60.

Item Associated with Civil


Works
1.0 EARTH WORK
1.1
Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division & laying
in layers (as per specification), dressing, including carriage irrespective of lead, loading and unloading,
watering and compaction in layers with roller including compensation of earth within the sub-station area
including yard, roads, approach road etc. complete in all respect.
1.2 EARTH WORK IN CUTTING
Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause 3.5.3),
dressing, including carriage, irrespective of lead, loading and unloading, watering
and compaction in layers with roller within sub-station area including yard, roads, approach road etc. or
disposal of surplus earth complete in all respect.
2.0 FOUNDATIONS
Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the cost of
excavation, cement concreting, reinforcement steel, form work, grouting, underpinning, backfilling etc. for
steel gantry structures/equipments as per approved HVPNL drawings and technical specifications.
2.1 GANTRY TOWERS
132 KV Side
i). BT-1
ii). BT-3
iii). BT-4
iv). BT-6
33 KV Side
v). DT-2
vi). DT-3
EQUIPMENT STRUCTURE FOUNDATION
132kV side
i) LA
ii) Isolator/L&E Switch
iii) CVT
iv) CT
v) NCT
vi) Bus Post Insulator
33kV side
i) LA
ii) Isolator/L&E Switch
iii) CT
iv) NCT
v) PT
3.0 CAPACITOR BANK FOUNDATIONS
Design, engineering, supply of labour, material and construction of capacitor bank & associated equipment
foundations complete in all respect including any other items not
specifically mentioned herein but required for completion of job as per technical specifications and approved
equipment drawings.
i). 1x10.872MVAR 33kV Capacitor Bank
BREAKER FOUNDATION
Design, Engineering, supply of labour, material, equipment etc. for construction of foundation for following
types of
breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any other
items not specifically mentioned herein but required for completion of work as per technical specification.
i). 132kV, SF-6 Breaker
ii). 33kV, VCB
5.0 CABLE TRENCH
2.2
4.0
Package G-21 (B)
Sr. No Description
Page 1 of 16
Sr. No Description
Supply of labour, material such as cement, reinforcement steel, steel
angles, flats, PCC and brick pillars below cable trenches for construction of Out Door Cable Trenches (ODCT)
of required depth/type with pre-cast RCC covers including associated works like Cable Trench Culverts
crossings for roads as per approved electrical (trench) layout plan, HVPNL drawing(s) and technical
specifications complete in all respect.
6.0 TRANSFORMER FOUNDATION
Design, engineering, supply of labour, material
such as PCC, RCC, reinforcement steel, misc.
structural steel, form work and other items not
mentioned herein but required for the
completion of work for construction of under
mentioned transformer/ DG set foundations
including all associated radiators foundations,
NIFPES fire fighting systems foundations etc.
complete as per approved transformer/DG set
and technical specifications.
i). 40/50MVA, 132/33 T/F foundation including radiator foundations etc. complete.
ii). 200KVA 33/0.4kV Station T/F
7.0 SITE SURFACING
7.1
Providing, supplying and laying two layers of uncrushed/crushed/broken stone pebbles gravel fill. The first
layer after compaction shall make minimum 50mm thickness course/layer of 20mm nominal size including
dressing, rolling &
compacting complete as per
GELO, specifications & instructions of Executive Engineer/Civil Works Division.
7.2
Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and
spreading 100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the PCC
including construction of toe wall (exposed wall plastered with cement mortar 1:5) to
hold 40mm single size uncrushed/crushed/broken stone pebbles wherever required in the bays
covered under the present scope as detailed in the GELO & instructions of
concerned Executive Engineer/Civil Works division.
8.0 CONCRETE/BITUMEN ROADS & PCC PAVEMENT
8.1
Construction of cement concrete roads and walkways/shoulders from NH/SH/Dist./ Village road
etc. to switchyard/switch
house building as per GELO/CLO & sectional detail drawing no. HCD/SK-
181 and tech. spec.
i. 6.0M wide road from PWD road including 5M within the main entrance gate.
ii. 5 M wide road as per GELO/CLO
iii. 3.66M wide road as per CLO
iv. PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172.
