Objective COREN Registered Engineer /Seasoned Project Manager whose experience spans through Oil and Gas sector and pipeline construction, structural fabrication and internal piping, with a outstanding technical skills backed-up with proven ability to building strong relationships with external and internal customers alike. Good project management/Design skills to deliver Project within budget time and scope Project/Design Experience
LASWAMO - Design of Sanitary Sewer Network For Anthony Mende and Enviroment, Lagos State (4.12km2) LASWAMO - Design of Gravity Sanitary Sewer Network for Agbowa Housing Estate, Ikorodu Lagos LASWAMO - Design of Vacuum Sanitary Sewer Network for Anthony Mende and Environment, Lagos Nigeria Fabrication and Installation of IRF Water Buffer Storage Tank Fabrication and Installation of ETP Laid down Aeration Piping Fabrication and Installation of Compressed Air Piping Network Installation of 6 Nrs of 10 bar Air Compressor and 2 Nrs of 40 Bar Air Compressor and Dryers PZ Wilmer Ikorodu Physical Refinery and Dry Fractionation Plant PZ Wilmer Ikorodu CPO Tanks Fabrication and Installations Guinness Nigeria- Fabrication and Installation of Spent Grain Silos International Brewries- General piping works and equipment Installation with Thermal Insulation. Tempo Paper Pulp and Packaging Limited- Equipment Installation and Structural
Fabrication. Food And Agro and Allied Industries Ltd- Various utility piping and complete Installation of Malt extract Plant with Thermal Insulation. Food And Agro and Allied Industries Ltd- Fabrication and Installation of 1000 CUM Water Storage Tank and associated Piping Food And Agro and Allied Industries Ltd- Fabrication and Installation of Worth and Mash Kettle Food And Agro and Allied Industries Ltd- Fabrication and Installation of Chimney, Spent Grain Silos Sona Breweries Ltd- Fabrication and Installation of 2nrs Spent Grain Silos. PZ Cussions- Fabrication and Installation of 5nrs Crude Palm Oil Tanks (2million Litters) Nigeria Foundry Ltd- Fabrication and installation of 2 nos 100 Cum Overhead Braithwaite Tanks and 1nr of 200 CUM Water Storage Tank, 12m by 18m High Bill Board, FMA Uk- Mash Cooker Replacement, Nexus Blending and DPVs Integration Project Guinness Benin Brewery FMA Uk- HMS Transfer Project Guinness Ogba Brewery Honey Well Superfine- Fabrication, Installation and testing of 250m Internal Gas Pipeline for gas Generators. Honey Well Superfine- Fabrication, Installation and testing of 49m Internal Gas Pipeline for gas Generators. FMA Uk- DAL and ODBB Upgrade- Gns Benin Brewery Gaslink Nig Ltd- Fabrication, Installation and testing of 48m spurline to oksweet factory 7up Nigeria Ltd Dismantling and Re installation, commissioning of Pet Production Line Chellarms Nig Ltd Tank Farm Piping Fabrication, Testing and Installations. Gaslink Nig Ltd- PRMS Upgrade for Epesok Paper Mills Gaslink Nig Ltd- PRMS Upgrade Pioneer Gaslink Nig Ltd- PRMS Upgrade for 7up Nig Ltd Gaslink Nig Ltd- Fabrication, Installation and testing of 720m spurline to Dangote Salt
Chellarams: 3D Models of Liquid Transfer section-internal piping-using PDMS 11.0 PZ Cussions - Spray Tower Project (Piping fabrication, installation, testing and commissioning, Hot insulation, equipment installation)- 30 km of internal piping. PZ Cussions - Spray Tower Project (Spray Tower Tank Fabrication and Installation) PZ Cussions - Spray Tower Project (Piping fabrication, installation and testing of 4km gas line. GEA Brewery - Installation of Pneumatic Grist Conveying Line. Guinness Nigeria - Fabrication of access platforms for LV Platforms 24m access Guinness Nigeria - Fabrication of access platforms for Condensate Collecting Tank Guinness Nigeria - Fabrication of access platforms for Heat Exchanger Guinness Nigeria - Fabrication of access platforms for CIP Stations July 2012 Till Date Hansataj Nigeria Limited Exec Director/Project Manager January 2012 Till Date Endorse and Review outcome of the survey (site visit) and technical feasibility. Reviews the project execution plan and work method statement before approval by the M.D. Endorse and Review passage of all necessary documents to the user departments e.g. the work method statement, the work schedule, the work break-down structure. Review the resources mobilization checklist and approve as appropriate. Endorse all documents needed from initiation of the project by the project engineer at the project site, e.g. scope statement with its diagram, the daily work diary, weekly man hour report, the daily attendance register, site material requisition, a copy of for each activity or process to be carried out and work instructions register e.t.c. Proffer immediate solution to all reported challenges that are beyond the capabilities of the SPE, PE and other site personnel. Present project performance report of all sites: - showing planned activities (budgeted time and cost, over-run, Quality and other issues, labour, equipment damage, material.) against the actual and explaining why the disparity and its impact on the % gross profit.
