3 of 33



5.3.6. HAZOP ........................................................................................................................................... 22
5.3.7. Human factors analysis ................................................................................................................. 22
5.4. Relationship between activities ..................................................................................................... 22
6. LIST OF RELIABILITY DOCUMENTS TO BE PRODUCED ........................................................ 24
APPENDIX A FAILURE DATA DOSSIER .......................................................................................... 25



Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 4 of 33



1. INTRODUCTION
1.1. Background
The sgard field lies in 250 300 m water depth in the Norwegian Sea, about 200 kilometres off
mid-Norway and 50 kilometres south of Heidrun. The sgard B platform receives gas production
from the Midgard and Mikkel reservoirs, which are connected through a subsea flowline system.

Additional pressure support is now required to maintain stable production flow and Statoil has
initiated the sgard Minimum Flow Project.

Aker Solutions has since 2000 been working with Statoil to define solutions for subsea
compression and is currently finalising the delivery of the Ormen Lange Subsea Compressor
Pilot. Under this pilot project Aker Solutions has delivered a full-scale, marinised subsea
compression system.

To meet the needs of the sgard MFP, Aker Solutions has developed a subsea compression
system based on the Ormen Lange Pilot and incorporating specific Technology Qualification
Programs performed under the sgard MFP.
1.2. Scope of Work
The purpose of this document is to outline a reliability management program for the Engineering
Procurement and Construction (EPC) phase of the Midgard Subsea Compression Field
development.

The document will address the following topics:
Performance objectives and optimisation criteria
Project risk categorisation
Description of responsibilities
An activity schedule including an overview of reliability activities.
1.3. System boundaries and life cycle status
The Subsea Compression System (SCS) comprises of a Subsea Compression Station (SCSt)
with two compression trains and a Subsea Compression Manifold Station (SCMS). The SCS is
illustrated in Figure 1-1.

Figure 1-1: Overview of Midgard Subsea Compression System
SCMS
SCSt
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 5 of 33



Each compression train consist of the following modules:
Interface Spool Module
Combined Inlet/Anti-Surge Cooler Module
Scrubber Module
Condensate Pump Module
Compressor Module
Discharge Cooler Module
Compressor Control Module
Active Magnetic Bearing Control Module
Stand-alone Subsea Control Module

Power and Control is supplied to the SCS through 2 combined Power and Control Umbilicals. The
umbilicals are terminated in a Transformer and Umbilical Termination Module.

Each compression train is installed on an alignment frame that allows for installation of one
completed train, as shown in Figure 1-2.
Compressor Train
Transformer and
Umbilical Termination
Module
Train Base Frame


Figure 1-2: Compression Train installed on alignment frame

The reliability management program has been developed for the EPC phase of a project life cycle
and any reliability activities not relevant for this phase have not described in this document. The
EPC phase covers the engineering, procurement and construction of the Subsea Compression
System. The EPC phase follows after the FEED (Front-End, Engineering and Design) phase is
completed. During the engineering phase, the deliverables and documentation needs are
identified, and design, material selection and technical specifications are established. When the
detailed system design is completed, a procurement plan is established according to
specifications. The construction phase covers the manufacturing of all equipment and the
assembling and testing of the complete Subsea Compression System.


Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 6 of 33



1.4. Distribution
The Equipment Reliability Management Program is an important document stating the Aker
Solutions reliability management system to be implemented for the EPC phase, and will as such
serve as a key document for Aker Solutions and the Company with regards to audits and follow
up of the Work. The content is specific, and must be adhered to during all phases of the Work.

The Equipment Reliability Management Program has been developed within the frames of the
ISO 20815 Standard for Production-Assurance Programs, ref./1/, Company requirements
specified in the project design basis, Scope of Work, Specifications and the Aker Solutions HSE
policy and standards.

The Equipment Reliability Management Program will be updated, as required, in connection with
the major project phases covering engineering, fabrication, assembly, testing and completion
activities.

The Equipment Reliability Management Program will be distributed to Company as well as key
project personnel, such as Work Package Manager, Project HSE Manager, Engineering Manager
and Construction Manager, for information and follow up.
1.5. Abbreviations
AMB Active Magnetic Bearing
AS Aker Solutions
Company Statoil
Contractor Aker Solutions
EFAT Extended Factory Acceptance Testing
EPC Engineering, Procurement and Construction
FAT Factory Acceptance Test
FEED Front End Engineering and Design
FMECA Failure Mode Effect and Criticality Analysis
HAZID Hazard Identification
HAZOP Hazard and Operability analysis
HV High Voltage
PEM Project Execution Model
RAM Reliability, Availability and Maintainability
RBD Reliability Block Diagram
SAFOP Safe Operation Analysis
SCMS Subsea Compression Manifold Station
SCS Subsea Compression System
SCSt Subsea Compression Station
SCM Subsea Control Module
SIT System Integration Test
SWIFT Structured What If Technique
VSD Variable Speed Drive
WP Work Package
1.6. Definitions
Availability, Ref./1/ The ability of an item to be in a state to perform a required
function under given conditions at a given instant of time, or
during a given time interval, assuming that the required external
resources are provided. This ability is expressed as the
proportion of time(s) the item is in the functioning state.

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 7 of 33



Note 1: This ability depends on the combined aspects of the
reliability, the maintainability and the maintenance
supportability.

Note 2: Required external resources, other than maintenance
resources do not affect the availability of the item.
Deliverability, Ref./1/ The ratio of deliveries to planned deliveries over a specified
period of time, when the effect of compensating elements, such
as substitution from other producers and downstream buffer
storage, is included.
Maintainability, Ref./1/ The ability of an item under given conditions of use, to be
retained in, or restored to, a state in which it can perform a
required function, when maintenance is performed under given
conditions and using stated procedures and resources
Production availability,
Ref./1/

The ratio of actual production to planned production, or any
other reference level, over a specified period of time.
Production assurance,
Ref./1/

Activities implemented to achieve and maintain a performance
that is at its optimum in terms of the overall economy and at the
same time consistent with applicable framework conditions.
Reliability, Ref./1/

The ability of an item to perform a required function under given
conditions for a given time interval.
1.7. References
1. ISO 20815 Petroleum, petrochemical and natural gas industries - Production assurance
and reliability management, First Edition, 01.06.2008
2. sgard Minimum Flow - Book 051.003-02 Functional Design Requirements - Midgard
Subsea Compression
3. Aker Solutions, General System Specification and Description, 10000942822
4. Aker Solutions Test and Fabrication Philosophy, 10000942834
5. IEC 61882 Hazard and Operability Studies (HAZOP Studies) - Application Guide
6. Rausand & Hyland, 2004, System Reliability Theory; Models, Statistical Methods and
Applications. Wiley
7. Murthy et al. 2008, Product Reliability, Springer
1.8. Document History
Version Description of Changes
00 Issued for Company Review

1.8.1. Changes Since Previous Revision
Cause of change Description of Changes Comment



Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 8 of 33



2. RELIABILITY MANAGEMENT PHILOSOPHY
2.1. General
The reliability management philosophy describes the overall optimisation criteria for the
Engineering, Procurement and Construction (EPC) of the Midgard Subsea Compression System
(SCS). The philosophy also defines the performance objectives and requirements, as well as the
performance measures.
2.2. Overall Optimisation Criteria
Previous studies show relatively high production availability for Subsea Compression Systems. It
is important to use availability and reliability analysis methods throughout the design phase and in
particular in the early phases, in order to obtain an optimal design with regard to availability.

The optimization process can be performed as illustrated in the ISO 20815 standard, Figure 2-1.


