Documente Academic
Documente Profesional
Documente Cultură
Capacidad
(Cajas por
semana)
Almacn
Demanda
(cajas por
semana)
Chicago
Houston
Planta
Nueva
10,000
7,500
Miami
Denver
7,000
9,000
Planta
Chicago
Miami
7
Denver
2
Lincoln
4
Jackson
5
8,000
Lincoln
4,500
Houston
TOTAL
25,500
Jackson
5,000
TOTAL
25,500
10
Planta
Buffalo
(alternativa 1)
Atlanta
(alternativa 2)
ALTERNATIVA
N 02 ATLANTA
ALTERNATIVA
N 01- BUFALO
SOLUCION
Planta
CHICAGO
HOUSTON
BUFALO (Altern N 01)
REQUISITOS
Planta
CHICAGO
HOUSTON
ATLANTA (Altern N 02)
REQUISITOS
Miami
2745.10
2058.82
2196.08
7000.00
ALMACENES
Denver
Lincoln
3529.41
1764.71
2647.06
1323.53
2823.53
1411.76
9000.00
4500.00
Jackson
1960.78
1470.59
1568.63
5000.00
Miami
2745.10
2058.82
2196.08
7000.00
ALMACENES
Denver
Lincoln
3529.41
1764.71
2647.06
1323.53
2823.53
1411.76
9000.00
4500.00
Jackson
1960.78
1470.59
1568.63
5000.00
Capacidad
10000.00
7500.00
8000.00
25500.00
Capacidad
10000.00
7500.00
8000.00
25500.00
ALTERNATIVA
N 01- BUFALO
ALTERNATIVA
N 02 ATLANTA
Planta
CHICAGO
HOUSTON
BUFALO (Altern N 01)
COSTOS TOTALES (US$)
Planta
CHICAGO
HOUSTON
ATLANTA (Altern N 02)
COSTOS TOTALES (US$)
Miami
19216
7
6176
3
13176
6
38569
ALMACENES
Denver
Lincoln
7059
2
7059
4
2647
1
6618
5
25412
9
9882
7
35118
23559
Jackson
9804
5
2941
2
6275
4
19020
COSTOS (US$)
SUBTOTALES
43137
18382
54745
116265
Miami
19216
7
6176
3
4392
2
29784
ALMACENES
Denver
Lincoln
7059
2
7059
4
2647
1
6618
5
28235
10
11294
8
37941
24971
Jackson
9804
5
2941
2
4706
3
17451
COSTOS (US$)
SUBTOTALES
43137.3
18382.4
48627.5
110147.1
PROBLEMA N 02.- Wiebe Trucking, Inc. Plantea instalar un nuevo almacn para atender al Oeste de EEUU. Denver, Santa Fe y SALT Lake City son los sitios que se
est estudiando. En la siguiente tabla se presentan los costos fijos anuales US$ (alquiler, equipo y seguro) y los costos variables US$ promedio por embarque (mano de
obra, transporte y servicios pblicos) para cada localizacin. Las proyecciones ventas fluctan entre 550,000 y 600,000, embarques al ao.
a) Realice el grafico de los costos Totales para todas las localizaciones en una sola grfica.(3 ptos)
b) Cual de esas ciudades proporciona los costos generales ms bajos? (3 Ptos).
Costos
Costos Fijos
LOCALIZACION
variables por
Anuales
embarque
Denver
Santa F
Salt Lake City
5000,000
4200,000
3500,000
4.65
6.25
7.25
N
Enbarques
por ao
455,000
460,000
465,000
470,000
475,000
480,000
485,000
490,000
495,000
500,000
505,000
510,000
515,000
520,000
525,000
530,000
535,000
540,000
545,000
550,000
555,000
560,000
565,000
570,000
575,000
580,000
585,000
590,000
595,000
600,000
605,000
610,000
615,000
620,000
Costo Total
DENVER
7,115,750.00
7,139,000.00
7,162,250.00
7,185,500.00
7,208,750.00
7,232,000.00
7,255,250.00
7,278,500.00
7,301,750.00
7,325,000.00
7,348,250.00
7,371,500.00
7,394,750.00
7,418,000.00
7,441,250.00
7,464,500.00
7,487,750.00
7,511,000.00
7,534,250.00
7,557,500.00
7,580,750.00
7,604,000.00
7,627,250.00
7,650,500.00
7,673,750.00
7,697,000.00
7,720,250.00
7,743,500.00
7,766,750.00
7,790,000.00
7,813,250.00
7,836,500.00
7,859,750.00
7,883,000.00
Costo Total
SANTA FE
Costo Total
SALT LAKE
CITY
7043750.00
7075000.00
7106250.00
7137500.00
7168750.00
7200000.00
7231250.00
7262500.00
7293750.00
7325000.00
7356250.00
7387500.00
7418750.00
7450000.00
7481250.00
7512500.00
7543750.00
7575000.00
7606250.00
7637500.00
7668750.00
7700000.00
7731250.00
7762500.00
7793750.00
7825000.00
7856250.00
7887500.00
7918750.00
7950000.00
7981250.00
8012500.00
8043750.00
8075000.00
6798750.00
6835000.00
6871250.00
6907500.00
6943750.00
6980000.00
7016250.00
7052500.00
7088750.00
7125000.00
7161250.00
7197500.00
7233750.00
7270000.00
7306250.00
7342500.00
7378750.00
7415000.00
7451250.00
7487500.00
7523750.00
7560000.00
7596250.00
7632500.00
7668750.00
7705000.00
7741250.00
7777500.00
7813750.00
7850000.00
7886250.00
7922500.00
7958750.00
7995000.00
8,200,000.00
8,100,000.00
8,000,000.00
6,900,000.00
6,800,000.00
6,700,000.00
6,600,000.00
6,500,000.00
6,400,000.00
6,300,000.00
6,200,000.00
6,100,000.00
455,000
465,000
475,000
485,000
495,000
505,000
515,000
525,000
535,000
545,000
555,000
565,000
575,000
585,000
595,000
605,000
615,000
PROBLEMA.- Ud est al frente de un gran taller de ensamble, especializado en asignaciones de trabajo bajo contrato. Uno de sus clientes le ha
prometido un jugoso contrato por el ensamble de 1000 unidades de un nuevo producto. El precio de cotizacin sugerido en el contrato se basa en un
promedio de 20 horas de mano de obra directa por unidad. Cuando Ud. realiza un par de ensambles en plan de prueba, descubre que aun cuando el de
la primera unidad requiri 50 horas, el ensamble de la segunda podra completarse en solo 40 horas.
a) Cuntas horas prev Ud. Que requerir el ensamble de la tercera unidad? (02 ptos)
b) Cuntas horas espera usted que requiera el ensamble de la centsima unidad? (02 ptos)
c) Es vlida la suposicin implcita en el contrato acerca de las horas promedio de trabajo por unidad o ser necesario revisar el precio? (02 ptos)
Curva Aprendizaje
55
50
Curva Aprendizaje
45
40
Hrs Aprendizaje
35
30
25
20
15
10
0
1
10
19
28
37
46
55
Numero de ensambles
64
73
82
91
100