, Managementul calitii totale, Cartea Universitar, Bucureti, 2003, ISBN 973-
7956-38-9 2. Nicolescu O., Plumb I., Pricop M., Vasilescu I., Verboncu I., Abordri moderne n managementul i economia organizaiei, Editura Economic, Bucureti, 2003, vol. 2, ISBN: 973-590-860-3, 973-590-862-X 3. Ciobanu E., Olaru M. Incursiune n trecutul i viitorul certificrii calitii, Revista Tribuna Calitii, nr. 1-2, Bucureti, 2000 4. Kotler P., Principiile Marketingului, Editura European, Editura Teora, 1989 5. Lambert A., J., Life cycle analysis including recycling, n Sarkis J., Ed. Greener Manufacturing and Operations: From Design to Delivery and Back, Greenleaf Publishers, Sheffield, 2001, 36-55 6. Lauwers L., "Justifying the incorporation of the materials balance principle into frontier- based eco-efficiency models," Ecological Economic, vol. 68, 2009, 1605-1614 7. Lee Hau, The Triple- A Supply Chain, Harvard Business Review, oct. 2004, 102-112 8. Lee, I.,Evaluating artificial intelligence heuristics for a flexible kanban system: Simultaneous kanban controlling and scheduling. International Journal of Production Research, 45(13), 2007, 28592873, ISSN 0020-7543 9. Leenders M., Purchaising and Supply Chain Management, Boston McGraw, 2005 10. Li H., Zhao Y., Stochastic Block Monotonicity in the Approximation of the Stationary Distribution of the Infinite Markov Chains, Stochastic Models 16, 2000, 313-333 11. Chira Robert, Obiective i rezultate ale gestiunii tiinifice a stocurilor , Simpozionul Internaional Management,Manageri i Organizaii 22 noiembrie 2007,pg.550-553,p.4, Editura A.S.E., ISBN: (13) 978-973-739-259-6 12. Lippolt, C., Furmans K., Sizing of Heijunka-controlled Production Systems with Unreliable Production Processes. in: T. Koch (Hrsg.), Lean Business Systems and Beyond, Band 257, S. 1119. IFIP International Federation for Information Processing: Springer, 2008 13. Lucey T., Tehnici cantitative, Ed.Tehnic, Bucureti, 2001 14. Malcovici M., Maini automate de croit, Fizica i Tehnologiile Moderne, vol. 4, nr. 1-2, 2006, 52-53 15. Maune C., Mglichkeiten des Komplexittsmanagements fr Automobilhersteller auf Basis IT-gesttzter durchgngiger Systeme, Tez Doctorat Universitatea-GH-Paderborn, 200 16. Banu Gheorghe,Telea Victor ,Chira Robert,ranu erban, The estimation of the operational capacity of the logistic system according to the level of the functionality status of its constituent organizations, Revista management Comparat Internaional nr 4/2011 ,editura ASE, cotaie CNCSIS B+ cod 361,BDI ,ISSN 1582-3458 17. Vollmann T., Berry W., Whybark D., Jacobs R. Manufacturing Planning and Control Systems for Supply Chain Management, 5.Ed., McGraw Hill, 2005, ISBN 0-07-144033 18. Vollmann, Thomas E.; William, Lee Berry; Whybark, David Clay and Jacobs, Robert F. Manufacturing planning and control for supply chain management, Boston (MA), McGraw- Hill/Irwin, 2004, 224-235 19. Wannenwetsch H., Integrierte Materialwirstchaft und Logistik, 4. Ed., Springer, Heidelberg, 2010, 5, ISBN 978-3-540-89772-9 20. Wannenwetsch H., Integrierte Materialwirtschaft und Logistik, 4. Ed., Springer, Heidelberg, 2010, ISBN 978-3-540-89772-9 21. Waller D., Operations Management. A supply chain approach, 2.ed. Thomson, 2003 22. Wang J.L., A supply chain application of fuzzy set theory to inventory control models DRP system analysis, Expert Systems with Applications 36, 2009, 92299239 23. Wang, S., Sarker, B.R. Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy. European Journal of Operational Research, 172, 2006, 179200 24. Wang T., Mller D.B., Graedel T.E. Forging the anthropogenic iron cycle. Environment Science and Technology, 2007; 41:51205129. 