Conduct site inspection at each project location at least three times in a week to ensure our internal procedures, clients scope have not derailed and processes, tests are carried out according to international standards. Approve all project requisitions be it from the site or Head office. Document the additional job and job change form, carries the Commercial Manager along and reports to the MD. Co-ordinate the problem solving sessions for all clients complaints, quality non- conformances and keeps the documents. Head the committee for correction and the corrective actions. Initiate action on recommendations of the Root Cause Analysis. Endorse all as-built diagrams, AFC, all transmittal and ensures they sent to client and necessary copies kept. Sign off close-out reports and all other relevant correspondences are written and dispatched accordingly November 2009 June 2012 Aklab Nigeria Limited Member Management Committee Nov 2011 June 2012 Project Manager/Snr Proj Engr June 2009 Till Date Assist all project engineers in charge to carry out proper survey, determine the technical feasibility of all projects and eventual scoping with its attendant documentation and documents. Draw and documents a project execution plan and work method statement which is reviewed by the Project Manager and approved by the M.D. Review and document the work breakdown structure, work schedule and the budget drawn by the project engineer and forwards to the PM, CM and/or M.D. as the case may be for approval. Ensure that all necessary documents are passed to the user departments e.g. the work method statement, the work schedule, the work break-down structure. Issue a checklist to ensure that adequate, approved, functional, reliable and right
machines (equipment and tools), materials and men are mobilized for that particular project. Ensure that all documents needed from inception of the project by the project engineer at the project site are issued e.g. scope statement with its diagram, the daily work diary, weekly man hour report, the daily attendance register, site material requisition, a copy of procedure for each activity or process to be carried out and work instructions register e.t.c. Proffer immediate solution to all site challenges reported by the project engineer and document them. He escalates those he cannot solve to the PM and/or the MD immediately. Write a weekly report to the PM and copies the M.D. on the weekly actual usage of materials, men and work done in comparison with the planned, with respect to the work schedule, the difference and the reasons for it. Track project performance of all sites:-the actual project time, project cost, cost over- runs, all sources of down- time and computes it with respect to the work schedule and budget. Conduct site inspection at each project location at least three times in a week to ensure compliance with the scope and conducts a project review meeting with project engineer, foremen and supervisors. Assist in proffering solution to all clients complaints, quality non-conformances and documents them. Assist PM in documentation of the additional job and job change form, carries the Commercial Manager and the MD along. Ensures the documentation of the correction and the corrective actions. Co-ordinate the filling of the Root Cause Analysis Form and ensures a copy is given to the QA/QC Engineer for record keeping. Ensure all as-built diagrams are signed and all transmittal sent to client and necessary copies kept. Ensure close-out reports and all other relevant correspondences are written and
dispatched accordingly. Review and authorises the number of his contract staff as the project progresses. Effect deployment of permanent project staff as the project progresses. Project Engineer Nov 2009 May 2011 See to Customers Job satisfaction and Improvement Prepare and Monitor work Procedure/Method Statement Development of Time Baseline Schedule and project charter. Prepare project execution plan. Ensure compliance with Quality Standards as detailed in quality assurance Manual. Supervise project execution according to detailed design and specification. Supervise welding and fitting according to standard codes and specs, API 1104, ASME, DEP, (BS31.8 for gas transmission lines) API 5l, BS 31.4 e.t.c Supervise technical team/Project Engineers in carrying out fabrication and installation works as per client specification. Supervise testing, pre commissioning and commissioning work scope Generate project status report. Close out reports, As built drawings e.t.c Pipeline Integrity Management April 2008 October 2009 Guaranty Trust Bank Plc Teller Captain/Vault Custodian/Customer information Services Officer Vetting and opening of account packages. Customer data update within the approved turnaround time. Debit cards, master cards and cheque requisition. Confirmation of references for other banks. Customer care services. ATM Dispense Error Reversal Supervision of Tellers within the approved bank's turnaround time. General Banking Operations. Cash Swap Management with other banks. Effective Vault cash ,STC and Safe custody management.