Figure 2-1: ISO 20815 Optimisation Process
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 9 of 33



High production availability depends on the following:
Inherently high reliability of the individual modules, can be achieved by a internal
redundancy on the components with the highest failure rate -> fault tolerance
High maintainability, effective intervention, modularization and sparing philosophies
High fault tolerance, through either overcapacity in the system, i.e. the potential to
maintain a percentage of the production upon failure in one compression train, or high
redundancy

In order to reach a high reliability for the Subsea Compression System, the following
optimisations should be considered:

Implementation, development and improvement of the Ormen Lange design for Subsea
Compression
High inherent reliability through:
Optimisation of the equipment lifetime
Reduction of the number of wet mate connectors
Reduction of the number of disconnect/connect operations of wet mates
o Stand-along SCM instead of pump SCM (to avoid disconnects when retrieval of
pump module)
o AMBC separately retrievable
Built-in redundancy in the system
Completely redundant control system (A and B system)
o Cross-connection between UPS A and UPS B each can run both trains

Reduced downtime through effective sparing philosophy --> Capital spares must be
available for the most critical items. If no spares are available the mean time to repair will
increase substantially. When a spare is available the expected active repair time will be
reduced to a couple of days (retrieve and replace on site). If no spare is available the
active repair time may vary from a couple of months to a year.
High maintainability through:
Optimisation of module weights according to weight limits of vessels --> Long
mobilization times will cause excessive downtime and lost production. Mobilization times
larger than one month for critical equipment intervention is not recommended.
Effective modularization philosophy--> The modules that are most likely to fail should be
easily/separately retrievable
o Control functionality easily retrievable, separately retrievable SCMs, AMBC and
junction boxes
o Low complexity of control functions on heavier modules, such as Scrubber and
Transformers

Allow for continued production in one train during failure/intervention on the other train
High fault tolerance through:
Overcapacity in the system: Compressor is bottle neck capacity on each train is
maximised accordingly. A rest capacity of more than 50% on one train will reduce failure
effect
Condition monitoring -> early detection of latent failure -> early mobilization of spares
2.3. Performance objectives and requirements
The objective of the reliability management program is to ensure that the reliability of the Subsea
Compression System is not compromised during the EPC phase, and to ensure the highest
possible inherent reliability of the system during later life cycle phases. The correct handling of
safety and production aspects, as well as reduced economic risk, is a desired goal.


Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 10 of 33



The basic equipment reliability management philosophy is:

A fault is a defect, imperfection, mistake or flaw of varying severity that occurs within and
affects the operational ability of the SCS.
All hazards shall be identified and evaluated for criticality
All critical failures shall be reviewed through MTTF (mean time to failure) and MTTR
(mean time to repair).
Requirement to design is that the predicted reliability meets the desired reliability within
acceptable limits.
All relevant failure events and faults shall be simulated as close as possible to realistic
operations.
All components and sub-systems shall be listed according to criticality/importance.
Testing of materials and equipment shall be performed for confirmation of predicted
reliability.
Documentation of reliability methods used and analysis results must be prepared.

The verification of these requirements is done through the acceptance of results performed in the
reliability management program. Later verification is obtained through the field experience and
performance.
2.4. Performance measures
The requirement to availability is given in the Functional Design Requirements, ref./2/, as:

The subsea compression system shall aim for process and system designs, which
maximises the production availability.
For calculation purposes, the production availability shall be calculated as the ratio of
production to planned production over the initial 10 years of production.
The production availability evaluation shall include lead- and down time due to repair
activities, but not external causes such as loss of power supply from Heidrun.

In order to evaluate the performance of the Midgard Subsea Compression Station, the following
performance measures will be calculated:

Production availability
System availability
Deliverability
Proportion of time the production is equal to or above demand
Proportion of time the production is zero
Proportion of time the production is below demand
Intervention frequency
Spare utilization
Estimated time for first failure
Sub-system and component criticality

During the previous FEED phase for Midgard Subsea Compression the average production
availability was predicted to an average of 94.92 %, giving a production unavailability of 5.08 %

The availability calculations were performed at a very detailed level, taking into account failures of
all parts of the control system (jumpers, connectors, juntion boxes, etc.) as well as the effect of
only having one spare for each module type.

The dominating contributor to the production unavailability was the compressor module. A total of
7 equipment types contributed to about of the system unavailability. These components were:

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 11 of 33



1. Compressor module
2. AMB control system
3. Condensate Pump Module
4. Scrubber module
5. SCM Compressor
6. HV connection systems for compressor
7. SCM Pump

The overall production availability was relatively high. This was mainly due to the following:

Inherently high reliability of the individual modules caused by internal redundancy on the
components with the highest failure rate (process sensors, control modules etc)
High maintainability, due to effective modularization philosophy and shallow water depth

It was identified that it was possible to increase the availability by 1.15 % to 96.07 %, if the three
most critical components were provided with two spares instead of one spare, thereby reducing
the downtime caused by shortage of spares.

For the EPC phase the availability calculations should be updated to reflect all design changes.
Accurate production profiles should be used to estimate the overcapacity in the system, as this
will to a large extent influence the production availability results. It is recommended to evaluate if
it there is a potential for increasing the production capacity of the compressors further.

The data dossier for the Midgard Subsea Compression System is attached in Appendix A to this
report. The failure data is, however, uncertain and should be confirmed as part of the EPC phase.
This is in particular true for the main contributors; compressor, the electric jumpers and the HV
connection system. Vendor data should be acquired and verified for the jumpers and HV
connection system. The compressor unit should undergo a detailed FMECA to confirm the
assumptions made with regard to the compressor failure data.




Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 12 of 33



3. PROJECT RISK CATEGORISATION
3.1. General
The effort needed for the reliability management program is linked to the technical risk of the
project. The higher the technical risk category of the project, the more effort should be put into
follow-up and handling of reliability activities.

The project risk categorisation has been performed based on the scheme described in section
4.3.2 of ISO 20815, ref./1/.
3.2. Risk categorisation
The categorisation of project risk provides a guideline with regard to how the equipment reliability
management program should be implemented. It is reasonable to believe that a project with low
risk will be open to more slack concerning the implementation of reliability activities, while a high
risk project needs extra attention to reliability in order to succeed.

ISO 20815, ref./1/, suggests that project risks can be separated in three main classes, see Table
3-1:
Low risk
Medium risk
High risk

Table 3-1: Project Risk Categorisation Matrix (ref./1/)
Technology
Operating
envelope
Technical
system scale
and complexity
Organisational
scale and
complexity
Risk
class
1 Description
Mature
Technology
Typical
operating
conditions
Small scale, low
complexity,
minimal change
of system
configuration
Small and
consistent
organisation, low
complexity
Low
Low budget, low risk project
using field-proven
equipment in the same
configuration and with the
same team under operating
conditions similar to
previous projects.
Mature
Technology
Typical
operating
conditions
Moderate scale
and complexity
Small to medium
organisation,
moderate
complexity
Low or
medium
Low to moderate risk project
using field-proven
equipment in an operating
envelope similar to previous
projects but with some
system and organisational
complexity
Novel or non-
mature
technology
for a new or
extended
operating
environment
New, extended
or aggressive
operating
environment
Large scale,
high complexity
Large
organisation, high
complexity
Medium or
high
2
Moderate to high risk project
using either novel or non-
mature equipment or with
new or extended operating
conditions. Project involves
large, complex systems and
management organisations.




1
The term low or medium indicates that projects comprising the indicated features can be classified as either low-risk
or medium risk projects, likewise for the term medium or high.
2
The novel or non-mature technology should have a potential significant impact on the project outcome to be classified
as high risk
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 13 of 33



The evaluation of the different categories for Midgard SCS has been done on a sub-system level. The project risk categorisation matrix
has been extended to include also a column on reliability. The results are summarized in Table 3-2.