9.0 ROAD CULVERTS
Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the approach
road (from main PWD road to the substation
entry point) including, cost of labour,
material complete in all respects as per I.R.C. Standards.
10.0 U/C FENCING & GATES
Providing and fixing chain link fencing including gates complete as per electrical layout and tech. specification
and as per drawing attached.
11.0 BOUNDARY WALL
11.1
Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate
(brickwork above DPC level) as per GELO/CLO, technical specification and
HVPNL drawings attached herewith complete in all respect
i. 6 ft. high with barbed wire on angles at top
ii. 4 ft. high front wall
iii. 4 ft. high side wall
12 BOUNDARY WALL
12.1
Supply of labour & material for construction of front, C & U/C boundary wallsincluding main gate
foundations (brickwork below DPC level) as per GELO/CLO, technical specifications and HVPNL drawings
including excavation backfilling, lean and DPC complete in all respect.
Page 2 of 16
Sr. No Description
13.0
Demolishing including demolishing of
foundations of followings structures. The
material whatsoever shall be the property of the successful bidder. The dismantled material shall not be
allowed for reuse at any of the substations;
however, HVPNL may allow use of
bricks for brick ballast purpose only.
i). One no. OHRT at 132kV S/Stn., Urlana
ii). 7 high boundary wall including Y-angles and barbed wire at 132kV S/Stn., Urlana.
14.0 CONTROL ROOM BUILDING
14.1
Supply of labour, material & construction of control room building complete in all respect as per technical
specifications & approved drawings attached including exterior and interior acrylic emulsion paint, all internal
services like water supply including supply & providing of 5000ltr. capacity triple layered Sintex/Diplast PVC
tank, sewerage system,
electrification including wiring, modular switches, 4 long CFL tubes, ceiling/exhaust fans & 2T split ACs,
finishing, plinth protection, indoor trenches, trench covers, soakage pit near the switch house building,
connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable),
connection to main water supply system of local authority/submersible bore (as applicable) etc. & any other
item not mentioned herein but required for completion of works. Before dismantlement of OHRT at Urlana, the
successful bidder shall also provide water supply connection from new bore well proposed for 132kV S/Stn.
Urlana to the existing 33kV control room and residential buildings without any extra cost of HVPNL.
15.0 DRAINAGECUM-RAIN HARVESTING SYSTEM
15.1
Supply of labour, material for construction of 2 nos. recharge structures with bore well(s) as per HVPNL
drawings & specifications complete in all respect. The location of recharge structures shall preferably be
located on corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil
Works Division on the basis of surroundings. In case ground water table is above 8m from NSL, rain
harvesting system shall not be constructed.
15.2
The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water from
buildings roof top & switch yard (substation) area into respective bore wells in such a way that there shall be
no pounding of water on the roof and switch yard (sub-station). The layout so developed shall be got
approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be located on
corner(s) of the substation and shall be got decided from the concerned Executive Engineer/Civil
Works Division. The successful bidder shall also supply labour, material and construct sump-pit-cum- pump
chamber(s) as per HVPNL drawings and also provide two no. clog pump(s) of suitable capacity (for each
sump pit) for disposal of excess water to outfall points. Any other item not mentioned herein but is/are
required for completion of works shall be done by the successful bidder without any extra cost to the
employer.
16.0
RCC M-20 inclusive of labour, material, shuttering, Steel reinforcement etc. complete in all respects to
compensate excess quantity required to execute difference in execution and tender drawings only due to
increased depth of foundations.
Page 3 of 16
(1) (2)
Cum 19,500
Cum 10
No. 6
No. 5
No. 3
No. 6
No. 7
No. 8
No. 12
No. 12
No. 6
No. 15
No. 2
No. 10
No. 24
No. 15
No. 24
No. 2
No. 6
Set 2
Nos. 5
Nos. 8
Package G-21 (B)
Unit Qty
Page 4 of 16
Unit Qty
Lot L/S
No. 2
No 1
Sqm 500
Sqm 3700
Mtr. 30
Mtr. 50
Mtr. 200
Sqm 250
No. 1
Mtrs. 120
Mtr. 330
Mtr. 65
Mtr. 30
Cum 485
Page 5 of 16
Unit Qty
Lot L/S
Lot L/S
Sqft. 3807.00
Lot L/S
Lot L/S
Cum 110
Page 6 of 16
(1)
60. Item Associated with Civil Works
1.0 EARTH WORK
1.1
Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division
& laying in layers (as per specification), dressing, including carriage irrespective of lead, loading and
unloading, watering and compaction in layers with roller including compensation of earth within the
sub-station area including yard, roads, approach road etc. complete in all respect.
