Sunteți pe pagina 1din 40

PRAGA

MARINE
PVT. LTD
Quality
Assurance
Manual
Version: 1.0
Head Office: KAMALA VILLA, 24 ABDUL RAHIM ROAD, RACE COURSE, COIMBATORE 641 018,
TAMILNADU, INDIA
E- mail : pragamarinepl@gmail.com Tel: 0422 2220230 Fax: 0422 2220170
Boat Yard: INDUSTRIAL DEV. AREA, AROOR P.O, ALAPUZHA DIST, KERALA 688 534, INDIA
Tel: 0478 2872390 Fax: 0478 2873313
Quality Assurance Manual
Fiberglass Reinforced Plastics Boats

CONTROLLED COPY



This manual is confidential and assigned to Praga Marine Pvt.Ltd.
It may not be duplicated or altered by other any person or company without written consent from
Praga marine Pvt.Ltd.
PRAGA MARINE PVT. LTD

1

TABLE OF CONTENTS

Contents


TABLE OF CONTENTS .................................................................................................... 1
Section1. PURPOSE ........................................................................................................... 5
1.1 Introduction ............................................................................................................... 5
1.2: Purpose ..................................................................................................................... 6
Section 2: Scope .................................................................................................................. 6
2.1 Type of Manufacture ................................................................................................. 7
2.2 Quality Policy ............................................................................................................ 7
2.3 Applicable Specifications and Standards .................................................................. 7
Section 3: Organisational Structure .................................................................................... 8
Section 4: Quality Management System ............................................................................. 9
4.1 General requirements ................................................................................................ 9
4.2 Documentation Requirements ................................................................................... 9
4.2.1 General ................................................................................................................ 9
4.2.2 Quality Manual ................................................................................................. 10
4.2.3 Control of Documents ...................................................................................... 10
4.2.4 Control of Quality Records............................................................................... 11
Section 5: Management Responsibility ............................................................................ 12
5.1 Management Commitment ...................................................................................... 12
5.2 Customer Focus ....................................................................................................... 12
5.3 Quality Policy .......................................................................................................... 13
5.4 Planning ................................................................................................................... 13
5.4.1 Quality Objectives ............................................................................................ 13
5.4.2 Quality Management System Planning ............................................................ 13
5.5 Responsibility, Authority and Communication ....................................................... 14
5.5.1 Responsibility and Authority ............................................................................ 14
5.5.2 Management representative .............................................................................. 14
PRAGA MARINE PVT. LTD

2
5.5.3 Internal Communication ................................................................................... 14
5.6 Management Review ............................................................................................... 15
5.6.1 General .............................................................................................................. 15
5.6.2 Review Input..................................................................................................... 15
QUALITY MANUAL ............................................................................................... 15
5.6.3 Review Output .................................................................................................. 15
Section 6: Resource Management ..................................................................................... 16
6.1 Provision of Resources ............................................................................................ 16
6.2 Human Resources .................................................................................................... 16
6.2.1 General .............................................................................................................. 16
6.2.2 Competence, Awareness and Training ............................................................. 16
6.3 Infrastructure ........................................................................................................... 17
6.3.1 Facility .............................................................................................................. 17
6.3.2 LAY OUT PLAN OF THE PLANT ................................................................. 18
6.4 Work Environment .................................................................................................. 19
Section 7: Product Realization .......................................................................................... 19
7.1 Planning of Product Realization .............................................................................. 19
7.2 Customer-Related Processes ................................................................................... 19
7.2.1 Determination of Requirements Related to the Product ................................... 19
7.2.2 Review of Requirements Related to the Product .............................................. 20
7.2.3 Customer Communication ................................................................................ 20
7.3 Design and Development ........................................................................................ 21
7.3.1 Design and Development Planning .................................................................. 21
7.3.2 Design and Development Inputs....................................................................... 22
7.3.3 Design and Development Outputs .................................................................... 22
7.3.4 Design and Development Review .................................................................... 23
7.3.5 Design and Development Verification ............................................................. 23
7.3.6 Design and Development Validation ................................................................ 23
7.3.7 Control of Design and Development Changes ................................................. 24
7.4 Purchasing ............................................................................................................... 24
7.4.1 Purchasing ........................................................................................................ 24
7.4.2 Purchasing Information .................................................................................... 24
7.4.3 Verification of Purchased Product .................................................................... 24
7.5 Production ............................................................................................................... 25
7.5.1 Control of Production ....................................................................................... 25
PRAGA MARINE PVT. LTD

3
7.5.2 Validation of processes for production ............................................................. 25
7.5.3 Identification and Traceability .......................................................................... 25
7.5.4 Customer Property ............................................................................................ 26
7.5.5 Preservation of Product .................................................................................... 26
7.6 Control of Monitoring and Measuring Equipment .................................................. 26
Section 8. Measurement, analysis and improvement ....................................................... 27
8.1 General .................................................................................................................... 27
8.2 Monitoring and Measurement ................................................................................. 27
8.2.1 Customer Satisfaction ....................................................................................... 27
8.2.2 Internal Audit .................................................................................................... 28
8.2.3 Monitoring and measurement of processes ...................................................... 28
8.2.4 Monitoring and measurement of product ......................................................... 28
8.3 Control of nonconforming product ......................................................................... 29
8.4 Analysis of data ....................................................................................................... 29
8.5 Improvement ........................................................................................................... 30
8.5.1 Continual Improvement .................................................................................... 30
8.5.2 Corrective action ............................................................................................... 30
8.5.3 Preventive action .............................................................................................. 30
Section 9. QUALITY ASSUARANCE ............................................................................ 31
9.1 GENERAL INSPECTION PROCEDURES ........................................................... 31
9.1.1 Purpose ............................................................................................................. 31
9.1.2 Application ....................................................................................................... 31
9.1.3 Definitions ........................................................................................................ 31
9.2. DEPARTMENT OF QUALITY ASSURANCE ................................................... 32
9.2.1 Engineering ....................................................................................................... 32
9.2.2 Material Control ............................................................................................... 32
9.2.3 Production Manager ......................................................................................... 33
9.2.4 Shipping (Post Production) ............................................................................... 33
9.3 Quality Assurance ................................................................................................... 33
9.4. INSPECTION PROCEDURES: QUALITY ASSURANCE ................................. 34
9.4.1 Purchased Materials .......................................................................................... 34
9.4.2 Purchased Material Control .............................................................................. 34
9.4.3 Molds ................................................................................................................ 35
9.4.4 Sub-Assembly Part (FRP heads, bottoms, and shell(s)) ................................... 35
9.5 Component Parts .................................................................................................... 35
PRAGA MARINE PVT. LTD