Table 3-2: Evaluation of technical risk categories for Midgard SCS
Sub-
System
Technology Reliability Operating envelope/
environment
Technical system
scale and complexity
Organisational scale and
complexity
Risk class Description
HV Power
Supply
system
The topside parts of the HV power
supply should be considered as
proven technology. The subsea
transformer technology is also
standard technology that has been
used previously in both subsea and
topside projects. The level of current
and voltages is secondary with regard
to qualification of a subsea
transformer.

HV connection system solutions
qualified through Ormen Lange and
Midgard TQPs may be used, however,
no previous subsea experience exists
with connection systems of this rating.
Little or no experience
data exists for the
subsea components and
it has been difficult to get
a qualified estimate for
the reliability of these
systems. The HV wet
mate connections are
believed to be critical
with regard to reliability.
Parts of the system are
topside, other will be
marinized. No
experience with HV
connection systems at
this rating for subsea
applications, however,
experience will be
achieved through
operation of the Ormen
Lange Pilot at Nyhamna.
The Midgard HV power
supply system is of a
lower complexity than
the power supply
system for Ormen
Lange due to less
subsea electronic
equipment. However,
this is still a complex
system compared to
standard subsea
production systems.
The Aker Solution subsea
organisation has worked on
similar systems in previous
projects such as the Ormen
Lange Pilot.

The Ormen Lange
organization is closely
integrated with the Midgard
project team.
Moderate The HV power system
has been developed for
previous projects, but
some parts are not yet
considered mature in
the subsea context, this
is particular valid for the
HV connection system
for the compressor.
Process
system
Technology assessment sessions
carried out for the Midgard SCS has
concluded that the main technology
gaps for the process system are
related to the Compressor Unit. The
assessment concluded that:

Gas-Liquid separation and liquid
pumping are considered well proven
from existing applications and do not
need special attention.

The subsea compressor is, however,
considered new technology, in
particular if MAN Turbo is the chosen
supplier. Ormen Lange has qualified a
GE compressor for subsea application,
however, no operating experience
exists for this technology.

No experience data
exists for subsea
compressor, but data
from topside applications
indicate that the
reliability of these
components is fairly low.
It is therefore imperative
to improve the reliability
of this equipment
through design for
subsea applications.
Compressors are in use
topside, but no operating
experience with these
systems exist subsea.
Testing at Nyhamna of
the Ormen Lange Pilot
will be useful input for
the Midgard SCS,
however, the
compressor supplier
may be different for
Midgard than for Ormen
Lange. The MAN Turbo
compressor has been
tested at K-Lab with wet
gas, however,
qualification with regard
to marinisation of the
compressor (casing
design) is required.
The process system
should be considered
as a high complexity
project. Little
experience with
marinisation of rotating
equipment at this scale.
The Aker Solution subsea
organisation has worked on
similar systems in previous
projects such as the Ormen
Lange Pilot.

The Ormen Lange
organization is closely
integrated with the Midgard
project team.
Moderate
to high.
The equipment is
relatively new and some
qualification items still
remain. No operating
experience exists
subsea for this type of
systems, however,
experience will be
gained through the
Ormen Lange Pilot
testing at Nyhamna.
The project organisation
is not overly complex
and has worked on a
similar development
before.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 14 of 33



Control
system
The qualification of the control system
has been completed for the Ormen
Lange project, this qualification is for
most parts transferrable to the Midgard
project. There are, however, some
outstanding qualification issues for
Midgard. The risk related to these
qualifications is however, estimated to
be limited.
Experience data exists
for a large part of the
control system
components, even if all-
electric control systems
of this scale has not
been implemented for
subsea application. In
general the availability of
this system should be
considered to be fairly
high due to high internal
redundancy.
There is limited
experience with all
electric control system;
however, experience
exists with some of the
components used in the
system.
The control system
stretches from topside
platform to the seabed
and is fairly large. The
system is composed of
a high number of
jumpers and
connectors and should
be regarded as
complex.
The Aker Solution subsea
organisation has worked on
similar systems in previous
projects such as the Ormen
Lange Pilot.

The Ormen Lange
organization is closely
integrated with the Midgard
project team.
Moderate The control system
consists of parts that
are already in use
subsea and the risks for
these are fairly well
known. Qualification has
been performed and
concluded successfully
through the Ormen
Lange Pilot project,
however, there are
some outstanding
qualification issues to
adapt the system to
Midgard SCS.

The overall project risk categorisation is somewhere between moderate to high. Some parts of the system are close to off-the-shelf and
well know, while the compressor and other modules have never been applied subsea before. The Aker Solution subsea organisation has
worked on similar systems in previous projects such as the Ormen Lange Pilot, and this organisation is working closely integrated with
the Midgard project team. In order to develop an appropriate equipment reliability program for the Midgard Subsea Compression Project
it is considered that the project needs a thorough follow-up for reliability, as for medium to high risk project. This is based on the novelty
of some of the equipment and the fact that the subsea compression system is being developed slightly differently for Midgard than for
Ormen Lange.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 15 of 33



4. ORGANISATION AND RESPONISBILITIES
4.1. Reliability Organization
Reliability is a management and line responsibility. The reliability/safety manager and reliability
engineers will operate in a network with the objective to maintain a high focus on reliability
throughout the design and manufacturing of the system in order to obtain solutions that ensure an
optimal availability of the system.

The reliability management project organization is shown in Figure 4-1 below. In addition, the
elected safety delegates at each work location will play an important role and are considered part
of the reliability network.

Project Engineering
TBN Manager
Reliability Manager
TBN
3rd party HAZOP, HAZID
facilitators
TBN
Control Systems WPs
HV Power Systems WP
Process Systems WPs
Tie-in & Manifold WP
WP Engineers
Relaibility Engineers
System Enginnering Group

Figure 4-1 Reliability Project Organisation Midgard SCS

4.2. Responsibilities
The Project Engineering Manager (Aker Solutions)
The Project Engineering Manager holds the overall responsibility for the system design. He/she
will be responsible to ensure an optimal design with regard to reliability and to ensure that all
reliability activities are coordinated with other project activities.

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 16 of 33



The Reliability Manager (Aker Solutions)
The Reliability Manager is responsible for assisting the Project Engineering Manager, the HSE
Manager and other project personnel in reliability matters. The Reliability Manager holds the
overall responsibility for managing and coordination of the project reliability activities. He/she shall
manage the daily execution of reliability related activities within scope of work, and as outlined in
the reliability management program.

Reliability analysis engineers
The reliability analysis engineers are responsible for performing reliability analyses and follow-up
of findings/results throughout the project phases. They are also responsible for the preparation of
the RAM and Risk analyses as input to the total field RAM and Risk analyses performed by
Company.

Other Managers and Leads
All project line managers, work-package leads and lead engineers are responsible for reliability
within their own area. They are responsible for contacting the Reliability Manager when
assistance is needed.

Engineering manager and work-package leads

are responsible for ensuring that the reliability
aspects are included in design work. This includes the responsibility for identifying applicable
authority acts and regulations. Activities such as design reviews, hazard and operability analyses
(HAZOP), etc. shall address and include reliability aspects as defined by regulatory- and contract
requirements. Adequate reliability requirements in technical specifications to suppliers shall be
ensured.
Procurement manager

has a responsibility to ensure that the appropriate reliability requirements
are included in purchase orders with suppliers and sub-contractors.
All team members
All team members are responsible for reliability and must in this respect execute a
personal responsibility.

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 17 of 33



5. ACTIVITY SCHEDULE
5.1. General
The activity schedule is presented according to the steps in the Aker Solutions Project Execution
Model (PEM) for the Engineering, Construction and Procurement phase of the project. The
activities schedule maps the reliability activities against the project milestone phases. The
reliability activities are dedicated to particular phases based on the knowledge assumed available
for the system at that point in time.
5.2. Activities overview
The activities that should be included as part of the reliability management program for the EPC
phase of the Midgard Subsea Compression Project, are shown in Figure 5-1.

