Works 1.0 EARTH WORK 1.1 Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division & laying in layers (as per specification), dressing, including carriage irrespective of lead, loading and unloading, watering and compaction in layers with roller including compensation of earth within the sub-station area including yard, roads, approach road etc. complete in all respect. 1.2 EARTH WORK IN CUTTING Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause 3.5.3), dressing, including carriage, irrespective of lead, loading and unloading, watering and compaction in layers with roller within sub-station area including yard, roads, approach road etc. or disposal of surplus earth complete in all respect. 2.0 FOUNDATIONS Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the cost of excavation, cement concreting, reinforcement steel, form work, grouting, underpinning, backfilling etc. for steel gantry structures/equipments as per approved HVPNL drawings and technical specifications. 2.1 GANTRY TOWERS 132 KV Side i). BT-1 ii). BT-3 iii). BT-4 iv). BT-6 33 KV Side v). DT-2 vi). DT-3 EQUIPMENT STRUCTURE FOUNDATION 132kV side i) LA ii) Isolator/L&E Switch iii) CVT iv) CT v) NCT vi) Bus Post Insulator 33kV side i) LA ii) Isolator/L&E Switch iii) CT iv) NCT v) PT 3.0 CAPACITOR BANK FOUNDATIONS Design, engineering, supply of labour, material and construction of capacitor bank & associated equipment foundations complete in all respect including any other items not specifically mentioned herein but required for completion of job as per technical specifications and approved equipment drawings. i). 1x10.872MVAR 33kV Capacitor Bank BREAKER FOUNDATION Design, Engineering, supply of labour, material, equipment etc. for construction of foundation for following types of breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any other items not specifically mentioned herein but required for completion of work as per technical specification. i). 132kV, SF-6 Breaker ii). 33kV, VCB 5.0 CABLE TRENCH 2.2 4.0 Package G-21 (B) Sr. No Description Page 1 of 16 Sr. No Description Supply of labour, material such as cement, reinforcement steel, steel angles, flats, PCC and brick pillars below cable trenches for construction of Out Door Cable Trenches (ODCT) of required depth/type with pre-cast RCC covers including associated works like Cable Trench Culverts crossings for roads as per approved electrical (trench) layout plan, HVPNL drawing(s) and technical specifications complete in all respect. 6.0 TRANSFORMER FOUNDATION Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel, form work and other items not mentioned herein but required for the completion of work for construction of under mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting systems foundations etc. complete as per approved transformer/DG set and technical specifications. i). 40/50MVA, 132/33 T/F foundation including radiator foundations etc. complete. ii). 200KVA 33/0.4kV Station T/F 7.0 SITE SURFACING 7.1 Providing, supplying and laying two layers of uncrushed/crushed/broken stone pebbles gravel fill. The first layer after compaction shall make minimum 50mm thickness course/layer of 20mm nominal size including dressing, rolling & compacting complete as per GELO, specifications & instructions of Executive Engineer/Civil Works Division. 7.2 Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and spreading 100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size uncrushed/crushed/broken stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO & instructions of concerned Executive Engineer/Civil Works division. 8.0 CONCRETE/BITUMEN ROADS & PCC PAVEMENT 8.1 Construction of cement concrete roads and walkways/shoulders from NH/SH/Dist./ Village road etc. to switchyard/switch house building as per GELO/CLO & sectional detail drawing no. HCD/SK- 181 and tech. spec. i. 6.0M wide road from PWD road including 5M within the main entrance gate. ii. 5 M wide road as per GELO/CLO iii. 3.66M wide road as per CLO iv. PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172. 9.0 ROAD CULVERTS Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the approach road (from main PWD road to the substation entry point) including, cost of labour, material complete in all respects as per I.R.C. Standards. 10.0 U/C FENCING & GATES Providing and fixing chain link fencing including gates complete as per electrical layout and tech. specification and as per drawing attached. 11.0 BOUNDARY WALL 11.1 Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate (brickwork above DPC level) as per GELO/CLO, technical specification and HVPNL drawings attached herewith complete in all respect i. 6 ft. high with barbed wire on angles at top ii. 4 ft. high front wall iii. 4 ft. high side wall 12 BOUNDARY WALL 12.1 Supply of labour & material for construction of front, C & U/C boundary wallsincluding main gate foundations (brickwork below DPC level) as per GELO/CLO, technical specifications and HVPNL drawings including excavation backfilling, lean and DPC complete in all respect. Page 2 of 16 Sr. No Description 13.0 Demolishing including demolishing of foundations of followings structures. The material whatsoever shall be the property of the successful bidder. The dismantled material shall not be allowed for reuse at any of the substations; however, HVPNL may allow use of bricks for brick ballast purpose only. i). One no. OHRT at 132kV S/Stn., Urlana ii). 