4
9.6 Loading and Documentation ................................................................................... 36
9.7. INSPECTION PROCEDURES: COATINGS ....................................................... 36
9.7.1 Purchased Materials .......................................................................................... 36
9.7.2 Purchased Materials Control ........................................................................... 37
9.7.3 Surface Preparation ........................................................................................... 37
9.7.4 Coating Material Preparation ............................................................................ 37
9.7.5 Coating Application .......................................................................................... 37
9.7.6 Handling and Curing of Coatings ..................................................................... 38
9.7.7 Coating Final Inspection .................................................................................. 38
9.8. INSPECTION PROCEDURES: FINAL ................................................................ 38
9.9 SHIPPING PROCEDURE ..................................................................................... 38
9.10 COMPUTER TECHNOLOGY ............................................................................ 39
9.10.1 Administration ................................................................................................ 39


























PRAGA MARINE PVT. LTD

5
Section1. PURPOSE
1.1 Introduction

Praga marine Pvt.Ltd. developed and implemented a Quality Management System in
order to document the companys best business practices, better satisfy the requirements
and expectations of its customers, and improve the overall management of the company.

The Quality Management System (QMS) of Praga marine Pvt.Ltd. addresses the design,
development, production, installation, and servicing of the companys products.

The manual is divided into nine sections that correlate to the Quality Management
System. Each section begins with a policy statement expressing Praga marine Pvt.Ltd.
obligation to implement the basic requirements of the referenced Quality Management
System section. Each policy statement is followed by specific information pertaining to
the procedures that describe the methods used to implement the necessary requirements.

This manual describes the Quality Management System, delineates authorities, inter-
relationships, and responsibilities of the personnel responsible for performing within the
system. The manual also provides procedures or references for all activities comprising
the Quality Management System to ensure compliance to the necessary requirements of
the standard.

This manual is used internally to guide the companys employees through the various
requirements of the ISO standard that must be met and maintained in order to ensure
customer satisfaction, continuous improvement, and provide the necessary instructions
that create an empowered work force.

This manual is used externally to introduce our Quality Management System to our
customers and other external organizations or individuals. The manual is used to
familiarize them with the controls that have been implemented, and to assure them that
PRAGA MARINE PVT. LTD

6
the integrity of the Quality Management System is maintained and focused on customer
satisfaction and continuous improvement.

1.2: Purpose
_____________________________________________________________
The purpose of this quality manual is to establish and state the general policies governing
Praga marines Quality Management System. These policies define managements
intentional provision for managing our operations and activities. These are the top-level
policies representing the company's plans or protocols for achieving quality assurance
and customer satisfaction. All departmental or functional policies and written procedures
must conform and parallel these policies. All changes to policies and procedures are
required to be reviewed to ensure that there are no conflicts with these policies stated in
this Quality Manual.

Section 2: Scope
__________________________________________________________
The policies stated in this manual apply to all operations and activities at Praga marine
Pvt.Ltd.



It is the responsibility of all department managers to help define, implement, and
maintain the procedures required by this manual and to ensure all processes conform to
these requirements. It is the responsibility of all employees to follow procedures that
implement these policies and to help strive for continuous improvement in all activities
and processes of Praga marine Pvt.Ltd.

The scope of Praga marines activities under Quality is:
The Design, Manufacture, and Sale of proprietary and custom fiber glass
boats

PRAGA MARINE PVT. LTD

7
2.1 Type of Manufacture

Praga marine Pvt.Ltd. design & manufacture Fibre glass Boats the products includes
Sailing dinghies, yachts, water sports boats, power boats, Ribs, work boats &
Catamarans.

2.2 Quality Policy

All employees of Praga marine Pvt.Ltd. are expected to strive to completely satisfy the
customer's needs. We are committed to delivering products, services, as well as technical
information that will meet or exceed the requirements and expectations of all our
customers. As our business relationship grows with our customers, each customer will be
assured of consistent performance from all our employees.

2.3 Applicable Specifications and Standards

ASTM D790, ISO 178 Standard Practice for Determining Flexural strength for the
Glass- Reinforced Plastic Laminate.
ISO 1172 Standard Practice for Determining Glass content for the Glass- Reinforced
Plastic Laminate
ISO 527-4, ASTM A370 Standard Practice for Determining Ultimate Tensile strength
for the Glass- Reinforced Plastic Laminate.
PRAGA MARINE PVT. LTD

8
Section 3: Organisational Structure








DIRECTOR
MANAGER
PRODUCTION

MANAGER
PURCHASE
MANAGER
ACCOUNTS
MANAGER
QUALITY
SUPERVISOR
MOULDING
SUPERVISOR
FITOUT
SUPERVISOR
ELECTRICAL/
INSTRUMENTATION
G.M.

PRAGA MARINE PVT. LTD

9
Section 4: Quality Management System

4.1 General requirements

Praga Marine limited has established, documented, and implemented a Quality
Management System in accordance with the requirements of ISO 9001:2008. The system
is maintained and continually improved through the use of the quality policy, quality
objectives, internal & external audit results, analysis of data, corrective and preventive
action and periodic management reviews.