Figure 5-1 shows the relationship between different engineering, construction and procurement
activities and proposed reliability tasks. For each task different tools may be chosen, depending
on what is optimal for the system throughout the EPC phase. The black arrows show the next
step in the program, while the blue arrows show the inputs from/ outputs to the engineering
activities. The Aker Solutions PEM is represented on the left side. The reliability management
program includes testing before and after the equipment has been assembled into subsystems
and systems. The test methods are described in the Test and Fabrication Philosophy, ref./4/.

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 18 of 33




Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 19 of 33




Figure 5-1: Reliability Program Activities as part of the EPC phase for Midgard SCS
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 20 of 33



5.3. Reliability activities
The following sub-chapters give a description of all methods and tools that can be applied in
order to evaluate the reliability during the EPC phase. No activities outside the EPC phase will be
presented here.
5.3.1. Reliability allocation
Reliability allocation deals with the setting of reliability goals for individual sub-systems such that
an overall specified reliability goal can be met. The complexity, criticality and achievable reliability
for individual sub-systems are among the points that may be used as a basis for the allocation.
Reliability allocation usually starts from a base of past experience and is first performed at a fairly
high level. Through the decomposition of the system and the overall required reliability, each
subsystem and component will allocated a required reliability. A good allocation of the reliability
will help the design process in giving pointers as to where extra measures must be taken in order
to obtain the necessary reliability.
5.3.2. Hazard identification analysis
A hazard identification of some sort must be performed at an early stage of the system design
process in order to identify the potential hazards related to the system. Several methods exist for
this purpose and a choice may be based on the type of hazard that is to be searched for. The
identification will serve as a basis for implementing design changes and provide valuable input to
operational manuals. For the Subsea Compression System, which consist of novel technology,
hazards which have been unproblematic in previous development projects may be of importance.
It is thus important to perform a thorough hazard identification.
5.3.2.1. HAZID
The HAZID is the most common hazard identification tool, based on a worksheet model. Potential
accidental events are evaluated one by one through the study of their probable cause, major
effects, and if possible, a ranking of severity and preventive measures. The outcome of the
HAZID will be a list of all relevant hazards associated with the system subject to the
analysis/study. The environmental risks/aspects of the design shall also be addressed.The
HAZID methodology has been applied in the previous phases of the Midgard SCS project and
can be easily implemented as part of the EPC phase.
5.3.2.2. SWIFT
The SWIFT is a brain-storming technique where questions beginning with what if? and How
could? are asked. A group goes through the system part by part, but on a rather high level.
Where the HAZID may go backwards from an event, the SWIFT can go forwards from an action
that causes an undesirable event to take place. It can be especially useful for environmental risk
assessments and human factors.
5.3.3. FMECA
The failure mode, effect and criticality analysis gives an overview of the possible failures that may
occur during the systems operational lifetime. The FMECA is often the first step of a system
reliability study and is commonly used in the evaluation of technical equipment. The FMECA is
performed in the design phase of a project as a qualitative analysis. The FMECA method involves
reviewing as many components, assemblies and subsystems as possible to identify failure
modes, causes, and effects of such failures. Although the FMECA is often finalised with the
completion of the detailed design, it is possible to continue filling in failure modes and effects
throughout the product life cycle. As a tool, it can be particularly useful as an overview of the
problems possibly encountered by the SCS.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 21 of 33



5.3.4. RAM analysis
The RAM analysis considers the overall reliability, availability and maintainability. Reliability and
availability are tightly connected through their definitions. While reliability predicts the systems
ability to function over time, availability measures the actual time in operation against the time the
system is meant to operate.

The MIRIAM Regina simulation software is often used for modelling and analysis of production
systems. MIRIAM Regina is a commercial software package developed in close cooperation with
Norwegian oil companies and has been used for several field development studies.

The results are based on stochastic simulations and are subject to uncertainties caused by both
input distributions (statistical reliability models) and simulation variability.

The following approach is applied to perform RAM studies using the MIRIAM Regina tool:

- Definition of study objective, approach and metrics
- Definition of study boundary, assumptions and limitations
- Identification of main failure modes and corresponding effects (often through previous
FMECA)
- Definition of reliability input data on component/module level (failure rates and MTTF,
can be found through detailed assessments of each component through FMECA, FTA
and RBD - see descriptions below)
- Definition of repair requirements, repair time and intervention vessel mobilization time
- Establishment of a base case availability simulation model (Miriam Regina)
- Running of simulations, including sensitivities for different concepts
- Generation and interpretation of results, e.g.:
Average Production Availability
Subsystem criticalities
- Generation of conclusions and recommendations for further work

The estimation of reliability of sub-systems can be performed using techniques such as Fault
Tree Analysis (FTA) and/or reliability block diagrams (RBD).
5.3.4.1. FTA
The Fault Tree Analysis is a top-down method where one failure event is broken down into the
initial failures. It shows the possible combinations of failures that may lead to a large failure
affecting the systems ability to function as normal. It can also be used in order to calculate the
probability that an event will occur, through the probabilities of the basic failures. While the SCS is
still in the engineering phase, it can be possible to alter the design if a common failure is shown to
propagate rapidly towards a functional failure for the entire system.
5.3.4.2. RBD
Reliability block diagrams are used to show how the different components, assemblies and
subsystems are connected. It describes the function of the system and can therefore also show
the failure combinations that will lead to a system failure. The minimal cut sets and the most
critical failures may be found through this type of diagram. For the SCS this can be useful in order
to discover where boosting or redundancy is of particular necessity.
5.3.4.3. Other available tools
FTA and RBD may be used together or instead of each other. There are many methods which
can be used for RAM analysis and among them are:
Markov models
Event tree analysis
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 22 of 33



5.3.5. Criticality importance measures
The importance of one component or subsystem depends on the systems ability to function
without it. A failure may stay unnoticed, weaken the system, or cause a downtime of the whole
system. An importance measure can help rank the components and subsystems based on their
effect on the system if they fail. The measure can be very useful in prioritising maintenance
operations. Several methods for measuring this exist:
Birnbaums measure
The improvement potential
Risk achievement worth
Criticality importance
5.3.6. HAZOP
The Hazard and Operability analysis can be used to study which hazards the system may present
towards its environment, surrounding equipment and personnel through its operational modes. It
can also identify the problems which prevents an efficient operation. The operational modes can
be production, intervention, work-over etc. Through HAZOP studies it is proven that the system
design allows for safe and effective operations. HAZOP studies are an integral part of the project
activity from a project review point. The HAZOP method applied at Aker Solutions is according to
IEC 61882 Hazard and operability (HAZOP) studies, and is normally chaired by a third party
HAZOP leader.
5.3.7. Human factors analysis
A human factors analysis can be performed in order to see how a human interacts with the
system. The human being is highly unpredictable and likely to do small errors which can have an
impact on the systems ability to function as normal. A human factors analysis aims to improve
operational performance and safety in relation to the system. Human factors are particularly
relevant during the manufacturing and assembly phases of the project. It is important to identify
and eliminate as far as possible any manufacturing or assemble mistakes that may decrease the
reliability of the system when put into operation.
5.4. Relationship between activities
Figure 5-1 does not to a full extent show how all the activities are connected through necessary
input. Some activities need input from previously performed activities; this is in particular true for
the RAM analysis that requires input from a FMECA.

Reliability analyses such as FMECA, HAZID, HAZOP and RAM have been performed as part of
the FEED phase of the Midgard Subsea Compression System project. However, all of these
analyses must be updated to reflect design changes to the system. At the start of the EPC phase,
it is recommended to perform a reliability allocation for all the subsystems. The main inputs to this
allocation process are the reliability requirements, the information about where high reliability is
needed and the design architecture.

