Sunteți pe pagina 1din 104

Schedule fo Rates for NH,

MORT Works in Nagaland(2010)


Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
1.1
Loading and unloading of stone boulder / stone aggregates / sand / kanker / moorum. (Placing
tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding
time for haulage and return trip)
cum 133.00 158.00 161.00 167.00 167.00 169.00 172.00 154.00
1.2 Loading and Unloading of Boulders by Manual Means cum 230.00 279.00 279.00 279.00 279.00 279.00 279.00 267.00
1.3 Loading and Unloading of Cement or Steel by Manual Means and stacking. tonne 271.00 322.00 322.00 322.00 322.00 322.00 322.00 308.00
1.4 Cost of Haulage Excluding Loading and Unloading
(i) Surfaced Road tonne.km 9.50 11.70 11.70 11.70 11.70 11.70 11.70 11.20
(ii) Unsurfaced Gravelled Road tonne.km 11.50 14.10 14.10 14.10 14.10 14.10 14.10 13.50
(iii) Katcha Track and Track in river bed / nallah bed and choe bed. tonne.km 23.10 28.40 28.40 28.40 28.40 28.40 28.40 27.20
1.5
Hand Broken Stone Aggregates 63 mm nominal size (Supply of quarried stone, hand breaking
into coarse aggregate 63 mm nominal size (passing 80 mm and retained on 50 mm sieve) and
stacking as directed)
cum 1671.00 1644.00 1644.00 1644.00 1845.00 1845.00 1845.00 1845.00
1.6
Crushing of stone aggregates 13.2 mm nominal size. (Crushing of stone boulders of 150 mm
size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates
of 13 mm nominal size.)
cum 1846.00 1802.00 1802.00 1802.00 2046.00 2046.00 2046.00 2046.00
1.7
Crushing of stone aggregates 20 mm nominal size (Crushing of stone boulders of 150 mm
size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates
of 20 mm nominal size.)
cum 1624.00 1667.00 1667.00 1667.00 1814.00 1814.00 1814.00 1814.00
1.8
Crushing of stone aggregates 40 mm nominal size (Crushing of stone boulders of 150 mm
size in an integrated stone crushing unit of 200 tonnes per hour capacity comprising of primary
and secondary crushing units, belt conveyor and vibrating screens to obtain stone aggregates
of 40 mm nominal size.)
cum 1653.00 1696.00 1696.00 1696.00 1768.00 1768.00 1768.00 1768.00
2.1
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees,
including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable
material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
(i) Girth from 300 mm to 600 mm each 197.00 218.00 220.00 224.00 224.00 226.00 228.00 211.00
(ii) Girth from 600 mm to 900 mm each 356.00 395.00 401.00 413.00 413.00 420.00 426.00 384.00
(iii) Girth from 900 mm to 1800 mm each 688.00 761.00 769.00 785.00 785.00 794.00 803.00 736.00
(iv) Girth above 1800 mm each 1300.00 1437.00 1450.00 1474.00 1474.00 1487.00 1500.00 1387.00
2.2 Clearing Grass and Removal of Rubbish hectare 13409.00 14801.00 14801.00 14801.00 14801.00 14801.00 14801.00 14157.00
Summary of Rate Analysis Districts of Nagaland
CHAPTER-1
CARRIAGE OF MATERIALS
CHAPTER-2
SITE CLEARANCE
1
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
2.3
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of
stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned up to a lead of 1000 metres including removal and disposal
of top organic soil not exceeding 150 mm in thickness.)
(i) By Manual Means:-
A In area of light jungle hectare 40605.00 44823.00 44844.00 44885.00 44885.00 44906.00 44928.00 42895.00
B In area of thorny jungle hectare 54392.00 60044.00 60088.00 60168.00 60168.00 60211.00 60254.00 57475.00
(ii) By Mechanical Means
A In area of light jungle hectare 40261.00 44729.00 46901.00 51268.00 51268.00 53453.00 55625.00 44862.00
B In area of thorny jungle hectare 48749.00 54157.00 56769.00 62022.00 62022.00 64650.00 67263.00 54301.00
2.4
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining
walls and other structure comprising of masonry, cement concrete, wood work, steel work,
including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal
of unserviceable material and stacking the serviceable material with all lifts and lead of 1000
metres)
(i) Lime /Cement Concrete
I By Manual Means
A Lime Concrete, cement concrete grade M-10 and below cum 296.00 328.00 332.00 341.00 341.00 346.00 350.00 318.00
B Cement Concrete Grade M-15 & M-20 cum 350.00 387.00 392.00 400.00 400.00 405.00 410.00 375.00
C Prestressed / Reinforced cement concrete grade M-20 & above cum 912.00 1012.00 1017.00 1025.00 1025.00 1030.00 1035.00 972.00
II By Mechanical Means for items No. 202( b) & ( c)
A Cement Concrete Grade M-15 & M-20 cum 382.00 425.00 439.00 470.00 470.00 485.00 497.00 420.00
B Prestressed / Reinforced cement concrete grade M-20 & above cum 652.00 731.00 749.00 791.00 791.00 811.00 827.00 717.00
(ii) Dismantling Brick / Tile work
A In lime mortar cum 189.00 209.00 214.00 223.00 223.00 227.00 232.00 205.00
B In cement mortar cum 243.00 269.00 273.00 282.00 282.00 287.00 291.00 261.00
C In mud mortar cum 168.00 186.00 190.00 199.00 199.00 204.00 208.00 182.00
D Dry brick pitching or brick soling cum 157.00 174.00 179.00 187.00 187.00 192.00 197.00 171.00
(iii) Dismantling Stone Masonry
A Rubble stone masonry in lime mortar cum 210.00 233.00 238.00 246.00 246.00 251.00 256.00 227.00
B Rubble stone masonry in cement mortar. cum 243.00 269.00 273.00 282.00 282.00 287.00 291.00 261.00
C Rubble Stone Masonry in mud mortar. cum 189.00 209.00 214.00 223.00 223.00 227.00 232.00 205.00
D Dry rubble masonry cum 178.00 198.00 202.00 211.00 211.00 216.00 220.00 193.00
E Dismantling stone pitching/ dry stone spalls. cum 168.00 186.00 190.00 199.00 199.00 204.00 208.00 182.00
F
Dismantling boulders laid in wire crates including opening of crates and stacking
dismantled materials.
cum 189.00 209.00 214.00 223.00 223.00 227.00 232.00 205.00
(iv)
Wood work wrought framed and fixed in frames of trusses upto a height of 5 m above
plinth level
cum 454.00 512.00 517.00 525.00 525.00 530.00 535.00 494.00
(v)
Steel work in all types of sections upto a height of 5 m above plinth level excluding
cutting of rivet.
2
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
A Including dismembering tonne 1156.00 1302.00 1306.00 1313.00 1313.00 1316.00 1320.00 1249.00
B Excluding dismembering. tonne 863.00 969.00 973.00 979.00 979.00 983.00 987.00 930.00
C Extra over item No( V ) A and( V ) B for cutting rivets. tonne 9.00 10.00 10.00 10.00 10.00 10.00 10.00 9.00
(vi) Scraping of bricks dismantled from brick work including stacking.
A In lime/Cement mortar 1000 nos 939.00 1036.00 1036.00 1036.00 1036.00 1036.00 1036.00 991.00
B In mud mortar 1000 nos 335.00 370.00 370.00 370.00 370.00 370.00 370.00 354.00
(vii) Scraping of Stone from dismantled stone masonry
A In cement and lime mortar cum 377.00 416.00 416.00 416.00 416.00 416.00 416.00 398.00
B In Mud mortar cum 80.00 88.00 88.00 88.00 88.00 88.00 88.00 84.00
(viii) Scarping plaster in lime or cement mortar from brick/ stone masonry sqm 12.00 13.00 13.00 13.00 13.00 13.00 14.00 13.00
(ix)
Removing all type of hume pipes and stacking within a lead of 1000 metres including
earthwork and dismantling of masonry works.
A Up to 600 mm dia metre 139.00 154.00 154.00 154.00 154.00 154.00 154.00 147.00
B Above 600 mm to 900 mm dia metre 188.00 208.00 208.00 208.00 208.00 208.00 208.00 199.00
C Above 900 mm metre 323.00 356.00 356.00 356.00 356.00 356.00 356.00 341.00
2.5
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of
dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable
materials separately)
I By Manual Means
A Bituminous courses cum 546.00 604.00 612.00 628.00 628.00 636.00 644.00 586.00
B Granular courses cum 393.00 435.00 442.00 455.00 455.00 463.00 470.00 423.00
II By Mechanical Means
A Bituminous course cum 230.00 256.00 264.00 280.00 280.00 289.00 298.00 253.00
2.6
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by
mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in
volume and stock piling at designated locations and disposal of dismantled materials up to a
lead of 1000 metres, stacking serviceable and unserviceable materials separately)
cum 1113.00 1242.00 1287.00 1382.00 1382.00 1428.00 1471.00 1231.00
2.7
Dismantling Guard Rails (Dismantling guard rails by manual means and disposal of
dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable
materials and unserviceable materials separately.)
metre 59.00 65.00 67.00 69.00 69.00 70.00 71.00 64.00
2.8
Dismantling Kerb Stone (Dismantling kerb stone by manual means and disposal of
dismantled material with all lifts and up to a lead of 1000 metre)
metre 12.00 13.00 13.00 14.00 14.00 15.00 15.00 13.00
2.9
Dismantling Kerb Stone channel (Dismantling kerb stone channel by manual means and
disposal of dismantled material with all lifts and up to a lead of 1000 metre)
metre 18.00 20.00 20.00 21.00 21.00 22.00 23.00 19.00
2.10
Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth,
foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back
filling of pit.)
A 5th KM stone each 296.00 329.00 333.00 339.00 339.00 342.00 345.00 318.00
B Ordinary KM Stone each 172.00 190.00 192.00 196.00 196.00 198.00 201.00 184.00
C Hectometre Stone each 34.00 38.00 38.00 39.00 39.00 40.00 40.00 37.00
3
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
2.11
Dismantling of Fencing (Dismantling of barbed wire fencing/ wire mesh fencing including
posts, foundation concrete, back filling of pit by manual means including disposal of
dismantled material with all lifts and up to a lead of 1000 metres, stacking serviceable material
and unserviceable material separately. )
metre 39.00 43.00 43.00 44.00 44.00 44.00 44.00 41.00
2.12
Dismantling of CI Water Pipe Line (Dismantling of CI water pipe line 600 mm dia including
disposal with all lifts and lead upto 1000 metres and stacking of serviceable material and
unserviceable material separately under supervision of concerned department)
metre 121.00 137.00 139.00 142.00 142.00 144.00 146.00 133.00
2.13
Removal of Cement Concrete Pipe of Sewer Gutter (Removal of cement concrete pipe of
sewer gutter 1500 mm dia under the supervision of concerned department including disposal
with all lifts and up to a lead of 1000 metres and stacking of serviceable and unserviceable
material separately but excluding earth excavation and dismantling of masonry works.)
metre 186.00 216.00 218.00 219.00 219.00 220.00 221.00 208.00
2.14
Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles
including excavation and dismantling of foundation concrete and lines under the supervision of
concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the
serviceable and unserviceable material separately)
each 135.00 150.00 152.00 154.00 154.00 155.00 156.00 145.00
3.1
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means
including loading in truck for carrying of cut earth to embankment site with all lifts and lead
upto1000 metres.)
cum 191.00 221.00 221.00 221.00 221.00 221.00 221.00 211.00
3.2
Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual
means including loading in a truck and carrying of excavated material to embankment site with
in all lifts and leads upto 1000 metres )
cum 247.00 282.00 282.00 282.00 282.00 282.00 282.00 270.00
CHAPTER-3
EARTH WORK, EROSION CONTROL AND DRAINAGE
4
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
3.3
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by
mechanical means including cutting and pushing the earth to site of embankment upto a
distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in
accordance with requirements of lines, grades and cross sections.)
cum 132.00 147.00 154.00 169.00 169.00 176.00 183.00 147.00
3.4
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for
roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut
earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ),
trimming bottom and side slopes in accordance with the requirements of lines, grades and
cross sections.)
cum 223.00 248.00 260.00 284.00 284.00 296.00 308.00 248.00
3.5
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres
(Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking,
trimming of bottom and side slopes in accordance with requirements of lines, grades and
cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres )
cum 322.00 383.00 397.00 420.00 420.00 430.00 441.00 380.00
3.6
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto
1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and cross sections, and transporting to the
embankment location within all lifts and lead upto 1000m)
cum 86.00 102.00 104.00 106.00 106.00 107.00 109.00 99.00
3.7
Excavation in Ordinary Rockusing Hydraulic ExcavatorCK-90 and Tippers with disposal
upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9
cum bucket capacity including cutting and loading in tippers, transporting to embankment site
within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross sections.)
cum 100.00 118.00 120.00 124.00 124.00 126.00 128.00 115.00
3.8
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock
(blasting prohibited) with rock breakers including breaking rock, loading in tippers and
disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in
accordance with requirements of lines, grades and cross sections.)
A Mechanised cum 463.00 571.00 584.00 609.00 609.00 622.00 634.00 558.00
B Manual Method cum 953.00 1112.00 1112.00 1112.00 1112.00 1112.00 1112.00 1063.00
3.9
Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres
(Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking,
trimming of bottom and side slopes in accordance with requirements of lines, grades and
cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres )
cum 373.00 440.00 468.00 501.00 501.00 514.00 529.00 452.00
3.10
Excavation in Marshy Soil (Excavation for roadway in marshy soil with hydraulic excavator
0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts
and lead upto 1000 metres, trimming of bottom and side slopes in accordance with
requirements of lines, grades and cross sections.)
cum 92.00 109.00 111.00 114.00 114.00 116.00 117.00 106.00
3.11
Removal of Unserviceable Soil with Disposal upto 1000 metres (Removal of
unserviceable soil including excavation, loading and disposal upto 1000 metres lead but
excluding replacement by suitable soil which shall be paid separately as per clause 305.)
cum 87.00 104.00 105.00 108.00 108.00 109.00 110.00 101.00
5
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
3.12
Pre-splitting of Rock Excavation Slopes (Carrying out excavation in hard rock to achieve a
specified slope of the rock face by controlled use of explosives and blasting accessories in
properly aligned and spaced drill holes, collection of the excavated rock by a 80 HP dozer,
loading in tipper by a front end loader and disposing of the material with all lifts and lead upto
1000 m, all as specified in clause No. 303)
sqm 145.00 159.00 168.00 180.00 180.00 185.00 191.00 162.00
3.13
Excavation for Structures (Earth work in excavation of foundation of structures as per
drawing and technical specification, including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the
excavation earth to the extent required and utilising the remaining earth locally for road work.)
(i) Ordinary soil
A Manual Means (Depth upto 3 m) cum 215.00 237.00 237.00 237.00 237.00 237.00 237.00 227.00
B Mechanical Means (Depth upto 3 m) cum 34.00 38.00 40.00 43.00 43.00 44.00 46.00 38.00
(ii) Ordinary rock (not requiring blasting)
A Manual Means (Depth upto 3 m) cum 268.00 296.00 296.00 296.00 296.00 296.00 296.00 283.00
B Mechanical Means cum 45.00 50.00 52.00 56.00 56.00 59.00 61.00 50.00
(iii) Hard rock ( requiring blasting )
A Manual Means cum 533.00 579.00 585.00 592.00 592.00 593.00 597.00 560.00
(iv) Hard rock ( blasting prohibited )
A Mechanical Means cum 482.00 536.00 554.00 595.00 595.00 615.00 629.00 530.00
(v) Marshy soil
A Manual means ( upto 3 m depth) cum 442.00 503.00 519.00 529.00 529.00 535.00 541.00 496.00
B Mechanical Means cum 212.00 256.00 267.00 270.00 270.00 271.00 272.00 255.00
3.14
Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means (Scarifying
the existing granular road surface to a depth of 50 mm and disposal of scarified material within
all lifts and leads upto 1000 metres. )
sqm 20.00 22.00 22.00 23.00 23.00 23.00 24.00 21.00
3.15
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means
(Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified
material with in all lifts and lead upto 1000 metres.)
sqm 6.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
3.16
Embankment Construction with Material Obtained from Borrow Pits (Construction of
embankment with approved material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and compacting to meet requirement
of table 300-2)
cum 443.00 536.00 542.00 553.00 553.00 555.00 564.00 518.00
3.17
Construction of Embankment with Material Deposited from Roadway Cutting
(Construction of embankment with approved materials deposited at site from roadway cutting
and excavation from drain and foundation of other structures graded and compacted to meet
requirement of table 300-2)
cum 143.00 195.00 199.00 208.00 208.00 209.00 216.00 191.00
3.18
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen
shoulders with approved material obtained from borrow pits with all lifts & leads, transporting
to site, spreading, grading to required slope and compacted to meet requirement of table No.
300-2)
cum 491.00 593.00 600.00 614.00 614.00 619.00 629.00 574.00
3.19 Compacting Original Ground
6
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
Case-I
Compacting original ground supporting subgrade (Loosening of the ground upto a level
of500 mm below the subgrade level, watered, graded and compacted in layers to meet
requirement of table 300-2 for subgrade construction.)
cum 69.00 84.00 88.00 96.00 96.00 99.00 103.00 84.00
Case-II :Compacting original ground supporting embankment cum 41.00 53.00 56.00 61.00 61.00 62.00 65.00 53.00
3.20
Stripping and Storing Top Soil (Stripping, storing of top soil by road side at 15 m internal
and re-application on embankment slopes, cut slopes and other areas in localities where the
available embankment material is not conducive to plant growth)
cum 173.00 191.00 193.00 198.00 198.00 200.00 202.00 185.00
3.21
Stripping, storing and re-laying top soil from borrow areas in agriculture fields.
(Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place,
spreading and re-laying after taking the borrow earth to maintain fertility of the agricultural
field, finishing it to the required levels and satisfaction of the farmer.)
cum 79.00 88.00 93.00 101.00 101.00 106.00 110.00 88.00
3.22
Turfing with Sods (Furnishing and laying of the live sods of perennial turf forming grass on
embankment slope, verges or other locations shown on the drawing or as directed by the
engineer including preparation of ground, fetching of rods and watering)
sqm 51.00 75.00 75.00 75.00 75.00 74.00 76.00 72.00
3.23
Seeding and Mulching (Preparation of seed bed on previously laid top soil, furnishing and
placing of seeds, fertilizer, mulching material, applying bituminous emulsion at the rate of0.23
litres per sqm and laying and fixing jute netting, including watering for 3 months all as per
clause 308)
sqm 178.00 248.00 250.00 254.00 254.00 251.00 260.00 239.00
3.24
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional
area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of
clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres
(average lead 25 metres))
A Mechanical means metre 52.00 57.00 60.00 65.00 65.00 67.00 70.00 57.00
B Manual Means metre 54.00 59.00 59.00 59.00 59.00 59.00 59.00 57.00
3.25
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross
sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as
per approved design and to the requirement of clause 301 to 309. Excavated material to be
used in embankment at site.)
A Mechanical Means metre 104.00 116.00 121.00 131.00 131.00 136.00 141.00 116.00
B Manual Means metre 80.00 89.00 89.00 89.00 89.00 89.00 89.00 85.00
3.26
Surface Drains in Hard Rock (Rate per metre may be worked out based on quantity of hard
rock as per design.)
metre
3.27
Sub Surface Drains with Perforated Pipe (Construction of subsurface drain with perforated
pipe of 100 mm internal diameter of metal/ asbestos cement/ cement concrete/PVC, closely
jointed, perforations ranging from 3 mm to 6 mm depending upon size of material surrounding
the pipe, with 150 mm bedding below the pipe and 300 mm cushion above the pipe, cross
section of excavation 450 x 550 mm. Excavated material to be utilised in roadway at site )
metre 789.00 833.00 856.00 3087.00 917.00 905.00 983.00 815.00
3.28
Aggregate Sub- Surface Drains (Construction of aggregate sub surface drain 300 mm x 450
mm with aggregates conforming to table 300-4, excavated material to be utilised in roadway ) metre 297.00 315.00 327.00 1575.00 354.00 346.00 387.00 311.00
7
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
3.29
Underground Drain at Edge of Pavement (Construction of an underground drain 1 m x 1 m
(inside dimensions) lined with RCC-20 cm thick and covered with RCC slab10 cm in thickness
on urban roads)
metre 3457.00 4075.00 4350.00 4049.00 6462.00 6051.00 8662.00 4469.00
3.30
Preparation and Surface Treatment of formation. (Preparation and surface treatment of
formation by removing mud and slurry, watering to the extent needed to maintain the desired
moisture content, trimming to the required line, grade, profile and rolling with 8-10 tonne
smooth wheeled roller, complete as per clause 310.)
sqm 2.60 3.70 3.70 3.80 3.80 3.70 3.80 3.60
3.31
Construction of Rock fill Embankment (Construction of rock fill embankment with broken
hard rock fragments of size not exceeding 300 mm laid in layers not exceeding 500 mm thick
including filling of surface voids with stone spalls, blinding top layer with granular material,
rolled with vibratory road roller, all complete as per clause 313)
cum 81.00 109.00 112.00 118.00 118.00 119.00 123.00 107.00
3.32
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by
mechanical means including cutting and trimming of side slopes and disposing of excavated
earth with all lifts and lead upto 1000 metres)
cum 179.00 206.00 212.00 225.00 225.00 231.00 237.00 203.00
3.33
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting.
(Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means
including cutting and trimming of slopes and disposal of cut material with all lift and lead upto
1000 metres )
cum 241.00 275.00 284.00 303.00 303.00 313.00 322.00 272.00
3.34
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in
hard rock requiring blasting, by mechanical means including trimming of slopes and disposal
of cut material with all lifts and lead upto 1000 metres.)
cum 344.00 382.00 395.00 418.00 418.00 428.00 439.00 378.00
3.35
Work in Urban Roads (The cost of earth work in urban roads inhabited area will be
comparatively higher due to following reasons:)
3.36
Embankment Construction with Fly ash/Pond ash available from coal or lignite burning
Thermal Plants as waste material. (Construction of embankment with fly ash conforming to
table 1 of IRC: SP: 58 - 2001 obtained from coal or lignite burning thermal power stations as
waste material, spread and compacted in layer of 200mm thickness each at OMC, all as
specified in IRC: SP: 58-2001 and as per approved plans.)
cum 440.00 1907.00 3382.00 4660.00 4660.00 6815.00 8436.00 4693.00
CHAPTER-4
8
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
4.1 Granular Sub-base with Close Graded Material (Table:- 400-1)
A
Plant Mix Method (Construction of granular sub-base by providing close graded Material,
mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in
uniform layers with motor grader on prepared surface and compacting with vibratory power
roller to achieve the desired density, complete as per clause 401 )
(i) for grading- I Material cum 2057.00 2432.00 2445.00 2471.00 2667.00 2679.00 2847.00 2526.00
(ii) for grading- II Material cum 2261.00 2646.00 2659.00 2686.00 2882.00 2894.00 3062.00 2731.00
(iii) for grading-III Material cum 2471.00 2866.00 2879.00 2906.00 3102.00 3113.00 3281.00 2941.00
B
By Mix in Place Method (Construction of granular sub-base by providing close graded
material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in
place method with rotavator at OMC, and compacting with vibratory roller to achieve the
desired density, complete as per clause 401)
(i) for grading- I Material cum 1543.00 1814.00 1821.00 1835.00 2013.00 2020.00 2028.00 1912.00
(ii) for grading- II Material cum 1728.00 2009.00 2016.00 2030.00 2209.00 2215.00 2223.00 2099.00
(iii) for grading-III Material cum 1919.00 2209.00 2216.00 2230.00 2408.00 2415.00 2423.00 2290.00
4.2
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular
sub-base by providing coarse graded material, spreading in uniform layers with motor grader
on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting
with vibratory roller to achieve the desired density, complete as per clause 401)
(i) for grading- I Material cum 1549.00 1836.00 1843.00 1855.00 2051.00 2056.00 2063.00 1950.00
(ii) for grading- II Material cum 1687.00 1981.00 1987.00 2000.00 2196.00 2201.00 2208.00 2088.00
(iii) for grading-III Material cum 1806.00 2106.00 2113.00 2125.00 2321.00 2327.00 2334.00 2208.00
4.3
Lime Stabilisation for Improving Subgrade (Laying and spreading available soil in the
subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator
with 3 % slaked lime having minimum content of 70% of CaO, grading with motor grader and
compacting with the road roller at OMC to the desired density to form a layer of improved sub
grade)
A By Mechanical Means cum 409.00 566.00 598.00 882.00 882.00 819.00 1027.00 579.00
B By Manual Means cum 410.00 568.00 598.00 880.00 880.00 813.00 1021.00 578.00
4.4
Lime Treated Soil for Sub- Base (Providing, laying and spreading soil on a prepared sub
grade, pulverising, mixing the spread soil in place with rotavator with 3 % slaked lime with
minimum content of 70% of CaO, grading with motor grader and compacting with the road
roller at OMC to achieve at least 98%of the max dry density to form a layer of sub base.)
cum 671.00 882.00 917.00 1207.00 1207.00 1146.00 1357.00 884.00
4.5
Cement Treated Soil Sub Base/ Base (Providing, laying and spreading soil on a prepared
sub grade, pulverising, adding the designed quantity of cement to the spread soil, mixing in
place with rotavator, grading with the motor grader and compacting with the road roller at
OMC to achieve the desired unconfined compressive strength and to form a layer of sub-
base/base.)
cum 1120.00 1286.00 1317.00 1534.00 1534.00 1490.00 1655.00 1261.00
SUB-BASES, BASES ( NON- BITUMINOUS) AND SHOULDERS
9
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
4.6
Cement Treated Crushed Rock or combination as per clause 403.2 and table 400.4in
Sub base/ Base (Providing, laying and spreading Material on a prepared sub grade, adding
the designed quantity of cement to the spread Material, mixing in place with rotavator, grading
with the motor grader and compacting with the road roller at OMC to achieve the desired
unconfined compressive strength and to form a layer of sub-base/base.)
(i) For Sub-Base course cum 2309.00 2667.00 2699.00 2942.00 3120.00 3068.00 3253.00 2754.00
(ii) For Base course cum 2242.00 5993.00 6025.00 6268.00 3050.00 2998.00 3182.00 2687.00
4.7
Making 50 mm x 50 mm Furrows (Making 50 mm x 50 mm furrows, 25mm deep, 45
0
to the
center line of the road and at one metre interval in the existing thin bituminous wearing coarse
including sweeping and disposal of excavated material within 1000 metres lead)
sqm 2.90 3.20 3.20 3.30 3.30 3.30 3.30 3.10
4.8
Inverted Choke (Construction of inverted choke by providing, laying, spreading and
compacting screening B type/ coarse sand of specified grade in uniform layer on a prepared
surface with motor grader and compacting with power roller etc)
cum 2827.00 5055.00 5926.00 13812.00 13812.00 11852.00 17891.00 5740.00
4.9
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of
specific sizes to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber,
applying and brooming requisite type of screening/ binding Materials to fill up the interstices of
coarse aggregate, watering and compacting to the required density.)
A By Manual Means
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1859.00 2090.00 2120.00 2162.00 2546.00 2526.00 2625.00 2369.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1874.00 2120.00 2130.00 2146.00 2513.00 2506.00 2538.00 2381.00
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1975.00 2217.00 2247.00 2288.00 2658.00 2638.00 2735.00 2477.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1855.00 2099.00 2109.00 2125.00 2456.00 2449.00 2481.00 2327.00
(c) Using Screening Type-B (11.2mm Agg.) cum 1963.00 2218.00 2228.00 2244.00 2591.00 2584.00 2616.00 2456.00
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 2010.00 2256.00 2285.00 2327.00 2700.00 2680.00 2777.00 2517.00
(b) Using Screening Type-B (11.2mm Agg.) cum 1998.00 2257.00 2267.00 2283.00 2633.00 2626.00 2658.00 2496.00
B By Mechanical Means:
(i) Grading- I (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1734.00 1952.00 1985.00 2033.00 2417.00 2399.00 2501.00 2240.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1749.00 1982.00 1995.00 2016.00 2383.00 2379.00 2414.00 2252.00
(ii) Grading- II (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1850.00 2079.00 2112.00 2159.00 2528.00 2511.00 2611.00 2348.00
(b) Using Screening Type-A (13.2mm Agg.) cum 1730.00 1961.00 1974.00 1995.00 2327.00 2322.00 2357.00 2198.00
(c) Using Screening Type-B (11.2mm Agg.) cum 1838.00 2080.00 2093.00 2114.00 2461.00 2457.00 2492.00 2327.00
(iii) Grading- III (Using Screening Crushable type such as Moorum or Gravel)
(a) Using Screening Crushable type such as Moorum or Gravel cum 1885.00 2118.00 2151.00 2198.00 2570.00 2553.00 2653.00 2388.00
(b) Using Screening Type-B (11.2mm Agg.) cum 1873.00 2119.00 2132.00 2153.00 2503.00 2499.00 2534.00 2367.00
10
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
4.10
Crushed Cement Concrete Sub-base / Base (Breaking and crushing of material obtained by
breaking damaged cement concrete slabs to size range not exceeding 75 mm as specified in
table 400.7 transporting the aggregates obtained from breaking of cement concrete slabs at a
lead of L km., laying and compacting the same as sub base/ base course, constructed as
WBM to clause 404 except the use of screening or binding Material.)
cum 480.00 592.00 598.00 610.00 610.00 614.00 776.00 572.00
4.11
Penetration Coat Over Top Layer of Crushed Cement Concrete Base (Spraying of bitumen
over cleaned dry surface of crushed cement concrete base at the rate of 25 kg per 10 sqm by
a bitumen pressure distributor, spreading of key aggregates at the rate of 0.13 cum per 10
sqm by a mechanical gritter and rolling the surface as per clause 506.3.8)
sqm 28.00 30.00 31.00 32.00 35.00 35.00 35.00 32.00
4.12
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to
wet mix macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with
paver in sub- base / base course on well prepared surface and compacting with vibratory roller
to achieve the desired density.)
cum 2269.00 2618.00 2627.00 2646.00 2883.00 2892.00 3071.00 2740.00
4.13
Construction of Median and Island with Soil Taken from Roadway Cutting (Construction
of Median and Island above road level with approved material deposited at site from roadway
cutting and excavation for drain and foundation of other structures, spread, graded and
compacted as per clause 407)
cum 228.00 294.00 298.00 304.00 304.00 304.00 311.00 285.00
4.14
Construction of Median and Island with Soil Taken from Borrow Areas (Construction of
median and Island above road level with approved material brought from borrow pits, spread,
sloped and compacted as per clause 407)
cum 548.00 685.00 690.00 700.00 700.00 701.00 710.00 660.00
4.15 Construction of Shoulders (A. Earthen Shoulders)
A. Earthen Shoulders
The rate as applicable for sub-grade construction may be adopted.
B. Hard Shoulders
Rate as applicable for sub-base and or base may be adopted as per approved design.
C. Paved shoulders
The rate may be adopted as applicable for different layers of pavement depending upon
approved design of paved shoulders.
4.16
Footpaths and Separators (Construction of footpath/separator by providing a 150 mm
compacted granular sub base as per clause 401 and 25 mm thick cement concrete grade
M15, over laid with precast concrete tiles in cement mortar 1:3 including provision of all
drainage arrangements but excluding kerb channel..)
sqm 1526.00 1723.00 1779.00 2049.00 2112.00 2088.00 2335.00 1734.00
4.17
Crusher Run Macadam Base (Providing crushed stone aggregate, depositing on a prepared
surface by hauling vehicles, spreading and mixing with a motor grader, watering and
compacting with a vibratory roller to clause 410 to form a layer of sub-base/Base)
A By Mix in Place Method
(i) For 53 mm maximum size cum 1578.00 1823.00 1829.00 1841.00 2061.00 2066.00 2073.00 1960.00
(ii) For 45 mm maximum size cum 1657.00 1939.00 1945.00 1956.00 2146.00 2150.00 2158.00 2041.00
11
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
B By Mixing Plant :
(i) For 53 mm maximum size cum 1929.00 2229.00 2242.00 2268.00 2489.00 2502.00 2668.00 2355.00
(ii) For 45 mm maximum size cum 1262.00 1479.00 1488.00 1504.00 1623.00 1630.00 1735.00 1536.00
4.18
Lime, Fly ash stabalised soil sub-base (Construction of Sub-base using lime - fly ash
admixture with granular soil, free from organic matter/ deleterious material or clayey silts and
low plasticity clays having PI between 5 and 20 and liquid limit less than 25 and commercial
dry lime, slaked at site or pre-slaked with CaO content not less than 50%, fly ash to conform
to gradation as per clause 4.3 of IRC: 88-1984, lime + fly ash content ranging between 10 to
30%, the minimum un-confined compressive strength and CBR value after 28 days curing and
4 days soaking to be 7.5kg/sq, cm and 25% respectively, all as specified in IRC: 88-1984. )
cum 654.00 1078.00 1381.00 1937.00 1937.00 2257.00 2786.00 1593.00
5.1
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of
granular Base including clearing of road surface and spraying primer at the rate of 0.60
kg/sqm using mechanical means.)
sqm 38.40 40.00 41.00 44.70 44.70 44.00 47.00 38.70
5.2 Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at
the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom.
sqm 13.50 14.20 14.50 15.80 15.80 15.60 16.50 13.60
5.3
Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading premixed with bituminous binder, transported to site, laid over a previously
prepared surface with paver finisher to the required grade, level and alignment and rolled as
per clauses 501.6 and 501.7 to achieve the desired compaction)
(i) for Grading I ( 40 mm nominal size ) cum 7757.00 8339.00 8480.00 9030.00 9322.00 9265.00 9808.00 8312.00
(ii) for GradingII(19 mm nominal size) cum 7854.00 8467.00 8608.00 9157.00 9423.00 9367.00 9910.00 8409.00
5.4
Bituminous Penetration Macadam (Construction of penetration macadam over prepared
Base by providing a layer of compacted crushed coarse aggregate using chips spreader with
alternate applications of bituminous binder and key aggregates and rolling with a smooth
wheeled steel roller 8-10 tonne capacity to achieve the desired degree of compaction)
A 50 mm thick sqm 416.00 445.00 451.00 482.00 492.00 486.00 509.00 436.00
B 75 mm thick sqm 570.00 602.00 611.00 651.00 673.00 665.00 696.00 598.00
5.5
Built-Up-Spray Grout (Providing, laying and rolling of built-up-spray grout layer over prepared
base consisting of a two layer composite construction of compacted crushed coarse
aggregates using motor grader for aggregates. key stone chips spreader may be used with
application of bituminous binder after each layer, and with key aggregates placed on top of the
second layer to serve as a Base conforming to the line, grades and cross-section specified,
the compacted layer thickness being 75 mm)
sqm 335.00 359.00 363.00 382.00 406.00 403.00 417.00 367.00
BASES AND SURFACE COURSES (BITUMINOUS)
CHAPTER-5
12
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
5.6
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam
with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling
with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per
MoRTH specification clause No. 507 complete in all respects.)
(i) for Grading I ( 40 mm nominal size ) cum 9489.00 10239.00 10424.00 11336.00 11603.00 11448.00 12273.00 10125.00
(ii) for GradingII(19 mm nominal size) cum 9573.00 10336.00 10521.00 11433.00 11692.00 11538.00 12362.00 10210.00
5.7
Semi - Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete
with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 % of mix
and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with
sensor control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification
clause No. 508 complete in all respects)
(i) for Grading I ( 13 mm nominal size ) cum 10039.00 10837.00 11028.00 11973.00 12221.00 12059.00 12909.00 10677.00
(ii) for GradingII(10 mm nominal size) cum 10790.00 11638.00 11842.00 12855.00 13074.00 12898.00 13799.00 11417.00
5.8
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch
type hot mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and
filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor
control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects)
(i) for Grading-I ( 13 mm nominal size ) cum 10885.00 11701.00 11909.00 12943.00 13212.00 13031.00 13951.00 11526.00
(ii) for Grading-II(10 mm nominal size) cum 10976.00 11807.00 12015.00 13049.00 13314.00 13134.00 14053.00 11623.00
5.9
Surface Dressing (Providing and laying surface dressing as wearing course in single coat
using crushed stone aggregates of specified size on a layer of bituminous binder laid on
prepared surface and rolling with 8-10 tonne smooth wheeled steel roller)
Case -1 :-19 mm nominal chipping size sqm 100.00 105.00 107.00 114.00 117.00 116.00 122.00 104.00
Case II 13 mm nominal size chipping sqm 84.00 89.00 90.00 96.00 99.00 98.00 102.00 87.00
5.10
Open - Graded Premix Surfacing (Providing, laying and rolling of open - graded premix
surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve
as wearing course on a previously prepared base, including mixing in a suitable plant, laying
and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and
grades.)
(i)
Case - I: Mechanical method using Penetration grade Bitumen and HMP of appropriate
capacity not less than 75 tonnes/hour .
sqm 159.00 170.00 173.00 184.00 190.00 189.00 200.00 170.00
(ii) Case - II: Open-Graded Premix Surfacing using cationic Bitumen Emulsion sqm 197.00 208.00 211.00 225.00 231.00 229.00 239.00 205.00
13
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
5.11
Close Graded Premix Surfacing/Mixed Seal Surfacing (Mechanical means using HMP of
appropriate capacity not less than 75 tonnes/hour. Providing, laying and rolling of close-
graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-
a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen to the
required line, grade and level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne
capacity, and finishing to required level and grade. )
sqm 209.00 222.00 226.00 241.00 246.00 244.00 258.00 219.00
5.12
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A and B seal coats)
(i) Case - I : Type A sqm 79.00 83.00 85.00 91.00 93.00 92.00 96.00 82.00
(ii)
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of
appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7
mm size and penetration bitumen of suitable grade.)
sqm 60.00 64.00 65.00 70.00 71.00 71.00 75.00 63.00
5.13
Supply of Stone Aggregates for Pavement Courses (Supply of stone aggregates from
approved sources confirming to the physical requirement, specified in the respective specified
clauses, including royalties, fees rents, collection, transportation, stacking and testing and
measured in cum as per clause 514.5 Competitive market rates to be ascertained.
Alternatively, rates for stone crushing given in chapter 1may be adopted, if found economical.
In case for supply of aggregates at site are not available, nearest crusher site may be
ascertained. Loading and un-loading charges and cost of carriage may be added to these
rates to arrive at the cost at site.)
cum
Please refer
items No.
1.5 to 1.8
5.14
Mastic Asphalt (Providing and laying 25 mm thick mastic asphalt wearing course with paving
grade bitumen meeting the requirements given in table 500-29, prepared by using mastic
cooker and laid to required level and slope after cleaning the surface, including providing
antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal
size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to
center in both directions, pressed into surface when the temperature of surfaces not less than
1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.)
sqm 676.00 743.00 777.00 881.00 886.00 874.00 948.00 743.00
5.15
Slurry Seal (Providing and laying slurry seal consisting of a mixture of fine aggregates,
portland cement filler, bituminous emulsion and water on a road surface including cleaning of
surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even
riding surface)
(i) 5 mm thickness sqm 84.00 90.00 91.00 100.00 100.00 99.00 105.00 87.00
(ii) 3 mm thickness sqm 60.00 63.00 64.00 70.00 71.00 69.00 74.00 61.00
(iii) 1.5 mm thickness sqm 36.00 38.00 39.00 42.00 43.00 42.00 45.00 37.00
14
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
5.16
Recycling of Bituminous Pavement with Central Recycling Plant (Recycling pavement by
cold milling of exiting bituminous layers, planning the surface after cold milling, reclaiming
excavated material to the extent of 30 % of the required quantity, hauling and stock piling the
reclaimed material near the central recycling plant after carrying out necessary checks and
evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant,
transporting and laying at site and compacting to the required grade, level and thickness, all
as specified in clause 517.)
cum 8068.00 8637.00 8797.00 9516.00 9706.00 9604.00 10113.00 8510.00
5.17 Fog Spray sqm 47.00 49.00 50.00 54.00 54.00 53.00 57.00 47.00
1.In case it is decided by the engineer to blind the fog spray, the following may be added sqm 5.70 6.20 6.30 6.60 6.90 6.80 7.10 6.50
5.18
Bituminous Cold Mix ( Including Gravel Emulsion) (Providing, laying and rolling of
bituminous cold mix on prepared base consisting of a mixture of unheated mineral aggregate
and emulsified or cutback bitumen, including mixing in a plant of suitable type and capacity,
transporting, laying, compacting and finishing to specified grades and levels.)