To design and implement the QMS, Praga Marine Pvt Limited has:
Identified the processes needed for the QMS and their application throughout the
organization.
1) Determined the sequence and interaction of these processes.
2) Determined criteria and methods needed to ensure that the operation and control
of the processes are effective.
3) Ensured the continuing availability of resources and information necessary to
achieve planned results and continual improvement of these processes.
4) Established systems to monitor, measure and analyze these processes.
5) Established processes to identify and implement actions necessary to achieve
planned results and continual improvement of these processes.
6) Established control processes to identify and implement actions necessary to
achieve planned results of outsourced processes.
7) Determined the criteria and information necessary to ensure that required
regulations and standards are met.

4.2 Documentation Requirements
4.2.1 General

The QMS documentation includes:

PRAGA MARINE PVT. LTD

10
1) Documented Quality Policy.
2) Quality Manual.
3) Documented Procedures.
4) Documents identified as needed for the effective planning, operation and control
of our processes.
5) Quality Records.


4.2.2 Quality Manual

This Quality Manual has been prepared to describe Praga Marine Pvt Limited QMS. The
scope and permissible exclusions of the QMS are described in section one of this manual

4.2.3 Control of Documents

All of the QMS documents are controlled according to the Document Control
Management System This procedure defines the process for:
1) Approving documents for adequacy prior to issue.
2) Reviewing and revising as necessary and ensuring proper approval of new
revisions.
3) Ensuring that changes and current revision status of documents are identified.
4) Ensuring that relevant versions of applicable documents are available at points of
use.
5) Ensuring that documents remain legible and readily identifiable.
6) Ensuring proper access control.
7) Identifying the retention period of quality records.
8) Ensuring that documents of external origin are identified and their distribution
controlled.
9) Preventing the unintended use of obsolete documents and to apply suitable
identification to them if they are retained for any purpose.
PRAGA MARINE PVT. LTD

11
4.2.4 Control of Quality Records

Quality records are maintained to provide evidence of conformity to requirements and of
the effective operation of the QMS. The records are maintained according to the Control
of Quality Records Procedure. This procedure requires that quality records remain
legible, readily identifiable and retrievable. The procedure defines the controls needed for
identification, storage, protection, retrieval, retention time and disposition of quality
records







PRAGA MARINE PVT. LTD

12
Section 5: Management Responsibility

5.1 Management Commitment

Top management has been actively involved in implementing the Quality Management
System. It has provided the vision and strategic direction for the growth of the QMS, and
established quality objectives and the quality policy.
To continue to provide leadership and show commitment to the improvement of the
QMS, management has done the following.

a) Communicated the importance of meeting customer, statutory, and regulatory
requirements.
b) Established quality objectives.
c) Ensured that the quality policy is communicated throughout the organization.
d) Conducted periodic management reviews.
e) Ensured the availability of resources.


5.2 Customer Focus

Praga Marine Pvt Ltd., Inc. strives to identify current and future customer needs, to meet
customer requirements and exceed customer expectations.
Top management ensures the focus on improving customer satisfaction is maintained by
setting and reviewing objectives related to customer satisfaction at Management Review
Meetings.
Top management ensures that customer requirements are understood and met. Customer
requirements are understood, converted into internal requirements, and communicated to
the appropriate personnel in our organization.
PRAGA MARINE PVT. LTD

13
5.3 Quality Policy

Top management ensures that the quality policy is communicated to all employees. It is
included in new employee training and training on the QMS. It is posted on the
organization intranet to maintain high standards within our organization.
Management reviews the quality policy during management review meetings to
determine the policys continuing suitability for our organization.

5.4 Planning

5.4.1 Quality Objectives

Quality objectives are established to support our organizations efforts in achieving our
quality policy and reviewed annually for suitability. Quality objectives are measurable,
and reviewed against performance goals during periodic management reviews.


5.4.2 Quality Management System Planning

The quality system has been planned and implemented to meet our quality objectives and
the requirements of 4.1 of the ISO 9001 standard. Quality planning takes place as
changes that affect the quality system are planned and implemented.

PRAGA MARINE PVT. LTD

14
5.5 Responsibility, Authority and Communication

5.5.1 Responsibility and Authority
An organizational structure has been established to show the interrelation of personnel in
the organization. Job descriptions define the responsibilities and authorities of each of the
positions. Job descriptions and the organizational structure are reviewed and approved by
top management for adequacy. These documents are available throughout the
organization to help employees understand responsibilities and authorities
5.5.2 Management representative

The Quality Assurance and Regulatory Affairs Manager has been appointed as the ISO
Management Representative. As Management Representative, he has the following
responsibility and authority:
a) Ensure that processes needed for the quality management system are established
and implemented.
b) Report to top management on the performance of the quality management system,
and note needed improvements.
c) Promote awareness of customer requirements throughout the organization.
d) Act as a liaison with external parties such as customers or auditors on matters
relating to the QMS.
5.5.3 Internal Communication

In line with Praga Marine Pvt Ltd. policy of leadership through employee involvement,
Praga Marine Pvt Ltd. personnel policies have established open communication
throughout the organization.
The effectiveness of our quality management system is evident through Internal Audit
results, Corrective and Preventive Actions, Customer satisfaction results, and the
departmental performance measures. Internal Audit results, Customer Satisfaction Survey
results, Corrective Actions and Preventive Actions are shared at departmental meetings as
appropriate.
PRAGA MARINE PVT. LTD

15
5.6 Management Review

5.6.1 General
Top management reviews the QMS periodically at management reviews to be executed a
minimum of twice per year. A schedule of Management Reviews will be published at the
beginning of each year. This review assesses the continuing QMS suitability, adequacy
and effectiveness, identifying opportunities for improvement and needed changes.
Records are maintained for each management review meeting.
5.6.2 Review Input

Assessment of the QMS is based on a review of information inputs to management
review. These inputs include the following:
a) Results of audits.
b) Customer feedback.
c) Process performance and product conformity.
d) Company level quality data.
QUALITY MANUAL

a) Status of preventive and corrective actions.
b) Follow-up actions from previous management reviews.
c) Planned changes that could affect the quality management system.
d) Recommendations for improvement.
5.6.3 Review Output

During these review meetings, management will identify appropriate actions to be taken
regarding the following issues:
a) Improvement of the effectiveness of the quality management system and its
processes.
b) Improvement of product related to customer requirements.
c) Resource needs.
PRAGA MARINE PVT. LTD

16
Responsibilities for required actions are assigned to members of the management review
team. Any decisions made during the meeting, assigned actions, and their due dates are
recorded on the management review presentation.