Daily reconciliation and proofs of Ledgers. E business and cards services Settlements of arbiter claims Batch Payment System April. 2006 March 2008 InterGlobal Procurement Engineering Services Ltd. 1. Otumara Gas Lift Compression Facility Lease Project (SPDC-West) 2. Oguta Gas Lift Compression Facility Lease Project (SPDC-East) 3. Manufacture and Installation of Furmaseal Clamps on 8 Oil Riser at IME and EDIKAN Drilling Platform Project (EPNL-East) Assistant Engineer (Project/Planning/Operations) Participate in Project Management Decision Making. Milestone proposal. Designing, modeling and running of MTO list. Reporting of Project Progress Status and Progress Measurement and Project Minutes of Meeting (MOM). Invoicing and Follow ups, Tender and Prequalification Packaging. Perfect orientation of the use of file system in keeping track record of Correspondences, Timesheets, Daily And Monthly Reports, Invoices And Daily Invoices, Cashes Requests, Materials Requisition Forms, Purchasing Orders (P.Os), Payments Advice . etc. Assists in Materials Procurements/Handling relating to the project interface and office uses. Assists the project/planning engineer in following up the project activities, planning schedules, cost estimates, weighting system and reporting. Monitor and maintenance records of personnels activities; timesheets, crew changes and funds required for daily activities. Creating, maintaining and updating of project cost Databases, Sub-Contractors Databases. E.t.c Preparations of Operations Monthly Reports. Updating of Overall Work Schedule and Responsibility Schedule. Subcontract Management.
April 2004 Oct. 2004 Fawel Engineering Services Warri, Delta State Internship Student Automobile Engine Block maintenance and overhauling. Change out of CP Pump to Robot Electrical Pump in Aviesere Flow Station. Spools and Flow lines Installations. Offloading and On-loading operations using Cranes. Health, Safety and Environmental Management System (HSE-MS) July 2003 Onaniyi Comroniks Engineering Services Starlite Area, Ogbomoso, Oyo State Internship Student Machining Operations Fabrication and Welding Automobile Engine Cylinders Reconditioning (Boring and Re-sleeving).
Education 19992005 Ladoke Akintola University of Technology, Ogbomoso, Oyo State B.Tech. Mechanical Engineering. 2 nd Class (Hons) Upper Division 1995 1998 The School of Science, Ogbomoso, Oyo State Senior Secondary School Certificate 1992 1994 Anglican Grammar School, Ogbomoso, Oyo State. Junior Secondary School Certificate. 1986 1992 A.U.D Primary School, Agbogbo, Iwo, Osun State.
Competencies AVEVA certified PDMS PIPE and EQUIPMENT Designer, Proficiency in Microsoft Office environment, Ms Project, Primavera Project Planner, Ms-Visio 2003, CorelDraw, AutoCAD, Project Planning and Scheduling e. t c. Workshop/Trainings
Long Hall Consulting Certification course on Project Management Prince II Aveva Certification course on Plant Design Management System (PDMS Pipping v 11.6 (July 2007). Anti money laundering Training-June 2009 Combating Financing of Terrorism-July 2009 Effective Project Management Training- April 2010 Time Management - June 2010 Habit of highly effective Managers - August 2010 Awards
Employee of the Year Award 2009 Project Engineer of the Year award 2010 Most committed and dedicated Project Engineer Award 2011 Leadership Skills
Interests
Member Management Committee Nov 2011 Till Date Citizenship and Leadership Training Centre (CLTC), Apapa, Lagos President, NYSC Poultry CD Group (2006) Reading, Traveling, Scouting and Sporting Professional Corporate Member, Nigerian Society of Engineers Affiliation Member, Nigerian Institution of Mechanical Engineers (NIMECHE) Member, National Fire Protection Association (NFPA) Alumni-International Member, National Society of Black Engineers. (NSBE) Member, International Association of Planning Engineers (IAPE) Member, Nigeria Institute of Management (MNIM)