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm nominal size aggregate cum 13175.00 14047.00 14281.00 15555.00 15788.00 15522.00 16646.00 13697.00
(ii) Using bitumen emulsion and 19 mm or 26.5 mm nominal size aggregate cum 13010.00 13833.00 14068.00 15341.00 15615.00 15350.00 16474.00 13532.00
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal size aggregate cum 9767.00 10481.00 10640.00 11531.00 11772.00 11589.00 12422.00 10294.00
(iv) Using cutback bitumen and 19 mm or 26.5 mm nominal size aggregate cum 9596.00 10263.00 10422.00 11312.00 11593.00 11411.00 12243.00 10123.00
5.19
Sand Asphalt Base Course (Providing, laying and rolling sand-asphalt base course
composed of sand, mineral filler and bituminous binder on a prepared sub-grade or sub-base
to the lines, levels, grades and cross sections as per the drawings including mixing in a plant
of suitable type and capacity, transporting, laying, compacting and finishing.)
cum 11384.00 14448.00 15656.00 25862.00 25862.00 23385.00 31323.00 14945.00
5.20
Modified Binder (Supply of modified binder produced by mixing bitumen with modifier such
as natural rubber or crumb rubber or any other polymer found compatible with bitumen and
which allows properties given in clause 521.3 and IRC: SP: 53 blending of modifier with
bitumen to be done either at the refinery or at the site plant capable of producing the modified
binder to be delivered in drums which shall be agitated in melted condition using suitable
device before use to ensure uniform dispersion.)
tonne
5.21 Crack Prevention Courses
(i)
Stress Absorbing Membrane (SAM) crack width less than 6 mm (Providing and laying of a
stress absorbing membrane over a cracked road surface, with crack width below 6 mm after
cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed
at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum
per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of
aggregates and surface finished to conform to clause 902.)
sqm 74.00 78.00 80.00 85.00 87.00 86.00 90.00 77.00
(ii)
Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm (Providing and laying
of a stress absorbing membrane over a cracked road surface, with crack width 6 to 9 mm after
cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed
at the rate of 11 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12
cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished
to conform to clause 902.)
sqm 87.00 92.00 93.00 100.00 102.00 101.00 106.00 90.00
15
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(iii)
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50
% (Providing and laying a single coat of a stress absorbing membrane over a cracked road
surface, with crack width above 9 mm and cracked area above 50 % after cleaning with a
mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15
kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm,
sweeping the surface for uniform spread of aggregates and surface finished to conform to
clause 902.)
sqm 116.00 121.00 123.00 132.00 135.00 133.00 140.00 119.00
(iv)
Case - IV : Bitumen Impregnated Geotextile (Providing and laying a bitumen impregnated
geotextile layer after cleaning the road surface, geotextile conforming to requirements of
clause 704.3, laid over a tack coat with 1.05 kg per sqm of paving grade bitumen 80 - 100
penetration and constructed to the requirement of clause 704.4.5)
sqm 100.00 105.00 108.00 116.00 116.00 116.00 124.00 102.00
5.22
Recipe Cold Mix (Providing and laying of premix of crushed stone aggregates and emulsion
binder, mixed in a batch type cold mixing plant, laid over prepared surface, by paver finisher,
rolled with a pneumatic tyred roller initially and finished with a smooth steel wheel roller, all as
per clause 519.3)
(i) 75 mm thickness cum 8335.00 8859.00 8987.00 9593.00 9946.00 9836.00 10457.00 8826.00
(ii) 40 mm thickness cum 11948.00 12640.00 12830.00 13756.00 14088.00 13909.00 14773.00 12423.00
(iii) 25 mm thickness cum 13865.00 14632.00 14860.00 15976.00 16279.00 16058.00 17068.00 14300.00
CHAPTER-6
CEMENT CONCRETE PAVEMENTS
16
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
6.1
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base
over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per table 600-1, cement content not to be less
than 150 kg/ cum, optimum moisture content to be determined during trial length construction,
concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported
to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller,
finishing and curing.)
cum 4145.00 5306.00 5690.00 4398.00 9314.00 8477.00 11250.00 5679.00
6.2
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement
concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum,
coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in
a continuous operation including provision of contraction, expansion, construction and
longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding
strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and
grades as per drawing )
cum 8153.00 9577.00 10052.00 9550.00 14508.00 13487.00 16898.00 9926.00
6.3
Rolled Cement Concrete Base (Construction of rolled cement concrete base course with
coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding
25 mm with minimum, aggregate cement ratio15:1 and minimum cement content of 200
kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant
at optimum moisture content, transporting to site, laying with a paver with electronic sensor,
compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural
strength, finishing and curing.)
cum 4633.00 5833.00 6233.00 5084.00 9999.00 9128.00 12010.00 6200.00
6.4
Transition section between rigid and flexible pavement (Due to change in the properties of
materials and type of construction, a gradual changeover from rigid pavement to flexible
pavement is desirable to avoid any damage at the butting joint. After provision of an expansion
joint in the cement concrete slab, the thickness of slab should be tapered to 10 cm over a
length of 3 m towards the flexible pavement. The deficiency of thickness caused due to
tapering of the slab should be made up by the asphaltic layers.)
6.5
Construction of Base/Sub-base of pavement with lean concrete - fly ash. (Construction of
Base/sub-base using cement, sand, fly ash and coarse aggregates proportioned as per table
4 of IRC: 74/1979 and with water content ratio, slump and compressive strength as defined in
the said table, mix prepared in a batching and mixing plant and compacted with a vibratory
roller 8-10 tonnes capacity within the time limit laid down vide clause 7.6.3 of IRC: 74-1979,
construction joints properly formed at the end of day's work, cured for 14 days, all as specified
in IRC: 74-1979 and as per approved plans.)
cum 3910.00 5069.00 5538.00 4455.00 9137.00 8299.00 11157.00 5517.00
17
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
6.6
Cement - Fly ash concrete pavement. (Construction reinforced-reinforced, dowel jointed,
plain cement concrete pavement over a prepared sub base with 43 grade cement, coarse and
fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25
mm, replacing cement by fly ash to the extent of 15% and sand by 10%, mixed in a batching
and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip
form paver, spread, compacted and finished in a continuous operation including provision of
contraction, expansion, construction and longitudinal joints, joint filler, separation membrane,
sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved,
curing compound, finishing to lines and grades as per drawing )
cum 8426.00 9863.00 10503.00 15248.00 15271.00 14319.00 18592.00 10346.00
7.1
Sub- Surface Drain with Geotextiles (Construction of sub surface drain 200 mm dia using
geotextiles treated with carbon black with physical properties as given in clause 702.2.3
formed in to a stable network and a planar geocomposite structure, joints wrapped with
geotextile to prevent ingress of soil, all as per clause 702 and approved drawings including
excavation and backfilling)
metre 347.00 383.00 387.00 394.00 394.00 399.00 406.00 370.00
7.2
Narrow Filter Sub- Surface Drain (Construction of a narrow filter sub- surface drain
consisting of porous or perforated pipe laid in narrow trench surrounded by a geotextile filter
fabric, with a minimum of 450 mm overlap of fabric and installed as per clause 702.3 and
309.3.5 including excavation and backfilling)
metre 669.00 713.00 732.00 740.00 740.00 750.00 758.00 700.00
CHAPTER-7
GEOSYNTHETICS AND REINFORCED EARTH
18
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
7.3
Laying Paving Fabric Beneath a Pavement Overlay (Providing and laying paving fabric with
physical requirements as per table 704-2 over a tack coat of paving grade Bitumen 80-100
penetration, laid at the rate of 1 kg per sqm over thoroughly cleaned and repaired surface to
provide a water resistant membrane and crack retarding layer. Paving fabric to be free of
wrinkling and folding and to be laid before cooling of tack coat, brooming and rolling of surface
with pneumatic roller to maximise paving fabric contact with pavement surface)
sqm 251.00 254.00 255.00 268.00 268.00 269.00 275.00 243.00
7.4
Laying Boulder Apron in Crates of Synthetic Geogrids (Providing, preparing and laying of
geogrid crated apron 1 m x 5 m, 600 mm thick including excavation and backfilling with baffles
at 1 metre interval, made with geogrids having characteristics as per clause 704.2, joining
sides with connectors/ring staples, top corners to be tie tensioned, placing of suitable cross
interval ties in layers of 300 mm connecting opposite side with lateral braces and tied with
polymer braids to avoid bulging, constructed as per clause 704.3. filled with stone with
minimum size of 200 mm and specific gravity not less than 2.65, packed with stone spalls,
keyed to the foundation recess in case of sloping ground and laid over a layer of geotextile to
prevent migration of fines, all as per clause 704 and laid as per clause 2503.3 and approved
design.)
cum 746.00 850.00 864.00 802.00 961.00 968.00 977.00 861.00
7.5
Reinforced Earth Retaining Wall (Reinforced earth retaining walls have four main
components as under: a) Excavation for foundation, foundation concrete and cement
concrete grooved seating in the foundation for facing elements (facia material). b) Facia
material and its placement. c) Assembling, joining with facing elements and laying of the
reinforcing elements. d) Earthfill with granular material which is to be retained by the wall.)
(i) Facing elements of RCC sqm 1547.00 1760.00 1863.00 1888.00 2621.00 2523.00 3223.00 2075.00
(ii) Assembling, joining and laying of reinforcing elements.
A With reinforcing element of steel / Aluminium strips / polymeric strips.
Type 1 1.Galvanised carbon steel strips metre 29.00 30.00 31.00 34.00 34.00 34.00 35.00 30.00
Type 2 2.Copper Strips metre 54.00 61.00 64.00 67.00 67.00 68.00 70.00 61.00
Type 3 3.Aluminium Strips metre 44.00 46.00 49.00 52.00 52.00 53.00 54.00 47.00
Type 4 4.Stainless steel strips metre 36.00 46.00 49.00 52.00 52.00 53.00 54.00 38.00
Type 5 5.Glass reinforced polymer/fibre reinforced polymer/polymeric strips metre 69.00 75.00 78.00 82.00 82.00 83.00 85.00 75.00
B With reinforcing elements of synthetic geogrids sqm 57.00 62.00 65.00 67.00 67.00 68.00 71.00 62.00
19
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.1
Cast in Situ Cement Concrete M20 kerb (Construction of cement concrete kerb with top and
bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade
foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone
laid with kerb laying machine, foundation concrete laid manually, all complete as per clause
408)
A Using Concrete Mixer metre 359.00 459.00 493.00 725.00 776.00 711.00 918.00 487.00
B Using Concrete Batching and Mixing Plant metre 366.00 463.00 492.00 422.00 752.00 692.00 880.00 487.00
8.2
Cast in Situ Cement Concrete M 20 Kerb with Channel (Construction of cement concrete
kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M
20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide, 50 mm
thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying
machine, foundation concrete laid manually, all complete as per clause 408)
A Using Concrete Mixer metre 668.00 857.00 922.00 1382.00 1486.00 1355.00 1766.00 913.00
B Using Concrete Batching and Mixing Plant metre 677.00 859.00 915.00 769.00 1434.00 1313.00 1688.00 908.00
8.3
Printing new letter and figures of any shade (Printing new letter and figures of any shade
with synthetic enamel paint black or any other approved colour to give an even shade)
(i)
Hindi ( Matras commas and the like not to be measured and paid for Half letter shall be
counted as half ) c
m

h
e
i
g
h
t

p
e
r

l
e
t
t
e
r
0.80 0.90 0.90 0.90 0.90 0.90 0.90 0.90
(ii)
English and Roman
c
m

h
e
i
g
h
t

p
e
r

l
e
t
t
e
r
0.50 0.60 0.60 0.60 0.60 0.60 0.60 0.50
8.4
Retro- reflectorised Traffic signs (Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective
sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild
steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below
ground level as per approved drawing)
CHAPTER-8
TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES
20
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
( i ) 90 cm equilateral triangle each 5662.00 5976.00 6184.00 6781.00 6873.00 6763.00 7459.00 6007.00
( ii ) 60 cm equilateral triangle each 3611.00 3866.00 3997.00 4568.00 4659.00 4522.00 5165.00 3903.00
( iii ) 60 cm circular each 4954.00 5248.00 5429.00 6017.00 6108.00 5989.00 6667.00 5280.00
( iv ) 80 mm x 60 mm rectangular each 7037.00 7391.00 7649.00 8265.00 8356.00 8264.00 8997.00 7417.00
( v ) 60 cm x 45 cm rectangular each 4816.00 5106.00 5282.00 5868.00 5960.00 5839.00 6513.00 5139.00
(vi ) 60 cm x 60 cm square each 5768.00 6085.00 6296.00 6895.00 6987.00 6878.00 7578.00 6115.00
( vii ) 90 cm high octagon each 9068.00 9479.00 9813.00 10455.00 10547.00 10482.00 11268.00 9500.00
8.5
Direction and Place Identification signs upto 0.9 sqm size board. (Providing and erecting
direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated
lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with
area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm
firmly fixed to the ground by means of properly designed foundation with M15 grade cement
concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)
sqm 12745.00 13278.00 13748.00 14470.00 14571.00 14563.00 15506.00 13293.00
8.6
Direction and Place Identification signs with size more than 0.9 sqm size board.
(Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67
made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post
75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed
foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground
level as per approved drawing)
sqm 21911.00 22871.00 23680.00 25076.00 25279.00 25215.00 27010.00 22918.00
8.7
Overhead Signs (Providing and erecting overhead signs with a corrosion resistant aluminium
alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type
with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause
802.7 over a designed support system of aluminium alloy or galvanised steel trestles and
trusses of sections and type as per structural design requirements and approved plans)
A Truss and Vertical Support tonne 84413.00 86314.00 86924.00 88514.00 88514.00 89230.00 90566.00 83883.00
B Aluminium alloy plate for over head sign sqm 891.00 938.00 1002.00 1000.00 1000.00 1014.00 1042.00 963.00
8.8
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface
with synthetic enamel paint in all shades on new plastered concrete surfaces)
sqm 133.00 138.00 138.00 139.00 139.00 139.00 139.00 132.00
8.9
Painting on Steel Surfaces (Providing and applying two coats of ready mix paint of approved
brand on steel surface after through cleaning of surface to give an even shade)
sqm 73.00 77.00 77.00 78.00 78.00 77.00 78.00 74.00
8.10
Painting on Wood Surfaces (Providing and applying two coats of ready mix paint of
approved brand on wood surface after through cleaning of surface to give an even shade) sqm 83.00 87.00 87.00 88.00 88.00 88.00 88.00 83.00
8.11
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines,
dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint
conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and
other foreign matter, demarcation at site and traffic control )
(i) Over 10 cm in width sqm 162.00 170.00 170.00 171.00 171.00 171.00 171.00 163.00
(ii) Up to 10 cm in width sqm 148.00 155.00 155.00 156.00 156.00 155.00 156.00 148.00
21
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.12
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work (Painting lines,
dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint
confirming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and
other foreign matter, demarcation at site and traffic control )
(i) Over 10 cm in width sqm 105.00 111.00 111.00 111.00 111.00 111.00 111.00 106.00
(ii) Up to 10 cm in width sqm 110.00 116.00 116.00 117.00 117.00 117.00 117.00 111.00
8.13
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass
Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound
2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5
mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be
level, uniform and free from streaks and holes.)
sqm 2167.00 2175.00 2181.00 2199.00 2199.00 2197.00 2208.00 2088.00
8.14
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design
as per IRC:8-1980, fixing in position including painting and printing etc)
(i) 5th kilometre stone (precast) each 3469.00 4112.00 4340.00 5823.00 6121.00 5809.00 7619.00 4482.00
(ii) Ordinary Kilometer stone (Precast) each 2119.00 2534.00 2683.00 3682.00 3887.00 3663.00 4890.00 2776.00
(iii) Hectometer stone (Precast) each 559.00 646.00 679.00 861.00 897.00 895.00 1147.00 749.00
8.15
Road Delineators (Supplying and installation of delineators (road way indicators, hazard
markers, object markers), 80-100 cm high above ground level, painted black and white in 15
cm wide stripes, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels
at the top, buried or pressed into the ground and confirming toIRC-79 and the drawings.)
each 1122.00 1158.00 1165.00 1193.00 1193.00 1179.00 1227.00 1114.00
8.16
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design
as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting) each 1065.00 1641.00 1658.00 1741.00 2055.00 2066.00 2191.00 1748.00
8.17
G.I Barbed wire Fencing 1.2 metre high (Providing and fixing 1.2 metres high GI barbed wire
fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres center to
center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post,
last but one end post and corner post shall be strutted on both sides and end post on one side
only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires,
fixed with GI staples, turn buckles etc complete as per clause 807 )
metre 638.00 673.00 737.00 785.00 785.00 785.00 802.00 705.00
8.18
G.I Barbed wire Fencing 1.8 metre high (Providing and fixing 1.8 metres high GI barbed wire
fencing with 2.4 m angle iron posts 50 mm x 50 mm x 6 mm placed every 3 metres center to
center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post,
last but one end post and corner post shall be strutted on both sides and end post on one side
only and provided with 12 horizontal lines and 2 diagonals interwoven with horizontal wires,
fixed with GI staples, turn buckles etc complete as per clause 807 )
metre 920.00 969.00 1051.00 1123.00 1123.00 1119.00 1148.00 1006.00
22
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.19
Fencing with welded steel wire Fabric 75 mm x 50 mm (Suggestive) (Providing 1.20 metre
high fencing with angle iron posts 50 mm x 50 mm x 6 mm at 3 metre center to center with
0.40 metre embedded in M15 grade cement concrete, corner, end and every 10th post to be
strutted, provided with welded steel wire fabric of 75 mm x 50 mm mesh or 75 mm x 25 mm
mesh and fixed to iron posts by flat iron 50 x 5 mm and bolts etc. complete in all respects.)
metre 611.00 663.00 671.00 723.00 723.00 708.00 744.00 643.00
8.20
Tubular Steel Railing on Medium Weight steel channel ( ISMC series) 100 mm x 50 mm
(Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium
weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m
centre to centre, complete as per approved drawings)
metre 1694.00 1852.00 1906.00 2311.00 2373.00 2239.00 2641.00 1838.00
8.21
Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level (Providing,
fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC
vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres
centre to, complete as per approved drawing)
metre 1212.00 1372.00 1433.00 1742.00 1969.00 1795.00 2348.00 1430.00
8.22
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete
crash barrier at the edges of the road, approaches to bridge structures and medians,
constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and
dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler
board, keyed to the structure on which it is built and installed as per design given in the
enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per
dimensions in the approved drawing and at locations directed by the Engineer, all as
specified)
(i) M 20 grade concrete metre 3917.00 4403.00 4661.00 4868.00 6555.00 6445.00 9200.00 5588.00
8.23 Metal Beam Crash Barrier
A
Type - A, "W" : Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash
barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground
level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to
centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised
by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed
on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete
as per clause 810)
metre 2940.00 3042.00 3066.00 3306.00 3306.00 3248.00 3423.00 2938.00
B
Type - B, "THRIE" : Metal Beam Crash Barrier (Providing and erecting a "Thrie" metal beam
crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above
road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m
centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail
to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long
complete as per clause 810)
metre 3975.00 4241.00 4309.00 4999.00 4999.00 4831.00 5336.00 4138.00
8.24
Road Traffic Signals electrically operated (Since it is a ready made item commercially
produced and erected by specialised firm in the electrical and electronic field, rate may be
taken based on market enquiry from firms specialised in this field and ISI certified for the
approved design and drawing.)