Section 6: Resource Management

6.1 Provision of Resources
During planning and budgeting processes and as needed throughout the year, Top
Management will determine and ensure that the appropriate resources are available to
implement and maintain the quality management system, and continually improve its
effectiveness and enhance customer satisfaction by meeting customer requirements.

6.2 Human Resources
6.2.1 General

To ensure competence of our personnel, job descriptions have been prepared identifying
the qualifications required for each position that affects conformity to product
requirements. Conformity to product requirements can be affected directly or indirectly
by personnel performing any task within the QMS. Qualifications include requirements
for education, skills and experience. Appropriate qualifications, along with required
training, provide the competence required for each position.

6.2.2 Competence, Awareness and Training

Qualifications are reviewed upon hire, when an employee changes positions or the
requirements for a position change. Human Resources maintain records of empemployee
qualifications. If any differences between the employees qualifications and
therequirements for the job are found, training or other action is taken to provide the
employee with the necessary competence for the job. The results are then evaluated to
PRAGA MARINE PVT. LTD

17
determine if they were effective. Training and evaluation are conducted according to the
training procedure.
All employees are trained on the relevance and importance of their activities and how
they contribute to the achievement of the quality objectives.
6.3 Infrastructure

Praga Marine Pvt Ltd. provides the infrastructure necessary to achieve conformity to
product requirements. During the budgeting and strategic planning processes; buildings,
equipment, workspace, and associated utilities are evaluated and provided. When new
personnel are added, hiring managers coordinate activities to ensure appropriate process
equipment including hardware and software if required and supporting services such as
telephones etc. are available based on information provided on the Personnel Requisition.
6.3.1 Facility

State-of-the-art building in excess of 40,000 square feet, which includes Two Air
conditioned Moulding shops of 200 square meters each, which enables us to mould our
boats under controlled environmental condition.

State-of-the-art building in excess of 40,000 square feet, constructed in 1995. It consist of
the following.

1) Sales/Marketing
2) New Product Development
3) Engineering
4) Tool Shop
5) Maintenance
6) Manufacturing
7) Quality
8) Warehouse
9) Offices, common area, kitchen, mechanical, rest rooms





PRAGA MARINE PVT. LTD

18
6.3.2 LAY OUT PLAN OF THE PLANT


Backwaters







Work
shop
500 m
2
OFFICE
Fit out
shop
270 M
2
Store
120
m
2
WOOD WORK
SHOP 150 m
2
Moulding shop
200m
2
A/c-11T
Moulding shop 2
200 m
2
A/c-11 T
O
F
I
C
E
Glass
cutting
area
NH 47 HIGH WAY
N
B
o
a
t
j
e
t
t
y
Slipway

PRAGA MARINE PVT. LTD

19
6.4 Work Environment
A safe work environment suitable for achieving product conformance is maintained.
Requirements are determined during quality planning. The work environment is managed
for continuing suitability. Data from the quality system is evaluated to determine if the
work environment is sufficient for achieving product conformance, or if preventive or
corrective action related to the work environment is required.

Section 7: Product Realization
7.1 Planning of Product Realization

Quality planning is required before new products or processes are implemented. During
this planning, management or assigned personnel identify:
The quality objectives and requirements for the product are developed during the
New Product Development Process.
Processes, documentation and resources required and stored in IFS.
Verification, validation, monitoring, inspection and test requirements.
Criteria for product acceptance.
Requirements for applicable risk management during product realization.

The output of quality planning includes documented quality plans, resource requirements,
processes, equipment requirements, procedures, test data, and design

7.2 Customer-Related Processes

7.2.1 Determination of Requirements Related to the Product

Praga Marine Pvt Ltd., Inc. determines customer requirements before acceptance of an
order. Customer requirements include the following:

PRAGA MARINE PVT. LTD

20
Previous customer requirements which pertain to current part numbers being
ordered.
Required for delivery and post-delivery activities.
Not stated by the customer but necessary for specified use or known and intended
use.
Statutory and regulatory requirements related to the product.
Additional requirements determined by Praga Marine Pvt Ltd., Inc.

Customer requirements are determined according to the Customer Related Processes
Procedure.
7.2.2 Review of Requirements Related to the Product

Prior to committing to the customer, Praga Marine Pvt Ltd., Inc. has a process in place
for the review of requirements related to the product. The review is conducted before the
order is accepted. The process ensures that:
Product requirements are defined and documented.
Contract or order requirements differing from those previously expressed are
resolved.
Praga Marine Pvt limited, has the ability to meet the defined requirements.
Records are maintained showing the results of the review and any actions arising
from the review.
Where a customer does provide a documented statement of requirement, the
customer requirements are confirmed before acceptance.
When product requirements are changed, The organization communicates
changes to relevant personnel and amends relevant documents.
7.2.3 Customer Communication

