BMS SYSTEM POI NT LI ST, GEN.

NOTES, & LEGEND


N.T.S
BMS SYSTEMPOI NT LI ST,
GEN. NOTES, & LEGEND
1 2 3 4
5 6 7 8
A
A
A
A
A
A
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL. Generator Priority Loading - KFMC
Priority 1 - Life Safety Loads/Critical Loads
Life Safety Branch:
a. Illumination of means of egress.
b. Exit lighting fixtures.
c. Alarm and alerting systems such as fire alarm and medical gas systems.
d. Communication systems : if used during emergency conditions, they shall include:
(1) Disaster Control or emergency communication centers, i.e. communication equipment,
selected receptacles, and task illumination
(2) Public address system (PA).
(3) Nurse Call System
e. Generator set location : typical for all task illumination, battery charger for emergency battery
powered lighting, and selected receptacles, and
f. Elevators: cab lighting, control intercom, signal systems, and elevator machine room lighting.
g. Fire Pumps
h. Smoke Control and Stair Pressurization System
The Critical Branch
a. Data Centre / Building Management System
Priority 2 - Equipment System necessary for Hospital Operations
1. Arrange the following equipment for delayed-automatic connection to the alternate power source thru BMS:
a. Central Suction Systems
b. Sump pumps and associated controls and alarm systems
c. Compressed air system/Medical gas systems
d. Kitchen hood Supply
e. Heating, ventilating, and air-conditioning (HVAC) systems for all types of Clean Rooms i.e. ICU,
Surgical Suites, Isolation Rooms,
CT Scanners, Proton Theraphy, Linear accelerator, UPS & Battery rooms, BMS rooms, Server rooms, etc.
f. Closed loop water chilling equipment for linear accelerator, Proton Therapy, CT Scanners and other medical equipment.
Priority 3 - Equipment System necessary for Patient Care
1. Arrange the following equipment for delayed-automatic or manual connection to the alternate power source thru the BMS;
a. Heating equipment;
b. Equipment and control systems for elevators;
c. General supply, return, and exhaust ventilating systems serving common basement, toilets and stores;
d. Proton Therapy cooling system;
e. Automatically operated doors.
f. Minimal electrically heated autoclaving equipment shall be permitted to be arranged for either automatic or manual
connection to the alternate source.
Priority 5 - Other Loads not included above
In case of one unit of genset as well as the standby genset break down the reverse sequence of operation will be observed i.e.
Priority 5 will be the first to be shed.
GENERAL NOTES:
BUILDING MANAGEMENT SYSTEM
1. BUILDING MANAGEMENT SYSTEM(BMS) SHALL UTILIZE LONWORKS PROTOCOL.
4. HIGH LEVEL INTERFACE VIA RS 232/485 COMMUNICATION LINK SHALL BE REQUIREDFOR A SELECTEDELECTRO-MECHANICAL
EQUIPMENT FOR ACCURATE DATA GATHERING. THE HIGH LEVEL INTERFACE INCLUDES A THIRDPARTY INTERFACE WHICH IS DIFFERENT
11. BMS CONTRACTOR SHALL DETERMINE THE SIZES OF DDC ENCLOSURES WITH CONSULTANTS APPROVAL PRIOR TO INSTALLATION.
3. EACH DDC PANEL SHALL BE CAPABLE OF ACTING INDEPENDENTLY FROMTHE BMS NETWORK. CONTROL ANDMONITORING
PROGRAMS OF EACH DDC POINT SHALL STILL BE IN EFFECT EVEN IN CASES OF DISCONNECTION FROMTHE NETWORK DUE TO
TECHNICAL / INCIDENTAL MATTERS.
12. BMS TERMINAL BOXES SHALL INCLUDE REPEATER CIRCUITS. THE BMS CONTRACTOR SHALL DETERMINE EXACT QUANTITY OF
REPEATERS , WHENEVER NECESSARY.
13. THE UNIT RATE FOR EACH BMS POINT SHALL INCLUDE THE FOLLOWING WORKS:
A. DIRECT DIGITAL CONTROLLERS (DDC'S) ANDALL ASSOCIATEDACCESSORIES.
B. ALL COMMUNICATION / CONTROL SIGNAL CABLES, CONDUITS / TRUNKING, TERMINATION, ETC.
C. ALL FIELDSENSORS, DEVICES INCLUDING FLOWMETER.
D. SOFTWARE ANDPROGRAMMING.
E. GRAPHIC GENERATION ANDTRENDLOGGING.
F. ELECTRICAL TERMINAL, CONTRACTORS, MARSHALING BOX, ETC.
G. TESTING ANDCOMMISSIONING.
16. THE SUPPLY OF ALL NECESSARY INTERFACE / TRANSDUCERS / MODULE /ACCESSORIES FOR EFFECTIVE BMS/ FA
INTERLOCKS / CONTROLS / MONITORING, ETC. AS DEFINEDIN THE RELEVANT SPECIFICATION CLAUSE SHALL BE INCLUDE IN THE BMS
CONTRACTOR'S SCOPE OF WORKS.
2. DIRECT DIGITAL CONTROLLERS (DDCs) TO BE USEDSHALL BE FULLY STAND-ALONE DEFINEDBY
HAVING ITS OWN INTERNAL CLOCK, DATA GATHERING MEMORY BANK ANDCENTRAL PROCCESSING UNIT.
FROMTHE LON WORKS PROTOCOL USEDBY THE BMS WHICH INCLUDES MODBUS, BACNET,PROFIBUS, ETC.
THE CONTRACTOR SHALL PROVIDE THE NECESSARY DEVICES TO THE ADAPT THE THIRDPARTY INTERFACE TO THE PRIMARY
NETWORK PROTOCOL
5. THE BMS CONTRACTOR SHALL CONSIDER IN THE BMS OPERATIONS PROGRAMMING THE REDUNDANCY OF DATA GATHERING
ANDOPERATIONS.
6. THE BMS CONTRACTOR SHALL CONSIDER PROVISION OF THE THIRDPARTY INTERFACE TO OTHER SYSTEMS
IN THE BUILDING SUCH AS;
A. FIRE ALARMSYSTEM
B. SECURITY SYSTEM(CCTV (SURVEILLANCE SYSTEM) ANDACCESS CONTROL)
C. LIGHTING CONTROL SYSTEM
D. OTHER ELECTRO-MECHANICAL SYSTEMS
7. THE PURPOSE OF THE SCHEMATIC DIAGRAM IS TO PROVIDE THE GENERAL CONCEPT ANDPRINCIPLE OF THE PROPOSED
KFMC BUILDING MANAGEMENT SYSTEM(BMS).
8. THE EQUIPMENT ANDDEVICES REFLECTEDON THE PLANS ARE INDICATIVE ONLY. THE BMS CONTRACTOR SHALL FURNISH
THE WHOLE SYSTEMTO INCLUDE ALL CABLES, DEVICES, FIELDDEVICES, ACCESSORIES, SOFTWARE PROGRAMMING,
ANDENGINEERING WORKS AS MAY DEEMNECESSARY FOR A COMPLETE ANDSUCCESSFUL OPERATION OF THE SYSTEM.
9. ALL BMS POINTS INDICATEDON THE PLAN ARE INDICATIVE ONLY. THE CONTRACTOR SHALL ENSURE THAT ALL BMS
CONTROL POINTS REQUIREDFOR THE ELECTRO-MECHANICAL OPERATIONS ARE COMPLETELY CONSIDRED.
10. THE BMS CONTRACTOR SHALL PROVIDE ANDSUBMIT THE ACTUAL CONTROL ANDMONITORING DIAGRAM(SHOP DRAWINGS)
FOR EACH SYSTEMOR EQUIPMENT FOR THE APPROVAL OF THE CONSULTANT PRIOR TO INSTALLATION.
DIFFERENTIAL PRESSURE SWITCH, TEMPERATURE SENSORS, ETC.
14. THE BMS CONTRACTOR SHALL CONSIDER THE SPARE POINTS IN THE BMS POINTS LIST.
15. THE BMS CONTRACTOR SHALL CONSIDER THE REQUIREDBMS POINTS IN THE OPERATION OF OTHER ELECTRO-MECHANICAL
EQUIPMENT REQUIREDIN THE ELECTRO-MECHANICAL DESIGN BUT NOT EXACLTY MENTIONEDIN THE ATTACHED
BMS POINTS LIST. ANY BMS POINTS NOT CONSIDEREDBY THE BMS CONTRACTOR ON THE BMS PACKAGE BUT
REQUIREDIN THE SYSTEMOPERATION SHALL BE UNDER THE RESPONSIBILITY OF THE BMS CONTRACTOR . NO ADDITIONAL
COST ANDTIME SHALL BE PROVIDEDTO THE CONTRACTOR.
17. ALL WIRING INSTALLATION WORKS SHALL BE IN ACCORDANCE WITH THE NEC ANDSASO STANDARDS.
LEGEND:
PB
- 400mm(W) x 400mm(H) x 200mm(D)
(OR SIZE AS REQUIRED)
DDC - DIRECT DIGITAL CONTROLLER
BMS - BUILDING MANAGEMENT SYSTEM
HLI - HIGH LEVEL INTERFACE
BMS SYSTEM POI NT LI ST FOR CSB (ADDI TI ONAL)
N.T.S
BMS SYSTEM POI NT LI ST
FOR CSB (ADDI TI ONAL)
1 2 3 4
5 6 7 8
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-12
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
BMS CONTROL DI AGRAM
N.T.S
M5.00.02
BMS CONTROL DI AGRAM
1 2 3 4
5 6 7 8
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
M5.00.03
BMS CONTROL DI AGRAM
1 2 3 4
5 6 7 8
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.