Cum
1.2 EARTH WORK IN CUTTING
Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause
3.5.3), dressing, including carriage, irrespective of lead, loading
and unloading, watering and compaction in layers with roller within sub-station area including yard,
roads, approach road etc. or disposal of surplus earth complete in all respect.
Cum
2.0 FOUNDATIONS
Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the
cost of excavation, cement concreting, reinforcement steel, form work, grouting, underpinning,
backfilling etc. for steel gantry structures/equipments as per approved HVPNL drawings and
technical specifications.
2.1 GANTRY TOWERS
66 KV Side
i). CT-4 No.
ii). CT-5 No.
iii). CT-6 No.
iv). CT-8 No.
11 KV Side
v). DT-2 No.
vi). DT-3 No.
EQUIPMENT STRUCTURE FOUNDATION
66kV side
i) LA No.
ii) Isolator/L&E Switch No.
iii) CVT No.
iv) CT No.
v) NCT No.
11kV side
i) NCT No.
3.0 CAPACITOR BANK FOUNDATIONS
Design, engineering, supply of labour, material and construction of capacitor bank & associated
equipment foundations complete in all respect including any other items not
specifically mentioned herein but required for completion of job as per technical specifications and
approved equipment drawings.
i). 13.608MVAR 11kV Capacitor Bank Set
BREAKER FOUNDATION
Design, Engineering, supply of labour, material, equipment etc. for construction of foundation
for following types of
breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any
other items not specifically mentioned herein but required for completion of work as per technical
specification.
i). 66kV, SF-6 Breaker Nos.
5.0 CABLE TRENCH
2.2
4.0
Description Unit
Sr.
No
Package G-21(B)
Page 7 of 17
Description Unit
Sr.
No
Supply of labour, material such as cement, reinforcement steel, steel angles, flats, PCC and brick
pillars below cable trenches for construction of Out Door Cable Trenches (ODCT) of required
depth/type with pre-cast RCC covers including associated works like Cable Trench Culverts crossings
for roads as per approved electrical (trench) layout plan, HVPNL drawing(s) and technical
specifications complete in all respect.
Lot
6.0 TRANSFORMER FOUNDATION
Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc.
structural steel, form work and other items not mentioned herein but required for the completion of
work for construction of under mentioned transformer/ DG set foundations including all associated
radiators foundations, NIFPES fire fighting systems foundations etc.
complete as per approved transformer/DG set
and technical specifications.
i). 25/31.5MVA, 66/11kV T/F foundation including radiator foundations etc. complete. No.
6.2
Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc.
structural steel, form work and other items not mentioned herein but required for the completion of
work for construction of under mentioned transformer/ DG set foundations including all associated
radiators foundations, NIFPES fire fighting systems foundations etc.
complete as per approved transformer/DG set
and technical specifications.
ii 200KVA 11/0.4kV Station T/F No.
7 RCC ANTIFIRE WALL
Construction of RCC anti fire wall of suitable height between 25/31.5MVA T/Fs as per HVPNL drawing
and all associated works at 66kV S/Stn., Sector-20, Panchkula including supply of labour, material,
cement, reinforcement steel, steel form work etc. as per technical specification
No.
8.0 SITE SURFACING
8.1
Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and
spreading 100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the
PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm
single size uncrushed/crushed/broken
stone pebbles wherever required in the bays covered under the present scope as detailed in the
GELO & instructions of concerned Executive Engineer/Civil Works division.
Sqm
9.0 CONCRETE/BITUMEN ROADS & PCC PAVEMENT
9.1
Construction of cement concrete approach road and
walkways/shoulders from NH/SH/
PWD/HUDA/village road etc. and roads within the
substation i.e. switchyard/switch house building as per GELO/CLO and sectional detail drawing no.