PRAGA MARINE PVT. LTD

21
Praga Marine Pvt limited, Inc. has implemented procedure for communicating with
customers in relation to:
In keeping with our commitment to customer satisfaction, Praga Marine Pvt Ltd.
views effective customer communication as an essential element of customer
satisfaction.
Appropriate handling of communications can reduce customer dissatisfaction in
situations and in many cases turn a dissatisfying scenario into a satisfying
experience.
The Customer Service and Sales department are responsible for establishing
communication methods to ensure inquiries, contracts or order handling,
including amendments, and customer feedback, including customer complaints
which are handled expeditiously and professionally.
All customer complaints are classified as Support Issues, which are maintained in
IFS.
The Sales and Marketing departments primary responsibility is directing the
business acquisition, retention and product development efforts of the Company,
including external communications.
Marketing, Sales and Customer Service are the primary customer contacts for
product information.
The QA department is committed to addressing all documented customer inquires
that reside within the organizations ERP system.
The QA department has the primary responsibility to address all customer related
issues in regard to the quality of our products and services.
The QA department is the key contact in regard to questions pertaining to the
companys QMS.
Lastly, the Sales department is responsible for initiating the appropriate Return
Material Authorization (RMA) documentation for approved product returns.
7.3 Design and Development

7.3.1 Design and Development Planning

Product design and development projects are planned and controlled.
PRAGA MARINE PVT. LTD

22
During design and development planning, our organization determines:
a) The stages of the design and development project,
b) The review, verification and validation activities appropriate to each design and
development stage, and
c) The responsibilities and authorities for design and development.

The Interfaces between different groups involved in design and development projects are
managed to ensure effective communication and clear assignment of responsibility.
Planning output is updated, as appropriate, as the design and development progresses.
Praga Marine Pvt. limited may at times verify and or validate design control and review
in combination or independently as suited for product or process as needed.
7.3.2 Design and Development Inputs

Inputs relating to product requirements are determined and records maintained. These
include:
a) Functional and performance requirements,
b) Applicable statutory and regulatory requirements,
c) Where applicable, information derived from previous similar designs, and
d) Other requirements essential for design and development.

The inputs are reviewed for adequacy. Requirements are complete, unambiguous and not
in conflict with each other.
7.3.3 Design and Development Outputs

The outputs of design and development are in a form suitable for verification against the
design and development input and are approved prior to release.
Design and development outputs:
PRAGA MARINE PVT. LTD

23
a) Meet the input requirements for design and development,
b) Provide appropriate information for purchasing, production and service provision,
c) Contain or reference product acceptance criteria, and
d) Specify the characteristics of the product that are essential for its safe and proper
use.
Information for production and service provision may include details for preservation of
product.
7.3.4 Design and Development Review

At suitable stages, systematic reviews of design and development are conducted to:
a) Evaluate the ability of the results of design and development to fulfill
requirements, and
b) Identify any problems and propose necessary actions.
Participants in such reviews include representatives of functions concerned with the
design and development stage(s) being reviewed. Records of the results of verifications
and any necessary actions are maintained.
7.3.5 Design and Development Verification

Verification is performed to ensure that the design and development outputs have
satisfied the design and development input requirements. Records of the results of the
verification and any necessary actions are maintained.
7.3.6 Design and Development Validation

Design and development validation are performed to ensure that the resulting product is
capable of fulfilling the requirements for the specified or known intended use or
application. Wherever practicable, validation is completed prior to the delivery or
implementation of the product. Records of the results of validation and any necessary
actions are maintained.
PRAGA MARINE PVT. LTD

24
7.3.7 Control of Design and Development Changes

Design and development changes are identified and records maintained. Changes are
reviewed, verified and validated, as appropriate, and approved before implementation.
Review of design and development changes includes evaluation of the changes on
constituent parts and delivered product. Records of the results of the review of changes
and any necessary actions are maintained.

7.4 Purchasing
7.4.1 Purchasing

Praga Marine Pvt Ltd. ensures that purchased product conforms to specified purchase
requirements. The type and extent of control applied to the supplier and the purchased
product is dependent upon the effect of the purchased product on subsequent realization
or the final product. Praga Marine Pvt Ltd. evaluates and selects suppliers based on their
ability to supply product in accordance with the organization's requirements. Criteria for
selection, evaluation and re-evaluation are established. Records of the results of
evaluations and any necessary actions arising from the evaluation are maintained.
7.4.2 Purchasing Information

Purchasing information describes the product to be purchased, including where
appropriate:
a) Requirements for approval of product, procedures, processes and equipment,
b) Requirements for qualification of personnel, and
c) Quality management system requirements.
Praga Marine Pvt Ltd. ensures the adequacy of specified purchase requirements prior to
their communication to the supplier.
7.4.3 Verification of Purchased Product

Praga Marine Pvt Ltd. identifies and implements inspection or other activities necessary
for ensuring that purchased product meets specified purchase requirements.

PRAGA MARINE PVT. LTD

25
Praga Marine Pvt Ltd. or its customer intends to perform verification activities at the
supplier's premises, our organization states the intended verification arrangements and
method of product release in the purchasing information.
7.5 Production
7.5.1 Control of Production

Praga Marine Pvt Ltd. plans and carries out production under controlled conditions.
Controlled conditions include, as applicable
a) The availability of information that describes the characteristics of the product,
b) The availability of work instructions,
c) The use of suitable equipment,
d) The availability and use of measuring and monitoring equipment,
e) The implementation of monitoring and measurement, and
f) The implementation of product release, and delivery.
7.5.2 Validation of processes for production

Praga Marine Pvt Ltd. validates production processes where the resulting output cannot
be verified by subsequent monitoring or measurement and as a consequence, deficiencies
become apparent only after the product is in use or the service has been delivered.
Validation demonstrates the ability of these processes to achieve planned results.
Praga Marine Pvt Ltd. makes arrangements for these processes including, as applicable:
a) Defined criteria for review and approval of the processes,
b) Approval of equipment and qualification of personnel,
c) Use of specific methods and procedures,
d) Requirements for records, and
e) Revalidation.
7.5.3 Identification and Traceability