J F

PARKING

SUPPLY
FAN
PARKING EXHAUST/
SMOKE FAN
TYPICAL
TYPICAL
M5.00.04
BMS CONTROL DI AGRAM
1 2 3 4
5 6 7 8
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
BMS SI NGLE LI NE DI AGRAM
N.T.S
M5.00.05
BMS SI NGLE LI NE
DI AGRAM
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
PB
PB
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
CAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
PB
PB
DDC
VAV
DDC
VAV
HLI HLI HLI HLI HLI HLI
PB
HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
PB
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
HLI HLI HLI HLI HLI HLI
PB
HLI HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI
PB
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
PB
PB
PB
PB
PB
PB
PB
PB
PB
DDC
VAV
DDC
VAV
HLI HLI
HLI
HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI
HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI
BMS SI NGLE LI NE DI AGRAM AREA-1
N.T.S
M5.00.06
BMS SI NGLE LI NE
DI AGRAM PART-1
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
PB
PB
PB
PB
HLI HLI
HLI
HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI
HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI
M5.00.07
BMS SI NGLE LI NE
DI AGRAM PART-2
BMS SI NGLE LI NE DI AGRAM AREA-2
N.T.S
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
PB
PB
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
CAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
CAV
DDC
VAV
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
HLI HLI HLI HLI HLI HLI
PB
HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI HLI
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI HLI
DDC
VAV
DDC
VAV
M5.00.08
BMS SI NGLE LI NE
DI AGRAM PART-3
BMS SI NGLE LI NE DI AGRAM AREA-3
N.T.S
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
PB
PB
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
PB
PB
DDC
VAV
DDC
VAV
PB
PB
M5.00.09
BMS SI NGLE LI NE
DI AGRAM PART-4
BMS SI NGLE LI NE DI AGRAM AREA-4
N.T.S
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
DDC
VAV
HLI HLI HLI HLI
PB
HLI
HLI HLI HLI HLI
PB
DDC
VAV
DDC
PB
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
DDC
VAV
HLI HLI HLI HLI HLI HLI
PB
HLI HLI
HLI HLI HLI HLI HLI HLI HLI HLI HLI
PB
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
DDC DDC
PB
PB
PB
DDC
VAV
DDC
VAV
BMS SI NGLE LI NE DI AGRAM
N.T.S
M5.00.10
BMS SI NGLE LI NE
DI AGRAM
HKS ARCHITECTS, PC.
NORTHVILLE, MI 48167, U.S.A.
CONSULTING ARCHITECT
235 E. MAIN STREET, SUITE 102C
KEY PLAN
REVISION
HKS PROJ ECT NUMBER
DATE
SHEET TITLE
SHEET NO.
DAR ENGINEERING
CIVIL / LANDSCAPE
STRUCTURAL / MEP ENGINEER
P.O. BOX 301
RIYADH 11411, SAUDI ARABIA
KING FAHADMEDICAL CITY
RIYADH 11525, SAUDI ARABIA
OWNER
P.O. BOX 59046
ISSUE
14381.000
NO. DESCRIPTION DATE
MINISTRY OF HEALTH
KINGDOMOF SAUDI ARABIA
NOTES:
RIYADH, SAUDI ARABIA
DAR PROJ ECT NUMBER
DB-09/10/11
DWG. NOS DESCRIPTION
REFERENCE DRAWINGS
15 APRI L, 2012
TENDER I SSUE
1. FOR GENERAL NOTES REFER
TO DWG. #M5.00.01
2. DDC &HLI QUANTITY
INCLUDING LOCATION ARE
BASED ON ALL ELECTRO-
MECHANICAL EQUIPMENT.
3. FINAL LOCATION OF DDC &HLI
SHOP DRAWING SHALL BE
SUBMITTEDBY CONTRACTOR
FOR APPROVAL.
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
DDC
VAV
DDC
VAV
PB
HLI HLI HLI HLI HLI HLI HLI
HLI HLI HLI HLI HLI HLI HLI
PB
PB