HCD/SK-181 and technical specification.
i. 6.0M from HUDA road and 5M minimum within the main entrance gate. Mtr.
ii. 3.66M wide road as per CLO Mtr.
iii.
PCC in front and rear of parking area of SH Building as per tech. specification and drawing
HCD/SK-172.
Sqm
10.0 ROAD CULVERTS
Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the
approach road (from main PWD road to the substation entry point)
including, cost of labour, material complete in all respects as per I.R.C. Standards.
No.
11.0 U/C FENCING & GATES
Providing and fixing chain link fencing including gates complete as per electrical layout and tech.
specification and as per drawing attached.
Mtrs.
12.0 BOUNDARY WALL
12.1
Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate
(brickwork above DPC level) as per GELO/CLO,technical specification and HVPNL drawings
attached herewith complete in all respect
i. 6 ft. high with barbed wire on angles at top Mtr.
Page 8 of 17
Description Unit
Sr.
No
ii. 4 ft. high front wall Mtr.
iii. 4 ft. high side wall with barbed wire on angles at top Mtr.
12.2
Supply of labour and material for construction of front, C & U/C boundary walls including main gate
foundations (brickwork below DPC level) as per GELO/CLO, technical
specifications and HVPNL drawing HCD/TS-1176 including excavation backfilling, lean and DPC
complete in all respect.
Cum
13.0
Demolishing including demolishing of foundations of followings structures. The material whatsoever
shall be the property of the successful bidder. The dismantled material
shall not be allowed for reuse at any of the substations; however, HVPNL may allow use of bricks for
brick ballast purpose only.
i). One no. building (about 195 sqm) at 66kV S/Stn. Sector-20, Panchkula. Lot
14.0 CONTROL ROOM BUILDING
14.1
Design including development of architectural and structural drawings, engineering, supply of labour,
material & construction of control room building complete in
all respect as per technical specifications including exterior and interior acrylic emulsion paint, all
internal services like complete water supply system, providing 5000ltr. capacity triple layered
Sintex/Diplast PVC tank, electrification including wiring, modular switches, 4 long CFL tubes,
ceiling/exhaust fans & 2T split ACs, finishing, plinth
protection, indoor trenches, trench covers, connection of sewerage system with HUDAs sewerage
system, water supply connection with HUDAs system etc. and any other item not mentioned herein
but required for completion of works at 66kV S/Stn., Sector-20, Panchkula.
The architectural design shall be matching with the surroundings.
Sqft.
15.0 DRAINAGECUM-RAIN HARVESTING SYSTEM
15.1
Supply of labour, material for
construction of 2 nos. recharge
structures (only one no. at 66kV
S/Stn., Sector-20, Panchkula)
with bore well(s) as per HVPNL
drawings & specifications
complete in all respect. The
location of recharge structures
shall preferably be located on
corner(s) of the substation and
shall be got decided from the
concerned Executive
Engineer/Civil Works Division on
the basis of surroundings. In
case ground water table is
above 8m from NSL, rain
harvesting system shall not be
constructed.
Lot
15.2
The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water
from buildings roof top & switch yard (substation) area into respective
bore wells in such a way that there shall be no pounding of water on the roof and switch yard (sub-
station). The layout so developed shall be got approved from the employer. The location of sump-pit-
cum-pump chamber shall preferably be located on corner(s) of the substation and shall be got decided
from the concerned Executive
Engineer/Civil Works Division on the basis of surroundings of the substation(s). The successful bidder
will also supply labour and material for construction sumppit-cum-pump chamber as per HVPNL
drawings and provide two no. clog pump(s) of suitable capacity (for each sump pit) for disposal of
excess water to outfall point. Any other item not
mentioned herein but is/are required for completion of works shall be done by the successful bidder
without any extra cost to the employer.
Lot
Page 9 of 17
Description Unit
Sr.
No
16.0
RCC M-20 inclusive of labour,material, shuttering, steel reinforcement etc. complete in all respects to
compensate excess quantity required to be executed due to difference in existing ground level and the
formation level to be fixed after contouring or difference on account of revised drawing issued at the
time of construction and the tender drawing.