Where appropriate, Praga Marine Pvt Ltd. identifies the product by suitable means
throughout production realization.
Praga Marine Pvt Ltd. identifies the product status with respect to monitoring and
measurement requirements throughout the product realization.
PRAGA MARINE PVT. LTD

26
Where traceability is a requirement, our organization controls and the unique
identification of the product and maintains records.
7.5.4 Customer Property

Praga Marine Pvt Ltd. exercises care with customer property while it is under the
organization's control or being used by the organization. Our organization identifies,
verifies, protects and safeguards customer property provided for use or incorporation into
the product. If any customer property is lost, damaged or otherwise found to be
unsuitable for use, Praga Marine Pvt Ltd. will report this to the customer and maintain
records. Customer property includes intellectual property and personal data.
7.5.5 Preservation of Product

Praga Marine Pvt Ltd. preserves the product during internal processing and delivery to
the intended destination in order to maintain conformity to requirements. As applicable,
preservation includes identification, handling, packaging, storage and protection.
Preservation also applies to the constituent parts of a product.
7.6 Control of Monitoring and Measuring Equipment

Praga Marine Pvt Ltd. determines the monitoring and measurement to be undertaken and
the monitoring and measuring equipment needed to provide evidence of conformity of
product to specified requirements.
Praga Marine Pvt Ltd. establishes processes to ensure that monitoring and measurement
can be carried out and are carried out in a manner that is consistent with the monitoring
and measurement requirements.
To ensure valid results, measuring equipment is:
a) Calibrated and verified, or both, at specified intervals, or prior to use, against
measurement standards traceable to international or national measurement
standards. Where no such standards exist, the basis used for calibration or
verification are recorded,
b) Adjusted or re-adjusted as necessary,
c) Have identification in order to determine its calibration status,
d) Safeguarded from adjustments that would invalidate the measurement result, and
PRAGA MARINE PVT. LTD

27
e) Protected from damage and deterioration during handling, maintenance and
storage.
In addition, Praga Marine Pvt Ltd. assesses and records the validity of previous
measuring results when the equipment is found not to conform to requirements. Praga
Marine Pvt Ltd. takes appropriate action on the equipment and any product affected.
Records of the results of calibration and verification are maintained.
When used in the monitoring and measurement of specified requirements, the ability of
computer software to satisfy the intended application is confirmed. This is undertaken
prior to initial use and reconfirmed as necessary.
Confirmation of the ability of computer software to satisfy the intended application
would typically include verification and Configuration management to maintain its
suitability for use.
Section 8. Measurement, analysis and improvement
8.1 General

Praga Marine Pvt Ltd. plans and implements the monitoring, measurement, analysis and
improvement processes needed to:
a) Demonstrate conformity to product requirements,
b) Ensure conformity of the quality management system, and
c) Continually improve the effectiveness of the quality management system.
This includes the determination of applicable methods, including statistical techniques,
and the extent of their use.
8.2 Monitoring and Measurement

8.2.1 Customer Satisfaction

As one of the measurements of performance of the quality management system, Praga
Marine Pvt Ltd. monitors information relating to customer perception as to whether Praga
Marine Pvt Ltd. has fulfilled customer requirements. Praga Marine Pvt Ltd. determines
the methods for obtaining and using this information.
PRAGA MARINE PVT. LTD

28
8.2.2 Internal Audit

Praga Marine Pvt Ltd. conducts internal audits at planned intervals to determine whether
the quality management system:
a) Conforms to the planned arrangements, to the requirements of ISO 9001: Latest
Revision of Standard and to the quality management system requirements
established by our organization, and
b) Is effectively implemented and maintained.
Our audit program is planned, taking into consideration the status and importance of the
processes and areas to be audited, as well as the results of previous audits. The audit
criteria, scope, frequency and methods are defined. The selection of auditors and conduct
of audits is accomplished so as to ensure objectivity and impartiality of the audit process.
Auditors are not assigned to audit their own work.
Praga Marine Pvt Ltd.s audit procedure defines responsibility and requirements for
planning and conducting audits, establishing records and reporting results.
Records of audits and their results are maintained.
The management responsible for the area being audited shall ensure that any necessary
corrections or corrective actions are taken without undue delay to eliminate detected
nonconformities and their causes. Follow-up activities include verification of actions
taken and reporting of verification results.
8.2.3 Monitoring and measurement of processes

Praga Marine Pvt Ltd. applies suitable methods to monitor, and where applicable,
measure the quality management system processes. These methods demonstrate the
ability of the processes to achieve planned results. When planned results are not
achieved, correction and corrective action is taken, as appropriate.
When necessary, Praga Marine Pvt Ltd. will consider the type and extent of monitoring
and measurement for each of its processes in relation to their impact on the conformity to
product requirements and on the effectiveness of our quality management system.
8.2.4 Monitoring and measurement of product

PRAGA MARINE PVT. LTD

29
Praga Marine Pvt Ltd. monitors and measures product characteristics to verify that
product requirements are fulfilled. This is carried out at appropriate stages of the product
realization process in accordance with planned arrangements and maintains evidence of
conformity to the acceptance criteria.
Records indicate the person(s) authorizing release of product for delivery to the customer.
The release of product and service delivery to the customer does not proceed until all the
planned arrangements have been satisfactorily completed unless otherwise approved by a
relevant authority and, where applicable, by the customer.
8.3 Control of nonconforming product

Praga Marine Pvt Ltd. ensures that product which does not conform to product
requirements is identified and controlled to prevent its unintended use or delivery. A
documented procedure has been established and defines the controls and related
responsibilities for dealing with and isolating nonconforming product.
When applicable, Praga Marine Pvt Ltd. deals with nonconforming product in one or
more of the following ways:
a) By taking action to eliminate the detected nonconformity,
b) By authorizing the use, release or acceptance under concession by a relevant
authority and, where applicable, by the customer,
c) By taking action to preclude its original intended use or application.
d) By taking action appropriate to the effects, or potential effects, of the
nonconformity when nonconforming product is detected after delivery or use has
started.
When nonconforming product is corrected it is subject to re-verification to demonstrate
conformity to the requirements.
Records of the nature of nonconformities and any subsequent actions taken, including
concessions obtained, are maintained.
8.4 Analysis of data