23
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.25
Flexible Crash Barrier, Wire Rope Safety Barrier (Providing and erecting a wire rope safety
barrier with vertical posts of medium weight RS Joist (ISMB series) 100 mm x 75 mm (11.50
kg/m), 1.50 m long 0.85 m above ground and 0.65 m below ground level, split at the bottom
for better grip, embedded in M 15 grade cement concrete 450 x 450 x 450 mm, 1.50 m center
to center and with 4 horizontal steel wire rope 40 mm dia and anchored at terminal posts 15 m
apart. Terminal post to be embedded in M 15 gradecementconcretefoundation2400 x 450 x
900 mm (depth), strengthened by a strut of RS joist 100 x 75 mm, 2 m long at 450 inclination
and a tie 100 x 8 mm, 1.50 m long at the bottom, all embedded in foundation concrete as per
approved design and drawing, rate excluding excavation and cement concrete.)
metre 3675.00 3753.00 3780.00 4068.00 4068.00 3996.00 4155.00 3768.00
8.26 Anti - Glare Devices in Median
A
Plantation (Plantation of shrubs and plants of approved species in the median. apart from
cutting off glare from vehicle coming from opposite direction, these plants provide a pleasant
envoirenment and are eco-friendly. The rate for this item is available in the chapter 11 on
horticulture. )
B
Anti - Glare Screen with 25 mm steel pipe framework fixed with circular and rectangular
vans (Providing and erecting an anti - glare screen with 25 mm dia vertical pipes fabricated
and framed in the form of panels of one metre length and 1.75 mtr height fixed with circular
vane 250 mm dia at top and rectangular vane 600 x 300 mm at the middle, made out of steel
sheet of 3 mm thickness, end vertical pipes of the panel made larger for embedding in
foundation concrete, applying 2 coats of paint on all exposed surfaces, all as per approved
design and drawings.)
metre 2457.00 2548.00 2574.00 2796.00 2795.00 2805.00 2864.00 2566.00
C
Anti - Glare Screen with Rectangular Vane of MS sheet (Providing and erecting anti - glare
screen with rectangular vanes of size 750 x 500 mm made from MS sheet, 3 mm thick and
fixed on MS angle 50 x 50 x 6 mm at an angle of 450 to the direction of flow of traffic, 1.5 m
center to center, top edge of the screen 1.75 m above ground level, vertical post firmly
embedded in cement concrete foundation 0.60 m below ground level, applying 2 coats of paint
on exposed faces, all complete as per approved design and drawings)
metre 915.00 948.00 956.00 1063.00 1063.00 1047.00 1101.00 948.00
8.27
Street Lighting (Providing and erecting street light mounted on a steel circular hollow pole of
standard specifications for street lighting, 9 m high spaced 40 m apart, 1.8 m overhang on
both sides if fixed in the median and on one side if fixed on the footpath, fitted with sodium
vapour lamp and fixed firmly in concrete foundation.)
(i) For Fixing in Median each 27794.00 28298.00 28484.00 29514.00 29513.00 29397.00 30056.00 27246.00
(ii) For fixing in Footpath each 27716.00 28216.00 28402.00 29366.00 29365.00 29314.00 29973.00 27168.00
8.28
Lighting on Bridges (Providing and fixing lighting on bridges, mounted on steel hollow
circular poles of standard specifications, 5 m high fixed on parapets with cement concrete, 20
m apart and fitted with sodium vapour lamp)
each 19477.00 19754.00 20023.00 20671.00 20670.00 20650.00 20932.00 19152.00
24
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.29
Cable Duct Across the Road (Providing and laying of a reinforced cement concrete pipe
duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts
and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a
minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded
on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at
least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints
to be made leak proof, invert level of duct to be above higher than ground level to prevent
entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.)
(i) Single Row for one utility service metre 7029.00 8156.00 8266.00 9859.00 10061.00 10452.00 11725.00 8477.00
(ii) Double Row for two utility services metre 13810.00 15999.00 16198.00 19216.00 19589.00 20426.00 22767.00 16617.00
(iii) Triple Row for three utility services metre 20605.00 23857.00 24145.00 28588.00 29133.00 30416.00 33824.00 24771.00
8.30
Highway Patrolling and Traffic Aid Post (It is proposed to locate one Traffic Aid Post every
50-60 km of the highway. )
8.31
Items related to under pass/ subway/ overhead bridge/ overhead foot bridge (The items
involved for underpass/ subway/ overhead bridge/ overhead foot bridge are earthwork, plain
cement concrete, plastering, painting, information sign etc. The rates for these items are
available in respective chapters which can be adopted for the quantities derived from the
approved designs and drawings)
8.32
Traffic Control System and Communication system (Providing a traffic control centre and
communication system including telecommunication facilities and related accessories, CCTV,
radar, vehicle detection camera, central computer system These are specialised item of
telecommunication system and are the commercial products. The designer is required to
contact the manufacturers to ascertain market prices. In case of civil works required to be
executed for these installations, pricing may be done as per rates in relevant chapters for
quantities derived approved design and drawing.)
8.33
Gantry Mounted Variable Message Sign board (Providing and erecting gantry mounted
variable message sign board electronically operated capable of flashing the desired message
over a designed support system of aluminium alloy or galvanised steel, erected as per
approved design and drawings and with lateral clearance as per clause 802.3)
(i) Gantry Support System tonne 82100.00 83836.00 84299.00 85685.00 85685.00 86302.00 87534.00 81370.00
(ii)
Message Display (Message display board 6 sqm electronically operated with complete
electronic fitments for flashing the pre-determined messages.)
8.34 Traffic Impact Attenuators at Abutments and Piers
A
With Scrap Tyres (Provision and installation of traffic attenuators at abutment/pier of flyovers
bridges using scrap tyres of size 100 x 20 retrieved from trucks laid in 2 rows and 4 tiers, one
above the other and tied with 20 mm wire rope as per approved design and drawings.)
sqm 3436.00 3576.00 3623.00 3754.00 3754.00 3815.00 3926.00 3732.00
25
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
B
Using Plastic/Steel Barrel, Filled with Sand (Provision and installation of traffic impact
attenuator at abutment/pier of flyovers bridges using plastic/steel barrels 0.60 m dia and 1.0 m
in height, filled with sand in three rows and tied with20 mm steel wire rope as per approved
design and drawings)
sqm 1540.00 2343.00 2668.00 1238.00 5405.00 4790.00 6843.00 2691.00
C
With HI - DRO cell Sandwich (Patented) ((In this patented HI - DRO cell system, water gets
discharged from plastic tubes on impact over a pre-determined time, thus absorbing the
energy))
sqm 3214.00 3504.00 3573.00 3750.00 3750.00 3808.00 3935.00 3748.00
8.35
Road Markers/Road Stud with Lense Reflector (Providing and fixing of road stud 100x 100
mm, die cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense
reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60
mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973)
each 1188.00 1258.00 1286.00 1314.00 1314.00 1300.00 1356.00 1230.00
8.36
Traffic Cone (Provision of red fluorescent with white reflective sleeve traffic cone made of low
density polyethylene (LDPE) material with a square base of 390 x 390 x 35 mm and a height
of 770 mm, 4 kg in weight, placed at 1.5 m interval, all as per BS 873)
each 1166.00 1240.00 1249.00 1255.00 1255.00 1263.00 1277.00 1195.00
8.37 Roadside Amenities
A
Rest Areas (Providing plainly furnished accommodation for rest rooms, dormitories,
restaurants, stalls, shops, petrol pump, telephone booth, first aid room, traffic aid post, police
assistance booth, including electricity, toilet and sewerage system Pricing may be done based
on current plinth area rates approved by PWD/CPWD/MES for a particular zone. Area is
required to be assessed for specific location as per actual site conditions)
B
Parking areas and Bus Laybyes for Trucks, Buses and Light vehicles (Pricing of parking
areas may be done for the quantities of various items based on the approved dimensions and
pavement design for a particular terrain and soil. Rates for items may be from respective
chapters.)
C Lawn (Providing a lawn planted with grass and its maintenance )
8.38
Rumble Strips (Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-
20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to
control speed, marked with white strips of road marking paint.)
sqm
8.39
Policeman Umbrella (Provision of a 2 m high (floor to roof) umbrella for traffic policeman at
road crossings, where necessary, installed on a raised platform, built on a central support of a
steel pipe 100 mm dia, roof made of 25 mm dia steel pipe to provide covered area of 3 sqm,
roofed with CGI sheets, all steel parts to be given 2 coats of paint)
each
26
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.40
High Mast Pole Lighting at Interchanges and Flyovers (Providing and erecting a high mast
pole lighting with 30 m high hot dip galvanised mast designed to withstand forces exerted with
wind speeds of 180 km per hour with 3 seconds gust, as per IS:875 (Part 3) - 1978, fitted
with a base flange, door at the base of mast with heavy duty internal lock, lantern carriage,
suitable winching arrangement for safe working load of 750 kg and high powered electrically
driven power tools for raising and lowering of lantern carriage, flexible 8 core electric cable,
lightening conductor, earthing terminal, and fixing 2 nos aviation obstruction lights on top of
the mast, all complete as per approved design and drawings This is a specialised work and is
generally done by firms who specialise in such jobs. The detailed designs and estimates are
submitted by the firms alongwith their tender for checks by the Department. The cost of this
work is required to be worked out based on approved design, drawings and estimate of the
lowest tender. A separate contract for this work is concluded as the contractors for road and
bridge works generally donot undertake such works)
8.41
Toll Plaza (The construction, operation and maintenance of Toll Plaza can be broken into
separate items of work as under based on the approved design and drawings:-)
8.42
Safety Devices and signs in Construction Zones (Provision and fixing of traffic signs for
limited period at suitable locations in construction zone comprising of warning zone, approach
transition zone, working zone and terminal transition zone with a minimum distance of 60 cm
from the edge of the kerb in case of kerbed roads and 2 to 3 m from the edge of the
carriageway in case of un-kerbed roads, the bottom edge of the lowest sign plate to be not
less than 2 m above the road level, fixed on 60 mm x 60 mm x 6 mm angle iron post,
founded and installed as per approved design and drawings, removed and disposed of after
completion of construction work, all as per IRC:SP:55-2001)
8.43
Portable Barricade in Construction Zone (Installation of a steel portable barricade with
horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm
angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white
stripes, 150 mm in width at an angle of 450, 'A' frame painted with 2 coats of yellow paint,
complete as per IRC:SP:55-2001 )
each 3010.00 3143.00 3164.00 3378.00 3378.00 3326.00 3483.00 3032.00
8.44 Permanent Type Barricade in Construction Zone
A
With Steel Components (Construction of a permanent type barricade made of steel
components, 1.5 m high from road level, fitted with 3 horizontal rails 200 mm wide and 4 m
long on 50 x 50 x 5 mm angle iron vertical support, painted with yellow and white strips, 150
mm in width at an angle of450, complete as per IRC:SP:55-2001 )
each 4816.00 5012.00 5046.00 5395.00 5395.00 5310.00 5565.00 4835.00
B
With Wooden Components (Construction of a permanent type barricade made of wooden components,
1.5 m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm
wooden vertical post, painted with yellow and white striups, 150 mm in width at an angle of450,
complete as per IRC:SP:55-2001 )
each 5046.00 5133.00 4937.00 4937.00 4937.00 4937.00 4937.00 4723.00
C
With Bricks (Construction of a permanent type barricade made with brick work in mud
mortar, 1.5 m high, 4 m long, 600 mm thick, plastered with cement mortar 1:6, painted with
yellow and white strips)
each 15856.00 22044.00 24386.00 45557.00 45671.00 40375.00 56669.00 23521.00
27
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
8.45
Drum Delineator in Construction Zone (Provision of metal drum/empty bitumen drum
delineator, 300 mm in diameter, 800 mm high, filled with earth for stability, painted in
circumferential strips of alternate black and white 100 mm wide fitted with reflectors 3 Nos of
7.5 cm dia, all as per IRC:SP:55-2001)
each 495.00 544.00 557.00 598.00 598.00 610.00 624.00 569.00
8.46
Flagman (Positioning of a smart flagman with a yellow vest and a yellow cap and a red flag
600 x 600 mm securely fastened to a staff 1 m in length for guiding the traffic)
each 349.00 395.00 393.00 393.00 393.00 393.00 393.00 376.00
9.1
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40
mm nominal size mechanically mixed, placed in foundation and compacted by vibration
including curing for 14 days.)
cum 5464.00 6989.00 7484.00 10959.00 11744.00 10774.00 13875.00 7389.00
9.2
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class
bedding in single row . (Laying Reinforced cement concrete pipe NP4/prestrssed concrete
pipe for culverts on first class bedding of granular material in single row including fixing collar
with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets . )
A 1000 mm dia metre 11626.00 12891.00 13005.00 16345.00 14503.00 14973.00 15909.00 12710.00
B 1200 mm dia metre 12178.00 14972.00 15191.00 16542.00 16706.00 17169.00 18133.00 15085.00
9.3
Laying Reinforced Cement Concrete Pipe NP 4 /prestrssed concrete pipe on first class
bedding in double row . (Laying Reinforced cement concrete pipe NP4 /prestrssed concrete
pipe for culverts on first class bedding of granular material in double row including fixing collar
with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets . )
A 1000 mm dia metre 23772.00 26332.00 26592.00 29333.00 29743.00 30663.00 32638.00 26057.00
B 1200 mm dia metre 24913.00 30535.00 31004.00 33751.00 34202.00 35106.00 37142.00 30852.00
CHAPTER-9
PIPE CULVERTS
28
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
10.1
Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of
these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not
exceeding 250 mm and compacting with plate compactor or power rammers to restore the
original alignment, levels and slopes)
cum 232.00 274.00 275.00 278.00 278.00 280.00 281.00 263.00
10.2
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/
irregularities on shoulder to the design level by adding fresh approved soil and compacting it
with appropriate equipment.)
sqm 70.00 81.00 82.00 85.00 85.00 87.00 89.00 79.00
10.3
Maintenance of Earth Shoulder (stripping excess soil) (Stripping excess soil from the
shoulder surface to achieve the approved level and compacting with plate compactor)
sqm 14.80 16.40 16.90 17.70 17.70 18.00 18.70 16.10
10.4
Filling Pot- holes and Patch Repairs with open - graded Premix surfacing, 20mm.
(Removal of all failed material, trimming of completed excavation to provide firm vertical
faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per
clause 503, back filling the pot holes with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to form a smooth continuous surface, all as
per clause 3004.2)
sqm 171.00 183.00 185.00 197.00 203.00 202.00 210.00 181.00
10.5
Filling Pot- holes and Patch Repairs with - Bituminous concrete, 40mm. (Removal of all
failed material, trimming of completed excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base of excavation as per clause 503, back
filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and
finishing the surface to form a smooth continuous surface, all as per clause 3004.2)
(i) for grading I Material sqm 434.00 465.00 472.00 503.00 515.00 510.00 533.00 458.00
(ii) for grading II Material sqm 445.00 480.00 488.00 529.00 541.00 534.00 564.00 473.00
10.6
Crack Filling (Filling of crack using slow - curing bitumen emulsion and applying crusher dust
in case crack are wider than 3mm.)
metre 4.60 4.80 4.90 5.30 5.30 5.20 5.50 4.60
10.7
Dusting (Applying crusher dust to areas of road where bleeding of excess bitumen has
occurred.)
sqm 1.70 2.03 2.03 2.03 2.30 2.28 2.28 2.18
10.8 A Fog Seal (ref item 5.17) sqm 53.00 55.00 56.00 61.00 61.00 60.00 64.00 54.00
CHAPTER-10
MAINTENANCE OF ROADS
29
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
B Crack Prevention courses. (ref item 5.21)
(i) Stress Absorbing Membrane (SAM) crack width less than 6 mm sqm 87.00 92.00 93.00 100.00 102.00 101.00 106.00 90.00
(ii) Stress Absorbing Membrane (SAM) with crack width 6 mm to 9 mm sqm 116.00 121.00 123.00 132.00 135.00 133.00 140.00 119.00
(iii)
Stress Absorbing Membrane (SAM) crack width above 9 mm and cracked area above 50
%
sqm 100.00 105.50 108.20 115.90 116.00 116.00 124.00 102.00
(iv) Bitumen Impregnated Geotextile sqm 93.00 110.00 116.00 163.00 171.00 158.00 200.00 110.00
C Slurry Seal (ref item 5.15)
(i) 5 mm thickness sqm 93.00 110.00 116.00 163.00 171.00 158.00 200.00 110.00
(ii) 3 mm thickness sqm 64.00 74.00 78.00 106.00 111.00 103.00 128.00 74.00
(iii) 1.5 mm thickness sqm 36.00 38.00 39.00 42.00 43.00 42.00 45.00 37.00
D Surface Dressing for maintance works. (ref item 5.9)
(i) 19 mm nominal chipping size sqm 100.00 105.00 107.00 114.00 117.00 116.00 122.00 104.00
(ii) 13 mm nominal size chipping sqm 84.00 89.00 90.00 96.00 99.00 98.00 102.00 87.00
10.9
Repair of joint Grooves with Epoxy Mortar (Repair of spalled joint grooves of contraction
joints, longitudinal joints and expansion joints in concrete pavements using epoxy mortar or
epoxy concrete)
metre 787.00 792.00 793.00 800.00 800.00 798.00 803.00 759.00
10.10
Repair of old Joints Sealant (Removal of existing sealant and re sealing of contraction,
longitudinal or expansion joints in concrete pavement with fresh sealant material)
metre 78.00 80.00 81.00 83.00 83.00 84.00 85.00 80.00
10.11
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it
on the valley side manually)
metre 28.00 31.00 31.00 31.00 31.00 31.00 31.00 30.00
10.12
Land Slide Clearance in soil (Clearance of land slides in soil and ordinary rock by a bull-
dozer D 80 A-12, 180 HP and disposal of the same on the valley side)
cum 67.00 75.00 79.00 86.00 61.00 89.00 93.00 75.00
10.13
Land slide Clearance in Hard Rock Requiring Blasting (Clearing of land slide in hard rock
requiring blasting for 50% of the boulders and disposal of the same on the valley side.) cum 153.00 163.00 170.00 180.00 180.00 185.00 190.00 163.00
10.14
Snow Clearance on Roads with Dozer (Snow clearance from road surface by a bull- dozer
165 Hp and disposing it on the valley side)
cum 4.70 5.20 5.40 6.00 6.00 6.20 6.50 5.20
10.15
Snow Clearance on Roads with Snow Blowers (Snow clearance from road surface by a
snow blower and disposing on the valley side.)
cum 1.50 1.70 1.70 1.90 1.90 2.00 2.00 1.70
11.1
Spreading of Sludge Farm Yard Manure or/and good Earth (Spreading of sludge farm yard
manure or/ and good earth in required thickness (cost of sludge, farm- yard manure or/and
good earth to be paid for separately))
cum 18.00 20.00 20.00 20.00 20.00 20.00 20.00 19.00
CHAPTER-11
HORTICULTURE
30
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
11.2
Grassing with ' Doobs' Grass (Grassing with 'Doobs' grass including watering and
maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds
and fit for moving including supplying good earth if needed)
(i) In rows 15 cm apart in either direction sqm 84.00 99.00 101.00 101.00 101.00 101.00 101.00 96.00
(ii) In rows 7.5 cm apart in either direction sqm 161.00 192.00 194.00 194.00 194.00 194.00 194.00 186.00
11.3
Making Lawns including Ploughing and Dragging with 'Swagha' Breaking of Clod
(Making lawns including ploughing and breaking of clod, removal of rubbish, dressing and
supplying doobs grass roots and planting at 15 cm apart, including supplying and spreading
of farm yard manure at rate of 0.18 cum per 100 sqm)
sqm 106.00 121.00 124.00 124.00 124.00 124.00 124.00 118.00
11.4
Maintenance of Lawns or Turfing of Slopes (Maintenance of lawns or Turfing of slopes
(rough grassing) for a period of one year including watering etc)
sqm 326.00 494.00 494.00 494.00 494.00 483.00 494.00 473.00
11.5
Turfing Lawns with Fine Grassing including Ploughing, Dressing (Turfing lawns with fine
grassing including ploughing, dressing including breaking of clods, removal of rubbish,
dressing and supplying doobs grass roots at 10 cm apart, including supplying and spreading
of farm yard manure at rate of0.6 cum per 100 sqm)
sqm 109.00 126.00 128.00 128.00 128.00 128.00 128.00 123.00
11.6 Maintenance of Lawns with Fine Grassing for the First Year sqm 336.00 472.00 472.00 472.00 472.00 465.00 472.00 452.00
11.7
a) Planting Permanent Hedges including Digging of Trenches (Planting permanent
hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated
earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and
supplying and planting hedge plants at 30 cm apart)
metre 136.00 165.00 165.00 165.00 165.00 165.00 165.00 158.00
(b) Maintenance of Hedge for one year metre 199.00 266.00 266.00 266.00 266.00 262.00 266.00 254.00
11.8 [a] Planting Flowering Plants and Shrubs in Central Verge km 36810.00 49066.00 49228.00 49235.00 49235.00 49183.00 49641.00 47087.00
(b) Maintenance of Flowering Plants and Shrubs in Central Verge for one Year km 233595.00 292436.00 292464.00 292484.00 292484.00 290274.00 292559.00 279748.00
11.9
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side
(Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed
farm yard/sludge mannure, planting the saplings, backfilling the trench, watering, fixing the
tree guard and maintaining the plants for one year)
each 935.00 1212.00 1213.00 1213.00 1213.00 1199.00 1214.00 1160.00
11.10
Renovation Lawns including, Weeding, Forking the Ground, Top Dressing with Forked
Soil (Renovation lawns including, weeding, forking the ground, top dressing with forked soil,
watering and maintenance the lawns, for 30 days or more, till the grass forms a thick lawn,
free from weeds, and fit for moving and disposal of rubbish as directed, including supplying
good earth, if needed but excluding the cost of well decayed farm yard manure)
sqm 18.00 24.00 24.00 24.00 24.00 24.00 24.00 23.00
11.11
Supply at Site Well Decayed Farm Yard Manure (Supply at site of work well decayed farm
yard manure, from any available source, approved by the engineer in charge including
screening and stacking)
cum
11.12
Supply at Site of Work/ Store - Deoiled Neem Cake (Supply at site of work/ store- deoiled
neem cake duly packed in used gunny bags)
quintal
11.13 Supplying Sludge (Supplying sludge duly stacked at site/ store) cum
31
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
11.14
Half Brick Circular Tree Guard, in 2nd class Brick, internal diametre 1.25 metres, and
height 1.2 metres, above ground and 0.20 metre below ground (Half brick circular tree
guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 metres, above
ground and 0.20 metre below ground, bottom two courses laid dry, and top three courses in
cement mortar 1:6 ( 1 cement 6 sand) and the intermediate courses being in dry honey
comb masonry, as per design complete)
each 1988.00 2809.00 3125.00 5953.00 5991.00 5278.00 7472.00 3015.00
11.15
Edging with 2nd class Bricks, laid dry lengthwise (Edging with 2nd class bricks, laid dry
lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading
nearly surplus earth within a lead of 50 metres)
metre 39.00 56.00 62.00 119.00 119.00 105.00 149.00 60.00
11.16
Making Tree Guard 53 cm dia and 1.3 m high as per design from empty bitumen drum
(Making tree guard 53 cm dia and 1.3 m high as per design from empty bitumen drum, slit
suitably to permit sun and air, (supplied by the department at stock issue rate) including
providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets, complete in all respect)
each 7314.00 7437.00 7533.00 7603.00 7603.00 7726.00 7908.00 7269.00
11.17
Making Tree Guard 53 cm dia and 2 metres high as per design from empty bitumen
drums (Making tree guard 53 cm dia and 2 metres high as per design from empty bitumen
drums, slit suitably to permit sun and air, ( supplied by the department at stock issue rate)
including providing and fixing four legs 40 cm long of 30 x 3 mm MS riveted to tree guard and
providing and fixing 2 nos MS sheet rings 50 x 0.5 mm with rivets complete in all respects)
each 16490.00 16742.00 16951.00 17082.00 17082.00 17351.00 17757.00 16330.00
11.18
Wrought Iron and Mild Steel Welded Work (Wrought iron and mild steel welded work) (using
angles, square bars, tees and channel grills, grating frames, gates and tree guards of any
size and design etc. including cost of screens and welding rods or bolts and nuts complete
fixed in position but without the cost of excavation and concrete for fixing which will be paid
separately)
quintal 8150.00 8574.00 8629.00 9192.00 9192.00 9055.00 9467.00 8267.00
11.19
Tree Guard with MS Iron (Providing and fixing MS iron tree guard 60 cm dia and 2 metre
high above ground level formed of 4 Nos (25 x 6 mm) and 8 Nos (25 x 3 mm) vertical MS
riveted to 3 Nos (25 x 6 mm) iron rings in two halves, bolted together with 8 mm dia and 30
mm long bolts including painting two coats with paint of approved brand over a coat of
priming, complete in all respects.)