It is recommended to perform hazard identification and FMECA early in the design phase to give
input to reliability improvements. Performing these activities after the reliability allocation will
corroborate the allocation; however, the outcome of these analyses may also cause a need for an
update of the allocation.

A detailed availability/RAM analysis of the system shall be carried out as part of the design phase
in order to contribute to optimisation of the system design. The RAM analysis may be used to run
sensitivities to evaluate the effect of different system designs on the overall availability.

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 23 of 33



In order to get the best possible results from the RAM analysis it is important to spend time
developing a detailed failure data dossier, i.e. update the data dossier included in Appendix A to
this report. For components and sub-systems where the experience data is scarce,
methodologies such as Fault Tree Analyses, FMECA and RBDs can be used to estimate the
reliability of the component/sub-system.

The RAM analysis gives an overview of the criticality of different components/sub-systems.
Further evaluations of component criticality can be performed. The criticality importance of one
component or subsystem depends on the systems ability to function without it. Based on the
outcomes of component criticality evaluations it is possible to give input the need for design
changes in certain components, such as increased redundancy at a component level.

The RAM analysis and criticality importance evaluations shall be updated as the design changes
and a final version shall be carried out upon design freeze to confirm that the production
availability is in compliance with requirements. The criticality importance evaluations made as a
part of this final report can be applied for final input to the sparing philosophy.

HAZOP studies should be carried out at an early stage to give input to design changes based on
the outcome of the HAZOP. The HAZOP should also be updated as the project approaches
design finalization to ensure that no new hazards have been introduced as part of the updated
design.

For the manufacturing and assembly phase the design is frozen and final RAM, FMECA and
HAZOP reports will have been issued. It is, however, important to follow up the reliability with
regard to the manufacturing and assembly activities. Procedure HAZOP/FMECA should be
performed for each process to ensure that no additional failure modes are introduced to the
system as a result of the manufacturing and assembly processes.

Human factors analyses may be used to evaluate the human interaction with the system as part
of the manufacturing and assembly processes.

The physical testing of equipment can only be planned when the manufacturing plans are
prepared or completed. When it is known how the system will be manufactured, assembled and
tested, it is possible to decide which test results must be obtained for reliability purposes. In order
to decide this, it is useful to go through the previous analysis results. Without such a preparation,
important information may be overlooked. The recommended test should be based on an
evaluation of what type of testing is required to study specific hazards to the component or
system functions.

Overall testing of the system cannot be done on the purpose of harming the system, but in order
to show that the system functions as expected. Any minor problems occurring must be analysed
and followed up.

At the end of the EPC phase all reliability documentation is gathered. This will provide information
on how maintenance tasks may be prioritised and what type of reliability feedback Aker Solutions
should ask for.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 24 of 33



6. LIST OF RELIABILITY DOCUMENTS TO BE PRODUCED
The Table 6-1 below represents list of reliability documents to be produced for the EPC phase of
the Midgard Subsea Compression Project.

Table 6-1 List of reliability documents to be produced
Document Description
Reliability allocation, included in RAM analysis
report
Reliability allocation, background for allocation and
allocation method.
Reliability program, issued as separate report Schedule including methods, dates and reports for
delivery.
Hazard identification, HAZID report Method descriptions and results.
HAZOP, HAZOP report Final analysis and previous results included.
FMECA, FMECA report Final analysis and previous results included.
RAM analysis report Analysis overview, FTA, RBD and regularity
analysis included.
Criticality importance analysis, included as part of
RAM analysis report
Document should include what the chosen method
for criticality measures, and lists of critical sub-
systems and components ranging from most critical
to least critical.
Human factors analysis, issued as separate report All factors should be listed according to their
possible negative effect on the manufacturing,
assembling and testing. Measures which may
decrease the impact of such factors should also be
included.
HAZOP for the manufacturing procedure,
Procedure HAZOP
Document describing how the manufacturing
process may affect the reliability negatively.
Possible measures for avoidance of problems
should be included.
Failure modes for manufacturing, used as input for
manufacturing procedures
All failure modes discovered should be described
with respect to their origin, effect and possible
solution.
FAT/EFAT - summary of findings related to
reliability
A document should be written about the discoveries
in the FAT/EFAT that affects the reliability of the
subsea compression system. Both positive and
negative effects are to be included. It should also be
stated why the effects occurred and whether it is
thought that the effects are probable to occur under
normal circumstances.
System integration test analysis - summary of
findings related to reliability
Any results of the system integration test which are
of interest to the system reliability should be
documented and commented on according their
effect on the reliability.

If it is thought necessary, a summary of these documents could be made describing the changes
in the reliability estimates throughout the EPC phase. A comment on how the reliability after
testing corresponds with the estimates may also be of interest.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 25 of 33



APPENDIX A FAILURE DATA DOSSIER
Component Name MTTF Data Source OREDA Filter Failure Modes Comment
Process System
Manifold Piping 3048 OREDA 24
Subunit = Manifold
AND Component = Piping
(hard pipe)
-
No registered failures registered for 233 units.

It is assumed that a critical failure for manifold piping will happen
during the next year of operation.
Mechanical Connector 1351 OREDA-2002. pg. 804
Connector Common
Components Subsea
External Leakage
Other
3 failures registered for 606 units. Only 1 failure registered as critical.
Critical failure rate is thus 1/3 of total failure rate

OREDA 24 has registered 0 failures for connectors
ROV Isolation Valve 1389 OREDA 24
Component = Valve.
Process isolation
AND Actuation = Manual
Fail to open/unlock
Leakage in closed
position
3 failures registered for 190 units. 67% of the failures are regarded as
critical. None of the failure modes are critical for ROV valves that are
normally open during production. It is assumed that a critical failure
for normally open ROV valves will happen during the next year of
operation.

The critical failures for an closed ROV valve is not assumed critical
during normal operation and closed ROV valves are therefore not
considered in the RAM analysis.
El. Isolation Valve
including Actuator
1389 OREDA 24
Component = Valve.
Process isolation
AND Actuation = Electric
Rotating
-
No failures are registered for valves operated by electric rotating
actuators.
- OREDA 24
Component = Valve.
Process isolation

Fail to open/unlock
Leakage in closed
position
3 failures registered for 478 units. None of the registered failure
modes are critical for normally open valves. For normally closed
valves the leakage in closed position is critical during operation and
accounts for 1 of the failures.
1489
(crit)
OREDA-2002. pg. 804
Valve Process isolation
Common Components
Subsea
External leakage
process medium
Spurious operation
18 failures registered for 898 units. 72% of the failures are regarded
as critical. However, for normally open valves, only the external
leakage of process medium and spurious operation is regarded as
critical. 3 failures are registered for external leakage and 1 failure for
spurious operation. This accounts for 22% of the failures.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 26 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
25
A Scandpower study present RAM estimates for anti surge actuator,
100 Nm rotating actuators and 2.7 kNm rotating actuators. The
estimates range from MTTF 23.5 years to MTTF 25.6 years. As an
approximation, MTTF 25 years are used for all actuators as was
previously applied in the DNV report.
Check Valve 162 OREDA-24
Component = Valve,
Check
Plugged/choked
1 critical failure registered for 92 units.

Scrubber 50 OREDA-2002. pg. 457 Scrubber, Topside
External leakage
Structural deficiency
Others
No relevant data basis on subsea scrubbers. Topside data for
scrubbers considered for relevant critical failure modes (external
leakage, structural deficiency and others). Instrument failures
will be treated separately, hence disregarded here.
Parameter deviation not considered relevant.

