CALCULATION

Analysis and Design of R.C.C CIRCULLAR TANK as per IS 3370

only

note : enter data in cell marked

Data
Visit
6.00
=
www.abqconsultants.com

Height of Tank
Inside Diameter of Tank

24.30

Uncracked Condition

This program
Designs
300 and mm
=
Optimises Rcc circullar tank of as per
30
N/mm2
=
IS 3370.

Thickness of Wall
Concrete grade fc'
Reinforcement Steel grade fy' - Tor Steel

Density of water / Liquid inside tank


Axial Load on Top of Tank Wall / m length

P1 =

500

S.B.C of Soil below Foundation

10

kn

300

Asc

0.85

N/mm2

Written and
byKn/m2
140
= programmed
:10
Kn/m3
=
A B Quadri
10
Kn
=
www.abqconsultants.com
abquadri@yahoo.com
abquadri@gmail.com
9959010210
9959010211

Inside face

Outside face

Hoop Tension

Moment

Horizomtal Hoop
distance from
Reinforcement on each
top - mm
face equally

Vertical Moment
Reinforcement on
tension side

CASE 1 : TOP FREE BOTTOM FIXED


0

10

1227

300

10

291

10

291

24300

600

10

234

10

291

Dia of Tank

900

10

167

10

291

1200

10

130

10

291

1500

20

430

10

291

1800

10

92

10

265

2100

10

82

10

224

2400

20

299

10

194

2700

10

70

10

172

3000

10

67

10

156

3300

10

67

20

579

3600

10

68

10

138

3900

10

72

10

135

4200

10

81

10

138

4500

10

96

10

152

4800

10

124

10

200

5100

10

184

10

291

5400

10

291

10

140

5700

10

291

10

94

20

285

20

213

6000

Height of Tank

OK- But give Haunch at bottom for


additional thickness required for Moment Refer to Details of Forces Table

Inside face

600

Haunch for Moment as per design.

0.18

Minimum reinforcement =

on both faces

both for Horizontal and Vertical Reinforcement.


300

200

min reqd

mm2/m

270
10

6000

291

Hoop Reinforcement

c/c

21
1000

300

dia

20

Distributed at equal spacing


along periphery.

900

2200
=

76.90

KN

945.84

KN

AREA OF CONC REQD FOR HOOP TEN AT BASE SLAB IN MM2

580271.1875

MM2

AREA OF STEEL REQD FOR HOOP TENSION IN MM2 IN BASE

6306

MM2

71.50

+
-

SHEAR FORCE AT BASE IN KN


HOOP TENSION IN BASE SLAB IN KN

Check SBC of Soil :

P
71.50

P=

Kn

M=

45.59

Kn.m

e=

-50

mm

Offset inside face

Wall thk

Offset outside face

900

300

1000

+
-

2.20

20

2200
21

31.66

kn.m

265

mm

Ast @ footing bottom reqd =

1472

mm2

(d' + 100 cover) reqd

20

0.81

Moment at face of Footing

wide
dia

45.59

285

264

ht

300

Ok

89.02

Max

-24.02

Min

Conc Grade =

OK

20

OK
=

20

dia @

213

c/c

2200
Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India. -- www.Abqconsiltants.com

Prepared by :

Date :

Sheet :
Job No. :
Cont'd :

Verified by :

Revision Notes :

Calculation Sheet
Project :
Subject :
CALCULATION

Details of Forces
Height from
top in mm HT

Hoop Tension

Moment

Steel reinforcement
Concrete thick reqd
reuired for hoop
Moment in
due to hoop
tension - mm2/m
tension - mm
on both faces.

Steel reinforcement
Concrete thick reqd
reuired for Moment
due to Moment - mm2/m on
mm
tension side

HT-mm

Hoop Tension
Kn/m

19.20

11.78

128.00

0.00

0.00

0.00

300

60.03

36.83

400.23

0.08

14.64

43.47

600

100.78

61.83

671.88

0.32

30.19

89.67

900

141.20

86.63

941.35

0.76

46.60

138.42

1200

180.86

110.96

1205.75

1.43

63.78

189.43

1500

219.11

134.42

1460.75

2.33

81.59

242.32

1800

255.07

156.48

1700.44

3.49

99.82

296.47

2100

287.60

176.44

1917.30

4.89

118.19

351.03

2400

315.33

193.46

2102.22

6.51

136.30

404.81

10

2700

336.71

206.57

2244.73

8.27

153.61

456.22

11

3000

350.02

214.74

2333.46

10.05

169.40

503.12

12

3300

353.53

216.89

2356.89

11.69

182.71

542.65

13

3600

345.67

212.07

2304.47

12.95

192.24

570.95

14

3900

325.23

199.53

2168.23

13.48

196.16

582.59

15

4200

291.74

178.98

1944.95

12.87

191.71

569.36

16

4500

245.82

150.81

1638.82

10.62

174.08

517.03

17

4800

189.73

116.40

1264.87

6.10

131.97

391.94

18

5100

127.92

78.48

852.83

-1.35

62.09

184.40

19

5400

67.73

41.55

451.56

-12.45

188.56

560.01

20

5700

20.05

12.30

133.65

-27.92

282.29

838.41

21

6000

0.00

0.00

0.00

-48.34

371.49

1103.32

Kn.m

Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India.-www.abqconsultants.com

Prepared by :

Date :

Sheet :
Job No. :
Cont'd :

Verified by :

Revision Notes :

Calculation Sheet
Project :
Subject :
CALCULATION

Moment Diagram

Hoop Tension Diagram

0
(50)

50

100

150

200

250

300

350

(60)

400

(50)

(40)

(30)

(20)

(10)

-5

-5

-10

-10

20

-6

-3

-15

-15

Inside face

10

outside face

Inside face

outside face

-20

-20

-25

-25

Prep By : A B Quadri- Abq Consultants - 9959010210 - em-abquadri@yahoo.com-12-2-826/2 Royal Residency, Besides Amba talkies, Mehdipatnam , Hyderabad-India.-www.abqconsultants.com

S-ar putea să vă placă și