each tree
guard
2064.00 2152.00 2168.00 2423.00 2423.00 2284.00 2395.00 2077.00
11.20
Tree Guard with MS Angle Iron and Steel Wire (Providing and fixing tree guard 0.60 metre
square, 2.00 metre high fabricated with MS angle iron 30 x 30 x 3 mm, MS iron 25 x 3 mm
and steel wire3 mm dia welded and fabricated as per design in two halves bolted together)
each tree
guard
2814.00 2973.00 3007.00 3276.00 3276.00 3163.00 3314.00 2888.00
11.21
Compensatory Afforestation (Planting trees as compensatory afforestation at the rate of 290
trees per hectare at a spacing of 6 m by grubbing and leveling the ground upto a depth of 150
mm, digging holes 0.9 m dia, 1 m deep, mixing farm yard/sludge manure with soil, planting
of sapling 2 m high with 25 cm dia stem, backfilling the hole and watering)
hectare 90254.00 106089.00 107521.00 110116.00 110116.00 111595.00 113110.00 102846.00
32
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
12.1
Excavation for Structures (Earth work in excavation of foundation of structures as per
drawing and technical specification, including setting out, construction of shoring and
bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and
backfilling with approved material.)
I Ordinary soil
A Manual Means
(i) upto 3 m depth cum 90.00 99.00 99.00 99.00 99.00 99.00 108.00 99.00
(ii) 3 m to 6 m depth cum 115.00 127.00 127.00 127.00 127.00 127.00 139.00 127.00
(iii) Above 6 m depth cum 154.00 170.00 170.00 170.00 170.00 170.00 185.00 170.00
B Mechanical Means
(i) Depth upto 3 m cum 41.00 46.00 47.00 51.00 51.00 53.00 60.00 47.00
(ii) Depth 3 m to 6 m cum 47.00 52.00 54.00 58.00 58.00 60.00 68.00 54.00
(iii) Depth above 6m cum 58.00 64.00 66.00 71.00 71.00 73.00 83.00 66.00
II Ordinary rock (not requiring blasting)
A Manual Means
(i) Depth upto 3 m cum 128.00 142.00 142.00 142.00 142.00 142.00 154.00 142.00
B Mechanical Means cum 52.00 58.00 60.00 65.00 65.00 67.00 76.00 60.00
III Hard rock ( requiring blasting )
A Manual Means cum 402.00 434.00 440.00 448.00 448.00 451.00 496.00 441.00
IV Hard rock ( blasting prohibited )
A Mechanical Means cum 328.00 364.00 375.00 398.00 398.00 409.00 455.00 0.00
V Marshy soil
(i) upto 3 m depth
A Manual means cum 353.00 391.00 396.00 407.00 407.00 412.00 455.00 396.00
B Mechanical Means cum 133.00 154.00 156.00 158.00 158.00 159.00 175.00 156.00
VI Back Filling in Marshy Foundation Pits cum 249.00 276.00 283.00 296.00 296.00 303.00 337.00 283.00
12.2
Filling Annular Space Around Footing in Rock (Lean cement concrete 1:3:6 nominal mix.
Rate may be taken as per items 13.4.)
CHAPTER-12
FOUNDATIONS
33
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
12.3 Sand Filling in Foundation Trenches as per Drawing & Technical Specification cum 1719.00 4052.00 4973.00 13349.00 13349.00 11265.00 19284.00 5053.00
12.4
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with
crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days.)
cum 5205.00 6636.00 7104.00 10398.00 11132.00 10215.00 14344.00 7330.00
12.5
Brick masonry (Brick masonry work in cement mortar 1:3 in foundation complete excluding
pointing and plastering, as per drawing and technical specifications
cum 5963.00 8159.00 8990.00 16445.00 16716.00 14666.00 22309.00 9062.00
12.6 A Cement mortar1:3 (1cement :3 sand) cum 6200.00 8221.00 9014.00 15173.00 16222.00 14428.00 19946.00 9083.00
B Cement mortar1:2 (1cement :2 sand) cum 7208.00 9137.00 9894.00 15847.00 16776.00 15064.00 20332.00 9960.00
C Cement mortar1:4 (1cement :4 sand) cum 5518.00 7584.00 8395.00 14646.00 15765.00 13932.00 19574.00 8465.00
D Cement mortar1:6 (1cement :6 sand) cum 5064.00 7405.00 8325.00 15352.00 16688.00 14607.00 21010.00 8405.00
12.7
Stone masonry (Stone masonry work in cement mortar 1:3 in foundation complete as
drawing and Technical Specification
(a) Square Rubble Coursed rubble masonry( first sort ) cum 5436.00 6312.00 6600.00 9280.00 9618.00 8712.00 11735.00 6814.00
(b) Random Rubble Masonry cum 4128.00 5037.00 5334.00 8024.00 8373.00 7365.00 10338.00 5402.00
12.8
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical
specifications
A PCC Grade M15 cum 5503.00 6818.00 7320.00 10857.00 11619.00 10707.00 15094.00 7555.00
B PCC Grade M20 cum 6359.00 7750.00 8273.00 12022.00 12783.00 11763.00 16415.00 8508.00
C RCC Grade M20
Case I Using concrete mixer cum 6441.00 7840.00 8364.00 12122.00 12880.00 11858.00 16527.00 8596.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 6880.00 8117.00 8666.00 8050.00 12925.00 12090.00 17360.00 8914.00
D PCC Grade M25
Case I Using concrete Mixer cum 6878.00 8309.00 8848.00 12745.00 13504.00 12447.00 17284.00 9084.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7314.00 8585.00 9148.00 8683.00 13549.00 12678.00 18116.00 9400.00
E RCC Grade M25
Case I Using concrete Mixer cum 6967.00 8406.00 8945.00 12854.00 13610.00 12551.00 17407.00 9179.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7404.00 8682.00 9247.00 8792.00 13655.00 12782.00 18237.00 9496.00
F PCC Grade M30
Case I Using Concrete Mixer cum 6919.00 8351.00 8891.00 12795.00 13552.00 12494.00 17341.00 9127.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7349.00 8620.00 9184.00 8735.00 13590.00 12717.00 18161.00 9436.00
G RCC Grade M30
Case I Using Concrete Mixer cum 6982.00 8420.00 8960.00 12868.00 13623.00 12564.00 17419.00 9193.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7420.00 8698.00 9262.00 8818.00 13670.00 12796.00 18251.00 9511.00
H RCC Grade M35
Case I Using Concrete Mixer cum 7095.00 8538.00 9080.00 13013.00 13764.00 12699.00 17585.00 9313.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7531.00 8815.00 9381.00 8982.00 13810.00 12930.00 18412.00 9629.00
12.9
Providing and constructing temporary island 16 m diameter for construction of well foundation
for 8m dia. Well.
A Assuming depth of water 1.0 m and height of island to be 1.25m. each 96598.00 123742.00 126525.00 143004.00 143004.00 153954.00 174973.00 126525.00
B Assuming depth of water 4.0 m and height of island 4.5 m. each 645084.00 863999.00 879886.00 1003849.00 1003849.00 1088124.00 1238459.00 879886.00
C
Providing and constructing one span service road to reach island location from one
pier location to another pier location
metre 3860.00 4490.00 4555.00 4830.00 4830.00 5003.00 5580.00 4555.00
34
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
12.10
Providing and laying cutting edge of mild steel weighing 40 kg per metre for well foundation
complete as per drawing and technical specification.
tonne 78928.00 82542.00 83112.00 88951.00 88951.00 87527.00 100144.00 83254.00
12.11
Plain/Reinforced cement concrete, in well foundation complete as per drawing and technical
specification
A Well curb
(i) RCC M20 Grade
Case I Using concrete mixer cum 7433.00 9046.00 9651.00 13872.00 14749.00 13684.00 19070.00 9920.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7940.00 9367.00 10000.00 9290.00 14915.00 13951.00 20031.00 9920.00
(ii) RCC M25 Grade
Case I Using concrete mixer cum 8059.00 9723.00 10347.00 14868.00 15743.00 14517.00 20134.00 10617.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8892.00 10380.00 11035.00 10518.00 16143.00 15139.00 21489.00 11324.00
(iii) RCC M35 Grade
Case I Using concrete mixer cum 8266.00 9948.00 10579.00 15162.00 16036.00 14796.00 20489.00 10851.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 9117.00 10623.00 11286.00 10830.00 16456.00 15435.00 20768.00 11575.00
B Well steining
(I) PCC M15 Grade cum 5820.00 7211.00 7744.00 11484.00 12290.00 11325.00 15965.00 7991.00
(ii) PCC M20 Grade cum 6727.00 8198.00 8750.00 12716.00 13520.00 12442.00 17363.00 8999.00
(iii) RCC M20 Grade
Case I Using concrete mixer cum 6813.00 8292.00 8847.00 12823.00 13624.00 12543.00 17481.00 9093.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7278.00 8586.00 9167.00 8516.00 13672.00 12788.00 18362.00 9429.00
(iv) PCC M25 Grade
Case I Using concrete mixer cum 7293.00 8810.00 9381.00 13514.00 14318.00 13198.00 18326.00 9632.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7756.00 9103.00 9700.00 9207.00 14365.00 13443.00 19209.00 9968.00
(v) RCC M25 Grade
Case I Using concrete mixer cum 7387.00 8912.00 9485.00 13629.00 14431.00 13307.00 18456.00 9732.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8151.00 9515.00 10116.00 9642.00 14798.00 13877.00 19698.00 10380.00
(vi) PCC M30 Grade
Case I Using concrete mixer cum 7354.00 8876.00 9450.00 13600.00 14404.00 13279.00 18430.00 9700.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7810.00 9163.00 9762.00 9284.00 14444.00 13516.00 19301.00 10029.00
(vii) RCC M30 Grade
Case I Using concrete mixer cum 7422.00 8950.00 9523.00 13677.00 14700.00 13563.00 18782.00 9947.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7886.00 9245.00 9844.00 9373.00 14529.00 13600.00 19397.00 10109.00
(viii) RCC M35 Grade
Case I Using concrete mixer cum 7577.00 9119.00 9698.00 13898.00 14700.00 13563.00 18782.00 9947.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8357.00 9738.00 10346.00 9928.00 15084.00 14149.00 20042.00 10611.00
(ix) RCC M40 Grade cum 8444.00 9832.00 10441.00 10048.00 15205.00 14263.00 20187.00 10707.00
C Bottom Plug
(i) PCC Grade M20
Case I Using Concrete Mixer cum 7106.00 8553.00 9107.00 12996.00 13764.00 12730.00 17584.00 9346.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7329.00 8602.00 9159.00 8603.00 13525.00 12662.00 18041.00 9410.00
(ii) PCC Grade M25
Case I Using Concrete Mixer cum 7428.00 8900.00 9463.00 13437.00 14205.00 13150.00 18114.00 9702.00
35
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7648.00 8945.00 9511.00 9040.00 13962.00 13078.00 18565.00 9764.00
(iii) PCC Grade M30
Case I Using Concrete Mixer cum 7486.00 8963.00 9528.00 13519.00 14287.00 13229.00 18214.00 9768.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7710.00 9012.00 9580.00 9127.00 14049.00 13161.00 18670.00 9833.00
(iv) PCC Grade M35
Case I Using Concrete Mixer cum 7623.00 9111.00 9681.00 13712.00 14480.00 13411.00 18446.00 9921.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7843.00 9156.00 9729.00 9315.00 14237.00 13339.00 18898.00 9982.00
D Intermediate plug
(I) Grade M20 PCC
Case I Using Concrete Mixer cum 6800.00 8183.00 8714.00 12422.00 13154.00 12171.00 16801.00 8941.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7039.00 8252.00 8787.00 8264.00 12952.00 12135.00 17307.00 9027.00
(ii) Grade M25 PCC
Case I Using Concrete Mixer cum 7108.00 8514.00 9053.00 12842.00 13574.00 12572.00 17305.00 9281.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7342.00 8579.00 9123.00 8679.00 13367.00 12532.00 17805.00 9363.00
(iii) Grade M30 PCC
Case I Using Concrete Mixer cum 7163.00 8574.00 9115.00 12920.00 13652.00 12646.00 17400.00 9344.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7402.00 8642.00 9189.00 8763.00 13450.00 12611.00 17906.00 9430.00
E Top plug
(i) Grade M15 PCC
Case I Using Concrete Mixer cum 5291.00 6556.00 7040.00 10440.00 11173.00 10296.00 14513.00 7265.00
(ii) Grade M20 PCC
Case I Using Concrete Mixer cum 6115.00 7452.00 7955.00 11560.00 12291.00 11311.00 15785.00 8181.00
(iii) Grade M25 PCC
Case I Using Concrete Mixer cum 6630.00 8009.00 8528.00 12285.00 13016.00 11998.00 16660.00 8757.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7051.00 8275.00 8818.00 8370.00 13060.00 12221.00 17462.00 9062.00
(iv) Grade M30 PCC
Case I Using Concrete Mixer cum 6685.00 8069.00 8591.00 12364.00 17653.00 12072.00 16755.00 8818.00
Case II Using Batching Plant, Transit Mixer and Crane/concrete pump cum 7100.00 8330.00 8874.00 8440.00 13131.00 12288.00 17547.00 9117.00
F Well cap
(i) RCC Grade M20
Case I Using concrete Mixer cum 6383.00 7777.00 8299.00 12041.00 12799.00 11781.00 16428.00 8531.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 6820.00 8053.00 8599.00 7966.00 12841.00 12010.00 17258.00 8848.00
(ii) RCC Grade M25
Case I Using concrete Mixer cum 6967.00 8406.00 8945.00 12854.00 13610.00 12551.00 17407.00 9179.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7405.00 8684.00 9249.00 8794.00 13657.00 12784.00 18240.00 9498.00
(iii) RCC Grade M30
Case I Using Concrete Mixer cum 6982.00 8420.00 8960.00 12868.00 13623.00 12564.00 17419.00 9193.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7419.00 8697.00 9261.00 8817.00 13669.00 12795.00 18249.00 9510.00
(iv) RCC Grade M35
Case I Using Concrete Mixer cum 7095.00 8538.00 9080.00 13013.00 13764.00 12699.00 17585.00 9313.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump cum 7531.00 8815.00 9381.00 8982.00 13810.00 12930.00 18412.00 9629.00
(v) RCC M40 Grade cum 7955.00 9258.00 9830.00 9476.00 14305.00 13420.00 18984.00 10079.00
36
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
12.12
Sinking of 6 m external diameter well ( other than pneumatic method of sinking ) through all
types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 1930.00 2093.00 2249.00 2487.00 2487.00 2632.00 2969.00 2249.00
(ii) Beyond 3m upto 10m depth metre 2673.00 2892.00 3127.00 3483.00 3483.00 3701.00 4184.00 3127.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 3530.00 3820.00 4129.00 4600.00 4600.00 4887.00 5526.00 4129.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 6620.00 7165.00 7748.00 8628.00 8628.00 9166.00 10365.00 7748.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 7944.00 8598.00 9298.00 10353.00 10353.00 11000.00 12437.00 9298.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 15730.00 17022.00 18412.00 20498.00 20498.00 21780.00 24627.00 18412.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 18876.00 20426.00 22094.00 24598.00 24598.00 26136.00 29552.00 22094.00
B Clayey soil ( 6m dia. Well )
(i) Depth below bed level upto 3.0 M metre 2680.00 2899.00 3134.00 3491.00 3491.00 3709.00 4192.00 3134.00
(ii) Beyond 3m upto 10m depth metre 6015.00 6523.00 7031.00 7817.00 7817.00 8289.00 9375.00 7031.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 7945.00 8615.00 9286.00 10323.00 10323.00 10947.00 12382.00 9286.00
b Add for dewatering @ 5% of cost, if required. metre 8342.00 9045.00 9751.00 10839.00 10839.00 11494.00 13001.00 9751.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 14902.00 16159.00 17418.00 19364.00 19364.00 20533.00 23226.00 17418.00
b Add 5% of cost for dewatering of the cost, if required metre 19559.00 21209.00 22861.00 25415.00 25415.00 26950.00 30484.00 22861.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 18628.00 20199.00 21772.00 24205.00 24205.00 25667.00 29032.00 21772.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 35406.00 38392.00 41384.00 46005.00 46005.00 48785.00 55182.00 41384.00
b Add 5% of cost for dewatering, if required metre 44612.00 48375.00 52143.00 57967.00 57967.00 61469.00 69530.00 52143.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 42488.00 46071.00 49660.00 55206.00 55206.00 58542.00 66219.00 49660.00
C Soft rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 10597.00 11681.00 12081.00 12714.00 12714.00 13086.00 14553.00 12081.00
37
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
D Hard rock (6m dia well )
(i) Depth of soft rock strata upto 3m metre 11197.00 12127.00 12715.00 13586.00 13586.00 14087.00 15744.00 12726.00
12.13
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all
types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 5559.00 6010.00 6514.00 7280.00 7280.00 7748.00 8706.00 6514.00
(ii) Beyond 3m upto 10m depth metre 3675.00 3967.00 4319.00 4854.00 4854.00 5181.00 5871.00 4319.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 4855.00 5239.00 5705.00 6411.00 6411.00 6843.00 7755.00 5705.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 9107.00 9828.00 10702.00 12026.00 12026.00 12839.00 14545.00 10702.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour) .
