Sunteți pe pagina 1din 3

1. Stanciu I.

, Managementul calitii totale, Cartea Universitar, Bucureti, 2003, ISBN 973-


7956-38-9
2. Nicolescu O., Plumb I., Pricop M., Vasilescu I., Verboncu I., Abordri moderne n
managementul i economia organizaiei, Editura Economic, Bucureti, 2003, vol. 2, ISBN:
973-590-860-3, 973-590-862-X
3. Ciobanu E., Olaru M. Incursiune n trecutul i viitorul certificrii calitii, Revista Tribuna
Calitii, nr. 1-2, Bucureti, 2000
4. Kotler P., Principiile Marketingului, Editura European, Editura Teora, 1989
5. Lambert A., J., Life cycle analysis including recycling, n Sarkis J., Ed. Greener
Manufacturing and Operations: From Design to Delivery and Back, Greenleaf Publishers,
Sheffield, 2001, 36-55
6. Lauwers L., "Justifying the incorporation of the materials balance principle into frontier-
based eco-efficiency models," Ecological Economic, vol. 68, 2009, 1605-1614
7. Lee Hau, The Triple- A Supply Chain, Harvard Business Review, oct. 2004, 102-112
8. Lee, I.,Evaluating artificial intelligence heuristics for a flexible kanban system:
Simultaneous kanban controlling and scheduling. International Journal of Production
Research, 45(13), 2007, 28592873, ISSN 0020-7543
9. Leenders M., Purchaising and Supply Chain Management, Boston McGraw, 2005
10. Li H., Zhao Y., Stochastic Block Monotonicity in the Approximation of the Stationary
Distribution of the Infinite Markov Chains, Stochastic Models 16, 2000, 313-333
11. Chira Robert, Obiective i rezultate ale gestiunii tiinifice a stocurilor , Simpozionul
Internaional Management,Manageri i Organizaii 22 noiembrie 2007,pg.550-553,p.4,
Editura A.S.E., ISBN: (13) 978-973-739-259-6
12. Lippolt, C., Furmans K., Sizing of Heijunka-controlled Production Systems with
Unreliable Production Processes. in: T. Koch (Hrsg.), Lean Business Systems and Beyond,
Band 257, S. 1119. IFIP International Federation for Information Processing: Springer, 2008
13. Lucey T., Tehnici cantitative, Ed.Tehnic, Bucureti, 2001
14. Malcovici M., Maini automate de croit, Fizica i Tehnologiile Moderne, vol. 4, nr. 1-2,
2006, 52-53
15. Maune C., Mglichkeiten des Komplexittsmanagements fr Automobilhersteller auf
Basis IT-gesttzter durchgngiger Systeme, Tez Doctorat Universitatea-GH-Paderborn, 200
16. Banu Gheorghe,Telea Victor ,Chira Robert,ranu erban, The estimation of the
operational capacity of the logistic system according to the level of the functionality status of
its constituent organizations, Revista management Comparat Internaional nr 4/2011 ,editura
ASE, cotaie CNCSIS B+ cod 361,BDI ,ISSN 1582-3458
17. Vollmann T., Berry W., Whybark D., Jacobs R. Manufacturing Planning and Control
Systems for Supply Chain Management, 5.Ed., McGraw Hill, 2005, ISBN 0-07-144033
18. Vollmann, Thomas E.; William, Lee Berry; Whybark, David Clay and Jacobs, Robert F.
Manufacturing planning and control for supply chain management, Boston (MA), McGraw-
Hill/Irwin, 2004, 224-235
19. Wannenwetsch H., Integrierte Materialwirstchaft und Logistik, 4. Ed., Springer,
Heidelberg, 2010, 5, ISBN 978-3-540-89772-9
20. Wannenwetsch H., Integrierte Materialwirtschaft und Logistik, 4. Ed., Springer,
Heidelberg, 2010, ISBN 978-3-540-89772-9
21. Waller D., Operations Management. A supply chain approach, 2.ed. Thomson, 2003
22. Wang J.L., A supply chain application of fuzzy set theory to inventory control models
DRP system analysis, Expert Systems with Applications 36, 2009, 92299239
23. Wang, S., Sarker, B.R. Optimal models for a multi-stage supply chain system controlled
by kanban under just-in-time philosophy. European Journal of Operational Research, 172,
2006, 179200
24. Wang T., Mller D.B., Graedel T.E. Forging the anthropogenic iron cycle. Environment
Science and Technology, 2007; 41:51205129.
25. Watters D. Global Logistics. New Directions in Supply Chain Management, 5 Ed., Kogan,
Replika Press, India, 2007, ISBN 13 978 0 7494 4813 4
26. Yamamoto, R, Eco-design-Best Practice 100, Tokyo, Diamond Co., 1999
27. Yuthas K., Young S.T., Material matters: Assessing the effectiveness of materials
management IS, Information & Management 33, 1998, 115-124
28. Zanoni S., Zavanella L. Model and analysis ofintegrated productioninventory system:
