Sunteți pe pagina 1din 6

Date

9.12.11
30.4.12
5.6.12
21.7.12
10.8.12
20.10.12
3.2.13

SL
1
2
3
4
5
6
7

Particulars
Bill
Plinth area 4005sqft @70/280350
Gnd Floor Slab Casting area 5326 sqft @ 60/319560
1st floor slabe casting level area 5032sqft @55/276760
2nd floor slabe casting level area 5032sqft @ 60/301920
gnd floor pcc casting work area 4005sqft @ 11/44055
4th floor slabe casting level 5326 sqft @ 67
356842
boundry wall despending work labour charge
1600
1st,2nd,3rd floor work monson 122@250, labour 200x 130 , brick
carring Rs. 7000
63000
1st ,2nd,3rd floor manson 127x250,200x142 labour rs 2000, sand
and brikcs carring rs 8000.
70000
Manson 250 x 149, 200 x 140, labour rs 2000 material carrying
rs5000
72000
4th floor brick work +plaster work manson 250x42, labour 200 x 36,
labour 2000, brick sand carring 4th floor rs 2000
21000
Manson 100x250 labour 114x200 labour rs 2000 material lifting rs
18000
67800
Manson 75x250 labour 77x00 labour rs 2000 material lifting rs
14000
50100
Manson 89x250 labour 96x200 labour contractor 2000 material
lifting rs 12000
55450
manson 73x250 labour 80 x 200 labour 2000
36250

27.1.13

3.2.13

10.2.13

10

17.2.13

11

23.2.13

12

2.3.13

13

11.3.13
25.3.13

14
15
16
17
18 gnd floor seling plaster work 5326 sqft @5/Head room slabe custing work 228sqft @95 water tank bottom slab
19 casting work 140 sqft @95/1st floor inside wall plaster work completed 5000*10, 2nd floor
20 inside wall plaster work 2500sqft x 10

26.6.13
4.8.13
5.8.13

14.9.13
5.8.13
11.9.13

21
22
23

13.9.13

24

12.9.13
5.4.13

25
26

16.6.13
22.8.13

27
28

Electrical Works wiring of light point pp 180x11, fan point pp 180x7,


5amps plug point pp 80x4, 5amp plug point 5/15 amps plug point pp
100x5, circuit line 2x2.5mm wore +1x1 mm2 coper wire rm 20x150
light point front gate gnd fl pp 300x6 laying pvc pipe 6/10mm for
water pump rm 60x50, provindgin fixing fittingh and connectionof
pvc pipe rm 200x150
Lift room works manson 14.5x370, labour 270x17.5
Manson 21x370 labour 23x270
2nd floor in side plaster75% complete less 25% @2500x10, 3rd floor
inside plaster 100% completion 5000x10
All building work completed on @70000, extra work old kitchen wall
plaster work 3000, new kitchen wall partiton work wall sespending
work 10000, parapide wall work complition 540x45, two stair case
railig work 3500 biru bari hazira work manson + labour 400 + 300
???????????????????????????????????
Gnd Floor wall plaster and floor casting work labour 33x260 monson
48x350
???????????????????????????????????

26000
34900
62500

30000
10000
13900
75000

105000

25000

9.10.13

2.12.13
20.11.13
11.11.13

11.11.13
19.12.13
19.12.13

4th Floor inside plaster complete 10x5000sqft., parpet wall 1096sqft


29 x 38
Bathroom down slab cleaning haking and plaster, netfinishgin work
30 40 nos. of bathroom work per number of bathroom @1000 x40
31 Extra Outside works manson 370x30 Labour 13x 260
Slab top RCC water tank rcc wall and top slab casting and outside
32 slope chata casting and finishing work.
Lift RCC Wall and slab casting and lift masin room wall and top slab
casting and plaster finishing work , wall and slab casting work, top
lsable and wall work, total lift lift and masin finishing work
33 30000,50000,40000
Building outside duct brick and plaster work 664sqft @25 duct area
34 groving dizine plaster 665x12
Poddar site window chaja casting and plastering 288x60, poddar site
35 belcony chaja casting and plastering 40x50

19.12.13

36

19.12.13

37

20.12.13

38

8.1.14

39

30.1.14

40

30.1.14
30.1.14
30.1.14

building outside chaja casting and plastering 95x60, poddar site


slabe top chaj casting and plaster finidhing 280x60, poddar site
slabe top inside chaja dizen beat plastering 229x17
Headroom brik and plaster finishing work 162x50, headroom inside
chaja casting and plastering 120x60, headroom inside chaja dizine
beat plaster 120x17
building outside plaster one side 50000, extra bill amt rs 87500,
water tank bill amt 85000 + 40000 + 14000
backside plaster complition 50000, extra work back side lintle chaja
suttering casting and plastering work 168x60, back side slabe chaja
only plastering 73x12
Building outside plaster 50000, north side slabe top chaja casting
and plaster 280x60 northside slabe top inside chaja dizen beat
plastering work 229sqftx17

Northside window chaja casting and plastering 376x60, northside


41 building outside duct brick and plaster work 688x25
Northside duct area groving sizine plastering 688x12, northside
42 building outside 340x5
43

91600

40000
14000
85000

120000
24500
19300

26400

17300
276500

60518

70693

39700
9950

Adv.
Discount Pay -1
Pay -2
100000
28000
50000
31956
95000
170000
27760
190000
30220
15000
4455
160000
35842

Pay -3

15000

Balance
152350
142604
79000
66700
39600
161000
1600
48000
70000
72000

10000

11000

2600

25000

25000

17800

25000

20000

5100

10000
14000

25000

20000

3400

3500
6200

25000

10000

10450
22250
0
0
0
31400

52000

4300

30000
10000
13900

0 check sl24
0 check sl24
0 check sl24

50000

105000

0
0

20000

5000
0

9200

82400

40000
14000
85000

100000

20000
24500
19300

26400

17300
80000

184000

12500

5000

30000

25518

70693

39700
9950
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0