metre 10928.00 11793.00 12842.00 14432.00 14432.00 15406.00 17453.00 12842.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 21637.00 23350.00 25426.00 28572.00 28572.00 30502.00 34556.00 25426.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 25965.00 28019.00 30511.00 34287.00 34287.00 36603.00 41467.00 30511.00
B Clayey soil ( 7m dia. Well )
(I) Depth below bed level upto 3.0 M metre 3675.00 3967.00 4319.00 4854.00 4854.00 5181.00 5871.00 4319.00
(ii) Beyond 3m upto 10m depth metre 5220.00 5629.00 6146.00 6930.00 6930.00 7409.00 8405.00 6146.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 6894.00 7434.00 8117.00 9152.00 9152.00 9785.00 11099.00 8117.00
b Add for dewatering @ 5% of cost, if required. metre 7239.00 7806.00 8523.00 9609.00 9609.00 10274.00 11654.00 8523.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 12932.00 13944.00 15227.00 17168.00 17168.00 18353.00 20820.00 15227.00
b Add 5% of cost for dewatering on the cost, if required metre 16974.00 18302.00 19985.00 22532.00 22532.00 24088.00 27327.00 19985.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 16166.00 17430.00 19034.00 21460.00 21460.00 22941.00 26025.00 19034.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 30727.00 33129.00 36179.00 40788.00 40788.00 43605.00 49467.00 36179.00
b Add 5% of cost for dewatering, if required metre 38716.00 41742.00 45585.00 51393.00 51393.00 54942.00 62328.00 45585.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 36872.00 39755.00 43414.00 48946.00 48946.00 52326.00 59360.00 43414.00
38
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
C Soft rock ( 7m dia well )
(i) Depth of soft rock strata upto 3m metre 8364.00 9181.00 9626.00 10328.00 10328.00 10741.00 12024.00 9626.00
D Hard rock ( 7m dia well )
(i) Depth upto 3 m metre 14167.00 15319.00 15947.00 16857.00 16857.00 17365.00 19342.00 15966.00
12.14
Sinking of 8 m external diameter well ( other than pneumatic method of sinking ) through all
types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 3415.00 3691.00 4004.00 4479.00 4479.00 4770.00 5399.00 4004.00
(ii) Beyond 3m upto 10m depth metre 4172.00 4507.00 4898.00 5492.00 5492.00 5856.00 6632.00 4898.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 5511.00 5952.00 6470.00 7254.00 7254.00 7734.00 8759.00 6470.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 10338.00 11166.00 12137.00 13606.00 13606.00 14507.00 16429.00 12137.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 12406.00 13399.00 14564.00 16328.00 16328.00 17408.00 19715.00 14564.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 3634.00 3925.00 4266.00 4783.00 4783.00 5099.00 5775.00 4266.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 4360.00 4710.00 5119.00 5739.00 5739.00 6119.00 6930.00 5119.00
B Clayey soil ( 8m dia. Well )
(i) Depth upto 3.0 M metre 4497.00 4854.00 5284.00 5937.00 5937.00 6337.00 7182.00 5284.00
(ii) Beyond 3m upto 10m depth metre 6361.00 6908.00 7446.00 8286.00 8286.00 8785.00 9946.00 7446.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 8402.00 9124.00 9834.00 10944.00 10944.00 11603.00 13135.00 9834.00
b Add for dewatering @ 5% of cost, if required. metre 8823.00 9580.00 10325.00 11491.00 11491.00 12184.00 13792.00 10325.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 15762.00 17113.00 18446.00 20527.00 20527.00 21764.00 24637.00 18446.00
b Add 5% of cost for dewatering on the cost, if required metre 20688.00 22461.00 24211.00 26942.00 26942.00 28566.00 32336.00 24211.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 19703.00 21391.00 23058.00 25659.00 25659.00 27206.00 30796.00 23058.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 37449.00 40656.00 43825.00 48769.00 48769.00 51710.00 58533.00 43825.00
b Add 5% of cost for dewatering, if required metre 47186.00 51227.00 55220.00 61449.00 61449.00 65154.00 73752.00 55220.00
39
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 44939.00 48787.00 52591.00 58522.00 58522.00 62052.00 70240.00 52591.00
C Soft rock ( 8m dia well )
(i) Depth in soft rock strata upto 3m metre 9358.00 10280.00 10767.00 11534.00 11534.00 11987.00 13411.00 10767.00
D Hard rock ( 8m dia well )
(i) Depth in hard rock strata upto 3 m metre 14981.00 16171.00 16758.00 17601.00 17601.00 18064.00 20078.00 16778.00
12.15
Sinking of 9 m external diameter well ( other than pneumatic method of sinking ) through all
types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 3487.00 3771.00 4084.00 4559.00 4559.00 4850.00 5486.00 4084.00
(ii) Beyond 3m upto 10m depth metre 4576.00 4943.00 5373.00 6027.00 6027.00 6426.00 7279.00 5373.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 6043.00 6528.00 7097.00 7959.00 7959.00 8487.00 9612.00 7097.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 11337.00 12244.00 13313.00 14929.00 14929.00 15921.00 18032.00 13313.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 13605.00 14693.00 15975.00 17915.00 17915.00 19105.00 21638.00 15975.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 26937.00 29093.00 31630.00 35469.00 35469.00 37826.00 42842.00 31630.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 32325.00 34911.00 37956.00 42563.00 42563.00 45391.00 51410.00 37956.00
B Clayey soil ( 9m dia. Well )
(i) Depth below bed level upto 3.0 M metre 4778.00 5159.00 5609.00 6292.00 6292.00 6710.00 7600.00 5609.00
(ii) Beyond 3m upto 10m depth metre 6847.00 7434.00 8016.00 8924.00 8924.00 9465.00 10717.00 8016.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 9042.00 9818.00 10587.00 11786.00 11786.00 12500.00 14154.00 10587.00
b Add for dewatering @ 5% of cost, if required. metre 9494.00 10309.00 11117.00 12376.00 12376.00 13125.00 14862.00 11117.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 16960.00 18415.00 19859.00 22107.00 22107.00 23445.00 26548.00 19859.00
b Add 5% of cost for dewatering on the cost, if required metre 22261.00 24170.00 26065.00 29016.00 29016.00 30772.00 34844.00 26065.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 21201.00 23019.00 24824.00 27634.00 27634.00 29307.00 33185.00 24824.00
(v) Beyond 30m upto 40 m
40
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 40299.00 43753.00 47184.00 52525.00 52525.00 55702.00 63074.00 47184.00
b Add 5% of cost for dewatering, if required metre 50777.00 55128.00 59452.00 66181.00 66181.00 70185.00 79474.00 59452.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 48359.00 52503.00 56621.00 63029.00 63029.00 66843.00 75689.00 56621.00
C Soft rock ( 9m dia well )
(i) Depth upto 3m metre 11462.00 12575.00 13221.00 14230.00 14230.00 14830.00 16614.00 13221.00
D Hard rock ( 9m dia well )
(i) Depth of hard rock strata upto 3 m metre 17432.00 18821.00 19517.00 20515.00 20515.00 21058.00 23414.00 19542.00
12.16
Sinking of 10 m external diameter well ( other than pneumatic method of sinking ) through
all types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth below bed level upto 3.0 M metre 4079.00 4403.00 4794.00 5388.00 5388.00 5751.00 6518.00 4794.00
(ii) Beyond 3m upto 10m depth metre 4864.00 5257.00 5707.00 6390.00 6390.00 6808.00 7707.00 5707.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 6423.00 6941.00 7537.00 8438.00 8438.00 8990.00 10178.00 7537.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 12049.00 13019.00 14139.00 15830.00 15830.00 16863.00 19091.00 14139.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 14458.00 15624.00 16967.00 18996.00 18996.00 20236.00 22909.00 16967.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 28627.00 30932.00 33594.00 37610.00 37610.00 40065.00 45358.00 33594.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 34352.00 37118.00 40313.00 45132.00 45132.00 48078.00 54429.00 40313.00
B Clayey soil (10m dia. Well )
(i) Depth below bed level upto 3.0 M metre 5464.00 5914.00 6383.00 7096.00 7096.00 7532.00 8510.00 6383.00
(ii) Beyond 3m upto 10m depth metre 6978.00 7591.00 8139.00 8997.00 8997.00 9506.00 10742.00 8139.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 9215.00 10026.00 10749.00 11882.00 11882.00 12554.00 14187.00 10749.00
b Add for dewatering @ 5% of cost, if required. metre 9675.00 10527.00 11286.00 12477.00 12477.00 13182.00 14897.00 11286.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 17283.00 18806.00 20161.00 22289.00 22289.00 23548.00 26612.00 20161.00
'b Add 5% of cost for dewatering on the cost, if required metre 22684.00 24683.00 26461.00 29255.00 29255.00 30906.00 34929.00 26461.00
41
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 21604.00 23508.00 25201.00 27862.00 27862.00 29435.00 33265.00 25201.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 41060.00 44682.00 47896.00 52957.00 52957.00 55944.00 63226.00 47896.00
b Add 5% of cost for dewatering, if required metre 51736.00 56299.00 60349.00 66725.00 66725.00 70489.00 79665.00 60349.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 49272.00 53618.00 57475.00 63548.00 63548.00 67133.00 75872.00 57475.00
C Soft rock (10m dia well )
(i) Depth of soft rock strata upto 3m metre 11667.00 12801.00 13463.00 14499.00 14499.00 15114.00 16935.00 13463.00
D Hard rock (10m dia well )
(i) Depth of hard rock strata upto 3 m metre 19016.00 20465.00 21363.00 22667.00 22667.00 23389.00 26088.00 21391.00
12.17
Sinking of 11 m external diameter well ( other than pneumatic method of sinking ) through
all types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 9095.00 9797.00 10736.00 12162.00 12162.00 13034.00 14804.00 10736.00
(ii) Beyond 3m upto 10m depth metre 8052.00 8741.00 9367.00 10317.00 10317.00 10899.00 12280.00 9367.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 10634.00 11544.00 12370.00 13626.00 13626.00 14394.00 16219.00 12370.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 19949.00 21655.00 23204.00 25557.00 25557.00 26998.00 30423.00 23204.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 23939.00 25986.00 27844.00 30669.00 30669.00 32398.00 36507.00 27844.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 47395.00 51450.00 55130.00 60721.00 60721.00 64145.00 72280.00 55130.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 56874.00 61740.00 66156.00 72865.00 72865.00 76974.00 86735.00 66156.00
B Clayey soil (11 m dia. Well )
(i) Depth from bed level upto 3.0 M metre 9078.00 9824.00 10607.00 11795.00 11795.00 12522.00 14148.00 10607.00
(ii) Beyond 3m upto 10m depth metre 14579.00 15873.00 16979.00 18713.00 18713.00 19740.00 22288.00 16979.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 19254.00 20964.00 22424.00 24714.00 24714.00 26071.00 29435.00 22424.00
b Add for dewatering @ 5% of cost, if required. metre 20217.00 22012.00 23545.00 25950.00 25950.00 27374.00 30907.00 23545.00
(iv) Beyond 20m upto 30 m
42
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 36117.00 39324.00 42062.00 46357.00 46357.00 48903.00 55212.00 42062.00
b Add 5% of cost for dewatering on the cost, if required metre 47404.00 51612.00 55206.00 60844.00 60844.00 64185.00 72466.00 55206.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 45146.00 49155.00 52577.00 57947.00 57947.00 61129.00 69015.00 52577.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 85810.00 93426.00 99931.00 110138.00 110138.00 116185.00 131176.00 99931.00
b Add 5% of cost for dewatering, if required metre 108121.00 117717.00 125912.00 138774.00 138774.00 146393.00 165281.00 125912.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 102972.00 112112.00 119917.00 132166.00 132166.00 139422.00 157411.00 119917.00
C Soft rock (11m dia well )
(i) Depth of soft rock strata upto 3m metre 25975.00 28488.00 29988.00 32327.00 32327.00 33720.00 37792.00 29988.00
D Hard rock (11m dia well )
(i) Depth of hard rock upto 3 m metre 41876.00 45044.00 47126.00 50157.00 50157.00 51844.00 57887.00 47187.00
12.18
Sinking of 12 m external diameter well ( other than pneumatic method of sinking ) through
all types of strata namely sandy soil, clayey soil and rock as shown against each case,
complete as per drawing and technical specifications. Depth of sinking is reckoned from bed
level.
A Sandy soil
(i) I) Depth below bed level upto 3.0 M metre 19270.00 20791.00 22669.00 25520.00 25520.00 27264.00 30914.00 22669.00
(ii) Beyond 3m upto 10m depth metre 22252.00 24055.00 26089.00 29178.00 29178.00 31068.00 35160.00 26089.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 29388.00 31769.00 34455.00 38535.00 38535.00 41030.00 46435.00 34455.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 55124.00 59591.00 64628.00 72281.00 72281.00 76962.00 87100.00 64628.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 66148.00 71509.00 77553.00 86737.00 86737.00 92354.00 104520.00 77553.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 130963.00 141579.00 153547.00 171728.00 171728.00 182851.00 206936.00 153547.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 157156.00 169894.00 184257.00 206074.00 206074.00 219422.00 248323.00 184257.00
B Clayey soil (12 m dia. Well )
(i) Depth below bed level upto 3.0 M metre 21963.00 23747.00 25704.00 28673.00 28673.00 30490.00 34482.00 25704.00
(ii) Beyond 3m upto 10m depth metre 34978.00 37973.00 40933.00 45546.00 45546.00 48294.00 54667.00 40933.00
(iii) Beyond 10 m upto 20 m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 46195.00 50151.00 54060.00 60151.00 60151.00 63781.00 72197.00 54060.00
b Add for dewatering @ 5% of cost, if required. metre 48505.00 52658.00 56763.00 63159.00 63159.00 66970.00 75807.00 56763.00
43
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 86651.00 94068.00 101402.00 112826.00 112826.00 119635.00 135422.00 101402.00
b Add 5% of cost for dewatering on the cost, if required metre 113729.00 123464.00 133090.00 148085.00 148085.00 157021.00 177742.00 133090.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 108313.00 117585.00 126753.00 141033.00 141033.00 149544.00 169278.00 126753.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 205870.00 223491.00 240916.00 268057.00 268057.00 284233.00 321745.00 240916.00
b Add 5% of cost for dewatering, if required metre 259396.00 281598.00 303555.00 337752.00 337752.00 358134.00 405399.00 303555.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 247044.00 268189.00 289100.00 321669.00 321669.00 341080.00 386094.00 289100.00
C Soft rock (12m dia well )
(i) Depth of soft rock strata upto 3m metre 59665.00 65356.00 69034.00 74748.00 74748.00 78162.00 87713.00 69034.00
D Hard rock (12m dia well )
(i) Depth of hard rock strata upto 3 m metre 92377.00 99125.00 104267.00 111771.00 111771.00 115973.00 129795.00 104409.00
12.19
Sinking of Twin D Type well ( other than pneumatic method of sinking ) through all types of
strata namely sandy soil, clayey soil and rock as shown against each case, complete as per
drawing and technical specifications. Depth of sinking is reckoned from bed level.
A Sandy soil
(i) Depth from bed level upto 3.0 M metre 4331.00 4671.00 5102.00 5755.00 5755.00 6155.00 6983.00 5102.00
(ii) Beyond 3m upto 10m depth metre 4709.00 5082.00 5542.00 6241.00 6241.00 6668.00 7561.00 5542.00
(iii) Beyond 10m upto 20m
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 6219.00 6712.00 7320.00 8242.00 8242.00 8807.00 9987.00 7320.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 11665.00 12588.00 13729.00 15459.00 15459.00 16521.00 18735.00 13729.00
b
Add 20% of cost for Kentledge including supports, loading arrangement and Labour .
metre 13999.00 15106.00 16475.00 18551.00 18551.00 19826.00 22482.00 16475.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 27716.00 29908.00 32620.00 36731.00 36731.00 39252.00 44511.00 32620.00
b
Add 20% of cost for Kentledge including supports, loading arrangement, and Labour
etc.
metre 33259.00 35890.00 39144.00 44077.00 44077.00 47103.00 53414.00 39144.00
B Clayey soil (Twin D Type Well )
(i) Depth below bed level upto 3.0 M metre 5189.00 5602.00 6091.00 6834.00 6834.00 7288.00 8255.00 6091.00
(ii) Beyond 3m upto 10m depth metre 7719.00 8398.00 9008.00 9964.00 9964.00 10530.00 11902.00 9008.00
(iii) Beyond 10 m upto 20 m
44
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
a
Add 5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 10195.00 11091.00 11896.00 13159.00 13159.00 13909.00 15719.00 11896.00
b Add for dewatering @ 5% of cost, if required. metre 10705.00 11646.00 12491.00 13818.00 13818.00 14604.00 16505.00 12491.00
(iv) Beyond 20m upto 30 m
a
Add 7.5% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 19123.00 20804.00 22315.00 24685.00 24685.00 26090.00 29483.00 22315.00
b Add 5% of cost for dewatering on the cost, if required metre 25099.00 27305.00 29288.00 32399.00 32399.00 34243.00 38697.00 29288.00
c
Add 25% of cost for Kentledge including supports, loading arrangement and Labour ).
metre 23904.00 26005.00 27894.00 30856.00 30856.00 32612.00 36854.00 27894.00
(v) Beyond 30m upto 40 m
a
Add 10% for every additional meter depth of sinking over the rate of sinking for the
previous meter
metre 45436.00 49427.00 53018.00 58649.00 58649.00 61986.00 70048.00 53018.00
b Add 5% of cost for dewatering, if required metre 57249.00 62278.00 66803.00 73898.00 73898.00 78103.00 88261.00 66803.00
c
Add 20% of cost for Kentledge including supports, loading arrangement and Labour).
metre 54523.00 59312.00 63622.00 70379.00 70379.00 74383.00 84058.00 63622.00
C Soft rock (Twin D Type well )
(i) Depth of soft rock strata upto 3m metre 12909.00 14143.00 14951.00 16219.00 16219.00 16969.00 19063.00 14951.00
D Hard rock (Twin D Type well )
(i) Depth of hard rock strata upto 3 m metre 19433.00 20922.00 21931.00 23410.00 23410.00 24245.00 27092.00 21956.00
12.20
Pneumatic sinking of wells with equipment of approved design, drawing and specifications
worked by competent and trained personnel and comprising of compression and
decompression chambers, reducers, two air locks separately for men and plant & materials,
arrangement for supply of fresh air to working chambers, check valves, exhaust valves,
shafts made from steel plates of riveted construction not less than 6 mm thick to withstand an
air pressure of 0.50 MPa, controlled blasting of hard rock where required, staircases and 1 m
wide landing plate forms with railing, arrangement for compression and decompression,
electric lighting of 50 V maximum, proper rooms for rest and medical examinations and
compliance with safety precautions as per IS:4138, all as per clause1207.6 of MoRTH
Specifications.
