Version 3.0 GM 156 - ENGINEERING CHANGE PROPOSAL Page 1 of 8 Originators Reference Proposal No. Proposal Revision No. TYPE OF CHANGE BEING PROPOSED: A. FLEET ENGINEERING CHANGE B. LOCAL ENGINEERING CHANGE C. ARTICLES MANUFACTURED IN WORKSHOP D. MANUFACTURE OF TECHNICAL COMPONENTS FOR TYPE A, B, C & D CHANGES PART 1 CHANGE REQUEST / CONCEPT / STATEMENT OF REQUIREMENT Priority: Routine Urgent Emergency Title of Proposed Change: Capability Title (main equipment): Contract Ref (if applicable): Prime CI (major assembly): Qty affected: Affected CI / component to be substituted: NSN: Manufacturers Part Number (if known): Description of Proposed Change / details of substituting part (including manufacturer, Manufacturers Part Number, NSN, etc): Attachment No. (if used) Reason/Justification for change (insert RODUM number if applicable): Attachment No. (if used) Originator: Organisation: Ph: FAX: Address: Clearance by Originators Supervisor Name: Rank/Position: Signed: Date: TRAMM Volume 3 Section 2 1B2 Version 3.0 Page 2 of 8 Originators Reference Proposal No. Proposal Revision No. FOR TYPE A, B, C & D CHANGES PART 2 PRELIMINARY DESIGN Broad scope detail: Attachments provided? Yes No Attach No : Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No : Possible safety / operational impact: Attachments provided? Yes No Attach No : Possible logistic impact: Attachments provided? Yes No Attach No : Approximate cost Labour: $A Materiel: $A Approximate cost to further develop design / investigate feasibility of proposal (if required): $A Expected date of completion / days to complete for detailed design: Designer Attach Preliminary Design. Attach No : Name: Rank/Position: Signed: Date: Reviewer Name: Rank/Position: Signed: Date: Release of Prelim Design Prelim design released? Yes No Recommendation: Name: Rank/Position: Signed: Date: Executive Authority approval to proceed Approved to proceed with detailed design? Yes No (Go to Part 6 Section 2) Comments: Name: Rank/Position: Signed: Date: TRAMM Volume 3 Section 2 1B3 Version 3.0 Page 3 of 8 Originators Reference Proposal No. Proposal Revision No. FOR TYPE A, B, C & D CHANGES PART 3 DETAILED DESIGN Designer Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No : Comments: Attach Detailed Design. Attach No : Name: Rank/Position: Signed: Date: Reviewer Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No : Design endorsed? Yes No Name: Rank/Position: Signed: Date: Design Authority Approval Safety / risk assessment conducted? Yes No Comments: Attach No : Design Approved? Yes No Comments: Attach No : Name: Rank/Position: Signed: Date: DESIGN ACCEPTANCE Judgement of Significance Significant Non-sigificant Attach Judgement of significance. Attach No : Safety / risk assessment satisfactory? Yes No Comments: Attach No : Design Accepted? Yes No Provisionally If yes or provisionally, Design Acceptance Certificate number: __________ Comments: Attach No : If provisionally design accepted, list Design Acceptance Concession number(s):___________ Comments: Attach No : Name: Rank/Position: Signed: Date: TRAMM Volume 3 Section 2 1B4 Version 3.0 Page 4 of 8 Originators Reference Proposal No. Proposal Revision No. FOR TYPE A, B, C & D CHANGES PART 4 EXECUTIVE SUMMARY OF LOGISTIC FACTORS DETAILED IN PART 7 Organisation responsible for carrying out change on equipment (if reqd) Part 7 completed? Yes No Incorporation plan attached? Yes No Start date Finish date Estimated time required to carry out action Hrs / item (if applicable) Production $A Installation $A Estimated Costs / Savings Through Life $A Estimated Net Costs or Savings through to Life of Type $A FOR TYPE A CHANGES ONLY PART 5 CONFIGURATION MANAGEMENT ACTION Engineering Change Proposal: Class 1 Class 2 Matter to be considered by: CAP Configuration Manager CCB SCCB Configuration Manager Init: CCB member recommendations Board Position Name Signature Date Recommended ? Attach No. Configuration Manager Yes No Fleet Manager Yes No DAAR Yes No User Representative Yes No Yes No Yes No Yes No Yes No TRAMM Volume 3 Section 2 1B5 Version 3.0 Page 5 of 8 Originators Reference Proposal No. Proposal Revision No. FOR TYPE A, B, C & D CHANGES PART 6 EXECUTIVE APPROVAL (executive authority to complete) This proposal is: Approved Not Approved If approved, go to section 1. If not approved, go to section 2. SECTION 1 - ENGINEERING CHANGE ORDER Date by which incorporation is to begin: Date by which incorporation is to be complete: Date and type of progress report(s): Qty of main items to be modified: Attach No ARN, Serial Number of item(s) to be modified (or refer attached list): Attach No Budget allocation (attach phasing information as required): Attach No Additional information or limitations/conditions placed upon approval: Attach No I hereby certify that this engineering change has been proposed and considered in accordance with the TRAMM, and authorise this change for incorporation as ECO number :_____________ (Signed by the Exec Authority, or the CMGR (Class 2 ECP only) when delegated.) Name: Rank/Position: Signed: Date: I hereby certify that all action arising from this ECO has been completed and as such this ECO is now closed. (Signed by the Exec Authority or the CMGR (Class 2 ECP only) when delegated.) Name: Rank/ Position: Signed: Date: SECTION 2 REASON FOR NON-APPROVAL This proposal was not approved due to: Attach No (Signed by the Exec Authority or the CMGR (Class 2 ECP only) when delegated.) Name: Rank/ Position: Signed: Date: TRAMM Volume 3 Section 2 1B6 Version 3.0 Page 6 of 8 Originators Reference Proposal No. Proposal Revision No. FOR TYPE A, B, C & D CHANGES (commensurate with complexity of proposed change) PART 7 LOGISTIC ISSUES Ser Effect upon: Effect: Attach No. 1 Baseline / Build Standard / Build State 2 Other systems / CI affected (list ECP Numbers which refer) 3 Capability Performance Master Document Index Specification Drawings Contract EMEIs, Handbooks, Manuals, RPS/CES 4 Docn LSAR TRAMM Volume 3 Section 2 1B7 Version 3.0 Page 7 of 8 Originators Reference Proposal No. Proposal Revision No. Ser Effect upon: Effect: Attach No 5 Current Tests or Trials 6 Lower level CI 7 Schedules (project, production, maint, etc) 8 Stock/spares holdings 9 Interfaces (internal/external) 10 Maintenance procedures 11 Reliability, Availability or Maintainability 12 Test & Support Eqpt 13 Facilities 14 Training & Training Support TRAMM Volume 3 Section 2 1B8 Version 3.0 Page 8 of 8 Originators Reference Proposal No. Proposal Revision No. Ser Effect upon: Effect: Attach No 15 Personnel 16 Packaging, Handling, Storage & Transport 17 Computer Support 18 Cataloguing/Codification 19 Safety 20 Operational Use 21 Environmental Considerations 22 23 24 25 Appendix: 1. A Guide to the Content of Engineering Change Proposal (GM 156)