7 high boundary wall including Y-angles and barbed wire at 132kV S/Stn., Urlana. 14.0 CONTROL ROOM BUILDING 14.1 Supply of labour, material & construction of control room building complete in all respect as per technical specifications & approved drawings attached including exterior and interior acrylic emulsion paint, all internal services like water supply including supply & providing of 5000ltr. capacity triple layered Sintex/Diplast PVC tank, sewerage system, electrification including wiring, modular switches, 4 long CFL tubes, ceiling/exhaust fans & 2T split ACs, finishing, plinth protection, indoor trenches, trench covers, soakage pit near the switch house building, connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water supply system of local authority/submersible bore (as applicable) etc. & any other item not mentioned herein but required for completion of works. Before dismantlement of OHRT at Urlana, the successful bidder shall also provide water supply connection from new bore well proposed for 132kV S/Stn. Urlana to the existing 33kV control room and residential buildings without any extra cost of HVPNL. 15.0 DRAINAGECUM-RAIN HARVESTING SYSTEM 15.1 Supply of labour, material for construction of 2 nos. recharge structures with bore well(s) as per HVPNL drawings & specifications complete in all respect. The location of recharge structures shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division on the basis of surroundings. In case ground water table is above 8m from NSL, rain harvesting system shall not be constructed. 15.2 The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water from buildings roof top & switch yard (substation) area into respective bore wells in such a way that there shall be no pounding of water on the roof and switch yard (sub-station). The layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division. The successful bidder shall also supply labour, material and construct sump-pit-cum- pump chamber(s) as per HVPNL drawings and also provide two no. clog pump(s) of suitable capacity (for each sump pit) for disposal of excess water to outfall points. Any other item not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer. 16.0 RCC M-20 inclusive of labour, material, shuttering, Steel reinforcement etc. complete in all respects to compensate excess quantity required to execute difference in execution and tender drawings only due to increased depth of foundations. Page 3 of 16 (1) (2) Cum 19,500 Cum 10 No. 6 No. 5 No. 3 No. 6 No. 7 No. 8 No. 12 No. 12 No. 6 No. 15 No. 2 No. 10 No. 24 No. 15 No. 24 No. 2 No. 6 Set 2 Nos. 5 Nos. 8 Package G-21 (B) Unit Qty Page 4 of 16 Unit Qty Lot L/S No. 2 No 1 Sqm 500 Sqm 3700 Mtr. 30 Mtr. 50 Mtr. 200 Sqm 250 No. 1 Mtrs. 120 Mtr. 330 Mtr. 65 Mtr. 30 Cum 485 Page 5 of 16 Unit Qty Lot L/S Lot L/S Sqft. 3807.00 Lot L/S Lot L/S Cum 110 Page 6 of 16 (1) 60. Item Associated with Civil Works 1.0 EARTH WORK 1.1 Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division & laying in layers (as per specification), dressing, including carriage irrespective of lead, loading and unloading, watering and compaction in layers with roller including compensation of earth within the sub-station area including yard, roads, approach road etc. complete in all respect. Cum 1.2 EARTH WORK IN CUTTING Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause 3.5.3), dressing, including carriage, irrespective of lead, loading and unloading, watering and compaction in layers with roller within sub-station area including yard, roads, approach road etc. or disposal of surplus earth complete in all respect. Cum 2.0 FOUNDATIONS Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the cost of excavation, cement concreting, reinforcement steel, form work, grouting, underpinning, backfilling etc. for steel gantry structures/equipments as per approved HVPNL drawings and technical specifications. 2.1 GANTRY TOWERS 66 KV Side i). CT-4 No. ii). CT-5 No. iii). CT-6 No. iv). CT-8 No. 11 KV Side v). DT-2 No. vi). DT-3 No. EQUIPMENT STRUCTURE FOUNDATION 66kV side i) LA No. ii) Isolator/L&E Switch No. iii) CVT No. iv) CT No. v) NCT No. 11kV side i) NCT No. 3.0 CAPACITOR BANK FOUNDATIONS Design, engineering, supply of labour, material and construction of capacitor bank & associated equipment foundations complete in all respect including any other items not specifically mentioned herein but required for completion of job as per technical specifications and approved equipment drawings. i). 