Sunteți pe pagina 1din 48

Reservoir Engineering 1 Course (1

st
Ed.)
1. Productivity Index (PI)
2. Inflow Performance Relationship (IPR)
3. Generating IPR
A. Vogels Method
B. Vogels Method (Undersaturated Reservoirs)
1. Future IPR Approximation
2. Generating IPR for Oil Wells
A. Wiggins Method
B. Standings Method
C. Fetkovichs Method
3. Horizontal Oil Well Performance
4. Horizontal Well Productivity
Quite often it is necessary to predict the wells
inflow performance for future times as the
reservoir pressure declines.
Future well performance calculations require the
development of a relationship that can be used to
predict future maximum oil flow rates.
Several methods are designed to address the
problem of how the IPR might shift as the reservoir
pressure declines.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 5
Some of these prediction methods require the
application of the material balance equation to
generate future oil saturation data as a function of
reservoir pressure.
In the absence of such data, there are two simple
approximation methods that can be used in conjunction
with Vogels method to predict future IPRs.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 6
IPR Prediction:
1st Approximation Method
This method provides a rough approximation of the
future maximum oil flow rate (Qomax)f at the
specified future average reservoir pressure (pr)f.
This future maximum flow rate (Qomax) f can be used in
Vogels equation to predict the future inflow
performance relationships at (pr)f.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 7
IPR Prediction:
1st Approximation Method (Cont.)
Step 1. Calculate (Qomax)f at (pr)f from:
Where the subscript f and p represent future and
present conditions, respectively.
Step 2. Using the new calculated value of (Qomax)f
and (pr)f, generate the IPR by:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 8
IPR Prediction:
2nd Approximation Method
A simple approximation for estimating future
(Qomax)f at (pr)f is proposed by Fetkovich (1973).
The relationship has the following mathematical
form:
Where the subscripts f and p represent future and
present conditions, respectively.
The above equation is intended only to provide a rough
estimation of future (Qo)max.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 9
Wiggins (1993) used four sets of relative
permeability and fluid property data as the basic
input for a computer model to develop equations to
predict inflow performance.
The generated relationships are limited by the
assumption that the reservoir initially exists at its
bubble-point pressure.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 11
Wiggins proposed generalized correlations that are
suitable for predicting the IPR during three-phase
flow.
His proposed expressions are similar to that of
Vogels and are expressed as:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 12
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 13
Standing (1970) essentially extended the
application of Vogels to predict future inflow
performance relationship of a well as a function of
reservoir pressure.
He noted that Vogels equation can be rearranged
as:
Standing introduced the productivity index J as
defined by J=Qo/ ((pr)-pwf) into above Equation to
yield:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 15
Standings
Zero-Drawdown Productivity Index
Standing then defined the present (current) zero
drawdown productivity index as:
Where J*p is Standings zero-drawdown
productivity index. The J*p is related to the
productivity index J by:
J=Qo/ ((pr)-pwf) Equation permits the calculation
of J*p from a measured value of J.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 16
Standings Final Expression
for IPR Prediction
To arrive at the final expression for predicting the
desired IPR expression, Standing combines
Equations to eliminate (Qo)max to give:
Where the subscript f refers to future condition.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 17
Standings Drawdown
Productivity Index (J*P)
Standing suggested that J*f can be estimated from
the present value of J*p by the following
expression:
Where the subscript p refers to the present
condition.
If the relative permeability data are not available,
J*f can be roughly estimated from:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 18
Standings methodology for predicting a future IPR
is summarized in the following steps:
Step 1. Using the current time condition and the
available flow test data, calculate (Qo)max from
Equations below.
Step 2. Calculate J* at the present condition, i.e.,
J*p.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 19
Summary
of Standings Method (Cont.)
Step 3. Using fluid property, saturation, and relative
permeability data, calculate both (kro/oBo)p and
(kro/oBo)f.
Step 4. Calculate J*f by using below Equation. Use
the other equation if the oil relative permeability
data are not available.
Step 5. Generate the future IPR by applying below
equation.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 20
Disadvantages
of Standings Methodology
It should be noted that one of the main
disadvantages of Standings methodology is that:
It requires reliable permeability information;
In addition, it also requires material balance calculations
to predict oil saturations at future average reservoir
pressures.
It should be pointed out Fetkovichs method has
the advantage over Standings methodology
In that, it does not require the tedious material balance
calculations to predict oil saturations at future average
reservoir pressures.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 21
Muskat and Evinger (1942) attempted to account
for the observed nonlinear flow behavior (i.e., IPR)
of wells
by calculating a theoretical productivity index from the
pseudosteady-state flow equation.
They expressed Darcys equation as:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 24
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 25
In the application of the straight-line pressure
function, three cases must be considered:
Case 1: pr and pwf > pb
Where Bo and o are evaluated at (pr+ pwf)/2.
Case 2: pr and pwf < pb
Case 3: pr > pb and pwf < pb
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 26
Fetkovichs Method:
2nd Case, Present IPR
The term (J/2pb) is commonly referred to as the
performance coefficient C, or:
To account for the possibility of non-Darcy flow (turbulent flow)
in oil wells, Fetkovich introduced the exponent n to yield:
The value of n ranges from 1.000 for a complete laminar flow to
0.5 for highly turbulent flow.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 27
Fetkovichs Method:
2nd Case, Calculation of C and N
There are two unknowns in the Equation:
The performance coefficient C and the exponent n.
At least two tests are required to evaluate these two