Praga Marine Pvt Ltd. determines, collects and analyzes appropriate data to demonstrate
the suitability and effectiveness of the quality management system and to evaluate where
continual improvement of the quality management system can be made.
PRAGA MARINE PVT. LTD

30
This includes data generated as a result of monitoring and measurement and from other
relevant sources.
The analysis of data provides information relating to:
a) Customer satisfaction,
b) Conformance to product requirements,
c) Characteristics and trends of processes and products including opportunities for
preventive action, and
d) Suppliers

8.5 Improvement

8.5.1 Continual Improvement

Praga Marine Pvt Ltd. continually improves the effectiveness of the quality management
system through the use of the quality
policy, quality objectives, audit results, analysis of data, corrective and preventive actions
and management review.
8.5.2 Corrective action

Praga Marine Pvt Ltd. takes action to eliminate the causes of nonconformities in order to
prevent recurrence. Corrective actions
are appropriate to the effects of the nonconformities encountered.
Our procedure for corrective action defines requirements for:
a) Reviewing nonconformities (including customer complaints),
b) Determining the causes of nonconformities,
c) Evaluating the need for action to ensure that nonconformities do not recur,
d) Determining and implementing action needed,
e) Recording the results of action taken, and
f) Reviewing effectiveness of the corrective action taken.
8.5.3 Preventive action

PRAGA MARINE PVT. LTD

31
Praga Marine Pvt Ltd. takes action to eliminate the causes of potential nonconformities in
order to prevent their occurrence.
Preventive actions taken are appropriate to the effects of the potential problems.
Our procedure for Preventive Action defines requirements for:
a) Determining potential nonconformities and their causes,
b) Evaluating the need for action to prevent occurrence of nonconformities,
c) Determining and implementing action needed,
d) Recording results of action taken , and
e) Reviewing effectiveness of preventive action taken.

Section 9. QUALITY ASSUARANCE

9.1 GENERAL INSPECTION PROCEDURES

9.1.1 Purpose

To communicate the responsibilities and functions of personnel involved with Quality
Assurance and Control
9.1.2 Application

Applies to Quality Assurance personnel and those areas that are responsible for
manufacturing a product to specific standards
9.1.3 Definitions

a) Quality Assurance Manager: The Manager is responsible for overseeing
and directing work under the guidelines of the Quality Assurance Manual
b) Shop Managers: Shop Managers are responsible for directing production
and insuring quality control in the respective areas
c) Area Leader Man:Area Leader Man is responsible for heading a group of
workers in accomplishing productive and quality acceptable goals

PRAGA MARINE PVT. LTD

32
9.2. DEPARTMENT OF QUALITY ASSURANCE

9.2.1 Engineering

The Engineering Department will follow these Quality Policies and Objectives as
standard requirements:
a. That all designs will be reviewed to ensure that the materials and dimensions
specified will meet the customer s specification
b. That all manufacturing methods will allow the specifications to be met.
c. That no changes in the design are made during production without Engineering s
approval
d. That all applicable drawings/prints are updated and controlled to assure
production has the latest revision
e. Develop the necessary procedures to implement these objectives

9.2.2 Material Control

The Materials Control Manager will follow these Quality Policies and Objectives as
standard requirements:
a. Identify and thoroughly inspect all incoming materials to assure that
specifications are met
b. Tag all materials
c. Identify special materials based on special projects or products according
d. Tag defective material and remove from non-defective material storage to prevent
accidental usage
e. Work with the Quality Assurance Manager to determine whether or not materials
are usable or must be rejected
f. Develop the necessary procedures to implement these objectives


PRAGA MARINE PVT. LTD

33
9.2.3 Production Manager

The Production Manager will follow these Quality Policies and Objectives as standard
requirements:
a) Control all applicable drawings/prints issued to their department to ensure that the
latest revision is received and earlier revision are removed
b) Ensure each production worker inspects work already complete prior to beginning
new task to uncover errors or non-conformance
c) Ensure supervisors have performed recorded inspection of all work completed
prior to final inspection by Quality Assurance Manager
d) Cease production of any product when non-conformance because apparent
e) Develop the necessary procedures to implement these objectives

9.2.4 Shipping (Post Production)

The Shipping (Post Production) Department will follow these Quality Policies and
Objectives as standard requirements:
a) No product will be loaded for shipment without completed inspection by Quality
Assurance Manager
b) No product will be released for shipment without completed Loading Inspection
report
c) Appropriate loading and offloading procedures and equipment must be used and
be available in all product shipments and/or deliveries
d) Develop the necessary procedures to implement these objectives

9.3 Quality Assurance

The Quality Assurance Manager will follow these Quality Policies and Objectives as
standard requirements:
a) Advise and coordinate with all departments in development, as well as execution
of all Quality Policies and Objectives
PRAGA MARINE PVT. LTD

34
b) Resolve any conflict that may exist between procedures and objectives developed
or executed by each quality department
c) Ensure that all practices are being followed by each department
d) Ensure that all specifications are met through inspections and documentation
e) Develop the necessary procedures to implement these objectives


9.4. INSPECTION PROCEDURES: QUALITY ASSURANCE

9.4.1 Purchased Materials

a) All incoming materials will be stored separate from in-stock materials until they
have been inspected and passed the receiving inspection
b) B. All materials that are rejected will be clearly tagged and separated from
accepted materials and returned to the vendor
c) No incoming materials will be used until they have passed the receiving
inspection
d) The receiving inspection will include, but is not limited to the following:
verify that received materials match the assigned purchase order
check of the shelf life to verify that is in within the date recommended by the
manufacturer
identify and document the type of material
identify and document the manufactured date
identify and document lot and batch number
identify and document date received
identify and document any shipping damage