12.21 Sand filling in wells complete as per drawing and technical specifications cum 1719.00 4052.00 4973.00 14591.00 13349.00 11265.00 19284.00 5053.00
12.22
Providing steel liner 10 mm thick for curbs and 6mm thick for steining of wells including
fabricating and setting out as per detailed drawing
tonne 72409.00 75544.00 76077.00 81547.00 81547.00 80213.00 91871.00 76211.00
12.23
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing
and technical specifications and removal of excavated earth with all lifts and lead upto 1000
m. (Pile diameter-750 mm)
metre 9758.00 11006.00 11117.00 11970.00 12236.00 13346.00 16450.00 11253.00
12.24
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing
and technical specifications and removal of excavated earth with all lifts and lead upto 1000
m. (Pile diameter-1000 mm)
metre 16634.00 18776.00 18946.00 20392.00 20866.00 22802.00 28199.00 19187.00
12.25
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing
and technical specifications and removal of excavated earth with all lifts and lead upto 1000
m. (Pile diameter-1200 mm)
metre 21318.00 24122.00 24408.00 24611.00 30173.00 29676.00 37074.00 24746.00
45
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
12.26
Driven cast-in-place vertical M35 grade R.C.C. pile excluding reinforcement complete as per
drawing and & Technical Specification (Pile diameter - 750 mm)
metre 3939.00 4573.00 4845.00 4686.00 6859.00 6484.00 8799.00 4963.00
12.27
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Pile diameter - 1000 mm)
metre 6811.00 7915.00 8391.00 8098.00 11962.00 11287.00 15372.00 8598.00
12.28
Driven cast-in-place vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Pile diameter - 1200 mm)
metre 9839.00 11434.00 12119.00 11698.00 17262.00 16291.00 22178.00 12418.00
12.29
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Pile Diameter=500 mm)
metre 2048.00 2360.00 2506.00 2464.00 3424.00 3276.00 4461.00 2558.00
12.30
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Pile Diameter=750 mm)
metre 3935.00 4567.00 4856.00 4733.00 6891.00 6532.00 9085.00 4971.00
12.31
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Pile Diameter=1000 mm)
metre 6803.00 7914.00 8400.00 8142.00 11978.00 11318.00 15825.00 8604.00
12.32
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Size of pile - 300 mm x 300 mm)
metre 1218.00 1390.00 1467.00 1466.00 1906.00 1849.00 2439.00 1493.00
12.33
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Size of pile - 500 mm x 500 mm)
metre 2440.00 2820.00 2999.00 2938.00 4160.00 3967.00 5450.00 3065.00
12.34
Driven precast vertical M35 grade R.C.C. piles excluding reinforcement complete as per
drawing and & Technical Specification (Size of pile - 750 mm x 750 mm)
metre 4959.00 5759.00 6126.00 5949.00 8698.00 8234.00 11481.00 6271.00
12.35
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of
the pile - H Section steel column 400 x 250 mm (ISHB Series) )
metre 5171.00 5342.00 5395.00 5841.00 5841.00 5746.00 6623.00 5405.00
12.36
Driven vertical steel piles complete as per drawing and & Technical Specification (Section of
the pile - H Section steel column 450 x 250 mm (ISHB Series) )
metre 5831.00 6024.00 6084.00 6587.00 6587.00 6481.00 7469.00 6096.00
12.37 Pile load test on single vertical pile in accordance with IS:2911(Part-IV)
12.38
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical
Specification
A RCC Grade M20
(i) Using Concrete Mixer cum 6395.00 7787.00 8309.00 12051.00 12809.00 11791.00 16440.00 8542.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 6846.00 8080.00 8627.00 7995.00 12870.00 12039.00 17290.00 8875.00
B RCC Grade M25
(i) Using concrete mixer. cum 6956.00 8394.00 8934.00 12841.00 13599.00 12540.00 17394.00 9168.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7392.00 8675.00 9232.00 8762.00 13638.00 12764.00 18218.00 9482.00
C RCC Grade M30
(i) Using concrete mixer. cum 7027.00 8471.00 9013.00 12941.00 13699.00 12635.00 17515.00 9248.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7478.00 8764.00 9331.00 8885.00 13760.00 12882.00 18365.00 9581.00
D RCC Grade M35
(i) Using concrete mixer. cum 7175.00 8631.00 9178.00 13149.00 13907.00 12833.00 17767.00 9413.00
(ii) Using Batching Plant, Transit Mixer and Concrete Pump cum 7612.00 8912.00 9476.00 9071.00 13946.00 13057.00 18591.00 9726.00
12.39 Levelling course for Pile cap cum 5446.00 6725.00 7207.00 10625.00 11358.00 10424.00 14660.00 7433.00
12.40
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as
per drawing and technical specifications
tonne 56670.00 58902.00 61338.00 76584.00 76584.00 82958.00 101612.00 95634.00
12.41
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as
per drawing and technical specification
tonne 54237.00 56499.00 57029.00 62238.00 62238.00 60989.00 70715.00 57148.00
46
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
13.1
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per
drawing and technical specifications
cum 6044.00 8327.00 9200.00 17028.00 17312.00 15159.00 23163.00 9276.00
13.2
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical
specifications
sqm 54.20 66.00 68.90 93.80 97.20 89.00 118.00 69.20
13.3
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical
specifications
sqm 139.70 179.40 193.00 300.60 329.10 288.00 419.00 194.00
13.4
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and
Technical Specifications
A Random Rubble Masonry cum 4270.00 5256.00 5588.00 8580.00 8971.00 7858.00 11145.00 5662.00
B Coursed rubble masonry (first sort ) cum 4292.00 5232.00 5534.00 8271.00 8626.00 7597.00 10631.00 5605.00
C Ashlar masonry ( first sort ) cum 6547.00 7630.00 7962.00 11039.00 11430.00 10387.00 13904.00 8191.00
13.5
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical
specifications
CHAPTER-13
SUB-STRUCTURE
47
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
A PCC Grade M15
(p) Height upto 5m cum 5820.00 7211.00 7744.00 11484.00 12290.00 11325.00 15965.00 7991.00
B PCC Grade M20
(p) Height upto 5m cum 6727.00 8198.00 8750.00 12716.00 13520.00 12442.00 17363.00 8999.00
C PCC Grade M25
(p) Height upto 5m
Case I Using concrete Mixer cum 7293.00 8810.00 9381.00 13514.00 14318.00 13198.00 19209.00 9632.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7756.00 9103.00 9700.00 9207.00 14365.00 13443.00 19698.00 9968.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7558.00 9130.00 9722.00 14005.00 14838.00 13678.00 19907.00 9983.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8038.00 9434.00 10053.00 9541.00 14888.00 13932.00 20414.00 10330.00
(r) Height above 10m
Case I Using concrete Mixer cum 7889.00 9531.00 10148.00 14619.00 15489.00 14278.00 20780.00 10421.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8390.00 9847.00 10494.00 9960.00 15541.00 14543.00 21309.00 10783.00
D PCC Grade M30
(p) Height upto 5m
Case I Using concrete Mixer cum 7354.00 8876.00 9450.00 13600.00 14404.00 13279.00 18514.00 9700.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7810.00 9163.00 9762.00 9284.00 14444.00 13516.00 19397.00 10029.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7621.00 9199.00 9794.00 14095.00 14928.00 13762.00 19100.00 10053.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8094.00 9496.00 10117.00 9621.00 14969.00 14008.00 20003.00 10394.00
(r) Height above 10m
Case I Using concrete Mixer cum 7955.00 9603.00 10223.00 14713.00 15583.00 14366.00 19938.00 10494.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8449.00 9912.00 10560.00 10043.00 15626.00 14622.00 20881.00 10850.00
E RCC Grade M20
(p) Height upto 5m
Case I Using concrete Mixer cum 6813.00 8292.00 8847.00 12823.00 13624.00 12543.00 17481.00 9093.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7278.00 8586.00 9167.00 8516.00 13672.00 12788.00 18362.00 9429.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7061.00 8594.00 9169.00 13289.00 14120.00 12999.00 18116.00 9424.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7543.00 8899.00 9500.00 8825.00 14169.00 13253.00 19030.00 9772.00
(r) Height above 10m
Case I Using concrete Mixer cum 7371.00 8971.00 9571.00 13872.00 14739.00 13570.00 18911.00 9837.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7873.00 9289.00 9917.00 9212.00 14791.00 13835.00 19864.00 10200.00
F RCC Grade M25
(p) Height upto 5m
Case I Using concrete Mixer cum 7387.00 8912.00 9485.00 13629.00 14431.00 13307.00 18456.00 9732.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8151.00 9515.00 10116.00 9642.00 14798.00 13877.00 19698.00 10380.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7629.00 9204.00 9795.00 14075.00 14903.00 13743.00 19060.00 10051.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8418.00 9827.00 10447.00 9957.00 15282.00 14331.00 20342.00 10720.00
48
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(r) Height above 10m
Case I Using concrete Mixer cum 7991.00 9642.00 10261.00 14745.00 15611.00 14396.00 19966.00 10529.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8818.00 10294.00 10943.00 10431.00 16009.00 15012.00 21309.00 11230.00
G RCC Grade M30
(p) Height upto 5m
Case I Using concrete Mixer cum 7422.00 8950.00 9523.00 13677.00 14479.00 13354.00 18514.00 9771.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 7886.00 9245.00 9844.00 9373.00 14529.00 13600.00 19397.00 10109.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7631.00 9202.00 9792.00 14063.00 14887.00 13730.00 19036.00 10046.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8108.00 9506.00 10121.00 9637.00 14939.00 13983.00 19944.00 10394.00
(r) Height above 10m
Case I Using concrete Mixer cum 7928.00 9560.00 10173.00 14610.00 15466.00 14264.00 19777.00 10437.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8424.00 9875.00 10515.00 10012.00 15520.00 14527.00 20720.00 10798.00
H RCC Grade M35
(p) Height upto 5m
Case I Using concrete Mixer cum 7577.00 9119.00 9698.00 13898.00 14700.00 13563.00 18782.00 9947.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8357.00 9738.00 10346.00 9928.00 15084.00 14149.00 20042.00 10611.00
(q) Height 5m to 10m
Case I Using concrete Mixer cum 7743.00 9318.00 9909.00 14202.00 15020.00 13859.00 19191.00 10164.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8540.00 9950.00 10572.00 10145.00 15413.00 14457.00 20479.00 10842.00
(r) Height above 10m
Case I Using concrete Mixer cum 7991.00 9616.00 10227.00 14656.00 15501.00 14303.00 19806.00 10489.00
Case II With Batching Plant, Transit Mixer and Concrete Pump cum 8813.00 10269.00 10910.00 10469.00 15907.00 14920.00 21135.00 11189.00
13.6
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per
drawing and technical specifications
tonne 56769.00 59010.00 61446.00 76692.00 76692.00 83066.00 101729.00 95742.00
13.7
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per
drawing and technical specification
tonne 53668.00 55851.00 56381.00 61590.00 61590.00 60341.00 70009.00 56501.00
13.8
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return
wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V
:20H towards drawing foce. Complete as per drawing and Technical specifications
R.metre 407.00 465.00 477.00 506.00 508.00 526.00 605.00 484.00
13.9
Back filling behind abutment, wing wall and return wall complete as per drawing and
Technical specification
A Granular material cum 2366.00 2516.00 2645.00 2817.00 3287.00 3207.00 3957.00 2990.00
B Sandy material cum 1877.00 4227.00 5151.00 13532.00 13532.00 11451.00 19490.00 5232.00
13.10
Providing and laying of Filter media with granular materials/stone crushed aggregates
satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size towards
the wall and provided over the entire surface behind abutment, wing wall and return wall to
the full height compacted to a firm condition complete as per drawing and technical
specification.
cum 2413.00 2558.00 2663.00 2802.00 2889.00 2819.00 3456.00 2645.00
49
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
13.11
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing
conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete
including all accessories as per drawing and Technical Specifications.
tonne
capacity
266.00 271.00 272.00 274.00 274.00 275.00 303.00 272.00
13.12
Supplying, fitting and fixing in position true to line and level forged steel roller bearing
conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete
including all accessories as per drawing and Technical Specifications.
tonne
capacity
249.00 254.00 255.00 257.00 257.00 259.00 284.00 255.00
13.13
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE
surface sliding on stainless steel complete including all accessories as per drawing and
Technical Specifications and BS: 5400, section 9.1 & 9.2 (for PTFE) and clause 2004 of
MoRTH Specifications.
tonne
capacity
2097.00 2125.00 2148.00 2154.00 2154.00 2159.00 2362.00 2132.00
13.14
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to
IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all
accessories as per drawing and Technical Specifications.
cubic
centimetre
5.00 5.00 5.10 5.10 5.10 5.10 5.50 5.10
13.15
Supplying, fitting and fixing in position true to line and level sliding plate bearing with stainless
steel plate sliding on stainless steel plate with mild steel matrix complete including all
accessories as per drawing and Technical Specifications.
tonne
capacity
2096.00 2124.00 2146.00 2152.00 2152.00 2158.00 2360.00 2130.00
13.16
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a
metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder,
sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface,
completre assembly to be of cast steel/fabricated structural steel, metal and elastomer
elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400,
section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete asper drawing and
approved technical specifications.
tonne
capacity
250.00 255.00 256.00 257.00 257.00 259.00 285.00 256.00
14.1
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per
drawing and Technical Specification
A RCC Grade M20
Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 7366.00 8973.00 9576.00 13893.00 14768.00 13593.00 18956.00 9844.00
(q) Height 5m to 10m cum 7672.00 9347.00 9975.00 14472.00 15383.00 14160.00 19746.00 10254.00
(r) Height above 10m cum 7979.00 9721.00 10374.00 15051.00 15998.00 14726.00 20535.00 10664.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 7672.00 9347.00 9975.00 14472.00 15383.00 14160.00 19746.00 10254.00
(q) Height 5m to 10m cum 7979.00 9721.00 10374.00 15051.00 15998.00 14726.00 20535.00 10664.00
CHAPTER-14
SUPER-STRUCTURE
50
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(r) Height above 10m cum 8286.00 10095.00 10773.00 15630.00 16614.00 15293.00 21325.00 11075.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 7869.00 9292.00 9922.00 9192.00 14817.00 13858.00 19913.00 10209.00
(q) Height 5m to 10m cum 8197.00 9679.00 10336.00 9575.00 15434.00 14435.00 20743.00 10634.00
(r) Height above 10m cum 8525.00 10066.00 10749.00 9958.00 16052.00 15013.00 21573.00 11060.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8197.00 9679.00 10336.00 9575.00 15434.00 14435.00 20743.00 10634.00
(q) Height 5m to 10m cum 8525.00 10066.00 10749.00 9958.00 16052.00 15013.00 21573.00 11060.00
(r) Height above 10m cum 8853.00 10453.00 11163.00 10341.00 16669.00 15590.00 22402.00 11485.00
B RCC Grade M25
Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 8013.00 9674.00 10297.00 14805.00 15679.00 14457.00 20057.00 10567.00
(q) Height 5m to 10m cum 8347.00 10077.00 10726.00 15421.00 16332.00 15060.00 20893.00 11007.00
(r) Height above 10m cum 8681.00 10480.00 11155.00 16038.00 16986.00 15662.00 21729.00 11448.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8347.00 10077.00 10726.00 15421.00 16332.00 15060.00 20893.00 11007.00
(q) Height 5m to 10m cum 8681.00 10480.00 11155.00 16038.00 16986.00 15662.00 21729.00 11448.00
(r) Height above 10m cum 9015.00 10883.00 11584.00 16655.00 17639.00 16265.00 22564.00 11888.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 8528.00 10007.00 10660.00 10114.00 15759.00 14749.00 21056.00 10949.00
(q) Height 5m to 10m cum 8883.00 10424.00 11104.00 10536.00 16416.00 15364.00 21934.00 11405.00
(r) Height above 10m cum 9238.00 10841.00 11548.00 10957.00 17073.00 15978.00 22811.00 11861.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8883.00 10424.00 11104.00 10536.00 16416.00 15364.00 21934.00 11405.00
(q) Height 5m to 10m cum 9238.00 10841.00 11548.00 10957.00 17073.00 15978.00 22811.00 11861.00
(r) Height above 10m cum 9594.00 11258.00 11993.00 11378.00 17729.00 16593.00 23689.00 12317.00
C RCC Grade M 30
Case I Using Concrete Mixer
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 8116.00 9785.00 10411.00 14942.00 15817.00 14589.00 20221.00 10681.00
(q) Height 5m to 10m cum 8454.00 10193.00 10845.00 15565.00 16476.00 15197.00 21064.00 11126.00
(r) Height above 10m cum 8792.00 10600.00 11278.00 16188.00 17135.00 15805.00 21906.00 11571.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8454.00 10193.00 10845.00 15565.00 16476.00 15197.00 21064.00 11126.00
(q) Height 5m to 10m cum 8792.00 10600.00 11278.00 16188.00 17135.00 15805.00 21906.00 11571.00
(r) Height above 10m cum 9130.00 11008.00 11712.00 16810.00 17794.00 16413.00 22749.00 12016.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump.
(i) For solid slab super-structure, 20-30% of (a+b+c)
51
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(p) Height upto 5m cum 8617.00 10110.00 10768.00 10231.00 15916.00 14894.00 21254.00 11057.00
(q) Height 5m to 10m cum 8976.00 10531.00 11217.00 10657.00 16579.00 15514.00 22140.00 11518.00
(r) Height above 10m cum 9335.00 10952.00 11666.00 11083.00 17242.00 16135.00 23025.00 11979.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
(p) Height upto 5m cum 8976.00 10531.00 11217.00 10657.00 16579.00 15514.00 22140.00 11518.00
(q) Height 5m to 10m cum 9335.00 10952.00 11666.00 11083.00 17242.00 16135.00 23025.00 11979.00
(r) Height above 10m cum 9694.00 11374.00 12114.00 11509.00 17905.00 16755.00 23911.00 12439.00
D RCC/PSC Grade M35
Case 1 Using concrete mixer.
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 8149.00 9804.00 10425.00 14930.00 15790.00 14571.00 20171.00 10691.00
(q) Height 5m to 10m cum 8494.00 10219.00 10866.00 15563.00 16459.00 15188.00 21025.00 11144.00
(r) Height above 10m cum 8839.00 10635.00 11308.00 16196.00 17128.00 15806.00 21880.00 11597.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 8494.00 10219.00 10866.00 15563.00 16459.00 15188.00 21025.00 11144.00
(q) Height 5m to 10m cum 8839.00 10635.00 11308.00 16196.00 17128.00 15806.00 21880.00 11597.00
(r) Height above 10m cum 9184.00 11050.00 11750.00 16828.00 17798.00 16423.00 22735.00 12050.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 9530.00 11466.00 12192.00 17461.00 18467.00 17040.00 23589.00 12503.00
(q) Height 5m to 10m cum 10220.00 12297.00 13075.00 18726.00 19805.00 18275.00 25299.00 13409.00
(r) Height above 10m cum 10911.00 13127.00 13959.00 19991.00 21143.00 19510.00 27008.00 14315.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 8630.00 10101.00 10750.00 10293.00 15824.00 14816.00 21097.00 11034.00
(q) Height 5m to 10m cum 8996.00 10529.00 11206.00 10729.00 16495.00 15444.00 21991.00 11502.00
(r) Height above 10m cum 9361.00 10957.00 11661.00 11165.00 17165.00 16072.00 22885.00 11970.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 8996.00 10529.00 11206.00 10729.00 16495.00 15444.00 21991.00 11502.00
(q) Height 5m to 10m cum 9361.00 10957.00 11661.00 11165.00 17165.00 16072.00 22885.00 11970.00
(r) Height above 10m cum 9727.00 11385.00 12117.00 11601.00 17836.00 16700.00 23779.00 12437.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 10093.00 11813.00 12572.00 12038.00 18507.00 17328.00 24673.00 12905.00
(q) Height 5m to 10m cum 10824.00 12670.00 13483.00 12910.00 19848.00 18583.00 26460.00 13840.00
(r) Height above 10m cum 11555.00 13526.00 14394.00 13782.00 21189.00 19839.00 28248.00 14775.00
E PSC Grade M-40
Case 1 Using concrete mixer.
(i) For solid slab super-structure, 20-30% of (a+b+c)
(p) Height upto 5m cum 8761.00 10467.00 11103.00 15721.00 16596.00 15354.00 21128.00 11374.00
(q) Height 5m to 10m cum 9126.00 10903.00 11566.00 16377.00 17288.00 15994.00 22008.00 11848.00
(r) Height above 10m cum 9491.00 11339.00 12029.00 17032.00 17979.00 16634.00 22888.00 12322.00
(ii) For T-beam & slab, 25-35% of (a+b+c)
52
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(p) Height upto 5m cum 9126.00 10903.00 11566.00 16377.00 17288.00 15994.00 22008.00 11848.00
(q) Height 5m to 10m cum 9491.00 11339.00 12029.00 17032.00 17979.00 16634.00 22888.00 12322.00
(r) Height above 10m cum 9856.00 11775.00 12491.00 17687.00 18671.00 17274.00 23769.00 12796.00
Case II Using Batching Plant, Transit Mixer and Concrete Pump
(i) For solid slab super-structure, 18-28% of (a+b+c)
(p) Height upto 5m cum 9066.00 10555.00 11209.00 10787.00 16319.00 15309.00 21664.00 11494.00
(q) Height 5m to 10m cum 9450.00 11002.00 11684.00 11245.00 17010.00 15958.00 22582.00 11981.00
(r) Height above 10m cum 9834.00 11449.00 12159.00 11702.00 17702.00 16607.00 23500.00 12468.00
(ii) For T-beam & slab, 23-33% of (a+b+c)
(p) Height upto 5m cum 9450.00 11002.00 11684.00 11245.00 17010.00 15958.00 22582.00 11981.00
(q) Height 5m to 10m cum 9834.00 11449.00 12159.00 11702.00 17702.00 16607.00 23500.00 12468.00
(r) Height above 10m cum 10218.00 11897.00 12634.00 12159.00 18393.00 17255.00 24418.00 12955.00
(iii) For box girder and balanced cantilever, 38-58% of cost of concrete.