parameters:
A plot of p2r p2wf versus Qo on log-log scales will result in a
straight line having a slope of 1/n and an intercept of C at p2r
p2wf = 1.
The value of C can also be calculated using any point on the
linear plot once n has been determined to give:
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 28
Fetkovichs Method:
2nd Case, Future IPR
To construct the future IPR when the average
reservoir pressure declines to (pr)f,
Fetkovich assumes that the performance coefficient C is
a linear function of the average reservoir pressure and,
Therefore, the value of C can be adjusted as:
Fetkovich assumes that the value of the exponent n would not
change as the reservoir pressure declines.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 29
Fetkovichs Method: Comparison
between Current and Future IPRs
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 30
Case 3: pr > pb and pwf < pb
o and Bo are evaluated at the bubble-point
pressure pb.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 31
Since 1980, horizontal wells began capturing an
ever-increasing share of hydrocarbon production.
Horizontal wells offer the following advantages
over those of vertical wells:
Large volume of the reservoir can be drained by each
horizontal well.
Higher productions from thin pay zones.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 33
Advantages
of Horizontal Oil Well (Cont.)
Horizontal wells minimize water and gas zoning
problems.
In high permeability reservoirs, where near-wellbore gas
velocities are high in vertical wells, horizontal wells can
be used to reduce near-wellbore velocities and
turbulence.
In secondary and enhanced oil recovery applications,
long horizontal injection wells provide higher injectivity
rates.
The length of the horizontal well can provide contact
with multiple fractures and greatly improve productivity.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 34
Horizontal Oil Well vs. Vertical Oil Well
The actual production mechanism and reservoir
flow regimes around the horizontal well are
considered more complicated than those for the
vertical well, especially if the horizontal section of
the well is of a considerable length.
Some combination of both linear and radial flow actually
exists, and the well may behave in a manner similar to
that of a well that has been extensively fractured.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 35
Several authors reported that the shape of
measured IPRs for horizontal wells is similar to
those predicted by the Vogel or Fetkovich methods.
The authors pointed out that the productivity gain from
drilling 1,500-foot (460m) long horizontal wells is two to
four times that of vertical wells.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 36
Figure shows the
drainage area of a
horizontal well of length L
in a reservoir with a pay
zone thickness of h.
Each end of the
horizontal well would
drain a half-circular area
of radius b, with a
rectangular drainage
shape of the horizontal
well.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 37
A horizontal well can be looked upon as a number
of vertical wells drilling next to each other and
completed in a limited pay zone thickness.
Assuming that each end of the horizontal well is
represented by a vertical well that drains an area of
a half circle with a radius of b, Joshi (1991)
proposed the following two methods for calculating
the drainage area of a horizontal well.
Joshi noted that the two methods give different
values for the drainage area A and suggested
assigning the average value for the drainage of the
horizontal well.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 38
Joshi proposed that the drainage area is
represented by two half circles of radius b
(equivalent to a radius of a vertical well rev) at each
end and a rectangle, of dimensions L(2b), in the
center.
The drainage area of the horizontal well is given then by:
Where
A = drainage area, acres
L = length of the horizontal well, ft
b = half minor axis of an ellipse, ft
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 39
Joshi assumed that the horizontal well drainage area is
an ellipse and given by:
Where a is the half major axis of an ellipse.
Most of the production rate equations require the
value of the drainage radius of the horizontal well,
which is given by:
Where
reh = drainage radius of the horizontal well, ft
A = drainage area of the horizontal well, acres
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 40
IPR Calculations for Horizontal Wells
From a practical standpoint, inflow performance
calculations for horizontal wells are presented here
under the following two flowing conditions:
Steady-state single-phase flow
Pseudosteady-state two-phase flow
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 42
Horizontal Well Productivity
under SS Flow
The steady-state analytical solution is the simplest
solution to various horizontal well problems.
The steady-state solution requires that the
pressure at any point in the reservoir does not
change with time.
The flow rate equation in a steady-state condition
is represented by:
Where
Qoh = horizontal well flow rate, STB/day
p = pressure drop from the drainage boundary to wellbore, psi
Jh = productivity index of the horizontal well, STB/day/psi
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 43
Productivity Index
of the Horizontal Well
The productivity index of the horizontal well Jh can
be always obtained by dividing the flow rate Qoh by
the pressure drop p, or:
Several methods are designed to predict the
productivity index from the fluid and reservoir
properties. Some of these methods include:
Borisovs Method
The Giger-Reiss-Jourdan Method
Joshis Method
The Renard-Dupuy Method
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 44
Horizontal Well Productivity
under PSS Regime
The complex flow regime existing around a
horizontal wellbore probably precludes using a
method as simple as that of Vogel to construct the
IPR of a horizontal well in solution gas drive
reservoirs.
If at least two stabilized flow tests are available,
however, the parameters J and n in the Fetkovich
equation could be determined and used to
construct the IPR of the horizontal well.
In this case, the values of J and n would not only account
for effects of turbulence and gas saturation around the
wellbore, but also for the effects of nonradial flow
regime existing in the reservoir.
2013 H. AlamiNia Reservoir Engineering 1 Course: IPR Methods for Vertical Oil Wells / Horizontal Well 45
1. Ahmed, T. (2006). Reservoir engineering
handbook (Gulf Professional Publishing). Ch7
1. Vertical Gas Well Performance
2. Pressure Application Regions
3. Turbulent Flow in Gas Wells
A. Simplified Treatment Approach
B. Laminar-Inertial-Turbulent (LIT) Approach (Cases A.
& B.)

S-ar putea să vă placă și