13.608MVAR 11kV Capacitor Bank Set BREAKER FOUNDATION Design, Engineering, supply of labour, material, equipment etc. for construction of foundation for following types of breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any other items not specifically mentioned herein but required for completion of work as per technical specification. i). 66kV, SF-6 Breaker Nos. 5.0 CABLE TRENCH 2.2 4.0 Description Unit Sr. No Package G-21(B) Page 7 of 17 Description Unit Sr. No Supply of labour, material such as cement, reinforcement steel, steel angles, flats, PCC and brick pillars below cable trenches for construction of Out Door Cable Trenches (ODCT) of required depth/type with pre-cast RCC covers including associated works like Cable Trench Culverts crossings for roads as per approved electrical (trench) layout plan, HVPNL drawing(s) and technical specifications complete in all respect. Lot 6.0 TRANSFORMER FOUNDATION Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel, form work and other items not mentioned herein but required for the completion of work for construction of under mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting systems foundations etc. complete as per approved transformer/DG set and technical specifications. i). 25/31.5MVA, 66/11kV T/F foundation including radiator foundations etc. complete. No. 6.2 Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel, form work and other items not mentioned herein but required for the completion of work for construction of under mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting systems foundations etc. complete as per approved transformer/DG set and technical specifications. ii 200KVA 11/0.4kV Station T/F No. 7 RCC ANTIFIRE WALL Construction of RCC anti fire wall of suitable height between 25/31.5MVA T/Fs as per HVPNL drawing and all associated works at 66kV S/Stn., Sector-20, Panchkula including supply of labour, material, cement, reinforcement steel, steel form work etc. as per technical specification No. 8.0 SITE SURFACING 8.1 Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and spreading 100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size uncrushed/crushed/broken stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO & instructions of concerned Executive Engineer/Civil Works division. Sqm 9.0 CONCRETE/BITUMEN ROADS & PCC PAVEMENT 9.1 Construction of cement concrete approach road and walkways/shoulders from NH/SH/ PWD/HUDA/village road etc. and roads within the substation i.e. switchyard/switch house building as per GELO/CLO and sectional detail drawing no. HCD/SK-181 and technical specification. i. 6.0M from HUDA road and 5M minimum within the main entrance gate. Mtr. ii. 3.66M wide road as per CLO Mtr. iii. PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172. Sqm 10.0 ROAD CULVERTS Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the approach road (from main PWD road to the substation entry point) including, cost of labour, material complete in all respects as per I.R.C. Standards. No. 11.0 U/C FENCING & GATES Providing and fixing chain link fencing including gates complete as per electrical layout and tech. specification and as per drawing attached. Mtrs. 12.0 BOUNDARY WALL 12.1 Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate (brickwork above DPC level) as per GELO/CLO,technical specification and HVPNL drawings attached herewith complete in all respect i. 6 ft. high with barbed wire on angles at top Mtr. Page 8 of 17 Description Unit Sr. No ii. 4 ft. high front wall Mtr. iii. 4 ft. high side wall with barbed wire on angles at top Mtr. 12.2 Supply of labour and material for construction of front, C & U/C boundary walls including main gate foundations (brickwork below DPC level) as per GELO/CLO, technical specifications and HVPNL drawing HCD/TS-1176 including excavation backfilling, lean and DPC complete in all respect. Cum 13.0 Demolishing including demolishing of foundations of followings structures. The material whatsoever shall be the property of the successful bidder. The dismantled material shall not be allowed for reuse at any of the substations; however, HVPNL may allow use of bricks for brick ballast purpose only. i). One no. building (about 195 sqm) at 66kV S/Stn. Sector-20, Panchkula. Lot 14.0 CONTROL ROOM BUILDING 14.1 Design including development of architectural and structural drawings, engineering, supply of labour, material & construction of control room building complete in all respect as per technical specifications including exterior and interior acrylic emulsion paint, all internal services like complete water supply system, providing 5000ltr. capacity triple layered Sintex/Diplast PVC tank, electrification including wiring, modular switches, 4 long CFL tubes, ceiling/exhaust fans & 2T split ACs, finishing, plinth protection, indoor trenches, trench covers, connection of sewerage system with HUDAs sewerage system, water supply connection with HUDAs system etc. and any other item not mentioned herein but required for completion of works at 66kV