0 evaluări0% au considerat acest document util (0 voturi)
12 vizualizări2 pagini
Meter factor data shall be supplied by the vendor / manufacturer (PIP PCCFL 001 Section 5.8.5;) SAES-J -100, Sec.3. QC materials shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.
Meter factor data shall be supplied by the vendor / manufacturer (PIP PCCFL 001 Section 5.8.5;) SAES-J -100, Sec.3. QC materials shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.
Meter factor data shall be supplied by the vendor / manufacturer (PIP PCCFL 001 Section 5.8.5;) SAES-J -100, Sec.3. QC materials shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use.
The meter factor data shall be supplied by the vendor / manufacturer
(PIP PCCFL 001 Section 5.8.5; ) SAES-J -100, Sec.3.2 A8 Verify that the contractor or it's Saudi Aramco approved third party inspector performed the quality activities at the supplier and sub-supplier locations as required by the inspection level assigned for the materials and equipment identified in SAER-1972 Inspection Requirements. Schedule Q Attachment llI Sec 1.2 A7 Traceability - Instrumentation materials shall be traceable from the manufacturer and supplier through delivery, storage, fabrication, erection, installation, repair, modification and use. Schedule "Q" Attachment lV Sec. 3.3 A6 QC Before Installation - Instrumentation materials shall conform to all applicable requirements, standards, and specifications prior to release to be used as part of the work. Schedule "Q" Attachment lV Sec 7.1 A5 Free of Damage - Instrumentation materials shall be free of damage. All Incoming material shall be visually inspected for damage and conformance to all applicable inspection releases with Material Test Report (MTR). Schedule "Q" Attachment lV Sec 7.1 Schedule "G" Sec. 4.1 A4 As Designed - Instrumentation materials shall be in accordance with the Saudi Aramco-approved project-specific design drawings, diagrams, schedules, lists, databases, and associated documents. Schedule "G" Sec. 4.1 A3 New and Unused - Instrumentation materials shall be new and unused. A2 Identification - Instrumentation materials shall be identified by using tags, stamps, color coding, stencils or labels. The location and method of identification shall not affect the function or quality of the materials. Schedule "Q" Attachment lV Sec. 3.2 A1 Review Quality Documentation for Material Receiving. Schedule Q, Att, IV, Sec. 3.1. FAIL N/A RE-INSP DATE ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Flow - Magnetic Flow Meter - Material Receiving SAIC-J-6109 1-Oct-05 INST PLANT NO. EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO. TRAVEL TIME SAUDI ARAMCO USE ONLY SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED? SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL A Document Review and Certification A10 Storage, Handling, and Preservation A11 The manufacturer's storage, handling and preservation instructions to be followed. Schedule Q, Att, IV, Sec 5. Page 1 of 2 1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), J uly 1993 2. Schedule Q -- Quality Requirements (Pro Forma Contract), November 2003 5. PIP PCCFL 001, Flow Measurement Criteria , J une 1998, Process Industry Practices Process Control, 3. SAES-J -003-Instrumentation Basic Design, 31 May, 2004 4. SAES-J -100, Process Flow Metering, 31 December 2003. Work / Rework May Proceed Name, Initials and Date: 4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization Work Verified Saudi Aramco with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the PMT Representative T&I Witnessed Test Performed Successfully and Results are Acceptable: Name, Initials and Date: Contractor / Third-Party QC Record Reviewed B Material Requirements B1 Purchase Order and Instrument specification sheet criteria shall be confirmed and compared with instrument stainless steel tags / labels and nameplates, all possible visual checks and shipment checked for damage, prior to acceptance of the shipment PASS FAIL N/A RE-INSP DATE REFERENCE DOCUMENTS: B3 Magnetic Flow meters shall be Smart type. (PIP PCCFL001 Sec 5.15.4) SAES-J -100, Sec.5 1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID). 2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling). 3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products NOTES: or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified Work Verified T&I Witnessed QC Record Reviewed QC Inspector PID Representative manufacturer indicates compliance with appropriate standards or performance in a specified manner. Technician Performing Test* Name, Title, Department, Company, Initials and Date: Work Verified Name, Sign and Date: Quality Record Approved: Name, Organization, Initials and Date: T&I Witnessed QC Supervisor Proponent and Others Name, Initials and Date: Witnessed Test Y =YES N =NO F =FAILED *Person Responsible for Implementation of Test and Analysis of Results QC Record Reviewed SAUDI ARAMCO ID/PID - 3/01/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR Flow - Magnetic Flow Meter - Material Receiving SAIC-J-6109 1-Oct-05 INST ITEM No. ACCEPTANCE CRITERIA REFERENCE Schedule Q, Att IV, Sec. 7.1. B2 Materials of construction shall be compatible with the process fluid. (PIP PCCFL001 Sec. 5.8.2) . SAES-J -100, Sec.3.2, Page 2 of 2