Process changes or modifications, extension of existing facility or installation of new equipment / plant and facility may be required for various reasons. It may involve changes in process materials, chemicals and catalysts, operating conditions, process equipment, structures, throughput, software, trips and alarm setting, etc. It is the policy of!I", #a$ira that all changes / modifications of plant / equipment, new plants and facilities shall be sub5ected to pre start up safety review prior to start up.
Process changes or modifications, extension of existing facility or installation of new equipment / plant and facility may be required for various reasons. It may involve changes in process materials, chemicals and catalysts, operating conditions, process equipment, structures, throughput, software, trips and alarm setting, etc. It is the policy of!I", #a$ira that all changes / modifications of plant / equipment, new plants and facilities shall be sub5ected to pre start up safety review prior to start up.
Process changes or modifications, extension of existing facility or installation of new equipment / plant and facility may be required for various reasons. It may involve changes in process materials, chemicals and catalysts, operating conditions, process equipment, structures, throughput, software, trips and alarm setting, etc. It is the policy of!I", #a$ira that all changes / modifications of plant / equipment, new plants and facilities shall be sub5ected to pre start up safety review prior to start up.
Procedure Manual Page No. of ! "."# PRE S$%R$ &P S%FE$' RE(IE) PR*+E,&RE -P.S.&.S.R. Introduction In chemical process plants, process changes or modifications, extension of existing facility or installation of new equipment / plant & facility may be required for various reasons like de-bottlenecking, capacity enhancement, improvements in operability, productivity, product quality, safety and environmental protection, etc. It may involve changes in process materials, chemicals & catalysts, operating conditions, process equipment, structures, throughput, software, trips and alarm setting, etc. ll intended changes / modifications at !I", #a$ira are evaluated and reviewed thoroughly and systematically by engineers of technical, operation, engineering and #%& departments before implementation as per the company's policy/procedure (o. ).)*+ ,-.rocedure for /ield 0hange 1rder23 so as to avoid any endangerment to people, environment and property and to ensure integrity and reliability of the plants/processes or product quality. ll changes are finally approved by the %ite .resident ,4fg.3 for implementation. It is also necessary to verify that all changes/modifications or new facilities are installed as per the intended design, standards and necessary inspections, tests are completed prior to start up including statutory requirements. It is the policy of !I", #a$ira that all changes/modifications of plant/equipment, new plants & facilities shall be sub5ected to pre start up safety review prior to start up. */0ective1 6he ob5ective of - .re %tart up %afety !eview .rocedure2 ,.%7%!3 is to ensure an inspection prior to operation start up of any facility, plant, equipment, etc. after modifications/changes or prior to commissioning of new plant/facility to assure that all such modifications /changes or new plants/facilities are installed in accordance with the intended design and process safety. 6his procedure also addresses other issues related to the change, like %1., training of affected personnel, site safety aspects and will provide to verify that defined safety & environmental aspects and other field safety requirements have been taken care in the change/modification or new plant/facility. Sco2e1 6his procedure shall be applicable to all intended changes, modifications of plant, process, equipment, structures, material within the purview of the company's policy/procedure (o. ).)*+ ,-.rocedure for /ield 0hange 1rder23 and also to all extensions of existing plants/facilities and new installations at Section No. 1 "."# Rev. 1 ## ,ate 1 "!.#3."##4 Reliance Industries Ltd. Health, Safety, Environment and Fire Procedure Manual Page No. " of ! !I", #a$ira complex. Procedure1 .re-start up %afety !eview ,.%7%!3 shall be carried out after completion of installation of any facility after intended change or section of facility in stages if installation is large and all new plants/facilities before commissioning. 6he 5ob executing agency will declare about completion of installation of facility as per approved /01 in writing to the #18 or co-ordinator of owning plant / dept. after thorough inspection at site. fter getting the confirmation from the 5ob executing agency , the #18 or co- ordinator of owning plant/department will intimate team members prior to start up for conducting .%7%!. .%7%! will be carried out by a team of technical persons from 1peration, 06%, 0&%, 4aintenance and %afety. ny other person as felt necessary may be included in .%7%! team. 6he team will be constituted by the #18 / coordinator of owning department. 6he .%7%! team members will have approved /01, .&I8s, Isometric drawings, reports of #91. study and other documents/data sheets before starting .%7%! for their reference and compile all the critical points for inspection and verification at site. 6he team members will start inspection at site, check every points one by one and sign off as per the attached checklist ,ppendix : %/);**/3 verifying completion of installation as per design /standards. . 6he check list points, which are not relevant will also be signed off as -(16 .."I0<"&2. dditional points, as required may be included in the inspection check list by the team members. 1bservations of team members will be recorded in the .%7%! check list, if the facility is not installed as per approved .&I8 / Isometric drawings or design/standards . 6he team members shall review all aspects of safety of the installation and may suggest additional actions, if required. .%7%! team, after inspection shall prepare report, if installation is not complete in all respects as per the approved /01/.&I8/design/ standards. 6he co-ordinator will follow up compliance of the balance points if any. fter the completion of the balanced points the concerned engineer/ officer shall endorsed the .%7%! report. 6he co-ordinator shall get the report approved from %ection #ead safety/#18 ,#%&&/3 for safety clearance .#18 from the owing plant/dept. shall give clearance for commissioning of the modification 6he team shall not give clearance for start up, if the installation is incomplete Section No. 1 "."# Rev. 1 ## ,ate 1 "!.#3."##4 Reliance Industries Ltd. Health, Safety, Environment and Fire Procedure Manual Page No. ! of ! or standards are not met or otherwise unsafe to start due to any reason, however, clearance may be given for start up in certain cases if there is no risk or the risk has been taken care temporarily by alternate means. ny significant deviation from approved /01/.&Ids/Isometric drawings , if any shall have approval of #18 ,06%3/0&%/ #%&&/ and %ite .resident,4fg.3 prior to start up. If the facility /installation is not cleared for any valid reason, the action required shall be defined by the team which will be inspected by the them after completion by owning plant /department prior to give clearance for start up. Res2onsi/ilities1 H*, -o5ning 2lant6de2artment.7 Information to #18 ,#%&&/3 for conducting .%7%!. 0onstitution of .%7%! team #e will after receiving the duly endorsed .%7%! report review the modification in totality prior to giving the clearance for commissioning of the system /modification +o7ordinator 4anager .roduction/.%! of the concerned plant /dept. will intimate the .%7%! team members for conducting .%7%!. #e will co- ordinate with the .%7%! team $eam mem/ers7 6hey will have approved /01, .&I8s, Isometric drawings,design data, #91. reports and other documents related to /01 /new facility and go through the details, compile all critical points for inspection and verification. Section Head Safety 6 H*, HSE8F #e will review .%7%! team report and he will give the safety clearance Records7 6he reports of all .%7%! shall be documented and kept with owning department and a copy of the same shall be kept with #%&/ department for record. Reference1 .rocedure no. ).)*+ - -.rocedure for /ield 0hange 1rder2 %ttachment1 ppendix : %/))*;/ Reason for Revision 1 IMS First Issue Pre2ared 9y 1 : P Pandey +hec;ed /y 1 S < Patel %22roved /y 1 S S ,ate Section No. 1 "."# Rev. 1 ## ,ate 1 "!.#3."##4