9.4.2 Purchased Material Control

a) As purchased materials come in, the Shop Manager will property tag and date
materials
PRAGA MARINE PVT. LTD

35
b) Dated purchased materials will be listed on the Material Certification Sheets
c) All purchased materials will be properly stored in accordance with the
manufacturers recommended practices

9.4.3 Molds

a) All molds will be built to meet all customer or engineering specifications,
requirements, and drawings
b) All molds will be inspected to ensure they are clean, smooth, and properly coated
prior to use

9.4.4 Sub-Assembly Part (FRP heads, bottoms, and shell(s))

a) All production materials and procedures will be inspected and evaluated to
insure that they were followed as stated on work order and all applicable
specifications
b) All production techniques used will be inspected and evaluated to insure
that they did not result in any defects, includes mold and equipment
inspection
c) All production materials will be inspected and evaluated to insure that the
required thicknesses were achieved


a) All production materials will be inspected and evaluated to insure that they are
clearly tagged with the job number to ensure proper use
b) All production materials will be documented as inspected
c) All production materials that are rejected will be clearly tagged as such


9.5 Component Parts

PRAGA MARINE PVT. LTD

36
a) All production materials and procedures will be inspected and evaluated to insure
that they were followed as stated on work order and all applicable specifications
b) All production techniques used will be inspected and evaluated to insure that they
did not result in any defects, includes mold and equipment inspection
c) All production materials will be inspected and evaluated to insure that the
required thicknesses were achieved
d) All production materials will be inspected and evaluated to insure that they are
clearly
e) All production materials will be documented as inspected
f) All production materials that are rejected will be clearly tagged as such


9.6 Loading and Documentation

a) No product will be loaded until the final inspection has been completed and is
released by the Quality Assurance Manager.
b) All products loading supports and tie-down procedures must comply with any
applicable specifications and/or Praga marine Pvt.Ltd. standards set by the
Quality Assurance Manager.
c) No load will depart our facility without the Bill of Lading being signed by and
authorized quality assurance representative.


9.7. INSPECTION PROCEDURES: COATINGS

9.7.1 Purchased Materials

All coating materials will be checked for the following:
a) Shipping damage (punctures, broken lid seal)
b) Proper identification (type, manufacture date, batch number)
c) Within shelf life recommended by the manufacturer
PRAGA MARINE PVT. LTD

37
9.7.2 Purchased Materials Control

a) As coating materials come in, the Shop Manager will property tag and date
materials
b) Dated coating materials will be listed on the Material Certification Sheets
c) All coating materials will be properly stored in accordance with the manufacturer
s recommended practices

9.7.3 Surface Preparation

a) Any contaminates will be removed from the surface using clean oil-free brushes,
filtered compressed air, water or vacuuming
b) Surfaces that are not be coated are to be adequately protected from the coating
procedures

9.7.4 Coating Material Preparation

All coatings will be mixed in accordance with the manufacturer s written instructions

9.7.5 Coating Application

a) Prior to application, the surface to be coated will be clean
b) The application method used shall be in accordance with the manufacturer s
written instructions
c) Temperature, humidity, and dew point will be monitored and will be within the
range indicated by the manufacturer s written instructions
d) A dry film thickness test will be conducted to insure that the proper mils have
been achieved
e) If the minimum thickness is not achieved, additional coats will be applied in
accordance to the manufacturer s written recoating instructions
PRAGA MARINE PVT. LTD

38
9.7.6 Handling and Curing of Coatings

a) After each coat the minimum and maximum curing times before recoating will
conform to the manufacturer s written instructions
b) Equipment will be protected from condensation, contamination and weather until
coating has cured for exterior exposure
c) Equipment will not be moved, loaded for shipment, or shipped until the coating
has cured, except as necessary in turning for coating and drying purposes
9.7.7 Coating Final Inspection

a) Prior to calling Quality Assurance for final inspections, the Shop Manager will
insure the following has been properly performed:
b) All checklists are properly documented (see checklist for required items to be
checked)
c) All non-conformance documents are complete
9.8. INSPECTION PROCEDURES: FINAL

a) After all equipment is complete and assembled, the Quality Assurance Manager
will be called for a final inspection
b) The Quality Assurance Manager will:

Review all quality assurance documentation
Review all non-conformance reports
Issue a shipping release
Retrieve all documentation and place it in the customer main file
9.9 SHIPPING PROCEDURE

After a shipping release is issued from the Quality Assurance Manager, each Shop
Manager will insure that all equipment is loaded and/or packaged properly for shipping

PRAGA MARINE PVT. LTD

39
9.10 COMPUTER TECHNOLOGY
9.10.1 Administration

(A) Work Order Processing and Control
1. After an order is placed, a work order is entered into our database system
2. Each work order created will contain the following information:
3. A unique work order ID number
4. A unique work order number
5. Customer shipping information
6. Customer purchase order number
7. Customer requested shipping dates
8. Work orders are then reviewed with the Quality Assurance Manager and the
appropriated Shop Manager
9. 4. Work orders will be tracked through our database to insure that the shipping
dates required are met

(B) Purchasing Order Processing and Control
1. All purchase orders will be entered into our database system
2. Purchase orders relating to a specific work order will be referenced to that work
order for material/purchasing control
3. Purchase orders will be tracked through our database to insure prompt delivery
dates
(C) Digital Pictures

1. After each work order is completed, digital pictures will be taken prior to and
after equipment is loaded for shipment, the pictures will then be stored in our
database and referenced to the work order
2. All repair work that is received will have digital pictures taken before, during and,
after the repair work

S-ar putea să vă placă și