(p) Height upto 5m cum 10603.00 12344.00 13109.00 12616.00 19085.00 17904.00 25336.00 13442.00
(q) Height 5m to 10m cum 11371.00 13238.00 14059.00 13530.00 20468.00 19201.00 27172.00 14416.00
(r) Height above 10m cum 12139.00 14133.00 15009.00 14444.00 21851.00 20499.00 29008.00 15390.00
F PSC Grade M-45
(i) For solid slab/voided slab super-structure, 16-26% of cost of concrete (a+b+c)
(p) Height upto 5m cum 9318.00 10813.00 11468.00 11165.00 16603.00 15583.00 21972.00 11749.00
(q) Height 5m to 10m cum 9719.00 11279.00 11963.00 11647.00 17319.00 16255.00 22920.00 12256.00
(r) Height above 10m cum 10121.00 11745.00 12457.00 12128.00 18035.00 16927.00 23867.00 12762.00
(ii)
For I-beam & slab including launching of precast girders by launching truss upto 40 m
span, 21-31% of cost of concrete.
(p) Height upto 5m cum 9719.00 11279.00 11963.00 11647.00 17319.00 16255.00 22920.00 12256.00
(q) Height 5m to 10m cum 10121.00 11745.00 12457.00 12128.00 18035.00 16927.00 23867.00 12762.00
(r) Height above 10m cum 10522.00 12211.00 12951.00 12609.00 18750.00 17599.00 24814.00 13268.00
(iii)
For cast-in-situ box girder, segmental construction and balanced cantilever, 36-56% of
cost of concrete.
(p) Height upto 5m cum 10924.00 12677.00 13446.00 13091.00 19466.00 18270.00 25761.00 13775.00
(q) Height 5m to 10m cum 11727.00 13609.00 14434.00 14053.00 20897.00 19614.00 27655.00 14788.00
(r) Height above 10m cum 12531.00 14541.00 15423.00 15016.00 22328.00 20957.00 29549.00 15800.00
G PSC Grade M-50
(i)
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of
cost of concrete
(p) Height upto 5m cum 11181.00 12947.00 13720.00 13461.00 19789.00 18580.00 26133.00 14048.00
(q) Height 5m to 10m cum 12009.00 13906.00 14737.00 14458.00 21255.00 19956.00 28069.00 15088.00
(r) Height above 10m cum 12837.00 14865.00 15753.00 15455.00 22721.00 21332.00 30004.00 16129.00
H PSC Grade M- 55
(i)
For cast-in-situ box girder, segmental construction and balanced cantilever, 35-55% of
cost of concrete
(p) Height upto 5m cum 11708.00 13516.00 14305.00 14191.00 20519.00 19275.00 27013.00 14634.00
(q) Height 5m to 10m cum 12576.00 14517.00 15365.00 15242.00 22039.00 20702.00 29014.00 15718.00
53
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
(r) Height above 10m cum 13443.00 15518.00 16425.00 16293.00 23559.00 22130.00 31015.00 16802.00
14.2
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per
drawing and technical specifications
tonne 57652.00 60008.00 62451.00 77697.00 77697.00 84079.00 102842.00 96745.00
14.3
High tensile steel wires/strands including all accessories for stressing, stressing operations
and grouting complete as per drawing and Technical Specifications
tonne 67664.00 71278.00 72257.00 78557.00 78557.00 77893.00 83889.00 72372.00
14.4
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement
complete as per drawing and Technical Specifications
cum 11542.00 12966.00 13697.00 14393.00 19130.00 18757.00 25469.00 16510.00
14.5
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of
deck slab excluding prime coat with paving grade bitumen meeting the requirements given in
table 500-29, prepared by using mastic cooker and laid to required level and slope after
cleaning the surface, including providing antiskid surface with bitumen precoated fine grained
hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an
approximate spacing of 10 cm center to center in both directions, pressed into surface when
the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic
surface, all complete as per clause 515.)
sqm 317.00 349.00 365.00 413.00 415.00 410.00 484.00 364.00
14.6
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm,
true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre
spacing between vertical post not to exceed 2000 mm, leaving adequate space between
vertical post for expansion, complete as per approved drawings and technical specifications.
metre 1766.00 1927.00 2025.00 2271.00 2717.00 2757.00 3611.00 2697.00
14.7
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to
line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre
spacing between vertical post not to exceed 2000 mm, leaving adequate space between
vertical post for expansion, complete as per approved drawings and technical specifications.
metre 1725.00 1886.00 1982.00 2214.00 2667.00 2700.00 3544.00 2623.00
14.8
Providing, fitting and fixing mild steel railing complete as per drawing and Technical
Specification
metre 2870.00 2974.00 2996.00 3224.00 3224.00 3168.00 3638.00 3002.00
14.9 Drainage Spouts complete as per drawing and Technical specification each 2732.00 3043.00 3117.00 3234.00 3234.00 3366.00 3791.00 3160.00
14.10
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical
specification
cum 5291.00 6556.00 7040.00 10440.00 11173.00 10296.00 14513.00 7265.00
14.11
Reinforced cement concrete approach slab including reinforcement and formwork complete as
per drawing and Technical specification
cum 10195.00 11573.00 12251.00 12576.00 17357.00 16815.00 23129.00 14211.00
14.12
Providing anti-corrosive treatment to HYSD reinforcement with Fusion Bonded Epoxy Coating
(FBEC) (To be taken as per the prevailing market rates.)
tonne
14.13
Precast - pretensioned Girders (Providing, precasting, transportation and placing in position
precast pretensioned concrete girders as per drawing and technical specifications)
cum 27583.00 30056.00 30865.00 32581.00 37552.00 37016.00 48062.00 34599.00
14.14 Providing and fixing Helical pipes in voided concrete slabs metre 976.00 1009.00 1015.00 1019.00 1019.00 1028.00 1131.00 1015.00
14.15
Crash Barriers (The rate analysis for rigid crash barrier in reinforced cement concrete, semi-
rigid crash barrier with metal beam and flexible crash barrier with wire ropes have been made
and included in chapter-8 on Traffic and Transportation.)
54
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
14.16
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to
unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease,
efflorescence and applying paint @ of 1 litre for 2 Sq.m. )
metre 90.00 103.00 103.00 109.00 109.00 112.00 127.00 106.00
14.17
Burried Joint (Providing and laying a burried expansion joint, expansion gap being 20 mm,
covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS:
2062, placed symmetrical to centre line of the joint, resting freely over the top surface of the
deck concrete, welding of 8 mm dia. 100 mm long galvanised nails spaced 300 mm c/c along
the centre line of the plate, all as specified in clause 2604.)
metre 1271.00 1294.00 1301.00 1323.00 1323.00 1333.00 1475.00 1313.00
14.18 Filler joint
(i)
Providing & fixing 2 mm thick corrugated copper plate in expansion joint complete as
per drawing & Technical Specification.
metre 124251.00 130353.00 132572.00 155310.00 155310.00 149764.00 181529.00 133126.00
(ii)
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as
per drawing & Technical Specification.
metre 266.00 271.00 275.00 281.00 281.00 285.00 313.00 275.00
(iii)
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint
for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal
movement upto 20 mm, covered with sealant complete as per drawing and technical
specifications.
metre 143.00 154.00 157.00 167.00 167.00 171.00 189.00 157.00
(iv)
Providing and filling joint sealing compound as per drawings and technical
specifications with coarse sand and 6% bitumen by weight
metre 21.00 24.00 25.00 31.00 33.00 31.00 40.00 25.00
14.19
Asphaltic Plug joint (Providing and laying of asphaltic plug joint to provide for horizontal
movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to
100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure
plate of 200mm x 6mm of wieldable structural steel conforming to IS: 2062, asphaltic plug to
consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5
mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings
and specifications.)
metre 1285.00 1337.00 1358.00 1448.00 1461.00 1444.00 1647.00 1365.00
14.20
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel
expansion joint, catering to right or skew (less than 20 deg., moderately curved with
maximum horizontal movement upto 50 mm, complete as per approved drawings and
standard specifications to be installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's instructions for installation and
clause 2606 of MoRTH specifications for road & bridge works.)
metre 13184.00 13378.00 14259.00 14538.00 14538.00 14573.00 15974.00 14259.00
14.21
Compression Seal Joint (Providing and laying of compression seal joint consisting of steel
armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a
preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into
the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and
vertical movement of 3 mm.)
metre 3531.00 3614.00 3640.00 3847.00 3847.00 3807.00 4314.00 3645.00
14.22
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to
maximum horizontal movement upto 70 mm, complete as per approved drawings and
standard specifications to be installed by the manufacturer/supplier or their authorised
representative ensuring compliance to the manufacturer's instructions for installation.)
metre 56.00 60.00 62.00 63.00 63.00 64.00 71.00 62.00
55
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
14.23
Modular Strip / Box Seal Joint (Providing and laying of a modular strip Box steel expansion
joint including anchorage catering to a horizontal movement beyond 70 mm and upto 140mm,
complete as per approved drawings and standard specifications to be installed by the
manufacturer/supplier or their authorised representative ensuring compliance to the
manufacturer's instructions for installation.)
metre 691.00 712.00 714.00 716.00 716.00 719.00 790.00 714.00
14.24
Modular Strip / Box Seal Joint (Providing and laying of a modular strip box seal expansion joint
catering to a horizontal movement beyond 140mm and upto 210mm, complete as per
approved drawings and standard specifications to be installed by the manufacturer/supplier or
their authorised representative ensuring compliance to the manufacturer's instructions for
installation.)
metre 897.00 910.00 937.00 952.00 952.00 960.00 1054.00 937.00
15.1
Providing and laying boulders apron on river bed for protection against scour with stone
boulders weighing not less than 40 kg each complete as per drawing and Technical
specification.
A Boulder laid dry without wire crates. cum 1873.00 2393.00 2393.00 1797.00 2729.00 2729.00 2977.00 2555.00
15.2
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates
made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh
(weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing
not less than 40 kg each.)
cum 3568.00 4077.00 4079.00 4099.00 4436.00 4431.00 4850.00 4242.00
CHAPTER-15
RIVER TRAINING AND PROTECTION WORKS
56
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
15.3
Cement concrete blocks (size 0.5 x 0.5 x 0.5 m) (Providing and laying of apron with cement
concrete blocks of size 0.5x0.5x0.5 m cast in-situ and made with nominal mix of M-15 grade
cement concrete with a minimum cement content of 250 kg/cum as per IRC: 21-2000.)
cum 5613.00 6954.00 7466.00 11074.00 11851.00 10921.00 15396.00 7706.00
15.4
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron
laid dry in front of toe of embankment complete as per drawing and Technical specifications
A Stone/Boulder cum 1873.00 2393.00 2393.00 2393.00 2729.00 2729.00 2977.00 2555.00
B
Cement Concrete blocks of size 0.3x0.3 x0.3 m cast in cement concrete of Grade M15
cum 5613.00 6954.00 7466.00 11074.00 11851.00 10921.00 15396.00 7706.00
15.5
Providing and laying Filter material underneath pitching in slopes complete as per drawing and
Technical specification
cum 2531.00 2688.00 2792.00 2932.00 3019.00 2949.00 3598.00 2775.00
15.6
Geotextile Filter (Laying of a geotextile filter between pitching and embankment slopes on
which pitching is laid to prevent escape of the embankment material through the voids of the
stone pitching/cement concrete blocks as well as to allow free movement of water without
creating any uplift head on the pitching.)
sqm 58.00 63.00 65.00 67.00 67.00 68.00 77.00 65.00
15.7
Toe protection (A toe wall for toe protection can either be in dry rubble masonry in case of dry
rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if
cement concrete block have been used for pitching . Rates for toe wall can be adopted from
respective clauses depending upon approved design. The rate for excavation for foundation,
dry rubble masonry and PCC M15 have been analysed and given in respective chapters.)
15.8
Providing and laying Flooring complete as per drawing and Technical specifications laid over
cement concrete bedding.
A Rubble stone laid in cement mortar 1:3 cum 6077.00 7788.00 8241.00 12088.00 13649.00 11654.00 15702.00 8493.00
B Cement Concrete blocks Grade M15 cum 7392.00 9159.00 9833.00 14584.00 15608.00 14383.00 20276.00 10149.00
15.9 Dry rubble Flooring cum 2137.00 2688.00 2688.00 2092.00 3024.00 3024.00 3299.00 2850.00
15.10 Curtain wall complete as per drawing and Technical specification
A Stone masonry in cement mortar (1:3) cum 5436.00 6312.00 6600.00 9024.00 9405.00 8712.00 11735.00 6814.00
B Cement concrete Grade M15 cum 5503.00 6818.00 7320.00 10857.00 11619.00 10707.00 15094.00 7555.00
15.11
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders
weighing not less than 40 kg beyond curtain wall.
cum 1920.00 2445.00 2445.00 1844.00 2785.00 2785.00 3038.00 2609.00
15.12
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for
retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m
compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm
having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating
conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x
100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4
mm galvanised steel wire)
cum 3925.00 4428.00 4430.00 4454.00 4790.00 4785.00 5239.00 4593.00
57
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
15.13
Gabian Structure for Erosion Control, River Training Works and Protection works (Providing
and constructing gabain structures for erosion control, river training works and protection
works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross
netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile
strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826,
woven into mesh with double twist, mesh size not exceeding 100 mm x 100 mm, filled with
boulders with least dimension of 200 mm, all loose ends to be securely tied with 4 mm
galvanised steel wire.)
cum 6684.00 7198.00 7204.00 7257.00 7594.00 7581.00 8313.00 7367.00
16.1
Removal of existing cement concrete wearing coat including its disposal complete as per
Technical specification without causing any detrimental effect to any part of the bridge
structure and removal of dismantled material with all lifts and lead upto 1000m(Thickness 75
mm)
sqm 78.00 86.00 89.00 95.00 95.00 98.00 100.00 89.00
16.2
Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid
over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m.
sqm 59.00 65.00 67.00 72.00 72.00 74.00 76.00 67.00
16.3
Guniting concrete surface with cement mortar applied with compressor after cleaning surface
and spraying with epoxy complete as per Technical specification
sqm 1088.00 1220.00 1269.00 1622.00 1622.00 1553.00 1824.00 1275.00
16.4
Providing and inserting nipples with approved fixing compound after drilling holes for grouting
as per Technical specifications including subsequent cutting/removal and sealing of the hole
as necessary of nipples after completion of grouting with Cement/Epoxy
each 80.00 92.00 92.00 93.00 93.00 93.00 94.00 92.00
16.5
Sealing of cracks/porous concrete by injection process through nipples/Grouting complete as
per Technical specification.
A Cement Grout kg 37.00 40.00 40.00 42.00 42.00 43.00 44.00 40.00
B Cement mortar (1:1) Grouting kg 111.00 123.00 124.00 129.00 129.00 130.00 134.00 124.00
16.6
Patching of damaged concrete surface with polymer concrete and curing compounds, initiator
and promoter, available in present formulations, to be applied as per instructions of
manufacturer and as approved by the Engineer.
sqm 2943.00 3062.00 3101.00 3256.00 3256.00 3335.00 3451.00 3101.00
16.7
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as
per clause 2803.1.
kg 788.00 804.00 821.00 831.00 831.00 832.00 839.00 821.00
CHAPTER-16
REPAIR AND REHABILITATION
58
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
16.8
Applying epoxy mortar over leached, honey combed and spalled concrete surface and
exposed steel reinforcement complete as per Technical specification
sqm 312.00 316.00 317.00 320.00 320.00 319.00 322.00 317.00
16.9
Removal of defective concrete, cleaning the surface thoroughly, applying the shotcrete
mixture mechanically with compressed air under pressure, comprising of cement, sand,
coarse aggregates, water and quick setting compound in the proportion as per clause
2807.1., sand and coarse aggregates conforming to IS: 383 and table 1 of IS: 9012
respectively, water cement ratio ranging from 0.35 to 0.50, density of gunite not less than
2000 kg/cum, strength not less than 25 Mpa and workmanship conforming to clause 2807.6.
sqm 372.00 437.00 462.00 600.00 621.00 596.00 710.00 465.00
16.10
Applying pre-packed cement based polymer mortar of strength 45 Mpa at 28 days for
replacement of spalled concrete
sqm 198.00 219.00 221.00 229.00 229.00 233.00 238.00 220.00
16.11 Eproxy bonding of new concrete to old concrete sqm 331.00 336.00 336.00 340.00 340.00 339.00 342.00 336.00
16.12
Providing external prestressing with high tensile steel wires/strands including drilling for
passage of prestessing steel, all accessories for stressing and stressing operation and
grouting complete as per drawing and Technical specification
tonne 255168.00 263351.00 266048.00 287013.00 287013.00 282820.00 298296.00 266844.00
16.13
Providing external prestressing with high tensile steel wires/strands including drilling for
passage of prestessing steel, all accessories for stressing and stressing operation and
grouting complete as per drawing and Technical specification
tonne 253789.00 262191.00 264549.00 286277.00 286277.00 281939.00 297522.00 265033.00
16.14
Providing external prestressing with high tensile steel wires/strands including drilling for
passage of prestessing steel, all accessories for stressing and stressing operation and
grouting complete as per drawing and Technical specification
tonne 231722.00 239430.00 241593.00 261550.00 261550.00 257578.00 271895.00 242037.00
16.15 Replacement of bearings complete as per Technical specification each 67399.00 68827.00 68930.00 69411.00 69411.00 69680.00 70310.00 68930.00
16.16 Rectification of bearings as per Technical specifications each 63199.00 65140.00 65358.00 65587.00 65587.00 65795.00 66103.00 65358.00
16.17 Replacement of Expansion Joints complete as per drawings metre 3217.00 3680.00 3878.00 3721.00 5426.00 5119.00 6499.00 3965.00
16.18 Replacement of damaged concrete railing. metre 164.00 182.00 184.00 188.00 188.00 190.00 192.00 184.00
16.19 Replacement of crash barrier. metre 293.00 323.00 325.00 329.00 329.00 331.00 333.00 325.00
16.20 Replacement of damaged mild steel railing metre 139.00 154.00 156.00 159.00 159.00 162.00 164.00 156.00
16.21
Repair of crash barrier (Repair of concrete crash barrier with cement concrete of M-30 grade
by cutting and trimming the damaged portion to a regular shape, cleaning the area to be
repaired thoroughly, applying cement concrete after erection of proper form work.)
metre 239.00 279.00 295.00 282.00 423.00 398.00 511.00 302.00
16.22
Repair of RCC Railing (Carrying out repair of RCC M30 railing to bring it to the original shape.)
metre 139.00 154.00 162.00 174.00 221.00 219.00 268.00 201.00
16.23 Repair of steel Railing (Repair of steel railing to bring it to the original shape) metre 256.00 265.00 267.00 288.00 288.00 283.00 298.00 267.00
59
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
60
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
61
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
62
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
63
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
64
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
65
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
66
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
67
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
68
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
69
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
70
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
71
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
72
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
73
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
74
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
75
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
76
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
77
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
78
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
79
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
80
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
81
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
82
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
83
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
84
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
85
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
86
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
87
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
88
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
89
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
90
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
91
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
92
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
93
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
94
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
95
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
96
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
97
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
98
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
99
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
100
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
101
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
102
Schedule of Rate for NH ,
MORT work in Nagland (2010)
Schedule fo Rates for NH,
MORT Works in Nagaland(2010)
Code No Descriptions Unit DMR
KMA / MKG /
PRN
WKA PHEK ZBTO TSG / LLG KPE MON
103
Schedule of Rate for NH ,
MORT work in Nagland (2010)
I N D E X
Sl. No
Chapter
Ref
Description of Works Page
1 CHAPTER - 1 CARRIAGE OF MATERIALS 1
2 CHAPTER- 2 SITE CLEARENCE 2 - 5
1 CHAPTER-3 EARTH WORK, EROSION CONTROL AND DRAINAGE 6 - 11
2 CHAPTER-4 SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS 12 - 15
3 CHAPTER-5 BASES AND SURFACE COURSES (BITUMINOUS) 16 - 21
4 CHAPTER-6 CEMENT CONCRETE PAVEMENTS 22 - 23
5 CHAPTER-7 GERSYNTHETICS AND REINFORCED EARTH 24 - 25
6 CHAPTER-8 TRAFFIC SIGNS, MARKINGS & OTHER ROAD APPURTENANCES 26 - 35
7 CHAPTER-9 PIPE CULVERTS 36
8 CHAPTER-10 MAINTENANCE OF ROADS 37 - 38
9 CHAPTER-11 HORTICULTURE 39 - 41
1 CHAPTER-12 FOUNDATIONS 42 - 59
2 CHAPTER-13 SUB-STRUCTURE 60 - 63
3 CHAPTER-14 SUPER-STRUCTURE 64 - 71
4 CHAPTER-15 RIVER TRAINING AND PROTECTION WORKS 72 - 73
5 CHAPTER-16 REPAIR AND REHABILITATION 74 - 75
COMMON WORKS
ROAD WORKS
BRIDGE WORKS

S-ar putea să vă placă și