Documente Academic
Documente Profesional
Documente Cultură
XXX
XXX
AYACUCHO
DISTRITO CORACORA
100.00%
1,988.00
1,988.00
0.90
FORMULAS UTILIZADAS
20
2,346
Pf = Po * ( 1+ r*t/100 )
D = (Q/(0,0004264*C*S^0,54))^(1/2,63)
100
V = Q/(3141,6*0,25*(Dc*0,0254)^2
2.72
Hf = (1,72*10^6*L*Q^1,85/140^1,85/Dc^4,87)
D
Dc
Q
C
S
L
3.530
150.00
76.240
A UTILIZAR :
77.000
PULG.
PULG.
l/s
--m/km
km
304.00
7.059
LINEA DE CONDUCCION
ELEMENTO
COTA TERRENO
**CAPTACION
**CRP-1
**DESARENADOR
**SEDIMENTADOR
**FILTRO LENTO
**RESERVORIO
TOTAL
1673.80
1631.18
1595.95
1594.69
1594.44
1593.76
LONGITUD (KM)
CAUDAL TRAMO
PENDIENTE S
COEFICIENTE DE
HAZEN
C
DIAMETRO (")
6.300
0.100
0.010
0.010
0.020
6.440
3.530
3.530
3.530
3.530
3.530
6.77
352.30
126.00
25.00
34.00
150
150
150
150
150
3.10
1.38
1.70
2.37
2.23
DIAMETRO
COMERCIAL
5
5
5
5
5
VELOCIDAD DE
FLUJO
Hf
0.28
0.28
0.28
0.28
0.28
4.72
0.07
0.01
0.01
0.01
H PIEZOMETRICA
DE INGRESO
PRESION INGRESO
H PIEZOMETRICA
DE SALIDA
1673.80
1,669.08
1,631.11
1,595.94
1,594.68
1,594.43
0.00
37.90
35.16
1.25
0.24
0.67
1673.80
1631.18
1595.95
1594.69
1594.44
1593.76
MAT
pvc
VALVULAS
6,300.00
-
6"
8"
10"
12"
LONG.
L = 20.00 mts
L = 50.00 mts
L = 80.00 mts
NUM.
1.00
2.00
1.00
CONTROL
6"
8"
10"
2.00
6"
8"
10"
PURGA
4.00
-
FG
TOTAL
TOTAL
4.00
TOTAL
2.00
TOTAL
4.00
TOTAL
6,300.00
AIRE
6"
8"
10"
13.00
TOTAL
13.00
__________________________________________________________________________
____
SSFD - ssfd310@hotmail.com
Pgina 1 de 4
__________________________________________________________________________
____
SSFD - ssfd310@hotmail.com
Pgina 2 de 4
1.15
12,653.95
20
15,564.36
14.051
Volumen =
305.00
0.95
303.505
A UTILIZAR :
305.000 m3
Altura =
4.00
Diametro Calculado =
9.85
2.- Para atender a toda la poblacion, asumiendo un nuevo tanque con dos tuberias, la existente + la proyectada
1.15
14,887.00
20
18,311.01
Pf = Po * ( 1+ r*t/100 )
E.- DOTACION (LT/HAB/DIA)
60
12.716
Volumen =
16.531
0.95
357.065
360.000 m3
Altura =
Diametro Calculado =
360.00
4.00
10.70
existente + la proyectada