It is furthermore assumed that the subsea design will be more robust
than a topside design and that the requirement with regard to
separation performance/quality is lower than topsides, thus reducing
the number of calibration valves contributing to failure to an
insignificant number. The contribution to failure from these valves is
removed from the critical failure rate. The structural deficiency failures
are reduced by 90% because of increased QA/QC requirements for
subsea manufacturing.
Scrubber Level
Detectors
98
Tracero: Level
Monitor: reliability.
Failure rates and
modes. Doc no.
IA0086 (March 2003)
- -
Radioactive source is not retrievable, and requires retrieval of
scrubber upon failures. The only failure mode considered relevant for
the source is mechanical failure, and should be negligible or at least
covered by failures of vessel internals.

Detector unit is mounted on a retrievable plate. Vendor data indicate
an MTTF of 9.8 yrs.

This estimate seems reasonable considering the potential level of
redundancy. A final estimate depends on operational requirements to
accuracy (which may reduce redundancy), but level of redundancy
could be increased further by adding detectors.

Given that the level of redundancy is high and that each detector is
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 27 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
separately retrievable it seems reasonable to state that the only
relevant failure is common cause failures. OLF Guideline 070 gives a
beta-factor of 10% for common cause failures on subsea transmitters.
DP Cell - -
The DP cell is not considered critical in previous studies performed by
Aker Solutions. The nucleonic sensors are considered to be the main
sensors for liquid measurement and the DP Cell is only used for back
up.
Magnetic Bearing
System Compressor
27.3
S2M MTTF report
for topside MBCM
system
- Critical
The magnetic bearing system has been evaluated by vendor and the
failures have been split in to failures in control pod and failures in
mechanical parts. The total failure rate of the MBCM system is
estimated to be 5.1 years. Failures in the mechanical parts include
bearing failures, position indicator failuresm temperature sensor
failures, and speed sensor failures, and will require compressor
retrieval. These failures account for about 1.9% of the total failure
rate (when the jumpers are treated separately)
Compressor 8,5 OREDA-2002, page 84
Compressors, Centrifugal,
Electric Driven (3-10 MW)
All critical failure
modes:
External Leakage-
Process Medium
Fail to start on
demand
Internal Leakage
Low output
Spurious stop
Vibration

The only failure
mode not included is
the external leakage
utility medium as no
utility medium is
applied subsea.
No relevant data basis on subsea compressors. Topside data for
compressors considered for relevant critical failure modes
Data for compressors of 3-10MW was applied due to a too small
population (and thus statistical unreliability) for the compressor of 20-
30MW.

The subsea design of the compressor is different from the topside
design. There are no power transmission elements, lubrication
system or shaft seal system. The contribution to failure for each of the
equipment units in a compressor is described for centrifugal
compressors in general (pages 70-75). It is assumed that the
contribution from different units will be the same for all centrifugal
compressors. The contribution from the elements not included in the
subsea design was removed from the total critical failure rate. In
addition to the systems above the contribution from the bearings,
valves and control units were removed as they are treated separately
in this analysis.

The removal of the non relevant items and the items treated
separately resulted in a 70% reduction in failure contribution.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 28 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment

It is therefore concluded that the critical failure rate of a subsea
compressor will be 30% of the critical failure rate for a topside
compressor (not included the failure rate for external leakage utility
medium)
Electric motor,
compressor
5.6
Ormen Lange Pilot
project, study
performed in
cooperation with
Client
- Critical
Magnetic bearing failures and penetrator failures are not included in
this estimate.
PSD Sensors

124 OREDA-2002. pg. 811
Subsea Control System
Combined Pressure and
Temperature Sensor
Erratic output
1 critical failure registered for 30 units.

Flow meter for anti-
surge control
650 OREDA-2002. pg. 811
Subsea Control System
Flow Sensor
-
No critical failures registered for 35 units. OREDA-2002 estimated
failure rate has been used
Anti-surge actuator 22,8 Vendor data - -
Vendor has 3
rd
party reliability analysis for actuator suggested used
on Midgard

Maintenance and degree of criticality of failures in redundant
modulating motors uncertain, but most conservative approach
estimates an MTTF of 22.8 yrs.
Anti-surge valve 89 OREDA-24
Component = Valve,
Control
Plugged/choked
4 failures registered for 69 units. 75% of the failures are regarded as
critical.

Check the data from Mokveld for next phase
Cooler 84 OREDA-2002. pg. 398
Heat exchangers shell
and tube
External leakage
Structural deficiency
No relevant data found for subsea coolers. The passive cooler is
basically just pipe segments and does not include a body/shell.
Topside data for shell and tube coolers have been studied. It was
decided to use the contribution to the critical failure rate from the
piping of a shell and tube cooler. In addition it is assumed that the
subsea design will be more robust than the topside design, however,
it may be somewhat more prone to damages due to vibration. The
critical failure rate has, based on the evaluations above, reduced by
30%.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 29 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
Condensate pump unit
w/ el motor
6.1
KOP FMECA.
LiquidBooster. TU
Z0900-230009-2
- -
A FMECA, done in conjunction with the Tordis Project, has evaluated
failure modes relevant for subsea application in order to estimate
MTTF. This estimate includes el motor.
Recirculation Choke
Valve
32 OREDA-2002. pg. 833
Wellhead and X-mas tree
Choke valve
Fail to function on
demand
Fail to close
Others
Plugged/choked
Fail to open
22 failures registered for 75 units. 7of the failures are regarded as
critical.

OREDA-24 has registered no critical failures for choke valves
MEG Piping 309 OREDA-2002. pg. 804
Piping (hard pipe)
Common Components
Subsea
Plugged/Choked 1 critical failure registered for 88 units.
Pressure and volume
regulator (PVR)
89 OREDA-24
Component = Valve,
Control
Plugged/choked
4 failures registered for 69 units. 75% of the failures are regarded as
critical.
Control System
Topside Master Control
Station
24,5 OREDA-24
Subunit = Master Control
Station (Topside)
Control/signal failure
Erratic output
Fail to function on
command
Spurious operation
Unknown
54 failures registered for 9 units. 56% of the failures are regarded as
critical.

Assumed that the MTTF is representative of one Master Control
Station with internal redundancy. The critical failures represents the
loss of redundancy.
Wet Mate Connector
72022
Reliability of Subsea
Harness Systems
including Wetmate
Connectors
Teledyne D.G.OBrian
ODI Cable Termination
Reliability study
Reliability Analysis of
Wet-Mate Nautilus
Connectors
Reliability Analysis of
Wet-Mate Hybrid
Connectors
- Critical
Pressure-Balanced Oil-Filled (PBOF) Hose Assemblies (Jumpers or
Harnesses) terminated with wetmate connectors has been assessed.
The data 3,17 FIT (10
-9
) has been divded in two, one half for the wet
mate connector and one half for the jumper
3836 - Critical General ODI cable terminations
22427 - Critical
ODIs Wet-Mate Nautilus Connector

1638 - Critical
ODIs Wet-Mate Rolling Seal Hybrid Connector

Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 30 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
380 OREDA -24
Component =
Power/Signal Jumper
Control/signal failure
Short circuit
Transmission
10 critical failures registered for 775 units.

Electrical Dry Mate
Connectors
4424
Data for wet-mate
connectors
- -
It is assumed that the dry mate connections are more reliable than
wet mate connections. An estimated 1/3 of the average failure rate for
wet mate connectors has been used to estimate the failure rate of dry
mate connectors
Electric Jumpers
300
OREDA -24
Reliability of Subsea
Harness Systems
including Wetmate
Connectors
Teledyne D.G.OBrian
Component =
Power/Signal Jumper
Control/signal failure
Short circuit
Transmission
10 critical failures registered for 775 units.