The case of steel production, Int. J. Production Economics 9394, 2005, 197205
29. Zhou B., Zhao Y., Katehakis M. Effective control policies for stochastic inventory
systems with a minimum order quantity and linear costs, Int. J. Production Economics 106,
2007, 523531
30. Zhang W., Chen M., A mathematical programming model for production planning using
CONWIP, International Journal Production Res. 39 (12), 2001, 27232734
31. Zhao Y, Liu D., The Censored Markov Chain and the Best Augmentation, Journal of
Applied Probability 33, 1996, 623-629
32. Zheng, J.,Knight L., Harland C., Humby S., James K., An analysis of research into the
future of purchasing and supply management, Journal of Purchasing & Supply Management
13, 2007, 6983
33. Zipkin, P., Foundations of Inventory Management. McGraw Hill, Boston, 2000.
34. .Patriche D. Bazele Comertului , Editura Economica, Bucureti, 1999
35. Pistol Gh.M., Bazele Comerului , Editura Fundaia Romnia de Mine, Bucureti, 2004
36. Pistol Gh. M., Marketing, Editura Fundaia Romnia de Mine, Bucureti, 2004
37. Ristea A.L., Purcarea Th.,Tudose C.,Distribuia Marfurilor, Editura Didactic i
Pedagogic Bucureti, 1996
38. Orlicky, J. Material requirements planning. McGraw Hill, New York, 1975
39. Persona, Alessandro, Regattieri, Alberto and Romano, Pietro An integrated reference
model for production planning and control in SMEs, Journal of Manufacturing Technology
Management, Vol. 15, Iss. 7, 2004, 626-640, ISSN 1741-038X
40. Pfohl, H.C.: Logistiksysteme Betriebswirtschaftliche Grundlagen, 5. Auflage, Berlin
1996, 20-40
41. Pfohl H.C. Logistiksysteme, Betriebswirtschaftliche Grundlagen. Springer, Heidelberg,
2004,
42. Plenert, G. Focusing material requirements planning (MRP) towards performance.
European Journal of Operational Research 119(1), 1999, 91-99
43. Porteus, E.L., Foundations of Stochastic Inventory Theory, Stanford University Press,
Stanford, 2002
44. Porumb E., M., Managementul strategic al resurselor materiale, Editura Economic,
Bucureti, 2000, 186
45. Rabinovich E, Evers P.T. Enterprise-wide adoption patterns of inventory management
practices and information systems, Transportation Research Part E 38, 2002, 389404
46. Raiu S.C., Luban F., Hincu D., Ene N. Modelarea economic aplicat, Editura
Economic, Bucureti, 2002, ISBN 973-590-657-0
47. Gopalakrishnan P. Handbook of materials management, Ed.8, 2005, ISBN 81-203-0709-7
48. Glaser H., Geiger W., Rohde V., PPS Produktionsplanung- und steuerung, Grundlagen, Konzepte,
Anwendungen, Wiesbaden, 1991
49. Gupta, S., M. Al-Turki, Y., Perry R.F., Flexible Kanban System, International Journal. Operation
Production. Management. 19 (10), 1999, 10651093
50. Hallihan, A., Sackett, P., Williams, G.M., JIT manufacturing: The evolution to an implementation
model founded in current practice. International Journal of Production Research 35 (4), 1997, 901
920.
51. Harrington J., Harrington H., Management Total n firma secolului 21, Ed. Teora, Bucureti,
2001
52. Herer Y., L, Shalom L., The Kanban assignment problem - A non-integral approach, European
Journal of Operational Research 120, 2000, 260-276
53. Ho, C., Ireland, T. Correlating MRP system nervousness with forecast errors. International Journal
of Production Research 36(8), 1998, 2285-2299, ISSN 0020-7543
54. Hou Tung-Hsu, Hu Wei-Chung, Expert Systems with Applications 38, 2011, 59125918
55. Hopp, W. Spearman M. Factory Physics (Ed. 2.). McGraw, Hill, 2000, 349
56. Husseini M, Brien C.O., Hosseini S.T., A method to enhance volume flexibility in JIT production
control, International Journal Production Economics, 104, 2006, 653665
57. IAI (International Aluminium Institute). Aluminium for future generations 2007 www.world-
aluminium.org/ cache/fl0000189.pdf. (accesat septembrie 2009)
58. Inderfurth, K., How to protect against demand and yield risks in MRP systems. International
Journal of Production Economics, 121(2), 2009, 474-481
59. IEA (International Energy Agency).Tracking industrial energy efficiency and CO2 emissions. Paris,
OECD/IEA, 2007.
60. Jaba O., Gestiunea produciei i a operaiilor, Editura Economic, Bucureti, 2002, ISBN 973-590-
593-0
61. Jacobs R., Whybark C., Why ERP?, New York, Irwin McGraw-Hill, 2000

S-ar putea să vă placă și