Cum
Page 10 of 17
(2)
2,000
10
5
2
4
5
2
2
12
10
6
12
2
2
2
4
Package G-21(B)
Qty
Page 11 of 17
Qty
1
2
1
1
1075
50
55
150
2
20
180
Page 12 of 17
Qty
45
32
285
1
4406.00
1
1
Page 13 of 17
Qty
20
Page 14 of 17
1.0
1.1
1.2
2.0
2.1
i).
ii).
iii).
iv).
v).
vi).
i)
ii)
iii)
iv)
v)
i)
3.0
i).
i).
5.0
6.0
4.0
Sr. No
Package G-21(B)
2.2
Page 15 of 21
Sr. No
i).
6.2
i
7.0
7.1
7.2
8.0
8.1
i.
ii.
iii.
8.2
9.0
10.0
Page 16 of 21
Sr. No
11.0
11.1
i.
ii.
iii.
12.2
13.0
14.1
15.0
15.1
15.2
Page 17 of 21
Sr. No
16.0
Page 18 of 21
CIVIL Works
EARTH WORK
Earth filling with good earth as per satisfaction of concerned Executive Engineer/Civil Works Division & laying in
layers (as per specification), dressing, including carriage irrespective of lead, loading and unloading, watering
and compaction in layers with roller including compensation of earth within the sub-station area including yard,
roads, approach road etc. complete in all respect.
EARTH WORK IN CUTTING
Earth work in cutting & spreading of cut earth within sub-station in layers (as per specification clause 3.5.3),
dressing, including carriage, irrespective of lead, loading and unloading, watering and compaction in layers with
roller within sub-station area including yard, roads, approach road etc. or disposal of surplus earth complete in all
respect.
FOUNDATIONS
Supply of labour, material and construction of RCC footings & pedestals etc. complete, including the cost of
excavation, cement concreting, reinforcement steel, form work, grouting, underpinning, backfilling etc. for steel
gantry structures/equipments as per approved HVPNL drawings and technical specifications.
GANTRY TOWERS
66 KV Side
CT-4
CT-5
CT-6
CT-8
11 KV Side
DT-2
DT-3
EQUIPMENT STRUCTURE FOUNDATION
66kV side
LA
Isolator/L&E Switch
CVT
CT
NCT
11kV side
NCT
CAPACITOR BANK FOUNDATIONS
Design, engineering, supply of labour, material and construction of capacitor bank & associated equipment
foundations complete in all respect including any other items not
specifically mentioned herein but required for completion of job as per technical specifications and approved
equipment drawings.
6.804MVAR 11kV Capacitor Bank
BREAKER FOUNDATION
Design, Engineering, supply of labour, material, equipment etc. for construction of foundation for following
types of breakers including all associated works PCC, RCC, structural steel, steel reinforcement and any
other items not specifically mentioned herein but required for completion of work as per technical specification.
66kV, SF-6 Breaker
CABLE TRENCH
Supply of labour, material such as cement, reinforcement steel, steel angles, flats, PCC and brick pillars below
cable trenches for construction of Out Door Cable Trenches (ODCT) of required depth/type with pre-cast RCC
covers including associated works like Cable Trench Culverts crossings for roads as per approved electrical
(trench) layout plan, HVPNL drawing(s) and technical specifications complete in all respect.
TRANSFORMER FOUNDATION
Description
Package G-21(B)
Page 19 of 21
Description
Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel,
form work and other items not mentioned herein but required for the completion of work for construction of under
mentioned transformer/ DG set foundations including all associated radiators foundations,
NIFPES fire fighting systems foundations etc.
complete as per approved transformer/DG set
and technical specifications.
12.5/16 MVA, 66/11kV T/F
foundation including radiator
foundations etc. complete.
Design, engineering, supply of labour, material such as PCC, RCC, reinforcement steel, misc. structural steel,
form work and other items not mentioned herein but required for the completion of work for construction of under
mentioned transformer/ DG set foundations including all associated radiators foundations, NIFPES fire fighting
systems
foundations etc. complete as per approved transformer/DG set and technical specifications.
200KVA 11/0.4kV Station T/F
SITE SURFACING
Providing, supplying and laying two layers of uncrushed/crushed/broken stone pebbles gravel fill. The first layer
after compaction shall make minimum 50mm thickness course/layer of 20mm nominal size including dressing,
rolling & compacting complete as per GELO, specifications & instructions of Executive Engineer/Civil Works
Division.