72022 - Critical
The data 3,17 FIT (10
-9
) has been divded in two, one half for the wet
mate connector and one half for the jumper
Junction boxes/ Splitter
boxes
41
Data from Telecordia,
supplied by Aker
Solutions Controls
Department in
Aberdeen
- Critical
Failure Rate Data Source: Mil-Hdbk-217F for resistors, capcitors, and
inductive devices, transformers
Magnetic Bearing
Control Module
6,3
S2M MTTF report
for topside MBCM
system
- Critical
The magnetic bearing system has been evaluated by vendor and the
failures have been split in to failures in control pod and failures in
compressor. Approx. 98.9% of the MTBF stated in report is caused
by control failures (not taking into account jumpers and connectors)
Anti-surge / Compressor
Control pod
38.7
ICS Triplex. Control
function description.
Doc. No 6592PF-
CFD-REV4
- Critical -
SCM
43
(one SEM)
OREDA-24
Subunit = Subsea Control
Module
Component = Subsea
electronic module

Control/signal failure
Fail to function on
demand
Insufficient power
Other
Short circuit
Spurious operation
A single SCM contains 3 separate dual SEMs (one part is powered
by the UPS A and the other by UPS B):
- PCS SEM
- PSD SEM
- CM SEM (non redundant, but considered to be not critical)

Data for two dual SEMs (A and B) are used to estimate the failure
data for an all electric subsea control module. OREDA-24 gives 27
failures for 263 units, whereof 85% critical failures.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 31 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment

Failure rate for one SEM: 2,669 x10
6
Failure rate of one redundant SEM: 2x10
6
(including common cause failures)
Failure rate for two SEM (each redundant): 4x10
6

UPS 8.1
Engineering
judgement
- -
The UPS contains a battery, a SEM, AC/DC converters, an internal
controller and transformers. Based on engineering judgement (given
a MTTF of 42 years for a SEM and 10 years for a battery) it is
assumed that the MTTF of the UPS will be about 8 years
HV Power System
Topside Main Circuit
Breaker
1116
OREDA 2002, tax 2.2,
page 334

- Critical
Data for cicuit breaker in eletric motor. Based on critical failures UST,
circuit breaker 0,36% of the failures 28.44 E-06.
Topside Transformers 554
Vetco Gray RAM
analysis report. 37-
1Y-VET-F15-00001,
rev.02
- Critical
Data for topside transformers assumed to be at least as good as the
data supplied by Vetco for the main subsea step-down transformer.

VSD
6.105
Alstom. RAM Prelim
Analysis. File no.
4MVE0036_C
- Critical
-
10.67
SPC Project. System
RAM Analysis
- Critical
Topside Umbilical
Hangoff
358 OREDA-24
Subunit = Static Umbilical

(OREDA-24has zero
registered failures for
dynamic umbilicals
including termination units,
use static umbilical as filter
instead)
No registered
failures
Assume critical failure in the next operational year

Power Umbilical 108 OREDA-2002. pg. 811
Subunit = Static Umbilical


Critical and
degraded
OREDA-24 has registered 22 registered failures for a static umbilical,
out of which 17 failures are related to the hydraulic lines. There are
no hydraulic lines in the power umbilical only 3 off power cores and 1
fibre optic line with 3 bundels 16 fibres. For the power cables there
are only degraded failures registered, however, for the power cores
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 32 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
there is no redundancy. It is therefore assumed that the degraded
failure of a control umbilical power line will be critical for the power
umbilical.

Failure rate P/S line:
0,34x10
6


Failure rate power cores:
0,34 x10
6
x 3

Due to the high number of internal power cables it is assumed that
the only critical failure of the umbilical is related to common cause
failures of the power/signal lines. A common cause factor of 10% is
assumed for the power/signal lines

Degraded failure rate P/S line: 0,34x10
6

Common Cause failure P/S lines: 0,034 x10
6

Umbilical Termination
Assembly (UTA)
310 OREDA-24 Subunit = Static Umbilical
No registered
failures
Assume critical failure in the next operational year
Subsea Enclosures
(Transformer)
675
(two
connectors)
OREDA-2002. pg. 804
Connector Common
Components Subsea
External Leakage
Other
There are no failure data registered for subsea enclosures. External
leakage is assumed to be the critical failure. It is further assumed that
the leakage points will most likely be through the connection/flange
points. In order to find data it has been decided to compare the
leakage rate for an enclosure to the leakage rate from 2 subsea
mechanical connectors. 3 failures registered for 606 units. Only 1
failure registered as critical.
Critical failure rate is thus 1/3 of total failure rate
Subsea Main Step-down
Transformer
554
Vetco Gray RAM
analysis report. 37-
1Y-VET-F15-00001,
rev.02
- Critical
It was decided to apply the data from the DNV analysis for the
transformers as the source seems to be more appropriate since
Vetco Gray supplies the transformer for OL. The failures caused by
the marine environment are reflected through the failure rate of the
subsea enclosures.
Document: 10000942820-PDC-000
Equipment Reliability Management Program Version: 00 - In Work
Technical Risk & Reliability Issue date:
Midgard Subsea Compression Page: 33 of 33



Component Name MTTF Data Source OREDA Filter Failure Modes Comment
HV Penetrator/
Dry connector
192
Data received from
Deutch
- Critical Data for 18/30 (36)kV 900A Dry mate connectors
HV Power Jumper 100
Engineering judgment
from the Ormen
Lange project, in
cooperation with
Statoil and DNV
- -
The engineering judgment assumed an MTTF of 100 years per
component, i.e. the jumper, connector and penetrator.
HV Wet Mate Connector
77
(female)
Data received from
Deutch
-

Critical
Data for female part of wet mate connector 18/30 (36)kv 900Amp.
Most complex part of connector
154
(male)

Data for male part of wet mate connector 18/30 (36)kv 900Amp.
Least complex part of connector



Appendix F Preliminary report
The preliminary report is quite short and was written more as an aid to the author, than to the
supervisors. This has been done in agreement with the supervisors. The master has evolved from the
eight main tasks described in the preliminary report, but is still focused towards these as the main
targets.




NTNU
Preliminary study
report
Design for reliability Applied to development of subsea process systems
Ingrid Alms Berg
1/2/2010


1. Project description
This thesis is a part of the master degree study in Production and Quality engineering at NTNU,
Norwegian University for Science and Technology. It is meant to be carried out as an in-depth
literature study during the spring semester 2010, valuing 30 ECTS. A part of the thesis is a suggested
methodology and case study, based on the findings in the literature study.

This preliminary report is written to describe the project tasks, the targets of the project and to
gather thoughts on how to manage the project. It has been carried out early in the spring semester
before the main part of the project and changes may occur as the project continues. The preliminary
report is meant to give a better knowledge of the problem and the tasks, defining work methods and
giving an outline of the work packages.

1.1 Problem description
The subsea power and process department at Aker Solutions is working to create innovative
processing solutions within the oil and gas industry. For the operation of a subsea system the
reliability is crucial. From the early design phases and through the whole lifetime of a system, the
product performance must be addressed properly.

Relevant methodologies and practices for reliable product design shall be studied in this thesis, as well
as a discussion of their application. A products full life cycle shall be considered and a methodology
for a subsea process system developed. This methodology will subsequently be applied to the
development of a specific process sub-system.
1.2 Objective
The project objectives can be divided in five tasks:

1. Perform a literature study on the application of different methods for design for reliability. The
literature study should cover, and discuss, methods normally applied across relevant
industries.
2. Familiarise with systems and main equipment used within subsea process industry.
3. Based on learning from the literature study discuss and summarise the main factors that
contribute to unreliability. Describe challenges for the subsea process industry in particular.
4. Suggest and develop a methodology for reliability performance and specification throughout
five defined stages of a Product Life Cycle (Front-end, Design, Development, Production and
Post-Production) of a typical Subsea Process System. Special attention should be paid to the 3
first phases.
5. Perform a case study to evaluate the applicability of the suggested methodology for a chosen
stage of the life cycle. The case study should be applied to a chosen sub-system within a
typical subsea process system.