25. Watters D. Global Logistics. New Directions in Supply Chain Management, 5 Ed., Kogan, Replika Press, India, 2007, ISBN 13 978 0 7494 4813 4 26. Yamamoto, R, Eco-design-Best Practice 100, Tokyo, Diamond Co., 1999 27. Yuthas K., Young S.T., Material matters: Assessing the effectiveness of materials management IS, Information & Management 33, 1998, 115-124 28. Zanoni S., Zavanella L. Model and analysis ofintegrated productioninventory system: The case of steel production, Int. J. Production Economics 9394, 2005, 197205 29. Zhou B., Zhao Y., Katehakis M. Effective control policies for stochastic inventory systems with a minimum order quantity and linear costs, Int. J. Production Economics 106, 2007, 523531 30. Zhang W., Chen M., A mathematical programming model for production planning using CONWIP, International Journal Production Res. 39 (12), 2001, 27232734 31. Zhao Y, Liu D., The Censored Markov Chain and the Best Augmentation, Journal of Applied Probability 33, 1996, 623-629 32. Zheng, J.,Knight L., Harland C., Humby S., James K., An analysis of research into the future of purchasing and supply management, Journal of Purchasing & Supply Management 13, 2007, 6983 33. Zipkin, P., Foundations of Inventory Management. McGraw Hill, Boston, 2000. 34. .Patriche D. Bazele Comertului , Editura Economica, Bucureti, 1999 35. Pistol Gh.M., Bazele Comerului , Editura Fundaia Romnia de Mine, Bucureti, 2004 36. Pistol Gh. M., Marketing, Editura Fundaia Romnia de Mine, Bucureti, 2004 37. Ristea A.L., Purcarea Th.,Tudose C.,Distribuia Marfurilor, Editura Didactic i Pedagogic Bucureti, 1996 38. Orlicky, J. Material requirements planning. McGraw Hill, New York, 1975 39. Persona, Alessandro, Regattieri, Alberto and Romano, Pietro An integrated reference model for production planning and control in SMEs, Journal of Manufacturing Technology Management, Vol. 15, Iss. 7, 2004, 626-640, ISSN 1741-038X 40. Pfohl, H.C.: Logistiksysteme Betriebswirtschaftliche Grundlagen, 5. Auflage, Berlin 1996, 20-40 41. Pfohl H.C. Logistiksysteme, Betriebswirtschaftliche Grundlagen. Springer, Heidelberg, 2004, 42. Plenert, G. Focusing material requirements planning (MRP) towards performance. European Journal of Operational Research 119(1), 1999, 91-99 43. Porteus, E.L., Foundations of Stochastic Inventory Theory, Stanford University Press, Stanford, 2002 44. Porumb E., M., Managementul strategic al resurselor materiale, Editura Economic, Bucureti, 2000, 186 45. Rabinovich E, Evers P.T. Enterprise-wide adoption patterns of inventory management practices and information systems, Transportation Research Part E 38, 2002, 389404 46. Raiu S.C., Luban F., Hincu D., Ene N. Modelarea economic aplicat, Editura Economic, Bucureti, 2002, ISBN 973-590-657-0 47. Gopalakrishnan P. Handbook of materials management, Ed.8, 2005, ISBN 81-203-0709-7 48. Glaser H., Geiger W., Rohde V., PPS Produktionsplanung- und steuerung, Grundlagen, Konzepte, Anwendungen, Wiesbaden, 1991 49. Gupta, S., M. Al-Turki, Y., Perry R.F., Flexible Kanban System, International Journal. Operation Production. Management. 19 (10), 1999, 10651093 50. Hallihan, A., Sackett, P., Williams, G.M., JIT manufacturing: The evolution to an implementation model founded in current practice. International Journal of Production Research 35 (4), 1997, 901 920. 51. Harrington J., Harrington H., Management Total n firma secolului 21, Ed. Teora, Bucureti, 2001 52. Herer Y., L, Shalom L., The Kanban assignment problem - A non-integral approach, European Journal of Operational Research 120, 2000, 260-276 53. Ho, C., Ireland, T. Correlating MRP system nervousness with forecast errors. International Journal of Production Research 36(8), 1998, 2285-2299, ISSN 0020-7543 54. Hou Tung-Hsu, Hu Wei-Chung, Expert Systems with Applications 38, 2011, 59125918 55. Hopp, W. Spearman M. Factory Physics (Ed. 2.). McGraw, Hill, 2000, 349 56. Husseini M, Brien C.O., Hosseini S.T., A method to enhance volume flexibility in JIT production control, International Journal Production Economics, 104, 2006, 653665 57. IAI (International Aluminium Institute). Aluminium for future generations 2007 www.world- aluminium.org/ cache/fl0000189.pdf. (accesat septembrie 2009) 58. Inderfurth, K., How to protect against demand and yield risks in MRP systems. International Journal of Production Economics, 121(2), 2009, 474-481 59. IEA (International Energy Agency).Tracking industrial energy efficiency and CO2 emissions. Paris, OECD/IEA, 2007. 60. Jaba O., Gestiunea produciei i a operaiilor, Editura Economic, Bucureti, 2002, ISBN 973-590- 593-0 61. Jacobs R., Whybark C., Why ERP?, New York, Irwin McGraw-Hill, 2000