Providing, supplying and laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and spreading
100mm thick layer of 40mm single size uncrushed/crushed/ broken stone pebbles over the PCC including
construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size
uncrushed/crushed/broken
stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO &
instructions of concerned Executive Engineer/Civil Works division.
CONCRETE/BITUMEN ROADS & PCC PAVEMENT
Construction of cement concrete approach road and
walkways/shoulders from NH/SH/
PWD/HUDA/village road etc. and roads within the
substation i.e. switchyard/switch house building as per GELO/CLO and sectional detail drawing no.
HCD/SK-181 and technical specification.
6.0M from proposed approach road and 5M minimum within the main entrance gate.
3.66M wide road as per CLO
PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172.
Supply of labour and material for
construction of 3.66M wide
bitumen (metalled) approach
road as per HVPNL drawing -
001/R from Naraingarh - Raipur
Rani highway upto Laha
substation concrete approach
road (15-20M outside main
entrance gate as per site
requirement) including earth
filling to match the level of PWD
and substation road.
ROAD CULVERTS
Design, Engineering and construction of one/ two no. pipe culverts at suitable locations under the approach road
(from main PWD road to the substation entry point)including, cost of labour, material complete in all respects as
per I.R.C. Standards.
U/C FENCING & GATES
Providing and fixing chain link fencing including gates complete as per electrical layout and tech. specification
and as per drawing attached.
Page 20 of 21
Description
BOUNDARY WALL
Supply of labour & material for construction of front, C-wall & U/C boundary walls including main gate (brickwork
above DPC level) as per GELO/CLO, technical specification and HVPNL drawings attached herewith complete
in all respect
6 ft. high with barbed wire on angles at top
4 ft. high front wall
4 ft. high side wall
Supply of labour and material for construction of front, C & U/C boundary walls including main gate foundations
(brickwork below DPC level) as per GELO/CLO, technical specifications and HVPNL drawing HCD/TS-1176
including excavation backfilling, lean and DPC complete in all respect.
CONTROL ROOM BUILDING
Supply of labour, material & construction of control room building complete in all respect as per technical
specifications & approved drawings attached including exterior and interior acrylic emulsion paint, all internal
services like water supply including supply & providing of 5000ltr. capacity triple layered Sintex/Diplast PVC tank,
sewerage system,
electrification including wiring, modular switches, 4 long CFL tubes, ceiling/exhaust fans & 2T split ACs, finishing,
plinth protection, indoor trenches, trench covers, soakage pit near the switch house building, connection of
sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water
supply system of local authority/submersible bore (as applicable) etc. & any other item not mentioned herein but
required for completion of works. Before dismantlement of OHRT
at Laha, the successful bidder shall also provide water supply connection from new bore well proposed for 66kV
S/Stn. laha to the existing 33kV
control room and residential
buildings without any extra cost
of HVPNL.
DRAINAGECUM-RAIN HARVESTING SYSTEM
Supply of labour, material for
construction of 2 nos. recharge
structures (only one no. at 66kV
S/Stn., Sector-20, Panchkula)
with bore well(s) as per HVPNL
drawings & specifications
complete in all respect. The
location of recharge structures
shall preferably be located on
corner(s) of the substation and
shall be got decided from the
concerned Executive
Engineer/Civil Works Division on
the basis of surroundings. In
case ground water table is
above 8m from NSL, rain
harvesting system shall not be
constructed.
The successful bidder shall evolve design & prepare drainage layout drawing for disposal of rain water from
buildings roof top & switch yard (substation) area into respective
bore wells in such a way that there shall be no pounding of water on the roof and switch yard (sub-station). The
layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall
preferably be located on corner(s) of the substation and shall be got decided from the concerned Executive
Engineer/Civil Works Division on the basis of surroundings of the substation(s). The successful bidder will also
supply labour and material for construction sumppit- cum-pump chamber as per HVPNL drawings and provide two
no. clog pump(s) of suitable capacity (for each sump pit) for disposal of excess water to outfall point. Any other
item not mentioned herein but is/are required for completion of works shall be done by the successful bidder
without any extra cost to the employer.