S/Stn., Sector-20, Panchkula. The architectural design shall be matching with the surroundings. Sqft. 15.0 DRAINAGECUM-RAIN HARVESTING SYSTEM 15.1 Supply of labour, material for construction of 2 nos. recharge structures (only one no. at 66kV S/Stn., Sector-20, Panchkula) with bore well(s) as per HVPNL drawings & specifications complete in all respect. The location of recharge structures shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division on the basis of surroundings. In case ground water table is above 8m from NSL, rain harvesting system shall not be constructed. Lot 15.2 The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water from buildings roof top & switch yard (substation) area into respective bore wells in such a way that there shall be no pounding of water on the roof and switch yard (sub- station). The layout so developed shall be got approved from the employer. The location of sump-pit- cum-pump chamber shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division on the basis of surroundings of the substation(s). The successful bidder will also supply labour and material for construction sumppit-cum-pump chamber as per HVPNL drawings and provide two no. clog pump(s) of suitable capacity (for each sump pit) for disposal of excess water to outfall point. Any other item not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer. Lot Page 9 of 17 Description Unit Sr. No 16.0 RCC M-20 inclusive of labour,material, shuttering, steel reinforcement etc. complete in all respects to compensate excess quantity required to be executed due to difference in existing ground level and the formation level to be fixed after contouring or difference on account of revised drawing issued at the time of construction and the tender drawing. Cum Page 10 of 17 (2) 2,000 10 5 2 4 5 2 2 12 10 6 12 2 2 2 4 Package G-21(B) Qty Page 11 of 17 Qty 1 2 1 1 1075 50 55 150 2 20 180 Page 12 of 17 Qty 45 32 285 1 4406.00 1 1 Page 13 of 17 Qty 20 Page 14 of 17 1.0 1.1 1.2 2.0 2.1 i). ii). iii). iv). v). vi). i) ii) iii) iv) v) i) 3.0 i). i). 5.0 6.0 4.0 Sr. No Package G-21(B) 2.2 Page 15 of 21 Sr. No i). 6.2 i 7.0 7.1 7.2 8.0 8.1 i. ii. iii. 8.2 9.0 10.0 Page 16 of 21 Sr. No 11.0 11.1 i. ii. iii. 12.2 13.0 14.1 15.0 15.1 15.2 Page 17 of 21 Sr. No 16.0 Page 18 of 21 CIVIL Works EARTH WORK Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division & laying in layers (as per specification), dressing, including carriage irrespective of lead, loading and unloading, watering and compaction in layers with roller including compensation of earth within the sub-station area including yard, roads, approach road etc. complete in all respect. EARTH WORK IN CUTTING Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause 3.5.3), dressing, including carriage, irrespective of lead, loading and unloading, watering and compaction in layers with roller within sub-station area including yard, roads, approach road etc. or disposal of surplus earth complete in all respect. FOUNDATIONS Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the cost of excavation, cement concreting, reinforcement steel, form work, grouting, underpinning, backfilling etc. for steel gantry structures/equipments as per approved HVPNL drawings and technical specifications. GANTRY TOWERS 66 KV Side CT-4 CT-5 CT-6 CT-8 11 KV Side DT-2 DT-3 EQUIPMENT STRUCTURE FOUNDATION 66kV side LA Isolator/L&E Switch CVT CT NCT 11kV side NCT CAPACITOR BANK FOUNDATIONS Design, engineering, supply of labour, material and construction of capacitor bank & associated equipment foundations complete in all respect including any other items not specifically mentioned herein but required for completion of job as per technical specifications and approved equipment drawings. 6.804MVAR 11kV Capacitor Bank BREAKER FOUNDATION Design, Engineering, supply of labour, material, equipment etc. for construction of foundation for following types of breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any other items not specifically mentioned herein but required for completion of work as per technical specification. 66kV, SF-6 Breaker CABLE TRENCH Supply of labour, material such as cement, reinforcement steel, steel angles, flats, PCC and brick pillars below cable trenches for construction of Out Door Cable Trenches (ODCT) of required depth/type with pre-cast RCC covers including associated works like Cable Trench Culverts crossings for roads as per approved electrical (trench) layout plan, HVPNL drawing(s) and technical specifications complete in all respect. TRANSFORMER FOUNDATION Description Package G-21(B) Page 19 of 21 Description Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel, form work and other items not mentioned herein but required for the completion of work for construction of under mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting systems foundations etc. complete as per approved transformer/DG set and technical specifications. 12.5/16 MVA, 66/11kV T/F foundation including radiator foundations etc. complete. Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel, form work and other items not mentioned herein but required for the completion of work for construction of under mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting systems foundations etc. complete as per approved transformer/DG set and technical specifications. 200KVA 11/0.4kV Station T/F SITE SURFACING Providing, supplying and laying two layers of uncrushed/crushed/broken stone pebbles gravel fill. The first layer after compaction shall make minimum 50mm thickness course/layer of 20mm nominal size including dressing, rolling & compacting complete as per GELO, specifications & instructions of Executive Engineer/Civil Works Division. Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and spreading 100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size uncrushed/crushed/broken stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO & instructions of concerned Executive Engineer/Civil Works division. CONCRETE/BITUMEN ROADS & PCC PAVEMENT Construction of cement concrete approach road and walkways/shoulders from NH/SH/ PWD/HUDA/village road etc. and roads within the substation i.e. switchyard/switch house building as per GELO/CLO and sectional detail drawing no. HCD/SK-181 and technical specification. 6.0M from proposed approach road and 5M minimum within the main entrance gate. 3.66M wide road as per CLO PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172. Supply of labour and material for construction of 3.66M wide bitumen (metalled) approach road as per HVPNL drawing - 001/R from Naraingarh - Raipur Rani highway upto Laha substation concrete approach road (15-20M outside main entrance gate as per site requirement) including earth filling to match the level of PWD and substation road. ROAD CULVERTS Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the approach road (from main PWD road to the substation entry point)including, cost of labour, material complete in all respects as per I.R.C. Standards. U/C FENCING & GATES Providing and fixing chain link fencing including gates complete as per electrical layout and tech. specification and as per drawing attached. Page 20 of 21 Description BOUNDARY WALL Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate (brickwork above DPC level) as per GELO/CLO, technical specification and HVPNL drawings attached herewith complete in all respect 6 ft. high with barbed wire on angles at top 4 ft. high front wall 4 ft. high side wall Supply of labour and material for construction of front, C & U/C boundary walls including main gate foundations (brickwork below DPC level) as per GELO/CLO, technical specifications and HVPNL drawing HCD/TS-1176 including excavation backfilling, lean and DPC complete in all respect. CONTROL ROOM BUILDING Supply of labour, material & construction of control room building complete in all respect as per technical specifications & approved drawings attached including exterior and interior acrylic emulsion paint, all internal services like water supply including supply & providing of 5000ltr. capacity triple layered Sintex/Diplast PVC tank, sewerage system, electrification including wiring, modular switches, 4 long CFL tubes, ceiling/exhaust fans & 2T split ACs, finishing, plinth protection, indoor trenches, trench covers, soakage pit near the switch house building, connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water supply system of local authority/submersible bore (as applicable) etc. & any other item not mentioned herein but required for completion of works. Before dismantlement of OHRT at Laha, the successful bidder shall also provide water supply connection from new bore well proposed for 66kV S/Stn. laha to the existing 33kV control room and residential buildings without any extra cost of HVPNL. DRAINAGECUM-RAIN HARVESTING SYSTEM Supply of labour, material for construction of 2 nos. recharge structures (only one no. at 66kV S/Stn., Sector-20, Panchkula) with bore well(s) as per HVPNL drawings & specifications complete in all respect. The location of recharge structures shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division on the basis of surroundings. In case ground water table is above 8m from NSL, rain harvesting system shall not be constructed. The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water from buildings roof top & switch yard (substation) area into respective bore wells in such a way that there shall be no pounding of water on the roof and switch yard (sub-station). The layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil Works Division on the basis of surroundings of the substation(s). The successful bidder will also supply labour and material for construction sumppit- cum-pump chamber as per HVPNL drawings and provide two no. clog pump(s) of suitable capacity (for each sump pit) for disposal of excess water to outfall point. Any other item not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer. Page 21 of 21