2. Work methods
2.1 Project management
- Preliminary report defining main objectives, activities and time frame.
- Continuous evaluation of time frame and finished activities.
2.2 Literature survey material
- Databases and articles
- Books written on the subject
- Norms, regulations and standards
2.3 Reports and written work
- Preliminary report
- Literature study on reliability, methods for design for reliability and unreliability
- Methodology for reliability performance and specification throughout a product life cycle
- Case study results
2.4 Framework conditions
The master thesis was handed out the 18th of January, 2010, and shall be handed in the 14th of June.
The assignment has a value of 30 credits, 100% of one semester, equalling 48 working hours per
week.


1
Preliminary study and report
Task:
To study the assignment and its tasks, and to write a report on the problem solving process.
Objective:
To get an understanding of the project assignment and how to approach the problem, and to plan the
project work.
Content:
- Problem description
- Objectives and tasks
- Description of activities
- CTR
Literature:
Rolstads, A, 2001, Praktisk Prosjekt Styring, ISBN 82-519-1652-6
Work method:
Project
Challenges:
- Limiting the report
- Separate the project activities/tasks
- Make a timeframe for each activity
Deliverable:
A report consisting of task descriptions, a time frame, work methods and thoughts on how to attack
the problems.
Duration:
Start: 20.01.2010
Finish: 4.02.2010


2
Design phases
Task:
Describe the five defined stages of a Product Life Cycle (Front-end, Design, Development,
Production and Post-Production).
Objective:
To understand and describe the different stages of a Product Life Cycle.

Content:
- An overview of the different stages of a Product Life Cycle.
- Examples of a product in the different stages
Literature:
- Murthy, Rausand and sters, 2008, Product Reliability Specification and Performance,
ISBN 978-1-84800-270-8
- Information from Aker Solutions
- Articles, books and standards
Work method:
- Literature study
- Finding main aspects of different stages
- Make examples based on a product, preferably equipment used in the subsea process
industry.
Challenges:
To properly describe the different stages and to exemplify them through a products life cycle.
Deliverable:
A description of the different stages of a product life cycle.
Duration:
Start: 12.03.2010
Finish: 26.03.2010


3
Reliability concept, history and basics
Task:
To study the concept and background for reliability engineering.
Objective:
To identify the meaning of reliability, why it is considered necessary and how it is applied across
industries.
Content:
- Definition of term
- Brief history
- Identification of use
- Identification of mathematical use
Literature:
- Dictionaries and encyclopaedias
- Murthy, Rausand and sters, 2008, Product Reliability Specification and Performance,
ISBN 978-1-84800-270-8
- Blishke and Murthy, 2000, Reliability, ISBN 0-471-18450-0
- Rausand and Hyland, 2004, System Reliability Theory, ISBN 0-471-47133-X
- Calculus and statistics books
- Articles
Work method:
- Study and analysis of literature
- Discussions with supervisors
- Report writing
- Literature discussion
Challenges
- To find definitions
- Identifying trustworthy internet information
- Finding good and sufficient sources
Deliverable:
A presentation of the concept reliability and its basic use in engineering
Duration:
Start: 18.01.2010
Finish: 19.02.2010


4
Methods for design for reliability
Task:
Identify and discuss different methods for design for reliability and their application.
Objective:
To describe and analyse how different methods for design for reliability are used in industry.
Content:
- Identification of different methods for design for reliability.
- Analysis of the application of the methods.
- Comparison of the different methods.
Literature:
- Murthy, Rausand and sters, 2008, Product Reliability Specification and Performance,
ISBN 978-1-84800-270-8
- OConnor, 2002, Practical Reliability Engineering, ISBN 0-470-84463-9
- Books and articles concerning the subject
- Standards
Work method:
- Literature study
- Analysis of literature
- Discussion with supervisors
- Discussion of literature and report writing
Challenges:
- Finding relevant literature
- Identifying main method procedures and application
- Identifying differences between the methods
Deliverable:
An overview of different methods for design for reliability, including their application and a
discussion of their use in relevant industries.
Duration:
Start: 18.01.2010
Finsih: 05.03.2010


5
Systems and main equipment
Task:
Familiarise with systems and main equipment used within subsea process industry.
Objective:
To get an overview and an understanding of the different equipment and systems used by the subsea
process industry.
Content:
Examples of systems and equipments presented in relation to different subjects presented in the
thesis.
Literature:
- Sangesland S., 2007, Subsea Production Systems, Course TPG4200, NTNU.
- Work in-house at Aker Solutions
Work method:
- Study of the different systems and equipment
- Development of examples for the thesis
Challenges:
To present the material in a context.
Deliverable:
Examples and other information used together with the different subjects presented in the thesis.
Duration:
Start: 19.01.2010
Finish (literature study): 26.03.2010
Finish: 6.06.2010

6
Factors contributing to unreliability
Task:
Discuss and summarise the main factors that contribute to unreliability. Describe challenges for the
subsea industry in particular.
Objective:
- To identify the factors contributing to unreliability.
- To analyse the factors that may have an impact on the subsea industry.
Content:
- Definition of unreliability
- Analysis of different contributors to unreliability
- Identification of the challenges related to unreliability in the subsea industry
Literature:
- Articles
- Books
- Previous literature study on reliability
- Previous project work
Work method:
- Further study of information found while working on the previous activities
- Identifying factors
- Analysis of challenges
Challenges:
To see how unreliability can occur and which effects it can have.
To understand what challenges are the most pressing in the subsea industry.
Deliverable:
A presentation of different contributors.
A discussion of the origins and effects of unreliability contributors.
An identification of challenges occurring in the subsea industry.
Duration:
Start: 18.01.2010
Finish: 12.03.2010


7
Methodology for reliability performance and specification
Task:
Suggest and develop a methodology for reliability performance and specification throughout five
defined stages of a Product Life Cycle of a typical Subsea Process System.
Objective:
- To develop a methodology for reliability performance and specification.
Content:
- Presentation of a methodology developed for the thesis.
Literature:
- Rausand M & Hyland A, 2004, System Reliability Theory, ISBN 0-471-47133-X
- Murthy, Rausand and sters, 2008, Product Reliability Specification and Performance,
ISBN 978-1-84800-270-8
- Articles
- Books
- Other methods

Work method:
- Literature study
- Analysis of existing methods in combination with previously discussed challenges for the
subsea industry
- Development of a methodology
- Discussion of the methodology
Challenges:
- To find suitable methods for the different stages of a product life cycle.
- To identify the measures needed to answer the challenges for unreliability.
- To develop a methodology including all necessary methods
Deliverable:
- A methodology for reliability performance and specification suitable for the development and
use of a subsea process system.
Duration:
Start: 06.04.2010
Finish: 23.04.2010


8
Case study
Task:
Perform a case study to evaluate the applicability of the suggested methodology for a chosen stage of
the life cycle. The case study should be applied to a chosen sub-system within a typical subsea
process system.
Objective:
To study how the chosen methodology works for a chosen stage of the life cycle.
Content:
- Presentation of the case study
- Analysis of the results found in the case study.
Literature:
- N/A, work will be carried out in-house at Aker Solutions
Work method:
- Perform a case study
- Analysis of results
- Discussion and evaluation of the applicability of methodology
Challenges:
To find a suitable tool for the case study.
To understand the results of the case study in connection with the choices made for the methodology.
Deliverable:
An evaluation of the methodology based on the results from a case study.
Duration:
Start: 23.04.2010
Finish: 26.05.2010