TPW/BPROS/FUJ2UAE/eng/THP/11.12/FR/7809 ALSTOM 2012. All rights reserved. Information contained in this document is indicative only.

No representation or
warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances.
It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Photo credits: Jorge Alvarez/Alstom, Alstom. Alstom contributes to the protection of the environment. This leafet is printed on environmentally-friendly paper.
In late 2007, Alstom was awarded the contract for the construction of the Fujairah 2
Cogeneration Power Plant.
Flexibility was a key driver for this independent water and power project as the
integrated plant needs to sustain seasonal power demand variations, while maintaining
full desalination output throughout the year.
Potable water in this region is always in great demand, while power consumption
driven by the need for air-conditioning dramatically increases during the peak summer
months, especially in the Northern Emirates.
Utilizing the Plant Integrator approach for designing and constructing turnkey EPC
power plants, Alstom was able to offer a highly fexible, tailor-made dual-fuel solution
with in-house core components (gas turbines, Generators, steam turbines, HRSG,
Condenser and Plant DCS).
The solution provided for power output variability from 40% to 100% using the GT26
with sequential combustion, air inlet cooling, duct fring and a condensing-extraction
steam turbine for controlled steam extraction.
The power plant currently generates a capacity of 2000 MW net and 130 MIGD(1)
(approximately 600000 m3/day) of potable water.
(1) MIGD = million imperial gallons of water per day
Customer an equal
joint-venture of: ................... - International Power Plc (IPR), UK
- Marubeni Corporation, Japan
- TAQA (Abu Dhabi National Energy Company)
- ADWEC (Abu Dhabi Water and Electricity Company),
the major government-owned utility
Scope of supply: .................... 12-year long-term supply agreement (LTSA) for
Operation & Maintenance and a full turnkey Engineering,
Procurement & Construction (EPC) contract
Electrical output: ...................2000 MW
Fuels: .....................................Natural gas and fuel oil (as back-up)
Cooling system: .....................Sea-water
Application: ............................Cogeneration - Power and desalination
Dual-fuel capability allows
Fujairah 2 to secure water
and electricity supplies
CASE STUDY: GAS PRODUCT SOLUTIONS
Fujairah 2 - United Arab Emirates
KA26 Cogeneration Power Plant
ADVANTAGES

Prominent operational
and fuel fexibility

High reliability

Superior part-load
performance

Low NOx emissions over
a wide load range
With its environmental and
economic advantages, this
plant is another example of
Alstoms capability to deliver
clean integrated power
solutions
TPW/BPROS/FUJ2UAE/eng/THP/11.12/FR/7809 ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or
warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances.
It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Photo credits: Jorge Alvarez/Alstom, Alstom. Alstom contributes to the protection of the environment. This leafet is printed on environmentally-friendly paper.
CASE STUDY: GAS PRODUCT SOLUTIONS
FUJAIRAH 2 - UNITED ARAB EMIRATES
For more information
please contact Alstom Power:
ALSTOM (Switzerland) Ltd.
Brown Boveri Strasse 7
5401 Baden
Switzerland
Visit us online: www.alstom.com
OUR PLANT INTEGRATOR APPROACH OFFERS MORE VALUE FOR CUSTOMERS
The Plant Integrator concept is Alstoms unique way of creating more value for
customers. We combine outstanding expertise at both component and plant levels,
as we are both an equipment designer and a manufacturer. In addition, we are an
Engineering, Procurement and Construction (EPC) contractor with proven worldwide
references. Through close collaboration, we guarantee that our customers meet
their business objectives and serve their market more effectively. There are six Plant
Integrator factors that help increase the Net Present Value for our customers.
PLANT INTEGRATOR FACTORS CUSTOMER BENEFITS
INVESTMENT

Optimised capital investment
LEAD TIME

Shorter lead times to produce electricity faster
PERFORMANCE

Higher power plant effciency for increased power output over
a wide range of operational modes

Reduced emissions to meet environmental responsibility

Lower Operation & Maintenance (O&M) costs
AVAILABILITY & FLEXIBILITY

Better reliability, availability and fexibility
LIFE EXTENSION

Extended power plant life options
PROJECT FEATURES
Fujairah 2 benefts from superior integration through Alstoms project management
skills, EPC capabilities and state-of-the art key components.

5 dual-fuel-fred GT26 gas turbines equipped with the sequential dry low NOx
combustion system for high effciency and environmentally-friendly operation

5 heat recovery steam generators (HRSG) with additional duct fring

3 foor-mounted steam turbines

2 high-effciency hydrogen-cooled TOPGAS turbogenerators and six high- effciency air-
cooled TOPAIR turbogenerators for greater output

ALSPA Distributed Control System
An environmentally
friendly plant with
high effciency
Arrangement